Sie sind auf Seite 1von 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

3
- LEGEND
A 1050 A
EX. EXISTING
PLATFORM TOG TOP OF GRATING
GRATING SPAN DIRECTION

PO

3
ST
ST

PO
2
NOTES
BEAM 3 1. FOR DEWATERING BUILDING NOTES REFER TO DRAWING 552089265.
EX. PLATFORM BEAM 2. ALL DIMENSIONS TO BE CHECKED ON SITE PRIOR TO FABRICATION.
TO REMAIN. PL20 (AL)
EX. PLATFORM BEAM
TO REMAIN. PL20 (AL)

B B

STRINGER 2 TO BEAM 4
REFER TYPICAL BEAM
CLEAT PLATE DETAIL
PLATFORM

BEAM 2
ALL NEW MEMBERS TO BE P20 (AL) UNO

BEAM 4
1590

STRINGER 2

BEAMS - STRINGERS - POSTS


C C

TREADS
EX. PLATFORM BEAM

600
TO REMAIN. PL20 (AL)

BEAM 1
D D

25 GRATING STRINGER 1
1
ST

OVERHANG
PO

AT STAIRS 1 10 THICK CLEAT PL.


2-M16 GR 316 SS
- (A4-70) BOLTS

NEW ACCESS PLATFORM PLAN

BE
BEAM

AM
(2 OFF REQUIRED)
GRIND WEB WELD
SCALE 1:10 (A1)

70
FLUSH FOR BEAM
CLEAT AT STRINGER 2
E E

SIDE-OFFSET MOUNTED ALUMINIUM ST

POST
RI
TUBULAR HANDRAIL "WEBFORGE" NG
OR APPROVED EQUAL TYP. ER
2

VIEW 3
SCALE 1:10 (A1) -
F
TYPICAL BEAM CLEAT PLATE DETAIL F

1050 1290
PLATFORM 25 GRATING 6 x 215 GOINGS
OVERHANG
ALUMINIUM GRATING
AT STAIRS
"WEBFORGE A325APM"
OR APPROVED EQUAL 86

TOG NEW ACCESS


MITRE CUT AND CPBW.
PLATFORM
GRIND WEB FLUSH
FOR BEAM CLEAT AT
STRINGER 2
G G

215mm TREADS
C:\users\mckeowm\appdata\local\projectwise\jacobs_anz_ie\d0259851\ IH173800-0000-ST-DRG-3065.dwg - Plotted by MckeowM on 2019.10.17 at 09:45

BEAM1
BEAM "WEBFORGE T6-A325APM" AS CONSTRUCTED DETAILS FOR REV. .
BEAM 3 (BEHIND) OR EQUAL BOLTED TO
STRINGERS IN ACCORDANCE I CERTIFY THAT THE "AS CONSTRUCTED" DETAILS
WITH MANUFACTURERS SHOWN ON THIS PLAN ARE A TRUE AND ACCURATE
POSTS 1, 2 & 3
REQUIREMENTS TYP. RECORD OF THE WORKS.
200 x 90 x 10 THICK CAP
(BEHIND)

PLATE WITH 2-M16 GR 316 SS SIGNATURE: DATE:


POST 1

POST 2

POST 3

(A4-70) BOLTS
G

NAME:
SIN
NO

RPEQ No.:
18

7 x 200 RISERS

POST 2 (BEHIND) & POST 3


200 x 90 x 10 THICK BASE COMPANY NAME:
1400

H PLATE WITH 2-M16 GR 316 SS H


(A4-70) BOLTS TO EX. START DATE: FINISH DATE:
PLATFORM BEAM S
TOG EXISTING ST TRIN
RI G
NG ER
ER 1
2(
BE
REF
25

HIN ABN 37 001 024 095 and ACN 001 024 095
D) Jacobs Group (Australia) Pty Ltd
18
JACOBS PROJECT No. JACOBS DOCUMENT No.
IH173800 IH173800-0000-ST-DRG-3066
MITRE CUT
REF
525

AND CPBW
POST 1 & STRINGERS EX. PLATFORM BEAM
20 NOM
GROUT
TYP.

220 x 110 x 10 THICK ALUMINIUM BASE PLATE. TO REMAIN. PL20 (AL)


I HILTI HIT-HY 200 CHEMICAL INJECTION WITH I
HIT-V-R M16 ROD (STAINLESS STEEL) 125 EX. PLATFORM POST
EMBEDMENT TO EX. CONC. FLOOR TO REMAIN. PL20 (AL)
NOM. EX. FFL 100 0 100 200 300 400 500

ELEVATION 1 SCALE OF MILLIMETRES


SCALE 1:10 (A1) - 1 : 10 FULL SIZE A1 SHEET
* DENOTES ORIGINAL SIGNED BY:

ASSET/PROJECT DRAWING TITLE SHEET No. OF


QUU CIP CODE DRAFTED D.LEMON
* M.MCKEOWN 31.07.19 * S.O'BRIEN 31.07.19 BUNDAMBA SEWAGE TREATMENT PLANT ST039 BUNDAMBA STP QUEENSLAND URBAN UTILITIES DRAWING No. REVISION
1 17.10.19 STAIR TREADS UPDATED *M.M *S.C. 09631 QUU DESIGN W/O No. DRAFTING REVIEW S.CHADWICK
J
0 15.10.19 ISSUE FOR CONSTRUCTION 09631 QUU CONST. W/O No.
DESIGN RPEQ No. APPROVED BY C755 IMPROVEMENT WORKS DEWATERING BUILDING 552089266 1 J
*M.M. *S.C. QUU CAD FILE BELT PRESS ACCESS MODIFICATION DRAWING STATUS
* S.CHADWICK 09631 31.07.19
REV. DATE AMENDMENT DESIGN DESIGN RPEQ
REVIEW No.
FUNDED BY QUU (ü) EXTERNAL ( ) QUU TRIM FILE
DESIGN REVIEW RPEQ No. DATE CONSTRUCTION MANAGER DATE
DETAILS FOR CONSTRUCTION
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Das könnte Ihnen auch gefallen