Projects
22
Dahon System
23 Lawson COG
Regatcho
24 COG
Magalona Regatcho
25 COG
M. Marcos Regatcho
26 COG
East Plainview Regatcho
27 COG
Pinatubo Regatcho
28 Sierra Madre COG
Regatcho
29 A. Rita COG
Regatcho
30 Empire East COG
Regatcho
31 P. Parada COG
Regatcho
32 Northeast Greenhills COG
Regatcho
33 West Greenhills COG
Regatcho
34 Saniboy COG
Regatcho
35 Countryside COG
Regatcho
36 P. Oliveros COG
Regatcho
37 Dagonoy COG
Abalos
38 Alabastro COG
Abalos
39 Nakar COG
Abalos
40 Agatha COG
Abalos
41 Hipodromo COG
Abalos
42 Greenbelt COG Abalos
A.rita to SJPS1
A.rita
A.rita
A.rita
SJPS1
SJPS1
SJPS1
A.rita
A.rita
A.rita
SJPS1
SJPS1
A.rita
SJPS1
SJPS1
(As of July 16, 2019) (As of July 19, 2019)
Newly road construction with drinage Newly road construction with drinage
outfall at center of the road outfall at center of the road
Permitting Permitting
as per abalos releasing of permit for as per abalos releasing of permit for
DPWH is on July 8, 2019 DPWH is on July 8, 2020
for payment on DPWH July 10, 2019 for payment on DPWH July 10, 2020
for payment on DPWH July 10, 2019 Permit already paid waiting for DPWH
to realeasing of permit
for payment on DPWH July 10, 2019 for payment on DPWH July 10, 2019
Permitting Permitting
Permitting Permitting
Permitting
(As of July 22, 2019) (As of July 29, 2019)
Permitting Permitting
Permitting Permitting
Permitting Permitting
Permitting
Permitting
Permitting
Permitting
Permitting
Permitting
Permitting
Permitting
Permitting
Permitting
Permitting
Permitting
Permitting
Permitting
Permitting
Permitting
Permitting
Permitting
Permitting
Permitting
Permitting
Permitting
(As of Aug 5, 2019) (As of Aug 13, 2019)
Waiting for releasing of permit (order of payment) Abalos to pay permit 8/13/19
BOM/BOQ (8/9/19), Waiting permiting to cityhall, no Already submit BOM/BOQ (for submission to
engineering) Check costing submittred by
processing of permit until approval of MWC engr'ng contractor)Portion2
Meeting in Brgy GH regarding to permit issue 8/5/19, Meeting already done, for submission of
send accomplishment report (8/6/19) scope of works 8/13/19
Waiting for releasing of permit (order of payment)- Abalos to pay permit 8/13/19
Karen
Waiting for releasing of permit (order of payment)- Waiting for releasing of permit (order of
Karen payment)-Mandaluyong city engr
Waiting for releasing of permit (order of payment)- Waiting for releasing of permit (order of
Karen payment)-Mandaluyong city engr
Waiting for releasing of permit (order of payment)- Waiting for releasing of permit (order of
Karen payment)-Mandaluyong city engr
for replacement due to HDD againsts policy of 180 for replacement due to HDD againsts policy of
days 180 days
Permit will be release after Wilson project Permit will be release after Wilson project
Re-schedule meeting (waiting for availability of Re-schedule meeting (waiting for availability of
brgy chairman) brgy chairman)
Delete( for submission in engineering (BOM/BOQ)
Pipe Laying is now at 80% already (250 Linear For material acquisition and on-going
meters) excavation
cutting along Arnaiz 117LM completed,start cutting along Arnaiz 117LM completed, cutting
cutting along west drive 180LM 8/20/2019 along west drive 180LM completed
2 weeks EZBO
2 weeks EZBO
1 Month EZBO
1 Month EZBO
1 Month EZBO
1 Month EZBO
1 Month EZBO
1 Month EZBO
1 Month EZBO
1 Month EZBO
1 Month EZBO
1 Month EZBO
1 Month EZBO
1 Month EZBO
1 Month EZBO
1 Month EZBO
1 Month EZBO
1 Month EZBO
1 Month EZBO
1 Month EZBO
1 Month EZBO
1 Month EZBO
1 Month EZBO
1 Month EZBO
1 Month EZBO
(As of Aug 30, 2019)
Permitting
Permitting
Permitting
Permitting
Done Permitting
Done Permitting
Pro
Step 1 DRI
Proceed / Defer / Delete / Time Line to Complete /
Completed / Ongoing Actual Completion
Completed Mar-22
proceed Oct-31
proceed Oct-31
proceed Oct-31
proceed 2020
delete For replacement '2020
proceed Oct-31
proceed 2020
proceed 2020
proceed Sep-30
Oct-31
Proceed
Oct-31
Proceed
Oct-31
Proceed
Oct-31
Proceed
Oct-31
Proceed
Oct-31
Proceed
Oct-31
Proceed
Oct-31
Proceed
Oct-31
Proceed
Oct-31
Proceed
Oct-31
Proceed
Oct-31
Proceed
Oct-31
Proceed
Oct-31
Proceed
Oct-31
Proceed
Oct-31
Proceed
Oct-31
Proceed
Oct-31
Proceed
Oct-31
Proceed
Proceed Oct-31
Oct-31
Proceed
Oct-31
Proceed
Project Specifics
Pipe Length Diameter Restoration (block or trench-width)
80 400 block
5 900 block
20 trench width
750
300
151
trench width
327 100
70 100 trench-width
80 100 trench-width
80 100 trench-width
81 63 trench-width
53 100 trench-width
66
100 trench-width
16
100 trench-width
257
100 trench-width
5
100 trench-width
205
100 trench-width
170
100 trench-width
29
100 trench-width
260
100 trench-width
50
100 trench-width
527
150 trench-width
180
150 trench-width
93
150 trench-width
170
100 trench-width
43
150 trench-width
297 200 trench-width
127
150 trench-width
200
100 trench-width
Pump Head / Specification Rationale
Reliability
Reliability/augmentation
Reliability/augmentation from
A.Rita Gravity to SJPS1
Pressure improvement
To meet the 7psi requirement
250x250
Looping of 150mm Water source regime changes interconnection
pipelaying of
Resizing of 200mm mainline to Pressure improvement 300mm using
300mm trenchless
Resizing of 300mm mainline to Pressure improvement specially to Brgy Pipe laying of
400mm Hulo 400mm
900x750mm
Interconnection of 900x750 Water source regime changes interconnection
interconnection
De loading of DMA libertad, Pressure of 400x200mm,
Interconnection of 400x200 improvement for CGS, Pressure pipe laying of
Improvement at Brgy Malamig 300mm
pipe laying of
De-loading West Greenhills from 150 and
Interconnection of 250x150 Valentina line to Edsa line interconnection
of 250 to 100
pipe laying of
De-loading NorthGreen Hills from 150 and
Interconnection of 250x200 Valentina line to Edsa line. interconnection
of 250 to 150
interconnection
of 400x 300mm,
Interconnection of 400x300 Reliability line from SJPS1 to PPS pipelaying of
400mm
100MM X 100MM
75MM X 63MM
100MM X 100MM
100MM X 100MM
100MM X 100MM
100MM X 100MM
150mm x 100mm
100mm x 63mm
100mm x 100mm
Newly road
pipe laying of construction with
Do Nothing drinage outfall Change location of project
200mm at
center of the road
interconnection Do Nothing Narrow road will Re-routing scheme with the help of
cause heavy
300x150mm brgy officials
traffic
Heavy Traffic in
pipe laying of Wilson St, VIP's
63mm Close coordination with West
Do Nothing might be
dedicated line Greenhills Association
disturbed during
for VIP's excavation
Disturbance
pipe laying of during Customer management during
63mm Do Nothing excavation / loud excavation, inform all residents /
dedicated line noise that might LGU near the area of excavation
along P. Cruz affect residents
Disturbance
pipe laying of during Customer management during
63mm Do Nothing excavation / loud excavation, inform all residents /
dedicated line noise that might LGU near the area of excavation
along Alchan affect residents
Heavy traffic
interconnection during excavation seek assistance to LGU regarding
of 400x200mm, Do Nothing at the intersection the proposed traffic scheme during
pipe laying of , near terminal of excavation
200mm PUVs
Heavy traffic
during excavation
pipe laying of along connecticut seek assistance to LGU / MMDA
100 and
interconnection Do Nothing (Greenhills
and Ortigas regarding the proposed traffic
area). scheme during excavation
of 250 to 100 Issuance of
permit
Heavy traffic
during excavation
pipe laying of along seek assistance to LGU regarding
250 and Do Nothing Mckinley/Eisenho the proposed traffic scheme during
interconnection wer (Greenhills excavation
of 250 to 150 area). Issuance of
permit
interconnection
of 400x with conflict with coordinate the As-Built plans , also
300mm, Do Nothing existing Sewer inform LGU regarding lane closure
pipelaying of Line, Narrow road during pipe laying
300mm
Heavy traffic
pipe laying of during excavation seek assistance to LGU regarding
150mm from Do Nothing along Shaw Blvd, the proposed traffic scheme during
300 SJPS1 to issuance of excavation
300 A.Rita permit from
DPWH
disturbance on
residential
pipe laying of housed during Customer management during
separate 63mm Do Nothing excavation and excavation, inform all residents /
line pipe laying, also LGU near the area of excavation
might cause
heavy traffic
Attachments in the Business Case for 180 Days Network Projects
Project :
BA:
Adequate Planning
Adequate Planning
Adequate Planning
Benchmark Costing
Consolidated AMP
Type D (for D2, excel file
from APEO including name
plate of equipment, Asset
Management Department)
Latest Service
Report/Maintenance For replacement of equipment
Order
Net Present
Cost/Value Could instead be reflected in
(signed by Financial
the business case
Planning)
Legend:
Mandatory
Optional / with Alternate document
If applicable
Technical Audit Guidelines (TAGs)
Adequate Planning
Risk Analysis and Mitigation
Adequate Planning
Adequate Planning
Risk Analysis and Mitigation
Adequate Planning
Benchmark Costing