Sie sind auf Seite 1von 2

CURRICULUM VITAE

CAREER OBJECTIVE:
To pursue a career in progressive organization that provides opportunities for
career growth and professional development in order to groom the overall
personality.

PERSONAL PROFILE:
Name: MOHAMMAD KASHIF
Father’s Name: Ghulam Qasim Khera
Date of Birth: 19th September 1976
N.I.C.: 45502-8403329-7
Domicile: Muzaffar Garh(Pakistan)
Marital Status Married
Contact #: 00966-540902206
E-Mail: Muhammad.kashif@safwacc.com
Address: Alsafwa Cement Company,
P.O Box 52904 Jeddah
11221 Kingdom of Saudi Arabia.
ACADEMIC HISTORY:
Qualification Institute
B.E. (Chemical) N.F.C. I.E.T. Multan
F.Sc. Government Islamia Science College, Sukkur
H.S.C. Government High School, Rohri

PROFESSIONAL HISTORY:
A. Al Safwa Cement Company (Polysius Plant having capacity of 5350 tpd, A Project
of LafargeHolcim Group).
Now Working as a Cement & Additive Manager (Managing Cement Operation,
Production Spares (Refractory & Media) & arranging Additives (Raw
Materials).(Planner, Performance Costing Analytical Engineer) Since Dec 2009-till
now.
 Participated in commissioning of plant and PGT activities.
 Participating in preparing Production Annual Budget as per Sales
Targets.
 Member of four Safety & Operational committees in plant (Confined
Space, WAH, RCA & Reliability Committee).
 Planning of Kiln/Mills shutdowns (necessary tools, stocks of
materials as per shutdown plan, arranging the Contractors for
repairing job).
 Involve in plant performance activities and guide sub ordinates to get
quality production targets in minimum cost and safe way. Developed
KPI’s to analyse the mills performance (for production and utilization
of media).
 Develop and manage the strategies, plans and budgets as agreed with
the Plant director to achieve the organizational and financial objectives
of the company. This includes working closely with the Maintenance &
Production team in the drafting and agreeing of strategy, Optimized
Operation and budget
 To ensure targets and objectives within each area of the business
are met and well define to working teams.
Page 1 of 2
 Effectively manage labor requirements/manpower planning, production
planning, stock management , instrumentation calibration, plant
modifications and develop innovative systems and processes utilizing all
available technology
 Daily preparing production targets & KPI’s status as daily, monthly
and annually to motivate or clear vision for operation team involve in
daily operation.
B. Serving in Riyadh Cement Company, Riyadh , as a Production Clinker
Engineer.(Reporting to Production Manager)
Since October 2007 to Nov 2009. Plant having capacity of 5000 tpd. Participated in
plant commissioning.
i) Regular
o Attend all abnormalities in the Plant without loss of time & coordinate
with the Maintenance Departments about shut down jobs.
o Achieve Operational Parameters & Production Targets.
o Assign responsibilities to subordinates and monitor their performance.
o Ensure that supervisors and workers observe norms of discipline.
o Supervise the manufacturing of Daily Production Report.
o Keep Manager Production informed on all activities/problems and seek their
advice where necessary.
o Ensure adherence to the safety & quality standards.
ii) Occasional
o Supervise clogging removal, refractory work in area.
o Member of the monthly stock taking committee.
o Perform many other function as may be assigned by Manager
C. Serving in Bestway Cement Ltd. Chakwal , as Kiln Area Incharge (Sr.
Assistant Manager) since April 2006 to September 2007,Plant having capacity of 6000
tpd. Participated in plant erection & commissioning.
Specific to job are followed:
i) Regular
o Attend all abnormalities in the Kiln without loss of time & coordinate
with the Maintenance Departments about shut down jobs.
o Achieve Operational Targets & Plan schedule maintenance activities.
o Assign responsibilities to subordinates and monitor their performance.
o Work as a kiln operator due to lack of kiln operator in different intervals (To
imporve Operation knowledge & Lack of Operators).
0

D. Served in Thatta Cement Co. Limited (Plant by Mitsubishi Japan) as


Assistant Manager (Production) since April 2004(Join as trainee Engineer) to
March 2006.
Trainings and Courses:
A. In 2009 (08 days) Expert optimizer training from ABB switzerland.
Application Software:
JDE for inventory, VAS for Packing Operation, Windows 95/98/2000/XP &
window 7 & MS Office.
Languages:
English, Urdu, Arabic & Punjabi.
Refrences:
Mr. Syed Ameen ud din Mr. Aftab Izhar
Manager Production Manager (Project & Optimization)
Alsafwa Cement Company Al Safwa Cement Company
00966541744924 00966548810585

Page 2 of 2

Das könnte Ihnen auch gefallen