Sie sind auf Seite 1von 1

KEY PLAN :

RO
AD
MAIN BUILDING WINDOW SCHEDULE
3

1
GROUND FLOOR
G
D IN
I

ROA ES
SL ATE

AT
D
G

EMIR
IN
MA ATE 2
G
NOTES:

FIRST FLOOR

LEGEND :

ROOF FLOOR
SPACE FOR STAMP :

FIRE PUMP ROOM & SECURITY ROOM

REFERENCE DRAWINGS
REV DRAWING NO. DRAWING TITLE STATUS

REVISION
NAME DATE NAME DATE
REV. DETAILS PREPARED CHECKED STATUS

END USER :

TRANSMISSION POWER DIVISION


P.O.BOX : 564, DUBAI - U.A.E.
FAX : +971 4 3248111
TEL : +971 4 3244444
PROJECT:

DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF


WAHADLND 132/11KV SUBSTATION AND ASSOCIATED WORKS

MAIN CONTRACTOR : CONTRACT NO:

KEC INTERNATIONAL LIMITED PO - 3091900013 & 14


P.O. BOX 392774, DUBAI, U.A.E.

SCALE: AS SHOWN STANDARD: - A1 SUBSTATION NAME :

DATE NAME SIGNATURE


132 / 11kV WAHADLND SUBSTATION
PREPARED 08.12.2019 AHA

CHECKED 09.12.2019 RSK DRAWING NO:

PO-3091900013&14-WAHADLND-C-15-323
APPROVED 09.12.2019 VRP
CONSULTANT / SUB CONTRACTOR / MANUFACTURER: DRAWING TITLE:
DRAWING CHECKED & COORDINATED FOR

Lakshmi Engineers Architects & Designers WINDOWS ELEVATION & SCHEDULE


KEC LEAD P.O. BOX 182185, DUBAI, U.A.E.
TEL: 00971 4 2288215

RAKESH
Name :......................................................... KHADER ALI
Name :......................................................... SUB CONTRACTOR REF: CAD REF. REV. SHEET LAST QTY.OF
Date :......................................................... Date :.........................................................
SHEET SHEET
SIGNATURE :........................................... SIGNATURE :........................................... 0 01 01 01

Das könnte Ihnen auch gefallen