CQI-12v2
1
Dated: 2/2012
CQI-12v2
2
Dated: 2/2012
CQI-12
Special Process: Coating System Assessment
Version 2 Issued 2/2012
Facility Name:
Address:
Personnel Contacted:
Name: Title: Phone: Email:
Auditors/Assessors:
Name: Company: Phone: Email:
Assessment
Are out of control/specification There are documented reaction plans to both out of
2.12 parameters reviewed and control and out of tolerance process parameters. There
reacted to? is documented evidence that reaction plans are followed
Job Identity:
Customer:
Shop Order Number:
Part Number:
Part Description:
Coating Requirements:
Related
Customer or Internal Job (Shop) Order or Reference Actual Condition Pass /
Question # Job Audit Question
CSA Question # Requirement Documentation Requirement (Objective Evidence) Fail / N/A
1.1
Is contract review and advanced quality
1.2
3.1 planning, FMEA, Control Plans, etc., N/A
1.3
performed by qualified individuals?
1.4
Each part may have one or more requirements determined by the coating specification.
What are the product inspection 1.5
3.8 Parts must meet each requirement. List each requirement below and validate.
requirements? 2.13 2.14
(Listed below are some examples)
3.8.1 Requirement: Coating Thickness
Test Method:
Test frequency or quantity:
Selection of samples:
Specification:
Requirement: Corrosion Resistance (if
3.8.2
applicable)
Test Method(s):
Test frequency or quantity:
Selection of samples:
Specification:
Requirement: Hydrogen Embrittlement
3.8.3
Relief (if applicable)
Test Method:
1.2
Were steps/operations performed that were
3.11 1.4
not documented in the Control Plan?
1.6
1.2
If additional steps were performed, were 1.4
3.12
they authorized? 1.6
1.10
Packaging Requirements
2.6
3.17 Are packaging requirements identified? 2.7
29
Are parts packaged to minimize mixed parts 2.6
3.18 (for example, parts packed over height of 2.7
container)? 2.9
Shipping Requirements
2.3
3.19 Were the parts properly identified?
2.9
2.3
3.20 Were the containers properly labeled?
29
Related
Item # CSA Question Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
#
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
Impurity Content
1.4
Per chemical supplier recommendation such as:
A2.5 2.11
Manual Once per week*
- acid split (oil contamination)
2.12
- alkalinity ratio
There is a tank maintenance schedule for cleaning
A2.6 2.11 Manual Per preventative maintenance program
baths.
3.0 Rinse(s)
1.4
Pressure for spray rinse.
A3.1 2.11
Automatic/Manual Once every 8 hours
Agitation or flow for immersion tanks.
2.12
1.4
Continuous monitoring by controller.
A3.2 2.11
Temperature (if controlled) Automatic
Manually verify once per day.
2.12
A3.4 2.11 There is a dump schedule for rinses. Manual Per preventative maintenance schedule.
1.4
A4.1 2.11
Concentration Manual Once every 8 hours
2.13
1.4
A4.2 Concentration of Fe, per coating supplier. Manual Once per day
2.11
2.12
1.4
A4.3 2.11
Inhibitor (if used) Manual N/A
2 12
1.4
A4.4 2.11
Solution Level Manual Once every 8 hours
2 12
A4.5 Rinse - See Section 3.0.
1.4
A5.2
Concentrations of Al, per coating supplier. Manual Once per day
2 11
A5.3 Rinse - See Section 3.0.
Related
Item # CSA Question Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
#
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
Related
Item # CSA Question Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
#
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
Chemical Analysis:
- Phosphate: Free Acid, Total Acid, Iron Content, pH,
1.4
Accelerator Amount as Applicable
C3.3 2.11 Automatic/Manual Once every 4 hours
- Non-phosphate: Concentration, pH
2.12
- Chromate: Concentration, pH
- Non-chrome: Concentration, pH
1.4
C3.4 Fluoride Ion Concentration (if aluminum is being coated)Automatic/Manual Once every 4 hours
2.11
2 12
1.4
C3.5 1.6
Coating Weight/Thickness Manual Once every 8 hours*
2.11
1.4
C3.6 2.11 Crystal/Grain Size (If applicable) Manual Per customer requirement
2 12
Coverage of phosphate coating is visually inspected for
C3.7 Manual Once every 8 hours
absence of voids.
C4.3 2.11 There is a dump schedule for rinses. Manual Once per week
Related
Item # CSA Question Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
#
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
1.4
All guns are properly assembled (e.g., electrodes and Prior to the start of production and once
D2.4 2.11
Manual
deflectors are installed and not damaged). every 8 hours.
2.12
1.4
The voltage and the current setting of the spray gun is At start-up, every process change and once
D2.5 2.11
Manual
defined and verified for each process and part. every 8 hours.
2.12
For automatic systems gun settings are defined and
verified for each process and part.
1.4
- Deflector
At start-up, every process change and once
D2.6 2.11
Automatic
- Gun to part distance
every 8 hours.
2.12
- Number of guns
- Spacing of guns
1.4
The air dryer output temperature and dew point need Prior to start of production and once every
1.17
D2.7 to be measured. The filter on main compressed air line Automatic/Manual 4 hours. With a control alarm, frequency
2.11
needs to be monitored. may be reduced to once every 8 hours.
2.12
1.4
Prior to start of production and once every
1.17
D2.8 The booth temperature and humidity are checked. Automatic 4 hours. With a control alarm, frequency
2.11
may be reduced to once every 8 hours.
2.12
1.4
1.17 Prior to the start of production and once
D2.10 Every sieve is clean and operational. Automatic/Manual
2.11
every 8 hours.
2.12
1.4
Prior to the start of production and once
D2.11 2.11
The powder flow on sieve is monitored. Automatic/Manual
every 8 hours.
2.12
1.4
Prior to the start of production and once
D2.12 2.11
The feed hopper fluidizing air pressure is checked. Manual
every 8 hours.
2.12
1.4
Prior to the start of production and once
D2.13 2.11
The dust vent on feed hopper is checked. Manual
every 8 hours.
2.12
1.4
1.17 Prior to the start of production and once
D2.14 The reclaim sieve is operating properly. Manual
2.11
every 8 hours.
2 12
1.4
1.17 The venturis (orifice or block) in the feed pumps and the Prior to the start of production and once
D2.15 Manual
2.11
pick up tubes in the hopper are checked. every 8 hours.
2.12
1.4
The feed hoses are checked to ensure that they have Prior to the start of production and once
D2.16 2.11
Manual
no excessive bends and kinks. every 8 hours.
2 12
1.4
The virgin to reclaim powder ratio is defined for each
D2.17 2.11
part and/or process. Verified by feed pressures, weight Manual Once every 8 hours
2.12 or volume.
1.4
1.17 The pressure differential across the filters in the booth Prior to the start of production and once
D2.18 Automatic
2.11
collection chamber is monitored. every 8 hours.
2 12
1.4
Prior to the start of production and once
D2.19 2.11
Sealing Rinse (if applicable) Manual
every 8 hours.
2.12
Related
Item # CSA Question Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
#
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
1.4
1.6
Paint agitation/time and reduction (solvent package)
E2.3 Manual Once every 8 hours
1.17
are proper and documented.
2.11
1.4
Booth balance (air flow) is monitored and Prior to start of production, every process
E3.2 2.11
Manual
documented. change and once every 8 hours.
2.12
1.4
1.6
Booth temperature and humidity are monitored and Prior to start of production, every process
E3.3 1.17
Automatic/Manual
documented. change and once every 4 hours.
2.11
2.12
1.4
1.6
Atomizer parameters (fluid flow, air pressures Prior to start of production and every
E3.4 1.17
(atomizing fan, shaping), electrostatics and mixing) Automatic/Manual process change. For continuous operations
2.11
are set within operational limits. once per day.
2.12
For manual process, prior to start of
production and every process change.
1.4
E3.5 Time is verified and documented if applicable. Automatic/Manual
1.6
For automated process, verify once per
month, or after every program change or
4.0 Basecoat (If applicable)
1.4
Flashtimes between coats are set at suppliers At the start of production and every
E4.1 1.6 Automatic/Manual
recommended times. process change.
2.11
1.4
1.6
Booth temperature and humidity are monitored and Prior to start of production, every process
E4.2 1.17
Automatic/Manual
documented. change and once every 4 hours.
2.11
2 12
1.4
1.6
Atomizer parameters (fluid flow, air pressures Prior to start of production and every
E4.3 1.17
(atomizing fan, shaping), electrostatics and mixing) Automatic/Manual process change. For continuous operations
2.11
are set within operational limits. once per day.
2 12
For manual process, prior to start of
production and every process change.
1.4
E4.4 Time is verified and documented if applicable. Automatic/Manual
1.6
For automated process, verify 1 per month,
or after every program change or major
E5.4 1.17 Air filter (if used) change is scheduled. Manual Per preventative maintenance schedule.
1.4
1.6 Percent solids after pre-dry is at the suppliers
E5.5 Manual Once every 8 hours
2.11
recommended percentage.
2.13
6.0 Clear coat
1.4
1.6 Flashtimes between coats are set at suppliers At the start of production and every
E6.1 Automatic/Manual
2.11
recommended times. process change.
2 13
1.4
1.6
Booth temperature and humidity are monitored and Prior to start of production, every process
E6.2 1.17
Automatic/Manual
documented. change and once every 4 hours.
2.11
2 12
1.4
1.6
Atomizer parameters (fluid flow, air pressures Prior to start of production and every
E6.3 1.17
(atomizing fan, shaping), electrostatics and mixing) Automatic/Manual process change. For continuous operations
2.11
are set within operational limits. once per day.
2 12
For manual process, prior to start of
production and every process change.
1.4
E6.4 Time is verified and documented if applicable. Automatic/Manual
1.6
For automated process, verify 1 per month,
or after every program change or major
Related
Item # Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
CSA Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
1.4 Pretreated parts are visually inspected for cleanliness and/or uniform phosphate
F1.1 Manual Once every 8 hours
2.11 coating (when phosphate is used).
1.4 2.11 Oil contamination (Panel inspection for pin holes).
Once per month and if any visual defects are
F2.2 Manual
2.12 Oil bags must be available. observed.
1.4
Is bath circulation monitored.
Once every 4 hours. With a control alarm, frequency
F2.4 2.11
Automatic/Manual
(Flow meter, pressure gage) may be reduced to once every 8 hours.
2.12
1.4
Bag filters are in use (not by-passed) and pressures monitored. Filter bags
F2.5 2.11
changed before pressure differential exceeds 10 PSI. (70 kPa)
Manual Once every 8 hours
2.12 Filter mesh size must be 25 µm maximum.
1.4
F2.6 2.11
Flow over the weir is verified. Manual Once every 8 hours
2 12
1.4
F2.7 2.11
Bath is checked for microbial contamination. Manual Once every month*
2 12
1.4
Incoming DI / RO water is checked for cleanliness. (Conductivity <10 µS/
F2.8 2.11
Automatic/Manual Once every 8 hours
µmhos )
2.12
1.4
1.17 2.11 Paint racks and/or barrels are visually inspected for cleanliness, excessive
F2.9 Manual Each time parts are racked/loaded
paint build-up, bent hooks, etc.
2 12
1.4
1.17 2.11 There is a paint rack/barrel maintenance program. Program must define rack/
F2.10 Manual Per preventative maintenance schedule.
barrel cleaning intervals.
2.12
1.4
F2.11 2.11
Saddle contact cleanliness (if applicable). Manual Once every 8 hours
2 12
1.4
1.17 2.11
F2.12 There is a tank cleaning and maintenance schedule. Manual Once every year
2 12
1.4
F2.13 2.11
Confirmation of ash content (pigment to binder ratio). Manual Once per month
2.12
1.4
F2.14 2.11
Analysis of accumulation of metallic impurities. Manual Once every 6 months
2 12
3.0 Sealing Rinse (if applicable)
1.4
F3.1 2.11
The conductivity of the anolyte solution has been measured. Manual Once every 8 hours
2.12
1.4
F3.2 2.11
The pH of the anolyte solution has been measured. Manual Once every 8 hours
2.12
1.4
Oil contamination (Panel inspection for pin holes). Oil bags must be
F3.3 2.11
Manual Once every month
available.
2.12
1.4
F3.4 2.11
The anolyte solution is being circulated to each cell. Automatic/Manual Once every 8 hours
2.12
1.4
F3.5 2.11
Dump and clean schedule for anolyte is being maintained. Manual Per preventative maintenance schedule.
2.12
1.4
F3.6 2.11
Amperage draw has been checked on anodes. Automatic/Manual Per preventative maintenance schedule.
2 12
4.0 Rectifier
1.4 1.6 The proper voltage is being used for the load size. (Electronically Controlled
F4.1 Manual When each bar or rack enters the coating tank.
2.11 2.12 with digital read-out)
1.4
Once every 6 months or after any change or
F4.2 2.11
The ramp up time to full voltage has been verified. Automatic/Manual
maintenance of rectifier.
2.12
F4.3 2.10 There is a visual indicator to alert personnel when system is energized. Automatic Ongoing
1.4
1.17 2.11 Once per year or after any change or maintenance of
F4.4 The ripple of the rectifier has been checked by an approved electrician. Automatic/Manual
rectifier.
2.12
5.0 Rinse System
1.4
Immersion rinse tanks are operating at the proper levels and tanks are being
F5.1 2.11
Automatic/Manual Once every 8 hours
agitated correctly.
2.12
1.4
F5.2 2.11
There is sufficient permeate supplied to the rinse. Automatic/Manual Once every 8 hours
2.12
1.4
The pH and conductivity of the DI rinse water are measured. (If part of
F5.3 2.11
Manual Once every 8 hours
production process).
2.12
1.4
F5.4 2.11
Ultra filters are in use (not by-passed) and pressures monitored. Automatic/Manual Once every 8 hours
2.12
1.4
Bag filters are in use (not by-passed) and pressures monitored. Filter bags
F5.5 2.11
changed before pressure differential exceeds 10 PSI. (70 kPa)
Manual Once every 8 hours
2.12 Filter mesh size must be 25 µm maximum.
1.4
F5.6 1.17 2.11 Rinse tanks and related equipment are emptied, inspected and cleaned. Manual Per preventative maintenance schedule.
Related
Item # Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
CSA Question
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
1.4
G2.2 2.11
Incoming solids checks are performed. Manual Each new lot of paint
2 12
1.4
Appropriate mixing equipment is used, capable of
G2.3 1.17 Manual Ongoing
dispersing settled solids.
2.11
1.4
Prior to start of production and once every 3
G2.12 2.11
Volume (paint depth in coating vat). Automatic/Manual
hours.
2 12
1.4
Equipment surfaces in contact with wet coating (ex.
G2.13 2.11
Vibratory feed tables) are free of loose debris and Manual Once per day
2 12 excess coating build-up
1.4
G2.14 1.17 Basket condition (basket mesh clean and undamaged). Manual Once per day
2.11
1.4
Paint and/or viscosity reducing agent additions are
G2.15 2.11
documented and the viscosity verified before Manual Each addition
2.12 production continues.
G2.16 2.10 Viscosity cups are cleaned after each use. Manual Ongoing
1.4
G3.2 Baskets are kept less than 2/3 full by volume. Automatic/Manual Every lot
1.6
Coating parameters are controlled and verified via
1.4
G3.3 external display (dip time, spin speed, spin time, spin Automatic/Manual Every lot
1.6
cycle, spin direction and tumbling).
There is a system (raking, vibe table, etc.) to uniformly
1.4
distribute parts prior to curing to ensure proper cure
G3.4 1.6 Automatic/Manual Every lot
and prevent parts from sticking and minimize touch
1.17
marks
G3.5 2.10 Vibratory feed tables are cleaned (if used). Manual As needed
2 11
4.0 Cure (See Cure Process Table I)
Related
Item # CSA Question Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
#
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
1.4
H3.2 2.11
Pump pressure or agitator speed is monitored. Automatic/Manual Once every 8 hours
2 12
1.4
Temperature is monitored and controlled if
H3.3 2.11
required by chemical manufacturer's technical data Automatic/Manual Once every 8 hours
2 12 sheet
1.4
1.17 Per Chemical Manufacturer's
H3.4 There is a dump schedule. Manual
2.11
recommendation and production volume.
2 12
4.0 Cure (See Cure Process Table I)
Item # Related
Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
CSA Question #
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
1.0
Oven and part temperature profile is verified. The verification shall be performed
Once every 3 months and after oven modification or
I1.2 under production load conditions and with thermocouples located to cover all Manual
repair.
areas of the part curing window.
1.4 1.6 For each coating in use, proper cure or drying time parameters are verified based Once every 3 months and after oven modification or
I1.3 Manual
2.11 2.12 upon oven temperature profile and product technical data sheet. repair.
1.4
1.6
For manual process, prior to start of production and
Conveyor speed set point is verified. If conveyor is not used, time in oven is
I1.4 1.17 2.11 verified. Automatic/Manual every part change. For automated process, at the
2 12
Per oven manufacturer, filter supplier
I1.5 Air filter (if used) change is scheduled. Manual
recommendation.
Related
Item # CSA Question Category/Process Steps Type of Control Monitoring Frequency Observation/Comments
#
Minimum Requirement Actual Condition Minimum Requirement Actual Condition (Pass / Fail / N/A)
1.4
J2.1 2.11
Solution Level Automatic or Manual Once every 8 hours
2.12
1.4
Contamination accumulation/build up on side
J2.2 2.11
Manual Visual Once per week *
of tanks
2.12
1.4
There is a process for control of biological
J2.3 2.11
Manual Once per week *
contamination
2 12
1.4
Pressure for spray rinse.
J2.4 2.11
Automatic/Manual Once every 8 hours
Agitation or flow for immersion tanks.
2 12
1.4
Continuous monitoring by controller.
J2.5 2.11
Temperature (if controlled) Automatic
Manually verify daily.
2.12
For manual process, prior to start of
1.4
production and every process change.
J2.6 2.11
Time Automatic or Manual
2.12 For automated process, verify after every
program change or major maintenance.
Cleanliness of last rinse
1.4
- alkalinity/pH/conductivity
J2.7 2.11
- visual inspection for oil or suspended Manual Once per day
2.12 contaminants
- overflow
J2.8 2.11 There is a dump schedule for rinses. Manual Per preventative maintenance schedule.
1.4
J3.7 2.11
Debris in bottom of tank Manual Once per day
2 12
4.0 Chemical Etch / Strip (alkaline or acid)
1.4
Continuous monitoring by controller.
J4.1 2.11
Temperature (if applicable) Automatic or Manual
Manually verify daily.
2 12
1.4
J4.2 2.11
Concentration Manual Once per day *
2 12
1.4
Contamination:
J4.3 2.11
Manual Once per day *
For alkaline: aluminum content
2 12
1.4
Contamination accumulation/build up on side
J4.4 2.11
Manual Once per week
of tanks
2 12
1.4
For acid etches only:
J4.5 2.11
Ratio (Total Acid/ Free Acid = Ratio)
Manual Once per day *
2.12 For acid: fluoride content
For manual process: every load.
1.4
J4.6 2.11
Time Automatic or Manual
For automated process, verify after every
2.12
process change or major maintenance.
1.4
J4.7 2.11
Agitation (Consistent Across tank) Automatic Once every 8 hours
2 12
1.4
J4.8 2.11
Solution Level Automatic or Manual Once every 8 hours
2 12
1.4
J4.9 2.11
Debris in bottom of tank Manual Once per day
2 12
5.0 Bright Dip
Continuous monitoring by controller with
1.4
low temperature alarm. Manually verify
J5.1 2.11
Temperature Automatic or Manual
prior to start of production and once every
2.12
4 hours
1.4
J5.2 2.11
Acid concentration Manual Once every 4 hours
2 12
1.4
J5.3 2.11
Specific gravity Manual Once every 4 hours
2 12
1.4
J5.4 2.11
Contamination: aluminum content Manual Once per week
2 12
1.4
Contamination accumulation, suspended
J5.5 2.11
Manual Once per day
solids
2 12
1.4
J7.6 2.11
Agitation (Consistent Across tank) Manual Once every 8 hours
2.12
1.4
J7.7 2.11
Solution Level Automatic or Manual Once every 8 hours
2.12
1.4
J7.8 2.11
Debris in bottom of tank Manual Once per week
2 12
For manual process: every load.
1.4
Voltage or Amperage with Gradual Ramp Up
J7.9 2.11
Automatic or Manual
(Current Increase) For automated process, verify after every
2.12
process change and major maintenance.
1.4
J7.10 2.11
Saddle Contact Cleanliness Manual Once every 8 hours
2 12
8.0 Dye
1.4
Continuous monitoring by controller.
J8.1 2.11
Temperature Automatic
Manually verify daily.
2.12
1.4
J8.2 2.11
Concentration Manual Once per day *
2.12
1.4
J8.3 2.11
pH Manual Once every 8 hours *
2.12
For manual process: every load.
1.4
J8.4 2.11
Time Automatic or Manual
For automated process, verify after every
2.12
process change or major maintenance.
1.4
J8.5 2.11
Agitation (as applicable) Automatic Once every 8 hours
2.12
1.4
J8.6 2.11
Solution Level Automatic or Manual Once every 8 hours
2.12
1.4
J8.7 2.11
Debris in bottom of tank Manual Once every 8 hours
2.12
1.4
There is a process for control of biological
J8.8 2.11
Manual Once per week *
contamination.
2.12
9.0 Pre-Seal (If applicable)
1.4
Continuous monitoring by controller.
J9.1 2.11
Temperature (if applicable) Automatic or Manual
Manually verify daily.
2.12
1.4
J9.2 2.11
Concentration Manual Once per week *
2.12
1.4
J9.3 2.11
pH Manual Once every 4 hours *
2 12
For manual process: every load.
1.4
J9.4 2.11
Time Automatic or Manual
For automated process, verify after every
2.12
process change or major maintenance.
1.4
J9.5 2.11
Agitation (as applicable) Automatic Once every 8 hours
2 12
1.4
J9.6 2.11
Solution Level Automatic or Manual Once every 8 hours
2.12
1.4
J9.7 2.11
Debris in bottom of tank Manual Once every 8 hours
2.12
10.0 Seal (if Applicable)
Related
Pretreatment/ Powder Calibration / Certification Included in Preventative
Item # CSA Question Equipment Type E-Coat Spray Dip/Spin A-Coat Cure Anodize Verification Frequency Comment
Aqueous Cleaning Coat Frequency * Maintenance Plan
#
PROCESS EQUIPMENT
K1.1 2.14 pH / Conductivity Meter X X X X X X Daily Once per year
pH / Conductivity Probe
K1.2 2.14 Solution compatible probes must be X Before each use N/A
used.
K1.3 2.14 Temperature Controller X X X X X X X X Every 3 months N/A
Wet Analysis:
K1.6 2.14 Before use, chemicals must be X X X X X X Daily N/A
checked for shelf life and/or expiration
d t
K1.7 2.14 Filters X X X X X X X Per process table N/A
K1.8 2.14 Laboratory Balance (Weight Scale) X X X X Once per month N/A
Related
Item # Category/Process Steps Monitoring Frequency Observation/Comments
CSA Question #
1.0
Procedures are in place to prevent damage to the finish or part during the
L1.1 1.4 System in place
inspection and packaging processes.
Initial adhesion
L1.3 At the start of production and once every 8 hours.
(Tape, bend, impact)
L1.5 Color and Gloss (If applicable) At the start of production and once every 8 hours.
L1.9 Dimensional check (e.g., Go-no go, Plug and Ring gage) Per customer specification