Beruflich Dokumente
Kultur Dokumente
Girder (Stations)
Occupa
no. of ncy
Durati No. of Area of
Total Total Total Total Total seg- days Repeat
Category Span length Category on sets shutteri Rate Amount
spans girders concrete shuttering nos. ments / for ation
(days) req. ng req.
month shutteri
ng
T-girder at 13.90 m 35 280 2199.88 12034.34 T-girder (13.90m span) 280 308 27 10 9 31 386.82 6400 2475636 80kg/sqm
platform level 17.00 m 28 224 2115.09 11869.71 T-girder (17.00m span) 224 308 22 10 8 28 423.92 6400 2713078
I-girder at 13.90 m 35 210 1336.13 9151.83 I-girder (13.90m span) 210 308 20 10 7 30 305.06 6400 1952390
concourse
level 17.00 m 28 168 1298.05 8923.98 I-girder (17.00m span) 168 308 16 10 6 28 318.71 6400 2039767
Total :- 882 6949.15 41979.87 9180871
e value
Rate
15225
15225
15225
15225
e value
60
210
55
lk head:
- Bulk head
- sides
Rate
15225
15225
15225
Pilecap concrete & shuttering (Viaduct spans)
Pier Total Total
Sr. Pier id Description Total nos. Remarks nos / cap Total nos.
category conc. shuttering
Normal pier (Height
1 P Typ-1 136 6367.25 4993.92 (5.1 x 5.1 x 1.8) 4 544
≤ 12.5m)
Normal pier (Height
2 P Typ-2 10 468.18 367.20 (5.1 x 5.1 x 1.8) 4 40
12.5 to 14.5m)
Normal pier (Height
3 P Typ-3 5 390.85 237.24 (6.59 x 6.59 x 1.8) 5 25
14.5 to 16m)
Normal pier (Height
4 P Typ-4 0 0.00 0.00 (6.59 x 6.59 x 1.8) 5 0
> 16m)
Cantilever pier
5 CP Typ-5 42 3283.16 1992.82 (6.59 x 6.59 x 1.8) 5 210
(Height ≤ 11.5m)
Cantilever pier
6 CP Typ-6 12 958.39 596.16 (5.1 x 5.1 x 1.8) 6 72
(Height > 11.5m)
Portal pier (Height ≤
7 PP Typ-7 19 1779.08 1395.36 (5.1 x 5.1 x 1.8) 8 152
12m)
Portal pier (Height >
8 PP Typ-8 14 1310.90 1028.16 (5.1 x 5.1 x 1.8) 8 112
12m)
Sabarmati river pier
9 RP Typ-9 0 0.00 0.00 Well foundation 0
(all height)
Total :- 238 14557.83 10610.86 1155
Pile length
750
6300
34650
Pile length
1800
1800
1800
1800
1800
1800
1800
Pile length
2400
15000
Typical calculations of shuttering & concrete
Mega Tender (671 crores)
Pile dia = 1.2 m RL to cap t 3.085
Pilecap
Pier Pier Ground Soffit Pier cap Foundn Pier ht.
Pier mark Rail level
no. id lvl level top top "H" Category Concrete Shutt.
Thaltej
1 64.773 58.323 63.683 50.001 49.501 61.143 9.142
gam
2 Thaltej 71.655 65.205 70.565 56.435 55.935 68.025 9.590
Door-
3 darsha 68.355 61.905 67.265 52.296 51.796 64.725 10.429
n
Guruku
4 64.290 57.840 63.200 49.590 49.090 60.660 9.070
lGuj.
5 18.627 12.177 17.537 0.000 -0.500 14.997 12.997 Portal
uni.
Comm.
6 14.590 8.140 13.500 0.000 -0.500 10.960 8.960
6 road
Stadiu
7 14.590 8.140 13.500 0.000 -0.500 10.960 8.960
m
Total :- 120.7594
Pier column Piercap
Span
Span Land-mark
Category Concrete Shutt. Category Concrete Shutt. length