1.2 Engineering design drawing is complete, dimensionally correct, readable and in compliance with other disciplines Dewa Practice Complied
1.3 Engineering design drawing is as per priority highlighted in DDCMS list . Dewa Practice Noted
1.5 Engineering design drawing number and title are same as indicated in DDCMS. Dewa Practice Noted
1.6 Engineering design drawing is provided with List of required legends and references of related drawings.DEWA approval status of reference drawings with Dewa Practice Complied
revision number to be provided.
1.7 Compliance statement for the previous comments (if any) is enclosed and all the comments are complied. Dewa Practice Complied
1.8 Copy of approved Architectural Drawing No's 479, 281 & 282 is attached as a reference Dewa Practice Complied
1.9 Copy of approved Soil Report is attached as a reference Dewa Practice Complied
2 Confirmation List
2.1 Drawings are in compliance with calculations. Dewa Practice Complied
2.2 Detailing of Reinforcement is in line with standard detailing practices as per applicable DEWA specification. Dewa Practice Complied
3.1.11 Water proofing membrane for all concrete faces in contact with soil is as per DEWA 132/11kV specification Dewa Specification Clause No.3.3 .48.1 Para 727 Complied
3.1.12 Distance of IDT/ET trench walls from the respective grids is checked . Dewa Practice Complied
3.1.13 Sectional elevation drawings which indicates the bottom and top levels of Raft, top of screed & top of RC wall is checked and verified with DMD level. Dewa Practice Complied
3.1.14 Extension of Raft from Building footprint is done after coordination with underground services. Dewa Specification Clause No.3.2.4 Para( 45) N/A
3.1.15 Cover to the reinforcement for the face of Raft in contact with soil is minm.75 mm. Standard Clause No.3.3.42.Para (546) Table 3.7 Complied
3.1.16 Column locations and their axis orientation are inline with approved Architechtural drawings. Dewa Practice Complied
3.1.17 The safe bearing capacity and water table level are as per the Soil Report and is mentioned in the notes on the drawing. Dewa Practice Complied
3.1.18 Screed depth at junction of drain trench and cable sleeves are checked. Dewa Practice Complied
Category
3.1.19 Cables are marked inside screed as per approved cable route layout to check the screed depth. Complied
SR. Description Applicable Reference Complied with
RAFT ON PILE CHECK
N The Pile layout and Type of the pile (Tension or compression) are based on the approved Design Calculation. Dewa Practice N/A
3.1.20 Working Pile load Capacities (Compression, tension/uplift and lateral ) is inline with the approved soil report. Dewa Practice N/A
3.1.21 Diameter and total number of piles are provided in a tabular form Dewa Practice N/A
3.1.22 Section and plan showing reinforcement details for pile caps ( with single, double,three or more pile groups) are provided. Dewa Practice N/A
3.1.23 Diameter, spacing and depth of the piles are mentioned in the notes on the drawing. Standard N/A
3.1.24 Reinforcement details of Pile cap is inline with the approved Design calculation. Standard N/A
3.1.25 Side face reinforcementis is provided for the pile caps to control temperature and shrinkage cracks. Standard N/A
3.2 Inspection
3.2.1 Cables arrangement to be as per approved cable route layout, copy to be attached for referance Complied
3.2.2
3.5 Maintenance
3.5.1
3.5.2