Table of Contents
1. General Information ............................................................... 1
6. Pictures.................................................................................... 6
9. Attachments .............................................................................. 8
1. General Information
Site inspection.
22.06.2016
Discuss the coming works.
Remove all necessary bolts.
23.06.2016
Lift the mill table.
Remove dowel pins (one needed to cut off).
Move the gearbox away from the mill.
Remove the outlet flange, due to low crane capacity.
24.06.2016
Remove 2nd stage.
Remove sun pinion.
25.06.2016
Remove motor coupling.
Remove cover.
Remove bevel gear.
Clean casing 1st stage.
26.06.2016
Remove destroyed dowel pin.
Install bevel gear, tighten bolts.
Drill and ream holes for dowel pins at bevel gear.
27.06.2016
Install front cover.
Install coupling.
28.06.2016 Drill and ream holes for dowel pins at bevel gear.
Assemble gearbox.
29.06.2016
Move gearbox underneath mill.
Alignment of gearbox.
30.06.2016
Tighten foundation bolts.
Lower mill table.
01.07.2016
Tighten bolts of mill table
Connect oil pipes.
Connect electric wires
Start lubrication system.
02.07.2016
Refill oil.
Check oil distribution in the gearbox.
Start mill with no load.
03.07.2016
Paperwork.
04.07.2016 Final meeting.
The client has very limited time for this bevel gear exchange. It was decided to fulfil the
inspection of 2nd stage in another time of this year.
From the old bevel gear stage only the casing with cover can be reused.
Two planet shafts were stored at site: one new, one repaired.
Mill start under load is earliest possible at 15. Of July.
Outlet flange:
Few fine scratches = normal (OK)
Thrust Pads:
Few fine scratches = normal (OK)
Planets:
Tooth contact pattern = no offset visible (OK)
Planet Shafts:
In Position = no abnormalities visible (OK)
Bevel Gear:
Pinion = Damaged (NOT OK)
Gear = pair to pinion (NOT OK)
Axial bearing (No.: 7) = damaged (NOT OK)
Pinion bearing (No.: 3) = Destroys by removing (NOT OK)
Pinion bearing (No.: 9) = Destroys by removing (NOT OK)
Gear bearing (No.: 32) = not recommended to keep (NOT OK)
Gear bearing (No.: 33) = not recommended to keep (NOT OK)
Pinion sleeve = damaged (NOT OK)
Casing = can be reused without drilling (OK)
Casing cover = visible ok, without dismantling (OK)
Exchanged to new one = Tooth contact acc. to request (OK)
Gear reducer:
Nominal pre-stress anchor bolts = acc. FLS manual (950 bar)
Actual pre-stress anchor bolts = 950 bar (OK)
Nominal positioning = 4 taper pins
Actual positioning = 3 taper pins (OK)
Nominal wedging = 4 wedges or bolts
Actual wedging = 4 bolts (OK)
Nominal orifices = 2 ( acc. manual)
Actual orifices (trust bearing/bevel gear) = 12mm, 11mm (OK)
Instruments
Nominal accuracy = ± 1%
Actual accuracy = ± 1% (OK)
Interlocking
Nominal = standard, acc. manual
Actual = standard, acc. manual (OK)
5. Alignment protocol
Vertical Alignment
Before Alignment:
Coupling Angularity “CA” 0.04
Coupling Offset “CO” 0.12
Front feet “F1” -0.20
Rear feet “F2” -0.40
After Alignment
Coupling Angularity “CA” 0.00
Coupling Offset “CO” 0.00
Front feet “F1” -0.02
Rear feet “F2” -0.03
Horizontal Alignment
Before Alignment:
Coupling Angularity “CA” 0.02
Coupling Offset “CO” 0.14
Front feet “F1” -0.16
Rear feet “F2” -0.23
After Alignment
Coupling Angularity “CA” 0.00
Coupling Offset “CO” 0.08
Front feet “F1” -0.04
Rear feet “F2” -0.09
Note: All measurements in millimeter unit. Shim were placed under the front and rear feet 0.2
and 0.4mm respectively
6. Pictures
Plant Manager
Name: Irshad Ali Ameer
E-mail: ialiameer@pakcem.com.pk
Phone No.: 0092 514020 100
Mobile No.: 0092 322 5000221
Maintenance manager
Name: Intizar Ahmad
E-mail: iahmad@pakcem.com.pk
Phone No.: 0092 514020 222
Mobile No.: 0092 322 8282809
9. Attachments
none
The customer agrees herewith on both the performed work and the contents of this site report.