Sr.DGM-Designs
PEBS PENNAR , HYD.
ENGINEERING WORKS COMPLETED BEFORE DESPATCH OF
MATERIAL TO SITE i.e.
1. DESIGNS & ESTIMATION
2.DETAILING
3.SHOP DRAWING
4.MANUCFACTURING AT PLANT
ERECTION PLANNING, REQUIRED TOOL, CRANE , MAN POWER
ETC.
STRUCUTRAL MEMBERS:-
BASE PLATE
COLUMN
RAFTER
CRANE GIDER
BRACING
MEZZANINE FLOOR
SECONDARY MEMBERS:-
PURLINS
GIRTS
GUTTER
SAG ANGLE
BUILT UP SECTION
PLATES
GAS CUTTING OF PLATE
WELDING OF BUILT UP SECTION
WELDING OF BUILT UP SECTION
SUB MERGED WELDING OF BUILT UP SECTION
COLD FORM SECTION
Z-SECTION , DEPTH 100,150,200,250,300
THICNESS : 1.5,2,2.5,3.0
Z-SECTION ARE USED AS CONTINEOUS BEAM
1. SAG ROD & SAG ANGLE PROVIDE LATERAL SUPPORT TO
PURLIN & GIRTS
2. SAG ANGLE ARE COLD FORM ANGLE SECTION -45X30X2.0
3.SAG ROD DIA12MM
FLANGE BRACING
FLANGE BRACING
1. PROVIDES LATERAL & TORSONAL RESTRAINT TO MEMBERS
2. STRAIGHT SECTION
3.STEPPED COLUMN
4. LACED COLUMN
MANUAL OPERATED CRANE – 0.5MT TO 5MT
PURPOSE:-
BRACING RESIT THE GABLE END WIND,
SEISMIC FORCE
CRANE LONGITUDINAL SURGE
TWO TYPES:- FRP , POLYCARBONATE
THICKNESS 1.5MM, 2MM
DAY LIGHT TRANSMISSION THROUGH IT
NATURAL LIGHTING SYSTEM
DIA 300MM,600MM, 900MM
TURBOVENT ARE WIND DRIVEN
RIDGE VENT 300, 600, 900 THROAT
REMOVAL OF SMOKE & HOT AIR
M.Tech & B.Tech Level
IIT Madras
NIT Warangal
IIIT Hyderabad
JNTU – Hyderabad
AU college of engineering
THANK YOU
Mohammad Rahmatulla