Sie sind auf Seite 1von 4

Curriculum Vitae

Life motto:
Address: “The crowning fortune of a man is to be
Mohalla Gung Sharif, born to some pursuit which finds him
employment and happiness, whether it
House # B-111/207,
be to make baskets, or broadswords, or
I/S Farid Gate Bahawalpur, canals, or statues, or songs.”
PAKISTAN ― Ralph Waldo Emerson
Contact Details:
“Happiness does not come from a job. It
+923335281095 (Pakistan) comes from knowing what you truly
Email : shair1018@gmail.com value, and behaving in a way that’s
consistent with those beliefs.”
― Mike Rowe

Engr. Muhammad Shair


B.E. Chemical Engg. (Hons.)

1. Professional Career Exposure


Total of 11 years + as being “Process Engineer” in Production Department.
Institution / Company & Designation & Details of
Address Duties & Responsibilities service
KOHAT CEMENT Deputy Manager (Production) From
COMPANY LIMITED  Working as a Second Incharge of production dep’t to look after all three
production lines May 2016
Rawalpindi Kohat Road.  DPR Preparation with all daily, monthly and yearly reports like to
stoppages report, fuel and energy consumption report, Refractory
Till the date
consumption report, Grinding media consumption report, Monthly stock
report, Monthly Environmental report.
 To handle Process Measurement, Heat Balance, Energy Balance.
 Preparation of SOP’s and Works Instruction with ISO standards.
 To monitor inventory of refractory and grinding media and to manage
their stock in ERP system.
About the Company  To manage planned shutdown as well as unplanned shutdown jobs, also
manage manpower.
Three Clinker Production Lines  To optimize the process to achieve the set targets of energy and power
[Two 6700 & 2000 TPD (OPC), consumption of the plant.
One 350 TPD (White Clinker)]  To monitor quality parameter of OPC & White clinker and cement.
Two Cement Mills (Ball Mills) with  Responsible to plan training schedule of production dep’t manpower.
Roller press Operation of Capacity
3900 TPD. 30 TPD White Cement
Ball Mill.

NORTHERN REGION Optimization & Planning Engineer.(Raw Mill & Kiln)


CEMENT CO. NRCC Production Department From
 Process Measurement(Flue gases and Flow rates, Heat Balance, cooler April 2014
efficiency, separator efficiency, Temperature, Pressure) & Optimization
of process Parameters,
to
 Daily Production Reports, Stock analysis reports May 2016
 Monitoring & Adjustments based on stock control system
 Evaluation on daily progress on production activities
Employee detail
 Proposal submission on every possibility of production target
About the Company improvement with a high efficiency. ENO: 1165
Northern Region Cement  Identifying the customized daily work requirements for a better Grade : 08
Company Turaif Saudi Arabia improvement of plant running and cost controlling events such as short- Rank : 04
Two Clinker Production Lines terms and long-terms shutdown activities of the Plant. Level : Senior
[6000 (OPC) & 3000 (SRC) TPD]  Pre-planning on the improvement of production , controlling, and
supplied by CNBM China. minimizing of breakdown or damages, or any other emergency alerts on
Promotion
stoppages of Raw mills, Kilns, Cooler, Cement Mills, and Packing

Engr. Muhammad Shair – Doc\PP\CVupdt20150907 1


Two Cement Mills (Ball Mills) with plant including all the supporting plant labour activities Appraisal B+
Roller press Operation of Capacity  Planning of annual planned shutdown activities and preparing work flow
6000 TPD each by CNBM China schedule for maintenance of Preheater, Kiln & Clinker Cooler refractory
work
 Arrangement & maintenance of process measuring instrument
 Planning and Optimization of refractory material for shutdown and
maintain the refractory consumption inventory on yearly basis
 Inspection and monitoring of Central Control Room (CCR) routine live
activities, and its related production parameters, diagnosing any
affections, machinery running-hours problems, trouble shooting, energy
consumptions, assets management, material consumption in the
production during the operation of the plant, and its factors in failures.
 Supportive works, and planning schedules weekly basis to improve the
efficiency of reports submission such as DPR, Daily Production Reports,
Sales Reports, SAP updates, Monthly Stock Reports, maintaining and
minimizing of differences from the actual using standard & ISO
methods.
 Meeting the factors to fulfil NRC quality policy and QMS standard
 General updates on Security, Safety and applicable of PPE
improvements
 Researching the possibility of best quality cement products- OPC, SRC,
& PPC
 Coordination with inter-departmental heads, Mechanical,
Electrical/DCS, PPM, and Mining for its best utilities and movements
 Yearly Planning, Monthly Planning for production targets
Institution / Company & Designation & Details of
Address Duties & Responsibilities service

Shift Engineer
BESTWAY CEMENT June 2005 ~ Dec 2009
COMPANY
Area in charge Raw Mill and Cement mill
Dec 2009 ~ April 2014

From
Production Department
June 2005
 Overall of supervision and activities controlled for better development of
daily Clinker and Cement Production to
Bestway Cement Limited
 Routine inspection daily basis to encounter the production activities April 2014
Bestway Building including all types of mechanical, electrical equipments operations
19-A, College Road  Studying of feasibility on different reports issued by departmental heads
for failure analysis of existing breakage, stoppage, and alerts. Employee detail
F-7 Markaz
 Daily Production Reports, Sales reports, Stock analysis reports ENO: 1018
Islamabad 44000  Daily tool-box meeting with sub coordinators, employees for purpose of Grade : C
PAKISTAN finding technical solutions for all level problematic activities at raw mill, Level : Senior
Kiln, Cement mill.
 Monitoring & Adjustments on production parameters which are to be
controlled by Control Room and operators Promotions
 Evaluation on daily progress on production activities submitted by shift Junior Engineer
engineers, and section in charge. Assistant Manager
About the company
 Identifying the customized daily work requirements for a better Sr. Asst. Manager
4000 TPD OPC Clinker improvement of plant running and cost controlling events such as short-
Production Line Supplied by MHI terms and long-terms shutdown activities of the Plant.
JAPAN.  Supportive works, and planning schedules weekly basis to improve the
efficiency of reports submission such as DPR, Daily Production Reports,
Cement Mill (Ball Mill) 4800 TPD Sales Reports, ERP updates, Monthly Stock Reports.
supplied by Fuller Germany.  Labours and planned schedule for duty deployment based on plant work
requirements, and adjustment are carried out on emergency alerts.
 Manipulating and proposing of the running machinery and equipments
efficiency and accuracy on timely.
 Researching the possibility of best quality cement products- OPC.
 Coordination with inter-departmental heads, Mechanical,
Electrical/DCS, and Mining for its best utilities and movements

Engr. Muhammad Shair – Doc\PP\CVupdt20150907 2


2. Professional Education Qualification & Technical Skills & Competency

College / University Major / Curriculum GPA / Award Year obtained


Graduated in Chemical
Engg. in 1st Division.
BZU Multan, Pakistan Chemical Engineering 1999 ~ 2003
PEC Registration No
(CHEM/5308 )
Internship & Training offered
Paksaudi Fertilizer, Mirpur Mathelo 2001 (06 wks)
Pakarab Fertilizer Multan 2002 (04 wks)
Technical Training on Pressure Vessels and Heat Exchanger at HMC Taxila by PEC
English Language Course 8 weeks conducted by NUMAL University.
Two days Training on Conservation of Energy in Cement Industry
Microsoft Office Application (Word/Excel/PowerPoint / Access/Outlook) & Internet
Customized Industrial Application software – ERP / SAP /IMS

3. Interpersonal Skills & Technical workable knowledge


 To verify process parameters (temperature, pressure, gas velocity).with help of manometer, Pitot tube,
digital pyrometer and portable flue gas analyzer.
 Handsome knowledge of tuning parameters of pressure, flow and temperature Controllers.
 Knowledge of fire detection, fire prevention and fire extinguishers and operational safety.
 Immense flexibility handling a variety of tasks and shift priorities simultaneously.
 Able to finalize and issue technically correct and quality engineering specifications in accordance with
established design standards.
 Be able to work with engineering subcontractors to ensure full and correct delivery of detailed
engineering and its integration.
 Hands on experience in preparation of effective work flow, Process Documentation according to the
requirements of the Process Quality Plan.
Responsibilities & assignment Completed
 Responsible to prepare Failure Analysis report of any breakdown of the plant and study of root cause of
breakdown with Remedial proposal.
 Responsible to Monitor the stocks of raw material, clinker and cement on monthly basis and also conduct
annual audit of department with external auditor.
 Responsible to inspect and verify the operational parameter of the plant like Temperature, Pressure and
flow measurements and Optimize process parameters to achieve set targets of production of Kiln and RM
 Responsible to inspect kiln shell temperature on daily basis and prepare comparison data of shell
Temperature and manage the refractory brick life and their replacement schedule.
 All aspects of the process engineering during the conceptual, preliminary and detailed design phases
 Prepared and implemented standards operating procedures (sop’s) for startup and shutdown others plant
related trouble shooting activities.
 Coordination with other departments for safe and smooth operation of plant.
 To plan plant annual shutdown activities i.e. refractory work at kiln, cooler and pre-heater and also manage
to plan opportunity shutdown jobs with coordination of other departments.
 Optimized PIDs and Fuzzy operation to Optimize fuel consumption (Kg/Ton of CK) and power
consumption (KWH/Ton of cement).
 Worked on the WHRPP project at Bestway Cement Ltd Hattar Plant with Chinese Company DALIAN
EAST NEW ENERGY DEVELOPMENT CO.LTD as a Process Engr.
 Member of ISO certification team as an internal auditor.
 Worked as a Team Member for the project of TDF at NRCC Saudi Arabia.

4. Specific Interpersonal skills

Engr. Muhammad Shair – Doc\PP\CVupdt20150907 3


 The ability to manage personal reactions and attitudes towards responsibilities and challenges in work and life.
 To comprehend, understand and profit from experience.
 Reasonable self-awareness and self-control, good planning, time management, ability to think abstractly, problem solve,
flexibility in changing ambience and situations, and the ability to adapt.
 Ability to recognize gaps in knowledge, skills and competence.
 Strong self-motivation and drive to comprehend new ideas.
 Ability to create, plan for and achieve personal and professional goals. To set realistic and clearly defined long-term and short-
term goals.
 Willing, tenacious, and motivated to commit and be obligated to achieve goals and persevere towards those goals.
 Ability to communicate motivates, inspire and build trust among colleagues and collaborators.
 Capacity or ability to lead, direct, guide, and manage in an efficient way.
 Capacity to recognize and respect the beliefs, practices, cultures, traditions, principles and positions of others.
 Effective verbal communication skills: to inform, present, teach, motivate, inspire, and persuade.
 Effective written communication skills: for essays, project descriptions, thesis papers, etc.
 Effective listening skills, ability to get the message across, assertive communication, control over the flow of communication,
focus on stated goals, fluid and dynamic in interpersonal communication.

5. Personal details

a. Full Name : Muhammad Shair


b. Father’s name : Allah Ditta
c. Nationality : Pakistani
d. Date of Birth : 1978-09-04
e. Civil Status : Male / Married : 02 Kids
f. Religion : Islam
g. Passport Number : EJ5191281
h. Address : Mohalla Gung Sharif, House # B-111/207, I/S Farid Gate Bahawlpur,
i. Languages proficiency : English / Urdu
: English Language
Reading / Writing / Listening Very Good
Urdu Language
Reading / Writing / Listening Excellent

I do hereby declare that above details furnished by me is true and correct, and all original certificates, and all
credential will be provide upon of request at the interview.

Thanking you,
Yours faithfully,
Engr Muhammad Shair.

Engr. Muhammad Shair – Doc\PP\CVupdt20150907 4

Das könnte Ihnen auch gefallen