Tentative Maintenance Plan in respect of 220kV G/S Jhampir

For the First Quarter of 2020 (January to March 2020)


Sr. # Equipment Date
1 132kV S/Y Earth Mesh 1-Jan-2020
2 220kV DIA 04 2-Jan-2020
3 220kV Bus Bar-II 3-Jan-2020

220V & 110V Battery Banks, ACDB and DCDB


4 6-Jan-2020
Panels

5 220kV DIA 03 and 250MVA ATR-1 7-Jan-2020


6 220kV DIA 02 and 250MVA ATR-2 8-Jan-2020
7 220kV DIA 01 and 250MVA ATR-3 9-Jan-2020
8 132kV S/Y Earth Mesh 10-Jan-2020
9 132kV S/Y Earth Mesh 13-Jan-2020
10 132kV S/Y Earth Mesh and Relay Panels 14-Jan-2020
11 220kV Dia 01 15-Jan-2020
12 220kV Dia 02 16-Jan-2020
13 220kV Dia 04 17-Jan-2020
14 220kV Dia 03 20-Jan-2020
220kV Switchyard, 220V & 110V Battery
15 21-Jan-2020
Banks,
16 220kV Switchyard 22-Jan-2020
17 220kV Switchyard 23-Jan-2020
18 220kV S/Y Lighting Boxes 24-Jan-2020
19 220kV MK Boxes 27-Jan-2020
20 220kV C.Bs 28-Jan-2020
21 250 MVA ATR-1 29-Jan-2020
22 250 MVA ATR-2 30-Jan-2020
23 250 MVA ATR-3 31-Jan-2020
24 220V & 110V Battery Banks, 3-Feb-2020
25 250 MVA ATR-1 4-Feb-2020
26 250 MVA ATR-2 5-Feb-2020
27 250 MVA ATR-3 6-Feb-2020
28 132kV C.B E3Q1 7-Feb-2020
29 132kV C.B E4Q1 10-Feb-2020
30 132kV C.B E5Q1 11-Feb-2020
31 132kV C.B E7Q1 12-Feb-2020
32 132kV C.B E8Q1 13-Feb-2020
33 132kV C.B E9Q1 14-Feb-2020

34 17-Feb-2020
220V & 110V Battery Banks,
35 132kV C.B E11Q1 18-Feb-2020
36 132kV C.B E13Q1 19-Feb-2020
37 132kV C.B E14Q1 20-Feb-2020
38 132kV C.B E15Q1 21-Feb-2020
39 132kV C.B E16Q1 24-Feb-2020
40 132kV C.B E17Q1 25-Feb-2020
41 132kV C.B E18Q1 26-Feb-2020
42 132kV Bus Bar-I 27-Feb-2020
43 132kV Bus Bar-II 28-Feb-2020
44 220V & 110V Battery Banks 2-Mar-2020
45 220kV C.B D1Q1 3-Mar-2020
46 220kV C.B D1Q2 4-Mar-2020
47 220kV C.B D1Q3 5-Mar-2020
48 220kV C.B D2Q1 6-Mar-2020
49 220kV C.B D2Q2 9-Mar-2020
50 220kV C.B D2Q3 10-Mar-2020
51 220kV C.B D3Q1 11-Mar-2020
52 220kV C.B D3Q2 12-Mar-2020
53 220kV C.B D3Q3 13-Mar-2020

54 16-Mar-2020
220V & 110V Battery Banks,
55 220kV C.B D4Q1 17-Mar-2020
56 220kV C.B D4Q2 18-Mar-2020
57 220kV Bus Bar-I 19-Mar-2020
58 220kV Bus Bar-II 20-Mar-2020
59 220kV DCDB Panels & Battery Chargers 23-Mar-2020
60 132kV DCDB Panels & Battery Chargers 24-Mar-2020

61 220kV ACDB Panels & Auxiliary Panels of 25-Mar-2020


Transformers In Control Room
62 132kV ACDB Panels & 11kV Panels 26-Mar-2020
63 All Relay Panels 27-Mar-2020

64 30-Mar-2020
220V & 110V Battery Banks,
65 All Control Panels & EVEN/Fault Recorder 31-Mar-2020
Panels
entative Maintenance Plan in respect of 220kV G/S Jhampir
For the First Quarter of 2020 (January to March 2020)

Work Carried to be Out


Mesh integrity Test of E11 to E13 bays
Contact Resistance test and alignmnet of Isolators, washing/Cleaning
Contact Resistance test and alignmnet of Isolators, washing/Cleaning

Checking of Sp. Gravity, Voltage and Electrolyte Level, cleaning of cells, Tightening of Nut Bolts, if necessary
Dusting, Cleaning/Blowing of Panels
Contact Resistance test and alignmnet of Isolators, washing/Cleaning
Contact Resistance test and alignmnet of Isolators, washing/Cleaning
Contact Resistance test and alignmnet of Isolators, washing/Cleaning
Mesh integrity Test of E14 to E15 bays
Mesh integrity Test of E16, E17 & E18 bays
Mesh integrity Test of E19 bay and Dusting, Cleaning/Blowing of Relay Panels
Mesh integrity Test
Mesh integrity Test
Mesh integrity Test
Mesh integrity Test
Phase Marking in Switchyard, Checking of Sp. Gravity, Voltage and Electrolyte Level, cleaning of cells, Tightening of
Nut Bolts, if necessary
Phase Marking in Switchyard
Phase Marking in Switchyard
Painting of Boxes
Cleaning Rust and Painting Rusty area
Cleaning Rust and Painting Rusty area, Repairing of LCC handles
Cleaning Rust and Painting Rusty area
Cleaning Rust and Painting Rusty area
Cleaning Rust and Painting Rusty area
Checking of Sp. Gravity, Voltage and Electrolyte Level, cleaning of cells, Tightening of Nut Bolts, if necessary
Annual Testing & Maintenance+ Washing and Cleaning+ Cleaning Blowing of LCCs and MKs
do
do
do
do
do
do
do
do

Checking of Sp. Gravity, Voltage and Electrolyte Level, cleaning of cells, Tightening of Nut Bolts, if necessary
Annual Testing & Maintenance+ Washing and Cleaning+ Cleaning Blowing of LCCs and MKs
do
do
do
do
do
do
Annual Testing of Bus Bar-P.T + Washing Cleaning
do
Checking of Sp. Gravity, Voltage and Electrolyte Level, cleaning of cells, Tightening of Nut Bolts, if necessary
Annual Testing & Maintenance+ Washing and Cleaning+ Cleaning Blowing of LCCs and MKs
do
do
do
do
do
do
do
do

Checking of Sp. Gravity, Voltage and Electrolyte Level, cleaning of cells, Tightening of Nut Bolts, if necessary
Annual Testing & Maintenance+ Washing and Cleaning+ Cleaning Blowing of LCCs and MKs
do
Annual Testing of Bus Bar-C.V.T + Washing Cleaning
do
Dusting/Cleaning, blowering and Vermin Proofing where necessary
do

do
do
do

Checking of Sp. Gravity, Voltage and Electrolyte Level, cleaning of cells, Tightening of Nut Bolts, if necessary

Dusting/Cleaning, blowering and Vermin Proofing where necessary