Prepared SV
PROJECT: Approved SMMI
Checked CE
CONNECTION TAG : 65
PROFILE SIZES:
BRACE : 2xL75X75X8
Db = 75.0 mm Wb = 75.0 mm Tb = 8.0 mm twb = 8.0 mm rx = mm
CONNECTION FORCES: Brace : ( 2xL75X75X8 ) Designed force Min Requirement Actual force
= ### kN
eb = 50 mm
tg = 16 mm
Le = 200 mm
Lw = 300 mm
sgwc = 12 mm
sgwa = 6 mm
L1pro = 250 mm
L2pro = 75 mm
456055120.xls
CONNECTION DESIGN CALCULATION
Prepared SV
PROJECT: Approved SMMI
Checked CE
MATERIAL PROPERTIES:
Design strength of E250BR incoming steel, fy.a = 250 N/mm2 (Refer Table 1, pg.14)
Design strength of E250BR supporting material, fy.t = 250 N/mm2 (Refer Table 1, pg.14)
Design strength of E250BR connection material, fy.p = 250 N/mm2 (Refer Table 1, pg.14)
Ultimate tensile strength of E250BR incoming steel, fu.a = 410 N/mm2 (Refer Table 1, pg.14)
Ultimate tensile strength of E250BR connection material, fu.p = 410 N/mm2 (Refer Table 1, pg.14)
Design strength of E70xx weld electrode fwd = 189.4 N/mm 2 (fwd = (Min(fu.weld , fu.parent / √3) / γmw )
= 448.7 kN
Maximum Hor. force component - FHf = Fx x Cos(θ1)
= 448.7 kN
= 0.7 x 6 x 189.4
= 795.48 N/mm
Size of intermitteent fillers = 100 mm x 55 mm x 16 mm (width x height x thickness ) & spacing at 500mm
456055120.xls
CONNECTION DESIGN CALCULATION
Prepared SV
PROJECT: Approved SMMI
Checked CE
Check Rupture capacity of brace - to resist axial
= [(75- 8/ 2 ) x 8] x 2
= 1136 mm2
= [(75- 8/ 2 ) x 8] x 2
= 1136 mm2
β = 1.4 - 0.076 x (w/t) x (fy.a/fu.a) x (bs/Lv) < (fu.a x γm0 / fy.a x γml) > 0.7
= 1.4 - 0.076 x ( 75 / 8 ) x (250/410) x (75/250) <= (410 x 1.1 / 250 x 1.25) >= 0.7
= 1.27 < 1.443 > 0.8
Rupture strength, Tdn = 0.9 x 1136 x 410/ 1.25 + 1.27 x 1136 x 250/1.1
= (75 x 0.707 x 6) x 2
= 636.3 mm2
= Min{ [4242 x 250 / (√ 3 x 1.10) + 0.9 x 410 x 636.3 / 1.25 ] , [ 0.9 x 410 x 4242 / (√ 3 x 1.25) + 250 x 636.3 / 1.10 ] } / 1000
= Sqrt [ 16^2 / 12 ]
= 4.61 mm
ε = √(250 / fy.p)
= √(250 / 250)
= 1.00
= 0.489
λΦ = Wg / [ ε x √ (π2 x E / 250) x tg ]
456055120.xls
CONNECTION DESIGN CALCULATION
Prepared SV
PROJECT: Approved SMMI
Checked CE
= 0.826
= 194.69 N/mm2
= ( 200 x 16 )
= 3200 mm2
= 448.7 / (2 x 300)
= 0.748 kN/mm
= 1 x 2 x 300^2 / 6
= 30000.0 mm3
= 448.7 x 60
= 26922 kN.mm
Bending stress per mm on weld due to moment Me,
Fwb = Me / Zw
= 26922 / 30000
= 0.898 kN/mm
= 1.169 kN/mm
= 8.74 mm
T-joint
300/16 18.75
ti/b0 ≤ 0.20
= ###
456055120.xls
O/All web thk.or
flg. Width flg. Thk root
S.No. SECTION WT kg/m depth or pipe k
2c tf radius r
dia. d thickness tw
1 2 3 4 5 6 7 8
PLATES
1 100
2 90
3 80
4 75
5 70
6 65
7 60
8 50
9 45
10 40
11 35
12 32
13 30
14 28
15 25
16 22
17 20
18 18
19 16
20 15
21 14
22 12
23 10
24 8
25 6
26 5
27 4
28 3
29 2
30 1.5
31 1
GROSS Clear rx
Ix Zx Iy Zy
AREA (mm^2) depth h1
9 10 11 12 13 14 15
16 17 18 19 20 21 22 23 24
l1 3 m l2 5 m l3 2
RB*8+800*3 = 2000*5+1000(8+2)
(2000*5)+((1000*(3+5+2))-(800*3))/8
RB 2200 N