IADC/SPE 59263

Improvement on the Procedure in Exploration Well By Unbalanced Drilling: A Case


History in BS7 Well in People’s Republic of China

GUO YONGFENG, Petroleum Technology Service, China National Offshore Oil Corporation

Copyright 2000, IADC/SPE Drilling Conference


not very accurate, and it is not worthy of raising the
This paper was prepared for presentation at the 2000 IADC/SPE Drilling Conference held in value of it in the whole section in well only according to a
New Orleans, Louisiana, 23–25 February 2000.
predicting value of the formation pressure gradient in
This paper was selected for presentation by an IADC/SPE Program Committee following
review of information contained in an abstract submitted by the author(s). Contents of the
shorter section, which predicting value of it mainly
paper, as presented, have not been reviewed by the International Association of Drilling depend on the data from neighbor wells. Since
Contractors or the Society of Petroleum Engineers and are subject to correction by the
author(s). The material, as presented, does not necessarily reflect any position of the IADC or beginning of 1999, the most of oil fields in main land of
SPE, their officers, or members. Papers presented at the IADC/SPE meetings are subject to
publication review by Editorial Committees of the IADC and SPE. Electronic reproduction,
China have accepted these principle in the drilling of
distribution, or storage of any part of this paper for commercial purposes without the written explored well so that decease the mud density, and get
consent of the Society of Petroleum Engineers is prohibited. Permission to reproduce in print is
restricted to an abstract of not more than 300 words; illustrations may not be copied. The obvious effect, which have found several huge oil fields
abstract must contain conspicuous acknowledgment of where and by whom the paper was so far.
presented. Write Librarian, SPE, P.O. Box 833836, Richardson, TX 75083-3836, U.S.A., fax
01-972-952-9435.
1 introduce
Abstract
In main land of China, there are about 19 oil fields in
The paper has discussed some questions in land and 3 oil fields in offshore. CNPC (China National
unbalanced drilling, and state that the most important petroleum Corporation) manage the land oil field, and
question is determining the information pressure CNOOC (China National Offshore Oil field) manage the
gradient before drilling in the design. The paper put out offshore oil field. The production of oil and natural gas in
some principles and formulae for determining the the oil fields on land has been decreasing for years
information pressure gradient, which are different from recently. How maintain the production of oil and gas in
that were put forward by some scholars in past to some the old oil fields and developing the potential of its
extent. The author introduced a case history about capability? By research and practice for long time, it has
unbalance drilling – BS7 well, which was drilled in been proved that the important way to raise the
Dagang oil field, Tianjin city, People’s Republic of China, production of well is using the quasi balance and
and explain the application of the principles and formula balance and unbalanced drilling.
in the well. There are two points in this paper. First, in The oil fields in offshore of China applied early the
term of new principle and formula of design formation technology of quasi balance and balance and
pressure gradient, the time that is from starting show of unbalanced drilling because they have cooperated with
some omen to having blow out in well, is longer than some international corporations since beginning of 80’s.
predicting in other method in past, and this predicting But the technology has been seldom used in continent
had been testified by the practise in the well. So the oil fields, special to the district of Bohai bay where is laid
operator has more time to deal with well kick and protect in east of China. In March 1998, I was invited by the
the blow out of well, in other words, designer can take a general manger of Dagang oil field as the senior advisor
risk to determine the formation pressure gradient more of general manager the oil field, to participate the design
than in past. Second, when determining the formation and operated in a key well of explore – BS7 well. The
pressure gradient, the designer would not consider purpose was drilling an explored well in the oil field using
abnormal layers, which are much smaller in thick than the technology of drilling in CNOOC, to improve the
the length of naked section in the hole. Because not only technology in CNPC. The main technology which used
the operator have enough time to deal with well blow out to the BS7 well was chiefly drilling in quasi balance and
if the blow out really happen, but also some situations balance and unbalanced. Of course, the mission in BS7
have not happened, in speciality to the block faulted oil well had been taken great success.
field, for example, Dagang oil field. The mainly reason is Had been drilled and tested, BS7 well product 620
the level of forecast the formation pressure gradient is tons oil and 430,000 stere gas every day. It should be
pointed, the average production in a well at the oil field,
2 GUO YONGFENG IADC/SPE 59263

which was just drilled within one year, is 12 tons every of devices of no killing well almost were made too
day, and the highest production of oil in a well is 200 lumpish, and it should be believed that a type of devices
tons every day since 30 years, and there are about 500 in unbalance would be made to be lighter than now. The
wells drilled in this area So far. After BS7 well was third, the device should be improved the technology of
drilled, there had been 6 explored wells drilled in round installment, and it is very difficulty to install the devices
district recently, and had gotten success too, which now in the site of drilling. Beside, the device of no killing
production in single well arrive to 420 ton in average per well, which main purpose is for unbalanced drilling,
day. should be enhance and strength the monitor and control
In April 1999, CNPC hold a conference in Dagang oil of parameters. For example, it should be improved that
field, and spread the way of balance and unbalanced the automatic monitor and control pressure in well head,
drilling in land oil fields, and thought it would efficiently so that it could be adjust that flow rate from the well
make more success in promoting the production of oil head in automatic and it would be guaranteed in
and natural gas in PR of China. After the conference, constant value of pressure in well head. Though the
several large oil fields had been found, for example, device that is used has some such function, it is not
Tahe oil field in Xinjing autonomy area in September utterly satisfy for operator in rig. Add to, there was a little
1999, Erdosi oil field in Neimeng autonomy area in question that the automatic compensating mechanics for
October 1999, and so on. wear off of seal material.
Because of adoption of quasi balance and balance and
2 the situation basically on BS7 well unbalanced drilling, the explored well had been better
effective of exploring and production than before. In the
BS7 well is located Qianmiqiao area in Dagang oil section of well which was from 1785 to 1892 meter, the
field, which is about 50 kilometers from Tianjin City, and layers of high production of oil were found, which is
is southern and eastern of Beijing, apart from about 200 about 200 tons oil every day pass by tested. But there
kilometers. The well is explored well in straight hole. The was nothing utterly when it had been drilled in more 200
well depth is 5350 meter, which include 30 meter length wells in identical formation since 30 years. There were
conducter string which diameter is 30 inch, 280 meter identical situations to happen in the section of well which
length 20 inch surface casing, 2000 meter length 13 3/8 was from 3150 to 3863 meter. In section of well from
inch protector casing, 4252 meter length 9 5/8 inch 4159 meter to 5350 meter, where is located formation of
protector casing, 5340 meter length 5 1/2 inch product the buried hill, it was found that high production of oil of
casing. The well started drilling in end of April 1998, and condensate and natural gas field. And it is said that the
finished in end of December 1998. During the procedure natural gas as a fuel gas in routine, which was found in
of drilling, it was used by quasi balance and balanced in the well, can supply to Beijing City for 50 years. But it
section of well above 4200 meter, and used by had been drilled in more than 90 wells in the buried hill
unbalanced drilling in section from 4200 to 5350 meters. formation in the oil field since 20 years.
Process of unbalanced drilling, the coefficient of
formation pressure in that section of formation is 1.05, 3 a key to question of unbalanced drilling is
but the density of mud for drilling just keep on 1.02 in accurately predicting Formation Pressure Gradient
practise. When drilled by unbalanced, there was some
equipment of unbalanced drilling that was installed in the Whatever quasi balance or balance or unbalanced
rig. They included some device in well head for no well drilling, a key to question is forecasting precisely the
killing drilling and some equipment of oil and gas formation pressure gradient before drilling, special to the
separation, and some device of gas blow out, which unbalanced drilling, it is more importance question.
transfer natural gas in high pressure to out of rig about Because the point of balance could not determine if
250 meter far from it then burning out. Meanwhile, to be operator do not know value of the gradient, the operator
operated by unbalanced drilling, the pressure in well do not determine the type of drilling procedure - quasi
head was all the while high, which was 2130 psi at balance or balance or unbalanced drilling, so other
annulus pressure in general and some time arrive to things will not be mention.
3915 psi. For protect poison gas, for example H2S, blow Before drilled in the explored well, the geologist submit
out from the well hole, the device of safeguard had been a report on prediction of the formation pressure gradient
installed in the rig. in BS7 well, and I check it and put forward a suggestion
The operation is very successful in BS7 well and to modify it according to a new principle of determine the
almost had not serious accidents to happen. But there pressure gradient. It is shown on the curve of pressure
were a few of questions that had been noticed by gradient, including the curve both original and modified
operators. The one is that the life of seal material of in figure 2. From the figure, we can see that the value of
device for no killing well is not used to long time, and it formation pressure gradient has been almost decrease
need renew by worker about 8 days, which it is very 30% than modified before in average, and it also tell us,
danger and waste time in drilling. The second is that all the density of mud during drilling will be decrease 30%
IADC/SPE 59263 Improvement on the Procedure in Exploration Well By Unbalanced Drilling: A Case History in BS7 Well in People’s Republic of China 3

than drilling in identical type explored well before. That injected to the sealing empty volume, and formula (3) is
amendment for the value of pressure gradient, which is that the gas in high pressure is injected to a balloon.
reduce the density of mud in drilling, has been significant Pass by long term observation and research in the
to protect the layers of oil and gas from the pollution and laboratory and the sites of drilling, I put forward a new
to improve the affect in exploring even to raise the formula about process of well kick and well blow out in
production of oil and gas in a well, which is knowledge the hole of well. The content is the volume of gas is
for every engineer of drilling. CNPC has generalized the direct proportion of both volume of gas i(t) and volume of
method, which is produced by the new principle above liquid s(t). So the equation is showed that
stated, to all oil fields in main land of China, and it has
di ( t )
made distinct effect so far. = Ki ( t ) s ( t )
dt

3.1 a new differential equation to describe the procedure …………………… (4)


of well kick and well blow out.

Before we introduce the new principle for determining To consider the formula (1) and the formula (4) is
the pressure gradient in formation, we first talk about solved by method of detach variable, so the solution of
some differential equations to describe the process of formula (5) is following:
well kick and blow out in well. The people put out original n
principle of determining pressure gradient, which is i (t ) =
n
according to the knowledge on procedure of well kick 1+ ( − 1) e − knt
and well blow out. i0
Let’s review the process that is from beginning of gas
into hole of well to erupting when well blow out. We …………………………….. (5)
suppose the hole of well is filled by liquid when drilling, The parameter i0 above formula represent the primary
and from certain moment, the gas start to enter the hole value of volume of gas in the well hole. It is obvious,
from formation by the wall of well. We hypothesis the bring the formula (1), it can be induced to following
volume both liquid and gas in the hole is n, the volume of equation:
liquid is s(t), the volume of gas is i(t), the variable t
represent to time. Of course, n is constant. It is obvious  
 
that
s (t ) = n 1 − 
1
 n 
n = i(t) + s(t) ……………………. (1)  1 + ( − 1) e − knt 
 i 0 
In general, people think the increase of gas is direct
proportion of t, and K is constant of proportion. In other …………………………….. (6)
words, the increase of gas is only following time. So it is The figure 1 has shown the curve of Formula (2) and
following formula (3) and formula (5). The curve of formula (5) in
figure 1 has told us a importance question.
di ( t ) The velocity that gas inject to hole of well from the
= K
dt formation by wall of well is slower than we imaged in
………………………. (2) past. We can see from the figure 1, the velocity of
Above formula represent to a linear of straight injecting is very slow at both beginning and ending of
inclined. In the formula, it is not consider that process of injecting, and the velocity is the most fast in
characteristic of inflating of gas after entering hole of middle phase in the injecting. So the process of injecting
well. gas in beginning and ending would take long time
After time, some scholars found the volume of gas is relatively. This phenomenon has been proved in the
direct proportion of t and i(t) laboratory and site of rig. It is obvious that velocity of
injecting is very slow when injecting start, but when
di ( t ) injecting will end, the velocity is very slow than middle
= Ki ( t )
dt phase too, how to explain this phenomenon for us? We
………………………… (3) can explain it by such reason. When the gas of injecting
Above formula represent a curve of index, which had is going to end, the most of gas would keep in liquid
used to method on detach variable to solve the because of action of drilling fluid that has certain density,
differential equation. The formulae (2) and (3) have a and the huge energy from gas injected act to the wall of
shortcoming in communal, which they do not consider well on the contrary, to resistant the gas continue
the suppressive action of fluid of drilling. The physical entering the hole of well, and it is really like a
model as formula (2) is that the gas in high pressure is appearance of the feedback in the electronics. Pass by a
4 GUO YONGFENG IADC/SPE 59263

process of accumulating of energy both gas and liquid in which we did not thought over the affect of the abnormal
long time, in case it is only broke up that the balance high layers in BS5-1 well so that value of coefficient of
both gas and liquid in the well hole, the well blow out formation pressure in the section was forecasted to 1.25
begin. The formula (5) is easy to explain why the well as highest value in the figure of curve.
blow out always erupt in sudden, alike as we saw in the In above example, there are two reasons that we do
site of drilling. To opposite, both formula (2) or formula not consider two abnormal layers. The first reason is that
(3) only describe a process that gas puff out the well it would take 6 hours or more time from the omen
head slowly, which has not the process of accumulating appear, even if it happen well blow out in this well,
of energy in gas and liquid. according to above formula (6) shown; so we have
We bring the active parameter to the formula (6), and enough time to adapt various way to protect it. The
got the result, which is time that show length from begin second reason is that Dagang is the block faulted oil
of injecting gas to well blow out really, is more bigger field, though the distance between BS7 well and BS5-1
than formula (2) and formula (3). For example, in well is very near, which is about 700 meters, but it is
Dagang area, the result using formula (2) and formula possible that exist the fault. Any how, we do not only for
(3) about 2 to 3 hours, but the result of using to formula the layers which thickness is about 20 meter to raise
(6) is 6 hours. And this conclusion is more longer than density of mud and bring out pollution of oil and gas
engineers imaged working there, which many engineers layers. It has been testified that they do not appear the
thought that the time of well blow out between have a abnormal layers.
omen and erupting really is 2 hours, at most 3 hours in Statistic shown, the rate of accuracy on prediction of
general. Afterwards, by look up a lot of material since 30 abnormal high pressure layers is not over 60% for the
years, which had been testified that the conclusion is explored well, and if the length of abnormal layer in hole
probable true in the main. Further, the practice of drilling of well is only lower 1/20, the operator should not
in BS7 well proved the conclusion is correct. consider it, and just as a reference to drilling.
Above conclusion formed a important base of principle
to design the formation pressure gradient, which the time 3.3 a new demand to the mud logging
between begin of omen and blow out is more longer than
we image in original. In the procedure of balance and unbalanced drilling,
the mud logging and drilling monitor has been more
3.2 a new principle of design the formation pressure important action. According to formula (6), we want to
gradient the mud logging team working at site of rig would must
send out alarm of well blow out to operator before about
It is base principle almost every textbook for many 6 hours. The main responsibility of accident in blow out
years that the value of formation pressure gradient is of well belong to the mud logging team if time between
determined by the highest value of formation pore send to alarm and well blow out is less 6 hours. During
pressure in identical section of open hole. Further, the drilled in BS7 well, the mud logging team worked very
data of formation pore pressure in a section is mainly well, and they thought there are few operators to require
from the neighbor wells in identical area, if there are so concrete at process of monitor drilling.
neighbor wells. In general, it is more rough than data of The demand is applied in the like way to process of
neighbor that the data of reference from the seismic unbalanced drilling. During unbalanced drilling, the mud
surveying. logging must carefully monitor various parameters and
We have an example. Let’s see the table 1. We can the omen of showing abnormal high pressure in the well
know that there are two abnormal layers near BS7 well, head. And they should send out alarm at once if the
which data are from the well BS5-1 in neighbor. There pressure was higher than permitting of device of
are two layers in this well, and one of layers is situated unbalanced drilling in well head, because there are
from 3369 to 3380 meter, and another layer from 3729 to different situation in the unbalanced drilling, which it is
3745 meter. Their thickness is both 11 meter and 16 always erupting from well head. In addition, it is very
meter. Both coefficient of formation pressure are 1.33 important for keeping high efficient in desander at site of
and 1.31. At same time, the coefficient of pressure in rig so that it was guaranteed to be lower density of mud
other layers near BS7 well is totally under 1.25, and their in process of drilling.
value in average is 1.09. If we wound had considered
the abnormal layers in the BS5-1 well when predicting 3.4 the significance of new principle for quasi balance
the gradient of pressure, the coefficient of pressure of and balance drilling
formation would have be raised to 1.31. So the density
of mud of drilling in BS7 well would keep on 1.31 even if The new principle of determining the gradient of
it was applied balance drilling, where are located to formation pressure has still been significant to quasi
section between 3000 to 4200 meter. Afterwards, we balance and balance drilling.
modified the predicting of formation pressure gradient,
IADC/SPE 59263 Improvement on the Procedure in Exploration Well By Unbalanced Drilling: A Case History in BS7 Well in People’s Republic of China 5
In the identical area where drilled in BS7 well, the physical model in modify can be testified.
density of mud that was used to drill other wells always 4.4 The operator can not consider some abnormal high
is 1.15 to 2.0 for more 20 years, which depth of well is pressure layers in thin, special to the block fault oil field.
from 800 to 2000 meter and the coefficient of formation The result of predicting can case greatly decrease of the
pressure is 0.97. The reason is that there are high density of mud in drilling. If it is really blow out in well
pressure layers of natural gas underground, and the meeting abnormal high pressure layers, operator have
operators afraid of well blow out in sudden, which make been enough time to deal with erupting from the well,
huge accidents on life or wealth. During drilling of BS7 according to above conclusion.
well, the density of fluid always keep on 1.11 in the 4.5 The mud logging and drilling monitor set in the rig
section of well for operators know that they have been has been very importance action. The operator in rig
enough time to ready shut well head or weight the should want not only to get the alarm before well blow
density of mud according to the new principle, which is out happened, but also to rule the time from getting
induced by formula (6). After beginning of drilling no long alarm to erupting. So it has been guaranteed the safe of
time, it was found high production of oil in 1780 meter to the procedure of drilling in balance and unbalanced.
1840 meter. Afterwards, the several wells were drilled 4.6 It has been spirited for many engineers of drilling
near BS7 well, one of them is B14-1 well, and they all that using balance and unbalanced drilling to improve
adopted the identical density of mud in same section of procedure and raise production of oil and gas. In long
well, and got high production of oil and gas. In time, the operators in drilling had not been enough vigor
dramatically, it has happen to nothing since using lower to research the formation pressure gradient, and one of
density of mud to drilling in the section of well so far. reason is the gradient belong to scope of work of
It has huge potential to raise production of oil and geologists mainly. To opposite, the geologists do not
natural gas in wells and oil fields by quasi balance and know utterly the significance of formation pressure
balanced and unbalanced drilling. It is forecast that the gradient. The most engineers of drilling try every means
oil fields in main land of China will place it as first task to decrease the density of mud for protecting the layers
that balance and unbalanced drilling afterwards. of oil and gas for many years. But few of them thought
According to predicting as the author, the total that they should consider to improve the method of
production of oil and gas in domestic will increase 28% predicting the pressure gradient, because few engineers
per year if the technology of balance and unbalanced could do work about predicting pressure gradient in
drilling really spread in main land of China. If we formation for themselves. It is told us that operators in
consider the factor of decreasing production in old oil site of rig should have widely knowledge about
fields, the production of oil and gas will raise 13% in engineering of drilling and geology, and the general
domestic every year for spread and apply the technology manager in rig should have good background in
of balance and unbalanced drilling. It should be pointed, education in engineering.
the increase of production of oil and gas by this way do
not need almost increase the cost. It is good example of
BS7 well and other found in new oil field in Dagang oil References
field.
1 D.B.Bennion, F.B.Thomas, R.F.Bietz,
4 conclusion D.W.Bennion:”Underbalanced Drilling: Praises and
Perils”, SPE DREILLING & COMPLETION (December
Pass by we research in idea and practice in BS7 well, 1998, Number 4)
we have some conclusion for quasi balance and 2 Nelson Villarroel, Edgar A.Almanza:”Underbalanced
balanced and unbalanced drilling. Coiled-Tubing-Conveyed Perforating in a Deviated Well”,
4.1 It is precondition on quasi balance and balanced JPT (July 1999)
and unbalanced drilling that forecasting the formation 3 Syed Ali, Louise Bailey, Hemant Ladva, Lindsay
pressure gradient. If there are enough accurate Fraser:”Fluid design impacts drilling and production
predicting on pressure gradient, it is no any significance operations”, OIL&GAS JOURNAL (January 25,1999)
for quasi balance and balanced and unbalanced drilling, 4 Robreto Maglione, Alberto Guarneri, and Giovanni
special to the explored well. Ferrri: ”Rheologic and Hydraulic Parameter Integration
4.2 It is the new and important way to decrease the Improves Drilling Operations”, OIL&GAS JOURNAL
density of fluid of drilling to improve the method of (February 8, 1999)
predicting the formation pressure gradient, and it has
been significant for protecting the pollution of layers of oil Acknowledgments
and gas and to praise production of oil and gas in wells
and oil fields. I thank Lu Yingmin, Shuai Jian, Zhang hong, Wang
4.3 The time from showing omen to occur well blow Caijing and Gao Deli of Petroleum University (Beijing) of
out is longer than most engineers image usually. The China for their courses on drilling mechanics when I was
post graduate; Qu Jingwen, Yin Zhaoxue, Yang Tianji,
6 GUO YONGFENG IADC/SPE 59263

Gao Yanxiang, Li Hongxiang, Wang wengang, Ai


bingxin, Liu Xueling, Liu Zhiyun of Dagang oil field for
provided some situations in drilling; Jin Xiaojian, Tan
Shuren, Xu Guojun, Xu Bin and Wang Aiguo of China
National Offshore Oil Corporation for valuable discussing Coefficient of formation pressure
about balanced and unbalanced drilling; Explored 1900 m
0.97

Company of Dagang oil field supplied most data on


1.13
drilling during I worked there.
1.08

2900 m
1.25
3350 m
1.31

1.12
TABLE 1 THE COEFFICENT OF FORMATION
PRESSURE WELLS NEAR BS7 WELL
Name of well Depth of layer Coefficient of pressure 3900 m
BS5 well 2596 – 2627 0.93
BS5 well 2451 – 2460 1.13 1.2
BS5-1 well 3923 – 3936 1.22
BS5-1 well 3800 – 3829 1.20 4450m
BS5-1 well 3729 – 3745 1.31
BS5-1 well 3698 – 3745 1.25
BS5-1 well 3369 – 3380 1.33
1.05
B851 well 2582 – 2596 0.94
B851 well 3703 –3721 1.05
B855 well 2765 –2776 1.01 5350 m
BS25 well 3851– 3870 1.23
BS26 well 3602– 3633 1.12 Depth (m)

Fig.2 the curve of formation pressure gradient in


BS7 well (the solid line represent the curve after
modified, the broken line represent curve before
modified)

i(t)

n
2
1

io 3

Fig.1 the curve of gas injecting hole of well


(1 represent formula (2), 2 represent formula (3), 3
represent formula (5))