BILL

SHIP NAME : OASIS 1

JOB. NO. : 111001

KIND OF SHIP : PRODUCT TANKER

GROSS TONNAGE (GT) : 4,484

DEAD WEIGHT TON (DWT) : 7,002

LOA : 117.4 X 16.5 X 8.3

MAIN ENGINE : NIL

INQ. OWNER : OASIS ENERGY CO. LLC

COUNTRY : OMAN

CLASS : 0

WORKING COMMENCED : 14 February 2014

WORKING COMPLETED : 20 May 2014

WORKING TIME : 96 Days (10 Days in dock)

____________________________________________________________________________________________
EST-WF-08
Page 1 of 57
DATE OF ISSUE : 20 May 2014

____________________________________________________________________________________________
EST-WF-08
Page 2 of 57
BILL A
P
R
SHIP NAME: OASIS 1

KIND OF SHIP: PRODUCT TANKER

SHIP OWNER OASIS ENERGY CO. LLC

JOB. NO. 111001

S.R.M. RICHE

ESTIMATOR ASIM

WORK TIME 96 Days (10 Days in dock)

TOTAL
PARTS AFTER DISCOUNT DISCOUNT RATE MA
(USD)
1) REDOCKING VESSEL2)VERTICAL AND UND
GENERAL SERVICES 71,287 71,287 0% HOSE

HULL - - 0%

PAINTING 23,341 23,341 0%

MACHINERY 10,030 10,030 0%

OUTFITTING 13,444 13,444 0%

ELECTRICAL 1,575 1,575 0%

Q.C. - - 0%

SUB-TOTAL 119,677 119,677

SUB-CONTRACTOR AMOUNT - 0% RE

ACCOMODATION FEES - 0%

TRANSPORTATION FEES - 0%

____________________________________________________________________________________________
EST-WF-08
Page 3 of 57
SPARE PART HANDLING FEES - 0%

GSM RECHARGE CARD FEES - 0%

OTHER FEES (CUSTOMS, VISA...) - 0%

GRAND TOTAL 119,677 119,677

____________________________________________________________________________________________
EST-WF-08
Page 4 of 57
JOB. NO.: 111001 SHIP NAME: OASIS 1

Owner No.
DESCRIPTION UNIT
(Yard No.)

GENERAL SERVICES
GS01 TUGGAGE & MOORING AND UNMOORING (INCLUDING LINE HANDLING) SHIP

NOTE : HARBOUR PILOTAGE TO BE PAID BY OWNER TO PORT OF DUQM COMPANY DIRECTLY.

GS02 THE VESSEL WAS IN DRYDOCK FOR DRYDOCK ITEMS AND INSPECTION AS FOLLOWING SCHEDULE

FROM: 14-Feb-2014 TO 22-Feb-2014 : in #1 Dock

FIRST AND LAST DAYS TIME

SUBSEQUENT DAYS DAY

TOTAL DAY IN DOCK : 9 Days

GS03 THE VESSEL WAS MOORED AT QUAY SIDE FOR FLOATING REPAIR DAY

FROM: 23-Feb-2014 TO 20-May-2014 : at Quay

FROM: TO : at Quay

TOTAL : 87 Days

GS04 GAS FREE INSPECTION & ISSUE CERTIFICATE

1) INITIAL INSPECTION SHIP

2) DAILY INSPECTION DAY

GS05 ARRANGEMENT OF FIRE LINE AND FIRE EXTINGUISHERS

LINE TO CONN. & FIRE EXTINGUISH TO ARRANGE LINE

MAINTENANCE DAY

GS06 FIRE WATCHMAN (ONE MAN) DAY

GS08 GARBAGE DISPOSAL DAY

GS09 CRANE SERVICE (UP TO 40 TON) LIFT

____________________________________________________________________________________________
EST-WF-08
Page 5 of 57
JOB. NO.: 111001 SHIP NAME: OASIS 1

Owner No.
DESCRIPTION UNIT
(Yard No.)
GS10 SEA WATER TO BALLAST TANK

LINE TO CONNECT & DISCONNECT 1 TIME(S) LINE

WATER TO SUPPLY TON

GS11 FRESH WATER SUPPLY

LINE TO CONNECT & DISCONNECT 1 TIME(S) LINE/TIME

WATER TO SUPPLY TON

GS14 SHORE ELECTRIC POWER

LINE CONNECT & DISCONNECT 1 TIME(S) LINE

CURRENT (415 VOLT 50 HZ) DAYS

ADD - 10 COLLECT SAMPLE OF WATER OF BALLAST FROM WBT TANKS FOR JOB

LABORTURY ANALYSIS (ENVIORMANTAL REQUIREMENT)

ADD - 17 SEWAGE DISPOSAL

LINE CONNECTION / DISCONNECTION 1 TIME(S) LINE/TIME

DISPOSAL TON

GS21 REMOVAL/REFIT OF BOTTOM PLUG (INCLUDED VACUUM TEST) PC

____________________________________________________________________________________________
EST-WF-08
Page 6 of 57
JOB. NO.: 111001 SHIP NAME: OASIS 1

Owner No.
DESCRIPTION UNIT
(Yard No.)

HULL WORKS

____________________________________________________________________________________________
EST-WF-08
Page 7 of 57
JOB. NO.: 111001 SHIP NAME: OASIS 1

Owner No.
DESCRIPTION UNIT
(Yard No.)

PAINT WORKS
HULL SIDE SHELL PAINTING

ADD - 03 JET WASHING 250BAR

TOPSIDE 685M2 (250 BAR) M2

SIDEBOTTOM 1692M2 (500 BAR) M2

FLAT BOTTOM 1255M2 (500 BAR) M2

ADD - 16 SCRAPING REQUIRED FOR FLAT BOTTOM AND VERTICAL SIDE M2

ADD - 19 PROPELLER SCRAPING, WASHING AND NORMAL POLISHING NO

SCAFFOLDING ERECTE AND REMOVED JOB

ADD - 18 CLEANED SEA CHEST STBD PUMPROOM & ENGINE ROOM NOS

TOP SIDE : 685 M2

- HP Jet Washing @ 250 Bar : M2

Side bottom Area : 1692 M2

Add - 16 - Hand Scrpaing M2

- HP Jet Washing @ 500 Bar : M2

Flat Bottom Area: 1255 M2

Add - 16 - Hand Scrpaing M2

- HP Jet Washing @ 500Bar : M2

Sea Chest (S) - 2 No. Job

____________________________________________________________________________________________
EST-WF-08
Page 8 of 57
JOB. NO.: 111001 SHIP NAME: OASIS 1

Owner No.
DESCRIPTION UNIT
(Yard No.)
Add - 16 - Hand Scraping

- HP Jet Washing

- Sea chest Grattings Open/Close : 2 No. Job

Add - 19 Propeller Job

Add - 16 - Hand Scraping

- HP Jet Washing

Barnacle Removed from Dock Floor Ton

Dock Cleaning

____________________________________________________________________________________________
EST-WF-08
Page 9 of 57
JOB. NO.: 111001 SHIP NAME: OASIS 1

Owner No.
DESCRIPTION UNIT
(Yard No.)

MACHINERY WORKS

ADD - 20 DECK CRANE STBD SIDE

REPLACE HYDRAULIC PIPE CONNECTION TO HYDRAULIC

MOTOR FOR WIRE ROPE ROLLER JOB

MATERIAL : STAINLESS STEEL PIPE YARD SUPPLY

ADD - 22 MECHANICAL SEAL 95MM SUPPLY NOS

ADD PROPELLER POLISHING (INCLUDED IN PAINTING)

M80100021R PROPELLER BLADES ( 5 NOS): DIA :3680mm

1. Cherry picker ( 1 no ) propeller area for access

2. Polished the propeller (super polish) SET

Material used ( yard supply )

Disc abrasive grit 36 dia 7" pcs

Disc abrasive grit 60 dia 7" pcs

5 STRIPPING PUMP OVERHAULING (INCLUDED IN FIRST BILL) SET

M86100021R Specification : capacity-300 m3/h

1. Disconnected the suction & discharge pipe connection; unbolted the coupling & rig into side prior to overhaul.

2. dismantled;cleaned & calibrated the mouth ring & impeller eye & submitted to owner for the clrearence.

____________________________________________________________________________________________
EST-WF-08
Page 10 of 57
JOB. NO.: 111001 SHIP NAME: OASIS 1

Owner No.
DESCRIPTION UNIT
(Yard No.)
3. Assembled the pump with new spare parts ; nut & bolts.

4. Fabricate new key for the pump/motor coupling.

material : ms squre bar 80 x 15 x 10 ( yard ) pc

man power m/h

5. Aligned the pump with the motor ( actual man power - 48 m/h ). m/h

6. Connected the discharge & suction pipe line with new water gasket.

7. Tried out the pump by ch eng. & comfirmed satisfactory work.

Material used ( yard supply )

Mechanical seal sus 55mm diameter ; length 50mm set

Oil seal 60mm x 85mm x 8mm thickness pcs

O' ring cord ɸ 8mm mtr

Ms bolt M20 x 80F pcs

Ms bolt M20 x 40F pcs

Ms nut M20 pcs

Ms washer M20 pcs

Water gasket 2mm thickness 1500x 1500 sheet

Brass shims 0.5mm thickness x 150mm width mtr

Brass shims 0.3mm thickness x 150mm width mtr

1&2 DECK CRANE HYD. CYLINDER PORT & STB ASSEMBLE & FIT (INCLUDED IN FIRST BILL) SET

M13270021R 1. Fabricate the wear guides & wipers

material : teflon round bar ɸ 70 x 150L PC

man power m/h

2. Fabriacte lock nut for stb piston

material : ms round bar ɸ 50 x 50L PC

man power m/h

3. Fabricate adapter for pressure testing

material : ms hex bar 30 x 100L pc

man power m/h

____________________________________________________________________________________________
EST-WF-08
Page 11 of 57
JOB. NO.: 111001 SHIP NAME: OASIS 1

Owner No.
DESCRIPTION UNIT
(Yard No.)
4. Fabricate pin ( 2 nos ) with grease nipple hole & split pin hole

material : ms round bar ɸ 70 x 240L pc

man power m/h

Add material : split pin ɸ 60 x 100L pcs

external cir-clip ɸ 45mm pcs

5. Assembled the cylinder parts & pressure tested @ 170 bar with owner witnessed.

6. Transported on-board & fitted in the crane.

material : banjo bolt washer M20 pcs

machinery used : fork lift , mobile crane

NOTE : All the materials yard supplied

6&7 NEW BALLAST PUMP COMPLETE SET ( PUMP & MOTOR ) INSTALLATION- PORT & STB SET

M86100021R Specification : model-CIS125-100-200B; capacity-172 m3/h ; total head- 37 m ; speed-2900r/min ; power-37kw

1. Request given to OUT-FITTING DEPT to fabricate & install the pump foundation. For information

see their WCR.

2. Pump full set transport on-board & rigged to the pump room bottom platform. trip

NOTE : narrow place & very difficult to rig.

3. Drilled the 4 nos of holes ( each set ) ɸ 18 mm x pass through( 12mm )

4. Fitted the pump set on the foundation with nut & bolts.

materials( yard ) : ms bolt M16 x 60F pcs

ms nut M16 pcs

ms washer M16 pcs

5. Fabricate & installing coupling guard. ea

- drilling & tapping holes M10 X 12MM( LENGTH ) nos

material (yard ) - ms bolt M10 X 15F pcs

ms spring washers M10 pcs

Galvonized flat bar 1.5mm thickness x 1200mm x 2400 mm sheet

6. Fabricate plug for bearing lubricating shell M24 X 1.5P pc

____________________________________________________________________________________________
EST-WF-08
Page 12 of 57
JOB. NO.: 111001 SHIP NAME: OASIS 1

Owner No.
DESCRIPTION UNIT
(Yard No.)
material ( yard ) : brass bar HEX 27 X 30L pc

man power m/h

7. Request given for fabricate power connection to pump motor; see electrical WCR for information.

8. Tried out both port & stb pump with owner satisfactorily.

ADD - 23 MATERIAL SUPPLY AS REQUESTED

INTERNAL CIRCLIP OD : 95 NOS

BALL BEARING 6210 SKF NOS

BALL BEARING 6215 SKF NOS

BALL BEARING 6405 SKF NOS

CYLINDERICAL ROLLER BEARING RN309M SKF NOS

BALL BEARING 6213 NRJEM SKF NOS

SS FLANGES SCREW 6 POINT A4 SIZE 5/16 UNF X 7/8L NOS

SS FLANGE SCREW 6 PPOINT A4 SIZE 5/16 UNF X 13/4L NOS


ADD DECK CRANE HYD MOTOR OVH( PORT SIDE) SET

M13270021R 1. Removed/refit from the foundation.

NOTE: All foundation bolts were broken & had to drill /tap ( M12X70L). nos

2. Transported to on-board to workshop. trip

3. Dismantled/cleaned & inspected by owner.

4. Fabricated the below items by yard

Shaft sleave : Material - EN8 ROUND BAR ɸ90 X 50 L pc

Man power m/h

Teflon plug( M16 X 1.5 P ): Material - TEFLON ROUND BAR ɸ30 x 30L pc

Man power (including old plug remove & tap ) m/h

Seal stuffing box : Material - MS FLAT BAR 120L X 80W X 40T pc

Man power ( including drilling holes ) m/h

5. Assembled with new spares (Yard supply-see below)

6. Fitted on-board & tried out.Witnessed by owner satisfactorily.

Yard supply spares:

1. BALL BEARING 6210 pc

2. BALL BEARING 6215 pc

____________________________________________________________________________________________
EST-WF-08
Page 13 of 57
JOB. NO.: 111001 SHIP NAME: OASIS 1

Owner No.
DESCRIPTION UNIT
(Yard No.)
3. BALL BEARING 6405 pc

4. CYLINDRICAL ROLLER BEARING RN309M pcs

5. BALL BEARING 6213 NRJEM pc

6. OIL SEAL 27 X 33 X T: 4 MM pc

7. OIL SEAL 55 X 80 X T:13 MM pc

8. OIL SEAL 80 X 105 X T:13 MM pcs

9. OIL RESISTANT PACKING 0.5 THICKNESS SHEET

10. INTERNAL CIRCLIP ɸ : 22 MM pc

11. MS STUD M10 X 40F pcs

12. MS NUT M10 pcs

13. ALLEN KEY BOLT SS M10 X 50 F pcs

14. MS BOLT M10 X 120H pcs

15. MS NUT M10 pcs

16. FOUNDATION BOLT MS M12 X 70F pcs

17. NUT MS M12 pcs

16. FLAT WASHER MS M12 pcs

ADD - 21 DECK CRANE STBD & PORT HYDRAULIC HOSES CONNECTION NOS

AND RENEW USIN YARD SUPPLY MATERIAL

MATERIAL : HYDRAULIC HOSE WITH FITTING

TS 6387/EN 658 2SN 1/2" (PRESSURE 275BAR- WORKING PRESSURE)

HYDRAULIC RUBBER METAL BONDED SEAL WASHER DIA 18MM

HYDRAULIC RUBBER METAL BONDED SEAL WASHER DIA 22MM

OIL SEAL 55 X 80 X 13MM

OIL SEAL 80DIA X 105 DIA X 13.5MM

ADD PORT SIDE DECK CRANE HYD HOSE RENEWAL & SUPPLY MATERIALS TO STB SIDE DECK CRANE

____________________________________________________________________________________________
EST-WF-08
Page 14 of 57
JOB. NO.: 111001 SHIP NAME: OASIS 1

Owner No.
DESCRIPTION UNIT
(Yard No.)
M13270021R PORT SIDE CRANE:

1. Removed the old hoses & fittings.

2. Cleaned the fitting area.

3. Renewed the hoses & fittings.

STB SIDE CRANE :

1. Supplied materials to owner.

FABRICATING THE FITTINGS FOR HOSES PCS

Materials : SS 30 HEX solid bar x 720mm length ( yard)

man power : 24 man hours

Materials used ( yard supply )

1. HYDRAULIC HOSE 2-36 MPA W/ BRAIDED WIRE ASSEMBLY ½” X 3500L - 1 HOSE END BANJO BOLT

PIPE FITTING EA

2. HYDRAULIC HOSE 2-36 MPA W/ BRAIDED WIRE ASSEMBLY ½” X 2500L–1 HOSE END BANJO BOLT

PIPE FITTING EA

3. HYDRAULIC HOSE 2-36 MPA W/ BRAIDED WIRE ASSEMBLY ½” X 2000L – 1 HOSE END STRAIGHT

MALE STUD FIT EA

4. HYDRAULIC HOSE 2-36 MPA W/ BRAIDED WIRE ASSEMBLY ½” X 1500L – 1 HOSE END BANJO BOLT

PIPE FIT EA

5. HYDRAULIC RUBBER METAL BONDED SEAL WASHER Ø 22 MM EA

6. HYDRAULIC RUBBER METAL BONDED SEAL WASHER Ø 18 MM EA

____________________________________________________________________________________________
EST-WF-08
Page 15 of 57
JOB. NO.: 111001 SHIP NAME: OASIS 1

Owner No.
DESCRIPTION UNIT
(Yard No.)

10 CARGO PUMP OVERHAULING ( DOUBLE SCREW) (INCLUDED IN 1ST BILL) NO

M86100021R SPECIFICATION: CAPACITY- 500 M3/H ; SPEED- 1450 RPM ; PRESSURE- 0.6 Mpa

1. Preperation: tools mobilizing/demobilizing ; utility ;electrical power ; enclosed space permit set

2. Uncoupled/coupled the shaft from the driving unit. times

3. Pump completely removed/refitted from the foundation. times

4. Dismantled/assembled all parts of the pump. set

Material used: Mechanical seal, Shaft dia 95MM ; OD 116MM ; Height including guide ring 140MM (yard) set

5. Alignment done on the shaft coupling.

6. Fitted suction & discharge pipe connection.

7. tried out the pump with owner representative. Working satisfactorily.

Used other Material ( yard)

1. General purpose packing 1.5 mtrx 1.5 mtr x 2mm(t) sheet

2. Ms bolt M22 x 70F pcs

3. Ms bolt M20 x 70F pcs

4. Ms nut M22 pcs

5. Ms nut M20 pcs

____________________________________________________________________________________________
EST-WF-08
Page 16 of 57
JOB. NO.: 111001 SHIP NAME: OASIS 1

Owner No.
DESCRIPTION UNIT
(Yard No.)

OUTFITTING

MODIFICATION OF FOUNDATION AND PIPES FOR NEW BALLAST

PUMPS X 2NOS

SURFACE PREPARATION FOR INSTALLATION NEW JOB

FOUNDATION NEW BALLAST PUMP TRANSFER ON SHIP

MODIFIED THE NEW CONNECTION AND CUT AND REMOVED

OLD FOUNDATION

MATERIAL

ANGLE BAR 100 X 100 X 10 - 18 MTR MTR

PLATE 1350 X 570 X 12 - 2NOS 148KG KG

FLAT BAR 7800 X 50 X 6MM - 1NO MTR

SEAMLESS PIPE DN100 SCH 80 X 6MTR MTR

ELBOW 90 DEG DN 100 SCH 80 X 8NOS NOS

U BOLT (GI) X 2NOS NOS

ADD BALLAST PUMP FOUNDATION


M86100021R Removed the Grating Plates for Foundation Welding.

Fabricated the Foundation & Installed in Position by Welding In Place.

Provided Fire Watch During the Hot Work Activities (Gas Cutting,Welding,Grinding)

MATERIALS PROVIDED BY YARD

PUMP FOUNDATION DETAILS ,PUMP ROOM PORT SIDE

Mild Steel Plate,Grade A, 1350 mm X 650 mm x 12 mm Thk PC

Angle Bar 100 x 100 x 10 mm,L=1.350 Mtr PC

Angle Bar 100 x 100 x 10 mm,L=0.650 Mtr PC

Angle Bar 100 x 100 x 10 mm,L=0.700 Mtr PC

Angle Bar 100 x 100 x 10 mm,L=0.350 Mtr PC

Flat Bar 1350 mm x 50 mm x 8 mm Thk PC

Flat Bar 650 mm x 50 mm x 8 mm Thk PC

____________________________________________________________________________________________
EST-WF-08
Page 17 of 57
JOB. NO.: 111001 SHIP NAME: OASIS 1

Owner No.
DESCRIPTION UNIT
(Yard No.)
Welding Joint DN 100 PC

Welding Joint for Coaming,L=1.35 Mtr PC

Welding Joint for Coaming,L=0.650 Mtr PC

Cut & Modified the Gratings Supports & Installed in Position 50 x50 x 4 x 0.9 Mtr PC

Cut & Modified the Gratings Plates & Installed in Position 700 x 450 x 6 mm Thk PC

Fire Watch Assisatace for Gas Cutting,Welding & Grinding (1 No x8 Hrs x 3 Days) MH

PUMP FOUNDATION DETAILS ,PUMP ROOM STBD SIDE

Mild Steel Plate,Grade A, 1350 mm X 650 mm x 12 mm Thk PC

Angle Bar 100 x 100 x 10 mm,L=1.350 Mtr PC

Angle Bar 100 x 100 x 10 mm,L=0.650 Mtr PC

Angle Bar 100 x 100 x 10 mm,L=0.700 Mtr PC

Angle Bar 100 x 100 x 10 mm,L=0.350 Mtr PC

Flat Bar 1350 mm x 50 mm x 8 mm Thk PC

Flat Bar 650 mm x 50 mm x 8 mm Thk PC

Welding Joint DN 100 PC

Welding Joint for Coaming,L=1.35 Mtr PC

Welding Joint for Coaming,L=0.650 Mtr PC

Cut & Modified the Gratings Supports & Installed in Position 50 x50 x 4 x 0.9 Mtr PC

Cut & Modified the Gratings Plates & Installed in Position 700 x 450 x 6 mm Thk PC

Fire Watch Assisatace for Gas Cutting,Welding & Grinding (1 No x8 Hrs x 3 Days) MH

ADD BALLAST PIPING RENEWAL IN PUMP ROOM


B45120012R WORK DONE

Modified the Existing Suction & Discharge Piping by Gas Cutting.

Routed New Pipes lines by Taking Measurements in Place

Welded & Grinded all the Joints as necessary.

Shifed all the Pipes to Onboard by Forklift & Crane,and Rigged to the Positions.

Installed all the pipes with new gaskets,bolt & Nuts & U Bolts.

All the Gaskets have been Cut Manually According to required Dimensions.

MATERIALS SUPPLIED BY YARD

____________________________________________________________________________________________
EST-WF-08
Page 18 of 57
JOB. NO.: 111001 SHIP NAME: OASIS 1

Owner No.
DESCRIPTION UNIT
(Yard No.)
BALLAST PUMP SUCTION & DISCHARGE PIPES RENEWAL @ STBD

SPOOL-1

Seamless Carbon Steel Pipes DN 125,OD 141.3,Sch 80 MR

Seamless Carbon Steel Pipes DN 125,OD 141.3,Sch 80 MR

Seamless Carbon Steel Pipes DN 100,OD 114.3,Sch 80 MR

Concentric Reducer DN 125 X DN 100 X Sch 80 PC

Elbow 90º L/R Carbon Steel, DN 125,OD 141.3,Sch 80 PC

Elbow 90º L/R Carbon Steel, DN 100,OD 114.3,Sch 80 PC

Slip On Flange DN 125,PN16 PC

Slip On Flange DN 100,PN16 PC

Threaded Socket(MS) 1/2" PC

Hole Cutting 1/2" PC

Hexogonel Headed Bolt & Nut(MS),Grade 8.8,M16 x 70 mm PC

Welding Joint,DN 125 JOINT

Welding Joint,DN 100 JOINT

Non Asbestos Gasket,3 mm Thk,DN 125,JIS 5K PC

Non Asbestos Gasket,3 mm Thk,DN 100,JIS 5K PC

New Flange Insertion by Inplace Welding DN 125 JOINT

SPOOL-2

Seamless Carbon Steel Pipes DN 125,OD 141.3,Sch 80 MR

Seamless Carbon Steel Pipes DN 125,OD 141.3,Sch 80 MR

Seamless Carbon Steel Pipes DN 125,OD 141.3,Sch 80 MR

Seamless Carbon Steel Pipes DN 125,OD 141.3,Sch 80(Remove & Refit) MR

Elbow 90º L/R Carbon Steel, DN 125,OD 141.3,Sch 80 PC

Elbow 45º L/R Carbon Steel, DN 125,OD 141.3,Sch 80 PC

Slip On Flange DN 125,PN16 PC

Threaded Socket(MS) 1/2" PC

Hole Cutting 1/2" PC

Hexogonel Headed Bolt & Nut(MS),Grade 8.8,M16 x 70 mm PC

Welding Joint,DN 125 JOINT

____________________________________________________________________________________________
EST-WF-08
Page 19 of 57
JOB. NO.: 111001 SHIP NAME: OASIS 1

Owner No.
DESCRIPTION UNIT
(Yard No.)
New Flange Insertion by Inplace Welding DN 125 JOINT

Hexogonel Headed Bolt & Nut(MS),Grade 8.8,M14 x 50 mm PC

Non Asbestos Gasket,3 mm Thk,DN 125,JIS 5K PC

Non Asbestos Gasket,3 mm Thk,DN 125,JIS 5K(Remove & Refit Pipes) PC

Fire Watch Assisatace for Gas Cutting,Welding & Grinding (2 No x 8 Hrs x 3 Days) MH

BALLAST PUMP SUCTION & DISCHARGE PIPES RENEWAL @ PORT

SPOOL-1

Seamless Carbon Steel Pipes DN 125,OD 141.3,Sch 80 MR

Seamless Carbon Steel Pipes DN 125,OD 141.3,Sch 80 MR

Seamless Carbon Steel Pipes DN 100,OD 114.3,Sch 80 MR

Concentric Reducer DN 125 X DN 100 X Sch 80 PC

Elbow 45º L/R Carbon Steel, DN 125,OD 141.3,Sch 80 PC

Elbow 90º S/R Carbon Steel, DN 100,OD 114.3,Sch 80 PC

Slip On Flange DN 125,PN16 PC

Slip On Flange DN 100,PN16 PC

Threaded Socket(MS) 1/2" PC

Hole Cutting 1/2" PC

Hexogonel Headed Bolt & Nut(MS),Grade 8.8,M16 x 70 mm PC

Welding Joint,DN 125 JOINT

Welding Joint,DN 100 JOINT

Non Asbestos Gasket,3 mm Thk,DN 125,JIS 5K PC

Non Asbestos Gasket,3 mm Thk,DN 100,JIS 5K PC

New Flange Insertion by Inplace Welding DN 125 JOINT

SPOOL-2

Seamless Carbon Steel Pipes DN 125,OD 141.3,Sch 80 MR

Seamless Carbon Steel Pipes DN 125,OD 141.3,Sch 80 MR

Elbow 90º L/R Carbon Steel, DN 125,OD 141.3,Sch 80 PC

Slip On Flange DN 125,PN16 PC

Threaded Socket(MS) 1/2" PC

____________________________________________________________________________________________
EST-WF-08
Page 20 of 57
JOB. NO.: 111001 SHIP NAME: OASIS 1

Owner No.
DESCRIPTION UNIT
(Yard No.)
Hole Cutting 1/2" PC

Hexogonel Headed Bolt & Nut(MS),Grade 8.8,M16 x 70 mm PC

Welding Joint,DN 125 JOINT

Non Asbestos Gasket,3 mm Thk,DN 125,JIS 5K PC

New Flange Insertion by Inplace Welding DN 125 JOINT

Galvanized U Bolts with 2 Nuts each (GI) DN 125,M16 EA

Angle Bar Support 50 X 50 X 6 ,L=0.300 Mtr EA

Fire Watch Assisatace for Gas Cutting,Welding & Grinding (2 No x 8 Hrs x 3 Days) MH

ADD CABLE PIPES FOR BALLAST PUMP MOTOR JOB

M86100021R WORK DONE

Routed New Pipes lines by Taking Measurements in Place

Welded & Grinded all the Joints as necessary.

Shifed all the Pipes to Onboard by Forklift & Crane,and Rigged to the Positions.

Installed all the pipes with new gaskets,bolt & Nuts & U Bolts.

All the Gaskets have been Cut Manually According to required Dimensions.

Provided Fire Watch During the Hot Work Activities (Gas Cutting,Welding,Grinding)

MATERIALS SUPPLIED BY YARD

CABLE PIPE FOR MOTOR @ PORT SIDE

SPOOL-1

Seamless Carbon Steel Pipes DN 80,OD 88.9,Sch 80 MR

Seamless Carbon Steel Pipes DN 80,OD 88.9,Sch 80 MR

Elbow 90º L/R Carbon Steel, DN 80,OD 88.9,Sch 80 PC

Slip On Flange DN 80,JIS 5K PC

Bulkhead Plate OD 150 mm x 12 mm Thk PC

Hole Cutting DN 80 PC

Welding Joint,DN 80(In Place) JOINT

Welding Joint,DN 150(In Place) JOINT

Non Asbestos Gasket,3 mm Thk,DN 80,JIS 5K PC

Hexogonel Headed Bolt & Nut(MS),Grade 8.8,M16 x 60 mm PC

____________________________________________________________________________________________
EST-WF-08
Page 21 of 57
JOB. NO.: 111001 SHIP NAME: OASIS 1

Owner No.
DESCRIPTION UNIT
(Yard No.)

SPOOL-2

Seamless Carbon Steel Pipes DN 80,OD 88.9,Sch 80 MR

Pipe Bending DN 80,OD 88.9,Sch 80 MR

Slip On Flange DN 80,JIS 5K PC

Welding Joint,DN 80(In Place) JOINT

Non Asbestos Gasket,3 mm Thk,DN 80,JIS 5K PC

Hexogonel Headed Bolt & Nut(MS),Grade 8.8,M16 x 60 mm PC

SPOOL-3

Seamless Carbon Steel Pipes DN 80,OD 88.9,Sch 80 MR

Slip On Flange DN 80,JIS 5K PC

Welding Joint,DN 80(In Place) JOINT

Threaded Socket(MS) 1" PC

Hole Cutting 1" PC

Blind Plate DN 80 PC

Hexogonel Headed Bolt & Nut(MS),Grade 8.8,M16 x 60 mm PC

Welding Joint,1"(In Place) JOINT

Angle Bar Support 65 X 65 X 8 ,L=0.150 Mtr EA

Hole Drilling 8 mm EA

Support Welding DN65 EA

Non Asbestos Gasket,3 mm Thk,DN 80,JIS 5K PC

BHD Plate Cutting PC

Fire Watch Assisatace for Gas Cutting,Welding & Grinding (2 No x 8 Hrs x 2 Days) MH

CABLE PIPE FOR MOTOR @ STBD SIDE

SPOOL-1

Seamless Carbon Steel Pipes DN 80,OD 88.9,Sch 80 MR

Elbow 90º L/R Carbon Steel, DN 80,OD 88.9,Sch 80 PC

Slip On Flange DN 80,JIS 5K PC

Bulkhead Plate OD 150 mm x 12 mm Thk PC

Hole Cutting DN 80 PC

____________________________________________________________________________________________
EST-WF-08
Page 22 of 57
JOB. NO.: 111001 SHIP NAME: OASIS 1

Owner No.
DESCRIPTION UNIT
(Yard No.)
Welding Joint,DN 80(In Place) JOINT

Welding Joint,DN 150(In Place) JOINT

Non Asbestos Gasket,3 mm Thk,DN 80,JIS 5K PC

Hexogonel Headed Bolt & Nut(MS),Grade 8.8,M16 x 60 mm PC

SPOOL-2

Seamless Carbon Steel Pipes DN 80,OD 88.9,Sch 80 MR

Pipe Bending DN 80,OD 88.9,Sch 80 MR

Slip On Flange DN 80,JIS 5K PC

Welding Joint,DN 80(In Place) JOINT

Non Asbestos Gasket,3 mm Thk,DN 80,JIS 5K PC

Hexogonel Headed Bolt & Nut(MS),Grade 8.8,M16 x 60 mm PC

SPOOL-3

Seamless Carbon Steel Pipes DN 80,OD 88.9,Sch 80 MR

Slip On Flange DN 80,JIS 5K PC

Welding Joint,DN 80(In Place) JOINT

Threaded Socket(MS) 1" PC

Hole Cutting 1" PC

Blind Plate DN 80 PC

Hexogonel Headed Bolt & Nut(MS),Grade 8.8,M16 x 60 mm PC

Welding Joint,1"(In Place) JOINT

Angle Bar Support 65 X 65 X 8 ,L=0.150 Mtr EA

Hole Drilling 8 mm EA

Support Welding DN65 EA

Non Asbestos Gasket,3 mm Thk,DN 80,JIS 5K PC

BHD Plate Cutting PC

Fire Watch Assisatace for Gas Cutting,Welding & Grinding (2 No x 8 Hrs x 2 Days) MH

ADD HYRRAULIC PIPE FOR DECK CRANE JOB

____________________________________________________________________________________________
EST-WF-08
Page 23 of 57
JOB. NO.: 111001 SHIP NAME: OASIS 1

Owner No.
DESCRIPTION UNIT
(Yard No.)
B41180012R WORK DONE

Fabricated the Pipes by Bending,Welded & Fitted in Position

MATERIALS SUPPLIED BY YARD

Seamless Stainless Steel Tube,Aisi 316,OD 6mm × 1.5mm Thk MR

Ferrule Nut(MS) OD 6mm, Fabricated & Machined PC

Manpower Fitting Fabrication 02 Nos x 4 Hrs MH

Welding Joint OD 6 mm PC

ADD PRESSURE GAUGE CONNETION FOR BALLAST PUMPS IN PR


B45120012R WORK DONE

Provided Connections to the Owner Fitted Pressure Gauges

Male Stud Connector(MS) ,1/2" X OD 6mm PC

Ferrule Nut 6mm PC

Manpower Fitting Fabrication 02 Nos x 3 Hrs MH

ADD SUPPLY OF BELLOW TO SHIP

Expansion Bellow (Stainless Steel) DN100, L=235mm,Flange OD=185mm PC

Manpower Transportation MH

GENERAL CLEANING IN PUMP ROOM

Done the Cleaning inside the Pump to Remove all the Scraps,Garbages etc

Manpower for Cleaning 02 Nos x 4 Hrs x 02 Days

ADD - 14 SUPPLY BUTTERFLY VALVE DN150 NO

NOTE: 1) CERTIFIED VALVE TO BE CHARGE EXTRA .

DURATION : 2) 4 TO 5 DAYS REQUIRED AFTER CONFIRMATION .

____________________________________________________________________________________________
EST-WF-08
Page 24 of 57
JOB. NO.: 111001 SHIP NAME: OASIS 1

Owner No.
DESCRIPTION UNIT
(Yard No.)

____________________________________________________________________________________________
EST-WF-08
Page 25 of 57
JOB. NO.: 111001 SHIP NAME: OASIS 1

Owner No.
DESCRIPTION UNIT
(Yard No.)

ELECTRIC

ADD - 07 PUMP ROOM NO

PUMP ROOM SUPPLY FAN ELECTRIC MOTOR TO BE

ELECTRIC MOTOR 3KW, 380V

ADD - 08 ENGINE ROOM NO

ENGINE ROOM SUPPLY FAN MOTOR TO BE OVERHAULED

ELECTRIC MOTOR 7.5KW, 380V

ADD BALLAST PUMP MOTORS CABLE LAYING AND COMISSIONING

(INCLUDED ABOVE)

____________________________________________________________________________________________
EST-WF-08
Page 26 of 57
JOB. NO.: 111001 SHIP NAME: OASIS 1

Owner No.
DESCRIPTION UNIT
(Yard No.)

QC

____________________________________________________________________________________________
EST-WF-08
Page 27 of 57
JOB. NO.: 111001 SHIP NAME: OASIS 1

Owner No.
DESCRIPTION UNIT
(Yard No.)

____________________________________________________________________________________________
EST-WF-08
Page 28 of 57
n dock)

____________________________________________________________________________________________
EST-WF-08
Page 29 of 57
____________________________________________________________________________________________
EST-WF-08
Page 30 of 57
IN-CHARGE A/MGR MGR SR. MGR

DATE: 20 May 2014

COUNTRY OMAN

GT 4,484

LOA 117.4 X 16.5 X 8.3

ETA 14 February 2014

ETD 20 May 2014

MAIN JOBS

TICAL AND UNDER WATER WASHING3)DECK CRANE CHANGE

REMARKS:

____________________________________________________________________________________________
EST-WF-08
Page 31 of 57
____________________________________________________________________________________________
EST-WF-08
Page 32 of 57
Date: May 20, 2014

UNIT PRICE SUB.TOTAL TOTAL


QTY
(USD) (USD) (USD)

1 6100 6,100 6,100

5,000

1 1850 1,850

7 450 3,150

87 200 17,400 17,400

7,680

1000 -

96 80 7,680

- 5,840

1 80 80

96 60 5,760

96 80 7,680 7,680

96 60 5,760 5,760

20 50 1,000 1,000

____________________________________________________________________________________________
EST-WF-08
Page 33 of 57
Date: May 20, 2014

UNIT PRICE SUB.TOTAL TOTAL


QTY
(USD) (USD) (USD)

317

2 100 200

650 0.18 117

- 980

1 80 80

300 3 900

11,760

2 120 240

96 120 11,520

1 1,200 1,200 1,200

440

1 200 200

8 30 240

2 65 130 130

Total G/S: 71,287 71,287

____________________________________________________________________________________________
EST-WF-08
Page 34 of 57
Date: May 20, 2014

UNIT PRICE SUB.TOTAL TOTAL


QTY
(USD) (USD) (USD)

Total Hull works: - -

____________________________________________________________________________________________
EST-WF-08
Page 35 of 57
Date: May 20, 2014

UNIT PRICE SUB.TOTAL TOTAL


QTY
(USD) (USD) (USD)

13,028

685 0.52 356

1692 4.3 7,276

1255 4.3 5,397


-

2271 3 6,813 6,813

1 2,250 2,250 2,900

1 650 650
-

2 300 600 600


-

685 -

1016 -

1692 -

1255 -

1255 -

1 -

____________________________________________________________________________________________
EST-WF-08
Page 36 of 57
Date: May 20, 2014

UNIT PRICE SUB.TOTAL TOTAL


QTY
(USD) (USD) (USD)

1 -

1 -

6 -

Total painting works: 23,341 23,341

____________________________________________________________________________________________
EST-WF-08
Page 37 of 57
Date: May 20, 2014

UNIT PRICE SUB.TOTAL TOTAL


QTY
(USD) (USD) (USD)

1,120

1 160 160

2 480 960

25

25

1 1,334

____________________________________________________________________________________________
EST-WF-08
Page 38 of 57
Date: May 20, 2014

UNIT PRICE SUB.TOTAL TOTAL


QTY
(USD) (USD) (USD)

48

1 480 480

2 65 130

2 40 80

16 8 128

8 10 80

16 4 64

24 3 72

1 60 60

5 40 200

1 40 40

10

____________________________________________________________________________________________
EST-WF-08
Page 39 of 57
Date: May 20, 2014

UNIT PRICE SUB.TOTAL TOTAL


QTY
(USD) (USD) (USD)

16

____________________________________________________________________________________________
EST-WF-08
Page 40 of 57
Date: May 20, 2014

UNIT PRICE SUB.TOTAL TOTAL


QTY
(USD) (USD) (USD)

3,400

10 12 120

4 60 240

4 120 480

4 90 360

4 180 720

4 330 1,320

16 4 64

16 6 96
1

____________________________________________________________________________________________
EST-WF-08
Page 41 of 57
Date: May 20, 2014

UNIT PRICE SUB.TOTAL TOTAL


QTY
(USD) (USD) (USD)

12

16 220 3,520 3,520

____________________________________________________________________________________________
EST-WF-08
Page 42 of 57
Date: May 20, 2014

UNIT PRICE SUB.TOTAL TOTAL


QTY
(USD) (USD) (USD)

16

30

12

____________________________________________________________________________________________
EST-WF-08
Page 43 of 57
Date: May 20, 2014

UNIT PRICE SUB.TOTAL TOTAL


QTY
(USD) (USD) (USD)

1 656

2 40 80

16 12 192

16 12 192

16 6 96

16 6 96

Total machinery works: 10,030 10,030

____________________________________________________________________________________________
EST-WF-08
Page 44 of 57
Date: May 20, 2014

UNIT PRICE SUB.TOTAL TOTAL


QTY
(USD) (USD) (USD)

5,038

1 1,850 1,850

18 67 1,206

148 4.5 666

8 30 240

6 103 618

8 50 400

2 29 58
-

____________________________________________________________________________________________
EST-WF-08
Page 45 of 57
Date: May 20, 2014

UNIT PRICE SUB.TOTAL TOTAL


QTY
(USD) (USD) (USD)

12

24

12

24

____________________________________________________________________________________________
EST-WF-08
Page 46 of 57
Date: May 20, 2014

UNIT PRICE SUB.TOTAL TOTAL


QTY
(USD) (USD) (USD)

0.450

0.200

0.150

16

10

0.200

0.100

0.550

0.500

16

24

____________________________________________________________________________________________
EST-WF-08
Page 47 of 57
Date: May 20, 2014

UNIT PRICE SUB.TOTAL TOTAL


QTY
(USD) (USD) (USD)

24

48

0.040

0.550

0.150

16

10

0.410

0.200

____________________________________________________________________________________________
EST-WF-08
Page 48 of 57
Date: May 20, 2014

UNIT PRICE SUB.TOTAL TOTAL


QTY
(USD) (USD) (USD)

16

48

1 1950 1,950 1,950

0.100

1.200

____________________________________________________________________________________________
EST-WF-08
Page 49 of 57
Date: May 20, 2014

UNIT PRICE SUB.TOTAL TOTAL


QTY
(USD) (USD) (USD)

1.500

1.200

32

0.100

____________________________________________________________________________________________
EST-WF-08
Page 50 of 57
Date: May 20, 2014

UNIT PRICE SUB.TOTAL TOTAL


QTY
(USD) (USD) (USD)

2.700

1.400

32

1 5506 5,506 5,506

____________________________________________________________________________________________
EST-WF-08
Page 51 of 57
Date: May 20, 2014

UNIT PRICE SUB.TOTAL TOTAL


QTY
(USD) (USD) (USD)

0.400

2 -

8 -

2 -

4 -

4 -

6 -

2 -

2 -

1 950 950 950

____________________________________________________________________________________________
EST-WF-08
Page 52 of 57
Date: May 20, 2014

UNIT PRICE SUB.TOTAL TOTAL


QTY
(USD) (USD) (USD)

Total outfitting works: 13,444 13,444

____________________________________________________________________________________________
EST-WF-08
Page 53 of 57
Date: May 20, 2014

UNIT PRICE SUB.TOTAL TOTAL


QTY
(USD) (USD) (USD)

1 685 685 685

1 890 890 890

Total electric works: 1,575 1,575

____________________________________________________________________________________________
EST-WF-08
Page 54 of 57
Date: May 20, 2014

UNIT PRICE SUB.TOTAL TOTAL


QTY
(USD) (USD) (USD)

____________________________________________________________________________________________
EST-WF-08
Page 55 of 57
Date: May 20, 2014

UNIT PRICE SUB.TOTAL TOTAL


QTY
(USD) (USD) (USD)

Total QC works: - -

____________________________________________________________________________________________
EST-WF-08
Page 56 of 57
F76: PLEASE DOUPLE CHECK THIS DISCOUNT RATE

G18: Please type Job No. for bill create

____________________________________________________________________________________________
EST-WF-08
Page 57 of 57