Sie sind auf Seite 1von 1

Technical Project Consultants (P.

) Ltd_Check List_Etabs
CODAL COMPLIANCE AS PER IS 1893 (PART-1):2016

1 Project Name: NILAMBER PITAMBER UNIVERSITY


1.1 Location: JHARKAND, INDIA
2 Data for earthquake analysis
2.1 Zone factor, Z = 0.16
Importance factor, I = 1.2
Reduction factor, R = 5
Soil site, S = 2
h (m) d (m)
Time period formula_X_dir = 0.09h/√d = 18 30.73 = 0.292 Sec

Time period formula_Y_dir = 0.09h/√d = 18 33.6 = 0.279 Sec

Time period formula = 0.075(h)0.75 = 18 = 0.655 Sec

2.2 Static Analysis: Dynamic Analysis:


Base Shear in X_dir : 2807.5984 kN Base Shear in X_dir (Spec_X): 2806.9973 kN
Base Shear in Y_dir : 2807.5984 kN Base Shear in Y_dir (Spec_Y) : 2806.4056 kN
Base Shear in Z_dir (Spec_Z) : 0 kN

Scale Factor in X_dir as/Etabs: 1.000


Scale Factor in y_dir as/Etabs: 1.000
Scale Factor in Z_dir as/Etabs: 0.667

2.3 Etabs out put


DEFLECTIONS :

(a) FOR SEISMIC CASE: AS per Etabs/Staad Allowable :


mm mm
Dir - X = 19.707 72 h/250
Dir - Y = 21.655 72 h/250

(b) FOR WIND CASE: AS per Etabs/Staad Allowable :


mm mm
Dir - X = 6.794 36 h/500
Dir - Y = 5.405 36 h/500

5 Check for Plan Irregularities of Building as per IS 1893 (Part_1):2016 :


(i) Table_5 of IS1893 (Part_1)_2016_Torsional Irregularity_(i):

A B

D C

DEFLECTIONS IN mm
A B C D
1 Defle Defle Defle Defle Defle Defle Defle Defle
ction _X ction _Y ction _X ction _Y ction _X ction _Y ction _X ction _Y
17.467 18.472 17.467 13.785 16.686 13.785 16.686 18.472

1.5 times of minimum deflection value:


A_D B_C A_B D_C
X_dir X_dir Y_dir Y_dir
2
25.029 25.029 20.6775 20.6775

OK OK OK OK

Page 1 of 1