Sie sind auf Seite 1von 4

DAMANSARA – SHAH ALAM ELEVATED EXPRESSWAY (DASH)

ENVIRONMENTAL ASPECT AND IMPACTS REGISTER

Construction Package TCS Approved by (Name, Designation)


Process/Location TP Canopy (TP1, TP2, & TP3) Approval Date

Situation Env. Final


No Activity Identify Aspect Identify Impact Concern LOR Counter Measures Ranking Action By
N A E
(H/M/L) (H/M/L)
Construction Package TCS Approved by (Name, Designation)
Process/Location TP Canopy (TP1, TP2, & TP3) Approval Date

Situation Env. Final


No Activity Identify Aspect Identify Impact Concern LOR Counter Measures Ranking Action By
N A E
(H/M/L) (H/M/L)

1 Fuel / oil leakage or A Mobilization / Soil contamination / 20(H) Yes Regular service 6(M) Project
spillage demobilization / Water Pollution -EQA 74,PART machinery Team
operation of IV, Section 23
machineries Subsection (1)

2 Generation of waste N Domestic waste Unmanaged waste 12(M) No As per DOE 3(L) Project
from human disposal requirement Team
activities

3 Generation of noise & N Machineries Noise Pollution 9(M) Yes Noise Monitoring 3(L) Project
vibration operation / -EQA 74,PART Team
movement IV, Section 23
Subsection (1)
Construction Package TCS Approved by (Name, Designation)
Process/Location TP Canopy (TP1, TP2, & TP3) Approval Date

Situation Env. Final


No Activity Identify Aspect Identify Impact Concern LOR Counter Measures Ranking Action By
N A E
(H/M/L) (H/M/L)

Legend:-Situation → N: Normal A: Abnormal E: Abnormal Evalution → H: High M: Medium L : Low

Prepared by: Verified by:

Name & Signature: Name & Signature:

Designation: Designation:
Date: Date:
Construction Package TCS Approved by (Name, Designation)
Process/Location TP Canopy (TP1, TP2, & TP3) Approval Date

Most Likely 5 (M) 10(M) 15(M) 20(M) 25(M)


The most likely result of the 5
hazard/event being realized
Likehood of Occurence

Possible 4(M) 8(M) 12(M) 16(M) 20(M)


Has a good chance of occuring 4
and is not unsual
Conceivable 3(M) 6(M) 9(M) 12(M) 15(M)
Might be occur at some time in 3
future
Remote 2(M) 4(M) 6(M) 8(M) 10(M)
Has not been known to occur 2
after many years
Inconceivable 1(M) 2(M) 3(M) 4(M) 5(M)
Is practically impossible and 1
never occured
Scale & Impact 1 2 3 4 5
ConsequencesSeverity Of

Limited Minor Moderate Serious Very Serious


Impact to minimal area Effects on biological or Short term effects but Medium term Long term environmental
of low significance physical environment not affecting environmental effects impairment of ecosystem
ecosystem with irreversible impact

Legal/Policy/Other - Effecting Policy & Potential breach of Actual breach of Serious breach of
performance regulations regulations regulations
Reputation - - Potential for internal Potential for external Complaints from various
complaint/ non- complaint stakeholders
conformance