Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

Revision History

Amendment Revision Amender


Amendment
Date Number Initials

03-12-17 O1

24-12-17 A1

01-05-18 B1

30-05-18 A2

26-09-18 B2

12-02-19 B3

 Isometric Numbering & Appendix 7 Updated


11-06-19 B4  Appendix 11 Added

Related Documents

Document Number Document Name Description of Content

Holds

Section Number Short Description of Hold

Definitions and Abbreviations

Term Comment

DRP001-OUF-PRO-U-000-001 Page 2 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

TABLE OF CONTENTS

1.0.  PURPOSE .................................................................................................................................................. 5 

2.0.  SCOPE ....................................................................................................................................................... 5 

3.0.  DEFINITIONS & ACRONYMS ................................................................................................................... 5 


3.1.  DEFINITIONS ................................................................................................................................ 5 
3.2.  ACRONYMS .................................................................................................................................. 5 

4.0.  REFERENCES ........................................................................................................................................... 5 

5.0.  RESPONSIBILITY...................................................................................................................................... 5 

6.0.  COMPANY’s DOCUMENTS NUMBERING ............................................................................................... 6 


6.1.  GENERAL NOTES ........................................................................................................................ 6 
6.2.  REVISION IDENTIFIERS .............................................................................................................. 6 
6.3.  SEQUENCE NUMBERING ............................................................................................................ 7 
6.4.  GENERAL DOCUMENTS NUMBERING ....................................................................................... 7 
6.5.  DATA SHEETS .............................................................................................................................. 8 
6.5.1.  Equipment Datasheets ...................................................................................................... 8 
Equipment datasheets shall be numbered according to the following convention.................... 8 
6.5.2.  Special Items Datasheets ................................................................................................. 8 
6.5.3.  Instrument Datasheets .................................................................................................... 10 
6.5.4.  Electrical & Piping Datasheets ....................................................................................... 11 
Electrical Equipment & Piping datasheets shall be numbered according to the
following convention. ..................................................................................................... 11 
6.6.  SYSTEM ORIENTED DOCUMENTS: .......................................................................................... 12 
6.7.  DRAWINGS, DIAGRAMS, AND SKETCHES: ............................................................................. 12 
6.7.1.  PROCESS & HSE P&IDs................................................................................................ 13 
6.7.2.  Isometrics ....................................................................................................................... 14 
6.8.  VENDOR DOCUMENT NUMBERING: ........................................................................................ 15 
6.9.  SUBCONTRACTOR NUMBERING ............................................................................................. 15 
6.9.1.  SUBCONTRACTOR DOCUMENT NUMBERING: .......................................................... 15 
6.9.2.  SUBCONTRACTOR DRAWING NUMBERING:.............................................................. 16 

7.0.  CONTRACTOR’s DOCUMENTS NUMBERING ...................................................................................... 16 


7.1.  CONTRACTOR’S DOCUMENTS NUMBERING .......................................................................... 16 

8.0.  APPENDICES .......................................................................................................................................... 18 


8.1.  APPENDIX 1: (COMPANY’s Document Type Code) ................................................................... 18 
8.2.  APPENDIX 2: (COMPANY’s Discipline Code) ............................................................................. 20 
8.3.  APPENDIX 3: (COMPANY’s & CONTRACTOR’s Unit Code) ...................................................... 21 
8.4.  APPENDIX 4: (COMPANY’s Equipment Code) ........................................................................... 23 
8.5.  APPENDIX 5: (COMPANY’s Instrument Function Code) ............................................................. 25 

DRP001-OUF-PRO-U-000-001 Page 3 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

8.6.  APPENDIX 6: (COMPANY’s & CONTRACTOR’s Area Code) ..................................................... 38 


8.7.  APPENDIX 7: (Construction Area – Split WBS) ........................................................................... 38 
8.8.  APPENDIX 8 (COMPANY’s Telecom Equipment Code) .............................................................. 40 
8.9.  APPENDIX 9: (COMPANY’s System Code - Fluid)...................................................................... 43 
8.10.  APPENDIX 10: (COMPANY’s Vendor Document Requirement List Code – VDRL Code) ........... 45 
8.11.  APPENDIX 11: (CONTRACTOR’s Phase Code) ......................................................................... 48 
8.12.  APPENDIX 12: (CONTRACTOR’s Discipline Code) .................................................................... 49 
8.13.  APPENDIX 13: (CONTRACTOR’s Document Type Code) .......................................................... 50 
8.14.  APPENDIX 14: (CONTRACTOR’s Sub-Document Type Code) ................................................... 51 

DRP001-OUF-PRO-U-000-001 Page 4 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

1.0. PURPOSE

The purpose of this procedure is to summarize the numbering schemes applied to different types of
documents and drawings generated during the life cycle of Duqm Refinery Project.

CONTRACTOR shall apply to each document the numbering system as per COMPANY’s
requirement and CONTRACTOR’s Internal Document Numbering, all the details of documents
numbering are explained in the following sections. CONTRACTOR’s Internal Document Numbers is
included herein for COMPANY’s reference.

2.0. SCOPE

This procedure encompasses all controlled documentation applicable to Duqm Refinery Project
including technical documents, drawings and general documents issued by Petrofac International Ltd
and its vendors/subcontractors.

3.0. DEFINITIONS & ACRONYMS

3.1. DEFINITIONS

COMPANY: Duqm Refinery & Petrochemical Industries LLC

CONTRACTOR: Joint venture of Petrofac International LTD & SAMSUNG ENGINEERING


CO.LTD

VENDOR: All companies, firms, bodies, entities and partnerships providing Goods for
the project.

SUBCONTRACTOR: All companies, firms and partnerships to whom any part of the Work has
been subcontracted by CONTRACTOR.
3.2. ACRONYMS

TDR: Technical Document Register


VDR: Vendor Document Register
VDRL: Vendor Data Requirement List
HAZOP: Hazard and Operability Study
PIL: Petrofac International LTD
SECL: SAMSUNG ENGINEERING CO.LTD
OUF: Utilities & Offsite EPC Contractor

4.0. REFERENCES

DRP001-FED-PRO-U-000-028 (Project Numbering Procedure – ITT)


DRP001-FED-PRO-U-000-032 (Vendor Document Instructions – ITT)

5.0. RESPONSIBILITY

Document Originator is responsible for ensuring that the document is numbered in accordance with
the requirements of this procedure.

DRP001-OUF-PRO-U-000-001 Page 5 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

Document Controller is responsible for accurately identifying the correct folder, where the issued
documents are stored.

Document Controller is responsible for maintaining the TDR, VDR.

Project Director has overall responsibility for ensuring the implementation of this procedure.

6.0. COMPANY’s DOCUMENTS NUMBERING

6.1. GENERAL NOTES

All project technical documents and drawings shall be numbered in accordance with this procedure.

Project document and drawing numbers shall not be duplicated under any circumstances.

If the numbering segment is alphabetical, and there is no expressly-intended value to fill the required
number of fields, leave blank space(s) except as otherwise specified in this procedure.

If the numbering segment is numeric, and there is no expressly-intended value to fill the required
number of fields, add a leading zero(s) except as otherwise specified in this procedure.

6.2. REVISION IDENTIFIERS

All project documents are to include a revision code and revision status in the appropriate space on
the title sheet as per the below table:

Issue Purpose Revision Issue Status Revision code


IFI Issued For Information C1
IFIR Issued For Internal Review IC
IFCR Issued For Client Review O1
ICCI (IFA) Issued Client Comments Incorporated A1
IFH Issued For HAZOP H1
IFD Issued For Design B1
IFP Issued For Purchase P1
IFT Issued For Tender D1
IFQ Issued For Quotation E1
IFAB Issued For As Built (AB) Z1
IFC Issued For Construction R1 (with Holds)
IFC Issued For Construction S1 (final)
IFPDP Issued For PDP K1
VOID Document Voided (deleted) XX

All documents (not drawings) that are revised at all revisions shall show changes and additional text
highlighted in yellow. The front page shall not include any yellow marking and/or text added to explain
what yellow marking means.

Drawing revisions shall be annotated with revision clouds. In addition, revision clouds shall be used to
identify any changes made to P&IDs subsequent to those used in the Preliminary HAZOP reviews.

For the changes made to the document but under same revision, the numeric sequence number shall
be used to differentiate the document revisions (e.g. A1, A2, A3…etc)

DRP001-OUF-PRO-U-000-001 Page 6 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

The Vendor document/Drawing revision shall start with O1, O2, O3... and after final approval by
PSJV it will be submitted in B1 (IFD) / R1/S1 (IFC) and Z1 (As-built) as per document nature.
The Subcontractor document/Drawing revisions shall start with O1, O2, O3... and after final approval by
PSJV/Company it will be submitted in B1 (IFD) / R1/S1 (IFC) and Z1 (As-built) as per document nature,
except for Engineering drawings for building subcontractors. For Engineering drawings from building
subcontractor internal revision shall be followed between subcontractor and contractor as O1A, O1B, R1A,
R1B..etc.

6.3. SEQUENCE NUMBERING

Sequence numbers for shared Units between EPC1 Contractor and EPC2 Contractor shall follow the
below reserved blocks of numbers.
Process Units EPC Contractor shall use 0001-0499
Offsite & Utilities EPC Contractor shall use 0500-0999

Abbreviation Document Discipline Sequence


Project No. Unit Code
Code Type Code Code Number
DRP001 OUF XXX X XXX NNN

6.4. GENERAL DOCUMENTS NUMBERING

These documents include specifications, procedures, reports, design criteria, technical standards,
system descriptions, requisitions, non-deliverables, calculations and engineering lists which shall be
numbered according to the following convention.

Document Type Discipline Sequence


Project No. Abbreviation Unit Code
Code Code Number
Code
DRP001 OUF XXX X XXX NNN

Constant Constant Appendix 1 Appendix 2 Appendix 3 (001-999)

Example: (DRP001-OUF-TSD-E-000-123)

DRP001: Duqm Refinery Project Number

OUF: Originating party of the document (Utilities & Offsite EPC Contractor)

TSD: Document type which can be selected from Appendix 1 in this procedure

E: Discipline Type (Electrical) which can be selected from Appendix 2 in this procedure

000: Unit Code which can be selected from Appendix 3 in this procedure, and for General documents
unit code shall be 000. In Case of any document which is applicable to multiple units, unit number
000(Common to all Units) shall be used.

123: This is the sequence number of the document which shall be from 001 to 999.

DRP001-OUF-PRO-U-000-001 Page 7 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

6.5. DATA SHEETS

6.5.1. Equipment Datasheets

Equipment datasheets shall be numbered according to the following convention.

Document Type Discipline Unit Code & Equipment Sequence


Project No. Abbreviation
Code Code Code Number
Code
DRP001 OUF DSH X XXXYYY NNN

Constant Constant Appendix1 Appendix 2 (001-099)

Appendix 3 Appendix 4

Example: (DRP001-OUF-DSH-R-500P-071)

DRP001: Duqm Refinery Project Number

OUF: Originating party of the document (Utilities & Offsite EPC Contractor)

DSH: Document type code for datasheets

R: Discipline Code (Rotating) which can be selected from Appendix 2 in this procedure

500: Unit Code (Seawater System) which can be selected from Appendix 3 in this procedure

P: Equipment Code (Pump) which can be selected from Appendix 4 in this procedure

071: This is the sequence number of the document which shall be from 001 to 099.

Notes:

- Equipment Code is 1 to 5 Alphabetical characters as shown in Appendix 4. No leading zeros nor


blanks shall be added to this code.

- Datasheet sequence number shall match the equipment item tag sequence number.

- If the equipment is located within a train, the first digit of the 3 digit sequence number indicates
the train number. Units not arranged as trains will use “0” (zero) as the first digit of the sequence
number.

- Equipment Tag sequence numbers for Units split between EPC Contractors shall use the below
reserved blocks of numbers. See EPC Scope of Work documents for details of shared units.

 Process Units EPC Contractor shall use 001-049

 Offsite & Utilities EPC Contractor shall use 050-099

6.5.2. Special Items Datasheets

Document Type Discipline Unit Code & Equipment Sequence


Project No. Abbreviation
Code Code Code Number
Code
DRP001 OUF DSH X XXXSPI NNN

Constant Constant Appendix1 Appendix 2 (001-999)

Appendix 3 Constant

Example: (DRP001-OUF-DSH-R-500SPI-060)

DRP001-OUF-PRO-U-000-001 Page 8 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

DRP001: Duqm Refinery Project Number

OUF: Originating party of the document (Utilities & Offsite EPC Contractor)

DSH: Document type code for datasheets

R: Discipline Code (Rotating) which can be selected from Appendix 2 in this procedure

500: Unit Code (Seawater System) which can be selected from Appendix 3 in this procedure

SPI: Equipment Code used for Special Items

060: This is the sequence number of the document which shall be from 001 to 999.

Specialty Items Sequence number defined by Process (number range from 001 to 399).

Item No. Description

001 – 099 Special valves

100 – 109 Ejectors

110 – 119 Valve interlocks

120 – 169 Strainers and filters (excluding temporary type)

170 – 199 Traps (i.e.: Process and ‘in-line’ traps)

200 – 209 Spray nozzles

210 – 229 Spare

230 – 239 Flame arrestors

240 – 249 Drain, condensate, knock-out pots, etc.

250 – 259 Vent silencers

260 – 399 Miscellaneous items

Specialty Items Sequence number defined by Piping MTO selection (number range from 400 to
999).

Item No. Description

400 – 419 Valve hand wheel devices

420 – 469 Adaptors, hoses and hose couplings

470 – 499 Flange insulating kits

500 – 509 Sample probes

510 – 529 Steam traps (for tracing and line drainage)

530 – 549 Temporary strainers

550 – 559 Sample Coolers

560 – 569 Emergency shower/eye bath

DRP001-OUF-PRO-U-000-001 Page 9 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

570 – 589 Flow glass/indicators

590 – 609 Exhaust heads

610 – 899 Miscellaneous Piping items

900 - 999 Other sections items

6.5.3. Instrument Datasheets

Instruments, Relief Valves, Control Valves (Modulating Services), Operated On/Off Valves
individual datasheets shall be numbered according to the following convention:
ISA
Project Document Discipline Sequence Suffix
Abbreviation Unit Code Function
No. Type Code Code Number Number
Code Code
DRP001 OUF DSH X XXX XXXX NNN XX

Constant Constant Appendix1 Appendix2 Appendix3 Appendix5 (AA-ZZ)

(001-999)
Example: (DRP001-OUF-DSH-K-500-PDAH-674-AA)

DRP001: Duqm Refinery Project Number

OUF: Originating party of the document (Utilities & Offsite EPC Contractor)

DSH: Document type code for datasheets

K: Discipline Code (Instrumentation) which can be selected from Appendix 2 in this procedure

500: Unit Code (Seawater System) which can be selected from Appendix 3 in this procedure

PDAH: Instrument Function Code (Diff Pressure Alarm High) which can be selected from Appendix
5 in this procedure

674: This is the sequence number of the document which shall be from 001 to 999

AA: Redundancy Code which can be selected from AA to ZZ except “I” and “O”

Notes:

- Sequence Number shall be assigned as follows:

 0000 to 6000 series tag number is for general P&ID use.

 8000 series tag number is for Incoming and Outgoing Battery Limit P&IDs

 9000 series tag number is for instruments within packaged units/items

- If the instrument is associated with trained units, the first of the four digits in the sequence
number shall be used to differentiate, i.e. 1 = Train 1, 2 = Train 2, etc.

- For instrument data sheets with multiple tag numbers shown on the data sheet, use the
instrument type and MTAG for the instrument number.

Example: (DRP001-OUF-DSH-K-100-MTAGTI-3001)

DRP001-OUF-PRO-U-000-001 Page 10 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

Instrument Datasheet Binder

Individual datasheets for Instruments, Relief Valves, Control Valves (Modulating Services),
Operated On/Off Valves shall be combined and issued as a binder of datasheets. The numbering
scheme for datasheet binder shall be as below.

Document Type Discipline Sequence


Project No. Abbreviation Unit Code
Code Code Number
Code
DRP001 OUF DSH X XXX NNN

Constant Constant Appendix 1 Appendix 2 Appendix 3 (001-999)

Example: (DRP001-OUF-DSH-K-500-001)

DRP001: Duqm Refinery Project Number

OUF: Originating party of the document (Utilities & Offsite EPC Contractor)

DSH: Document type code for datasheets

K: Discipline Code (Instrumentation) which can be selected from Appendix 2 in this procedure

500: Unit Code (Seawater System) which can be selected from Appendix 3 in this procedure

001: This is the sequence number of the document which shall be from 001 to 999

6.5.4. Electrical & Piping Datasheets

Electrical Equipment & Piping datasheets shall be numbered according to the following
convention.

Document Type Discipline Sequence


Project No. Abbreviation Unit Code
Code Code Number
Code
DRP001 OUF DSH X XXX NNN

Constant Constant Appendix1 Appendix 2 Appendix 3 (001-099)

Example: (DRP001-OUF-DSH-E-490-001)

DRP001: Duqm Refinery Project Number

OUF: Originating party of the document (Utilities & Offsite EPC Contractor)

DSH: Document type code for datasheets

E: Discipline Code (Electrical) which can be selected from Appendix 2 in this procedure

490: Unit Code (Electrical Power Distribution) which can be selected from Appendix 3 in this
procedure

001: This is the sequence number of the document which shall be from 001 to 099.

DRP001-OUF-PRO-U-000-001 Page 11 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

6.6. SYSTEM ORIENTED DOCUMENTS:

System oriented documents such as Instrument Loop Diagrams, Instrument Wiring Diagrams and
System Descriptions shall be numbered according to the following convention:

Unit Code
Project Discipline Document System Sequence Sheet
Abbreviation & Area
No. Code Type Code Code Number Number
Code Code
DRP001 OUF XXXYYY X XXX XXXX NNN NNN

Constant Constant Appendix3 Appendix2 Appendix1 Appendix9 (001-999) (001-999)

Appendix6

Example: (DRP001-OUF-500010-E-CWD-FACP-001-001)

DRP001: Duqm Refinery Project Number

OUF: Originating party of the document (Utilities & Offsite EPC Contractor)

500: Unit Code (Seawater System) which can be selected from Appendix 3 in this procedure

010: Area Code (Common) which can be selected from Appendix 6 in this procedure

E: Discipline Code (Electrical) which can be selected from Appendix 2 in this procedure

CWD: Document type code (Combined Wiring Diagram) which can be selected from Appendix 1 in
this procedure

FACP: System Code (Fire Alarm Control Panel) which can be selected from Appendix 9 in this
procedure

001: This is the sequence number of the document which shall be from 001 to 999

001: Sheet Number of the document

Note: If Area is not applicable for a document, add zeros (000).

6.7. DRAWINGS, DIAGRAMS, AND SKETCHES:

Drawings, diagrams and sketches shall be numbered according to the following convention:
Unit Code
Project Discipline Document Sequence Sheet
Abbreviation & Area
No. Code Type Code Number Number
Code Code
DRP001 OUF XXXYYY X XXX NNN NNN

Constant Constant Appendix3 Appendix2 Appendix1 (001-999) (001-999)

Appendix6

Example: (DRP001-OUF-500010-P-PP-003-001)

DRP001: Duqm Refinery Project Number

OUF: Originating party of the document (Utilities & Offsite EPC Contractor)

DRP001-OUF-PRO-U-000-001 Page 12 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

500: Unit Code (Seawater System) which can be selected from Appendix 3 in this procedure

010: Area Code (Common) which can be selected from Appendix 6 in this procedure

P: Discipline Code (Piping) which can be selected from Appendix 2 in this procedure

PP: Document type code (Plot Plan) which can be selected from Appendix 1 in this procedure

003: This is the sequence number of the document which shall be from 001 to 999

001: Sheet Number of the document

Note: If Area is not applicable for a document, add zeros (000).

6.7.1. PROCESS & HSE P&IDs

For P&IDs the last digit of the Area # shall indicate the train number, if applicable. In addition to
that, following table shall be applied to assign the sequence number:

Sequence No. Description


001 – 199 Process P&ID
200 – 299 Utility Distribution P&ID
300 – 399 Battery & Unit Limit P&ID
400 – 499 Auxiliary P&ID
500 – 699 O&U P&ID

Example: (DRP001-OUF-400010-U-PID-505-001)

DRP001: Duqm Refinery Project Number

OUF: Originating party of the document (Utilities & Offsite EPC Contractor)

400: Unit Code (Potable /Service Water) which can be selected from Appendix 3 in this procedure

010: Area Code (Common) which can be selected from Appendix 6 in this procedure (Note- for
Process P&IDs, 000 shall be used in place of area code)

U: Constant

PID: Document type code (P&ID) which can be selected from Appendix 1 in this procedure

505: This is the sequence number of the document which shall be from 500 to 699

001: Sheet Number of the document

Note: The drawing sequence number for Unit 920 – Interconnecting P&IDs shall be split as
follows between the two EPC Contractors:

Process Units EPC Contractor shall use 001 to 399

Offsite & Utilities EPC Contractor shall use 400 to 999.

DRP001-OUF-PRO-U-000-001 Page 13 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

6.7.2. Isometrics

Piping isometric drawings shall be numbered according to the following convention:

Isometric Numbers (AG)


Unit Code & System Line
Sheet
Area & Split Code(Fluid) – (2 Sequence
Number
WBS to 4 Digit) Number
XXXYYY.YY NNNN XXXX NN

Appendix3 Appendix 9 (0001-9999) (01-99)

Appendix7

Note: Sequence number shall be same as number used in the Line Number.

Example: (920020.01-FWS-0097-01)

920: Unit Code (Interconnecting Rack) which can be selected from Appendix 3 in this procedure

020.01: Split WBS (North Side Interconnecting Pipe Rack) which can be selected from Appendix 7
in this procedure

FWS: System Code-Fluid (Fire water System) which can be selected from Appendix 9 in this
procedure

0097: This is the sequence number of the isometric which shall be same as number used in the
Line Number.

01: Sheet Number of the document

Isometric Numbers (UG)


Unit Code & System Line
Sheet
Area & Split Code(Fluid) – (2 Sequence
Number
WBS to 4 Digit) Number
XXXUYYYYY NNNN XXXX NN

Appendix3 Appendix 9 (0001-9999) (01-99)

Appendix7

Note: Sequence number shall be same as number used in the Line Number.

Example: (920U020.01-FWS-0097-01)

920: Unit Code (Interconnecting Rack) which can be selected from Appendix 3 in this procedure

U: Identifier for UG Isometrics

020.01: Split WBS (North Side Interconnecting Pipe Rack) which can be selected from Appendix 7
in this procedure

FWS: System Code-Fluid (Fire water System) which can be selected from Appendix 9 in this
procedure

0097: This is the sequence number of the isometric which shall be same as number used in the
Line Number.

01: Sheet Number of the document

DRP001-OUF-PRO-U-000-001 Page 14 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

6.8. VENDOR DOCUMENT NUMBERING:

General Notes:

 On receipt of the first issue of a Vendor Document, it will be allocated a unique Document
Sequence Number by the Document Management Group. This number must be clearly shown on
all subsequent issues of the document by the Vendor.

 In addition to VENDOR’s own document numbering system, VENDOR documents shall be


provided with CONTRACTOR’s standard document numbering system in the title block of the
VENDOR document.

 Vendor documents shall be numbered according to the following convention:

Abbreviation Purchase Order Sequence Sheet


Project No. VDRL Code
Code No. Number Number
DRP001 OUF PPPPP XXX XXXX NNN

Constant Constant (15 Digit Alpha Num) Appendix 10 (0001-9999) (001-999)

Example: (DPR001-OUF-PSCI-M98-17-P256-DA-A06-0057-001)

PSCI-M98-17-P256-DA: An example of the CONTRACTOR Purchase Order Number.

A06: Vendor Document Code (Process Data Sheet) which can be selected from Appendix 10 in this
procedure

0057: This is the sequence number of the document which shall be from 0001 to 9999

001: Sheet Number of the Document

6.9. SUBCONTRACTOR NUMBERING

Subcontractor documents shall be numbered in accordance with this procedure (6.1 – 6.7) with
addition of subcontractor code (3 Digits Code).

6.9.1. SUBCONTRACTOR DOCUMENT NUMBERING:

Example: (DRP001-OUF-ABC-TSD-E-000-123)

DRP001: Duqm Refinery Project Number

OUF: Originating party of the document (Utilities & Offsite EPC Contractor)

ABC: Subcontractor Identification Code (3 Digits)

TSD: Document type which can be selected from Appendix 1 in this procedure

E: Discipline Type (Electrical) which can be selected from Appendix 2 in this procedure

000: Unit Code which can be selected from Appendix 3 in this procedure, and for General documents
unit code shall be 000

123: This is the sequence number of the document which shall be from 001 to 999.

DRP001-OUF-PRO-U-000-001 Page 15 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

6.9.2. SUBCONTRACTOR DRAWING NUMBERING:

Project Unit Code & Discipline Document Sequence Sheet


Abbreviation Subcon
No. Area Code Code Type Number Number
Code Code
DRP001 OUF ABC XXXYYY X GAD NNN NNN

Constant Constant Subcon Code Appendix 3 & 6 Appendix 2 Appendix 1(001-999) (001-999)

Example: (DRP001-OUF-ABC-900060-E-TSD-123)

DRP001: Duqm Refinery Project Number

OUF: Originating party of the document (Utilities & Offsite EPC Contractor)

ABC: Subcontractor Identification Code (3 Digits)

GAD: Document type which can be selected from Appendix 1 in this procedure

E: Discipline Type (Electrical) which can be selected from Appendix 2 in this procedure

900: Unit Code which can be selected from Appendix 3 in this procedure, and for General documents
unit code shall be 000

060: Area Code which can be selected from Appendix 6 in this procedure

123: This is the sequence number of the document which shall be from 001 to 999.

7.0. CONTRACTOR’s DOCUMENTS NUMBERING

7.1. CONTRACTOR’S DOCUMENTS NUMBERING

These documents include specifications, procedures, reports, design criteria, technical standards,
system descriptions, requisitions, calculations and engineering lists which shall be numbered
according to the following convention.
All documents shall be numbered beginning with CONTRACTOR's code (13 Digits Code) and
COMPANY's document numbering will be followed except “DRP001-OUF”.

COMPANY's document numbering


CONTRACTOR DOCUMENT CODE
excepts "DRP001-OUF"

Project Discipline Document Sub-document Document type


Phase
No. Code Type type code or Unit/Area/Sequence number

SO0267 X XX X XXX XXX-Ommission…

Constant Appendix11 Appendix12 Appendix13 Appendix14

DRP001-OUF-PRO-U-000-001 Page 16 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

Example for general document:

Company’s document numbering: DRP001-OUF-TSD-E-000-123

Contractor’s document numbering: SO0267-EN0D-STD-TSD-E-000-123

SO0267: Contractor’s Project No.

EN0D-STD: Contractor’s Document Code from Appendix 11 to 14 in this procedure

TSD-E-000-123: COMPANY's document numbering followed except “DRP001-OUF”.

Example for general drawing, diagrams and sketch:

Company’s document numbering: DRP001-OUF-100010-P-PP-003-1

Contractor’s document numbering: SO0267-EH0D-PLO-100010-P-PP-003-1

SO0267: Contractor’s Project No.

EH0D-PLO: Contractor’s Document Code from Appendix 11 to 14 in this procedure

100010-P-PP-003-1: COMPANY's document numbering followed except “DRP001-OUF”.

Note:

1- Common Areas with other Contractors (such as Main IPR)

EPC1 will use the numbers from 001 to 499

EPC2 will use the numbers from 500 to 999

2- Common documents within (EPC2 JV)

001 to 300 for JV common documents (General document which already made on the FEED
stage will follow same numbering)

301 to 600 for PIL Documents (only additional)

601 to 900 for SEC Documents (only additional)

901 to 999 for un-known Documents

DRP001-OUF-PRO-U-000-001 Page 17 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

8.0. APPENDICES

8.1. APPENDIX 1: (COMPANY’s Document Type Code)

Duqm Refinery Document Type

Code Document Type


ACL Area Classification
ARC Architectural
B Facilities
BOQ Bill Of Quantities
CAL Calculations
CBE Commercial Bid Evaluation
CED Cause and Effects Diagrams
CON Concrete
CSL Cable Schedule
CVL Civil
CWD Combined Wiring Diagrams
DCR Design Criteria
DEM Demolition Drawing
DFD Detailed Fabrication Drawing
DLL General Documents List
DPT Design Pressure and Temperature Diagram
DSH Data sheet
ECR Cable Routing
EHC Equipment Hazardous Classification List
EHT Electrical Tracing Schedules
EID Interconnection Diagram
ELL Electrical List / Index
ELY Electrical /Equipment Building Layout
EPS Electrical Protection Scheme
EQL Equipment List
EQP Equipment Location
ERE Erection
ESK Elementary Diagram
FGL Fire and Gas Detector
FLD Functional Logic Diagram
FPR Fabrication Procedure
FSK Flow Sketch / Blow Diagrams / Pipeline Schematic Diagram
General Arrangement Drawing / Pipeline Approach Layout / Pipeline Alignment
GAD Sheet
GEO Geotechnical
GMD General Management Documents
GND Grounding
GSU General Summary
HMB Heat Material Balances
HTD Hydrostatic Test Diagram
ILD Instrument Location Drawing

DRP001-OUF-PRO-U-000-001 Page 18 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

Code Document Type


IFD Interface Documents
INL Instrument List / Index
INT Instrument Installation details / Hook-up Diagrams
IOL Input/Out List
ISO Isometric Drawings
ITP Inspection & Test Plan
IWD Instrument Wiring Diagram
KLD Instrument Loop Diagram
LDT Line Designation Table
LPD Lighting Protection Diagram
LTG Lighting & Small Power
MR Material Requisition
MSD Material Selection Diagram
MTO Material Take Off
MTS Method Statement
ND Non Deliverables
OPM Operational Manual
PAG Piping ( Above ground/except Isometrics)
PFD Process Flow Diagrams
PHD Philosophy Documents
PHY Physical
PID Piping and Instrumentation Diagram
PIL Piping Index List
PLY Power Layout
POC Procurement Management Documents
PP Plot Plan / Pipeline Route Map / Pipeline Layout Drawing
PRO Procedures
RAM Request for Approval of Material
RPT Project Reports
SCH Schedule
SDE System Description
SIL Safety Integrity Level
SK Sketch
SLD Single Line Diagram
SPE Specification
SPL Specialty Item List
STL Steel
TBE Technical Bid Evaluation
TDL Technical Document List
TIL Tie-in Points
TLY Telecoms Drawing/Layout
TPR Test Procedure
TS Standard Details Drawings
TSD Technical Standard

DRP001-OUF-PRO-U-000-001 Page 19 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

UFD Utility Flow Diagrams


VLS Valve List
WIR Wiring (one-line, 2-line)

8.2. APPENDIX 2: (COMPANY’s Discipline Code)

Duqm Refinery Discipline Code

Code Discipline
A Technical Information Management
B HVAC
C Civil/Structural/Architectural
D Telecoms
E Electrical
F Fluid Systems
G Project Control & ITC
H Furnaces
I Estimating
J Process Control
K Instrumentation/Controls
L Subcontractors / Construction
M Mechanical
N Procurement
P Plan Design & Piping
Q Quality
R Rotating Equipment
S Marine
T Process
U Project
V Vessel & Tanks
W Materials (Technology)
X Heat Exchangers
Y Pipelines
Z Safety

DRP001-OUF-PRO-U-000-001 Page 20 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

8.3. APPENDIX 3: (COMPANY’s & CONTRACTOR’s Unit Code)

Unit Licensed (L) or


Description Abbreviation
Code Non-Licensed Unit (NL)
GENERAL
000 Common to all Units
555 Fire & Gas to All Units F&G NL
PROCESS UNITS
Refinery Units
100 Crude Distillation Unit CDU NL
105 Saturated Gas Plant SGP L
110 Vacuum Distillation Unit VDU NL
120 Hydrocracker Unit HCU L
130 Delayed Coker Unit (including Gas Plant) DCU L
135 Coker Amine Regeneration CAR NL
136 Coker Sour Water Stripper CSW NL
150 Kerosene Treatment Unit KTU L
160 Diesel Hydrodesulphurization Unit DHT L
170 LPG Treatment Unit LTU L
300 Future Use (if required)
310 Hydrogen Production and PSA Unit HPU L
320 Amine Regeneration Unit ARU NL
330 Sour Water Stripper SWS NL
340 Sulphur Recovery Unit SRU L

UTILITIES
Water Systems & Chemical Systems
400 Potable Water, Service Water NL
410 Cooling Water System NL
420 Demin Water System NL
450 Refinery Fuel Systems NL
460 Plant and Instrument Air NL
470 Nitrogen System NL
480 Chemicals Systems: Caustic, Sulphuric Acid NL
500 Seawater System NL
510 Desalination Unit NL

DRP001-OUF-PRO-U-000-001 Page 21 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

Power Station/Distribution and Steam


430 Boiler Feed Water System NL
440 Steam Generation & Condensate NL
490 Electrical Power Distribution NL
Unit Licensed (L) or
Description Abbreviation
Code Non-Licensed Unit(NL)
520 Power Plant NL
OFF-SITES
Flare / Effluent Treatment /Disposal
530 Refinery Flare System NL
540 Fire Fighting System NL
560 Hydrocarbon Drain System NL
570 Waste Water Treatment Plant NL
580 Waste Handling & Disposal System NL
590 Spent Caustic System NL
595 Drainage System – Oily Water System NL
596 Drainage System – Clean Water NL
Storage & Loading Facilities / Pipelines
550 Slop Oil System NL
585 Flushing Oil System NL
600 Natural Gas Pipeline (Third Party Scope) NL
610 Natural Gas Reception Facilities NL
635 Crude Import Facilities NL
640 Diesel Truck Loading NL
650 Products Export Pipelines NL
660 Sulphur Pelletisation Unit & Refinery Sulphur NL
670 General for Pipelines NL
680 Refinery Coke Loading and storage NL
700 Crude Oil Storage NL
710 Intermediate Storage NL
730 Product Storage NL
740 LPG Storage and Associated Facilities NL
750 Sulphur Storage NL
INFRASTRUCTURE / PIPE RACKS / BUILDINGS
900 General Buildings NL
910 Telecommunications NL
920 Interconnecting Facilities (Pipe racks, sleeper ways) NL
930 Administrative Buildings NL
940 Operational Buildings NL
950 Warehousing NL

DRP001-OUF-PRO-U-000-001 Page 22 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

960 Gate House NL


970 Main Access Road NL
980 Fencing NL
INTERFACE UNITS
800-899 Export Terminal Facility NL
630 Crude Pipeline from Ras Markaz NL

8.4. APPENDIX 4: (COMPANY’s Equipment Code)

Code Equipment
A Flares
AE Air-Cooled Heat Exchanger
AH Analyser Shelter
AR Arm
B Boiler
BDV Blow Down Vaporizer
BN Bunker
BR Burner
BAT Battery
BD Bus Duct
BG Building, Warehouse, Admin building, Fire station
C Column / Tower
CN Overhead cranes, Electric Hoists, etc
CNT Canister
CNV Conveyor
CR Control Room
CPI Corrugated Plate Interceptor
CT Cooling Towers
DA Deaerator
DR Dryer
DS Desuperheater

All types of Heat Exchanger except air coolers, e.g., shell & tube Heat
E Exchanger, Cold Box, Plate and Frame, Double Pipe, Platefin Heat Exchanger,
Process heater (electric)
EG Emergency Diesel Generator
F Cracking Furnace or Fired Heater or Incinerators
G Generator
J Eductors / Ejectors
K Compressor, Blower, Fan, Expander
LA Loading Arm
LCS Local Control Station
LRS Local Refuge Shelter
ME Machinery, Elevator
M Motor
MCC Motor control centre
MX Mixers

DRP001-OUF-PRO-U-000-001 Page 23 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

N Agitators
NET Neutral earthing transformer
NER Neutral earthing resistor
P Pump
PDB Power distribution board
PK Unit / Package equipment (Where the details are not yet known)
PNL Panel
Code Equipment
Q Civil Structure, Water Basins, Sump, Dikes, Ponds, Pits, API separator
R Reactor
S Filter, Coalescer and Strainer
SIL Silencer
SK Stack
SPI Specialty Item
SS Substation
SWG Switchgear
T Steam Turbine, Gas Turbine, Hydraulic Turbine
TK Tank
TX Transformer
UPS Uninterruptible Power Supply
V Drum, Vessel
W Weigher
Miscellaneous (e.g. Fire water monitor, Foam generators, deluge skid, Pig
Z
receiver/launcher)

Letter Combinations can be made from the above e.g.

PM = Motor drive for Pump,


PKSIL = Silencer within package equipment
PT = Turbine drive for Pump
KM = Motor Drive for Compressor, Blower
KT = Turbine Drive for Compressor, Blower
TG = Steam Turbine Generator

DRP001-OUF-PRO-U-000-001 Page 24 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

8.5. APPENDIX 5: (COMPANY’s Instrument Function Code)

Instrument Function Code Instrument Description


AA ANALYSER ALARM (SOFT)
AAH ANALYSER ALARM HIGH (HARD)
AAH ANALYSER ALARM HIGH (SOFT)
AAHH ANALYSER ALARM HIGH HIGH
AAL ANALYSER ALARM LOW (HARD)
AAL ANALYSER ALARM LOW (SOFT)
AALL ANALYSER ALARM LOW LOW
AC ANALYSER CONTROLLER (SOFT)
AE ANALYSER ELEMENT
AHS ANALYZER STREAM SELECTOR HAND SWITCH
AI ANALYSER COMPONENT
AI ANALYSER INDICATION (CO)
AI ANALYSER INDICATION (H2O)
AI ANALYSER INDICATION (NOx)
AI ANALYSER INDICATION (O2 DRY)
AI ANALYSER INDICATION (O2 WET)
AI ANALYSER INDICATION (PM)
AI ANALYSER INDICATION (SO2)
AI ANALYSER INDICATION (SOFT)
AI ANALYSER INDICATION (THC)
AI ANALYSER INDICATOR (FIELD)
AIT ANALYSER INDICATING TRANSMITTER
AL ALARM
AP ANALYSER SAMPLE POINT
AS ANALYSER SWITCH
AT ANALYSER TRANSMITTER
AT ANALYSER TRANSMITTER (O2 DRY)
AT ANALYSER TRANSMITTER (O2 WET)
AT ANALYSER TRANSMITTER (PM)
AT ANALYSER TRANSMITTER (SO2 / NOx / CO)
AT ANALYSER TRANSMITTER (THC)
AT ANALYSER TRANSMITTER FF
AV ANALYSER CONTROL VALVE
AV ANALYSER CONTROL VALVE FF
AX ANALYSER PROBE
AY ANALYSER DCS FUNCTION (SOFT)
AY ANALYSER I/P CONVERTER
AY ANALYSER SOLENOID VALVE
AY ANALYZER STREAM SELECTOR
AZLC ANALYSER VALVE POS. INDIC. CLOSED (SOFT)
AZLO ANALYSER VALVE POS. INDIC. OPEN (SOFT)
AZSC ANALYSER VALVE POITION SWITCH CLOSED

DRP001-OUF-PRO-U-000-001 Page 25 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

AZSO ANALYSER VALVE POSITION SWITCH OPEN


Instrument Function Code Instrument Description
BAL BURNER FLAME LOW ALARM
BE BURNER ELEMENT
BE FLAME DETECTOR ELEMENT
BI BURNER INDICATION (SOFT)
BL BURNER ON LAMP
BS BURNER SWITCH
BT BURNER TRANSMITTER
BT BURNER TRANSMITTER (HART)
BT BURNER TRANSMITTER FF
BT FLAME DETECTOR
CAL-EQ CALIBRATION EQUIPMENT
CI CONDUCTIVITY INDICATION (SOFT)
CI CORROSION INDICATION (SOFT)
CL GROUND VERIFICATION LAMP
CS GROUND VERIFICATION MONITOR
CT CONDUCTIVITY TRANSMITTER
CT CORROSION TRANSMITTER
DI DENSITY INDICTION (SOFT)
DIT DENSITY INDICATING TRANSMITTER
EI VOLTAGE INDICATION (SOFT)
ET VOLTAGE TRANSMITTER
FA FLOW ALARM (SOFT)
FAH FLOW ALARM HIGH (HARD)
FAH FLOW ALARM HIGH (SOFT)
FAHH FLOW ALARM HIGH HIGH (SOFT)
FAL FLOW ALARM LOW (HARD)
FAL FLOW ALARM LOW (SOFT)
FALL FLOW ALARM LOW LOW (SOFT)
FC FLOW CONTROLLER (SOFT)
FCV FLOW REGULATOR
FE ANNUBAR
FE CORIOLIS FLOW METER
FE ELECTROMAG FLOW METER
FE ORIFICE PLATE
FE OVAL WHEEL METER
FE PITOT TUBE
FE THERMAL MASS METER
FE TURBINE METER
FE ULTRASONIC FLOW METER
FE V CONE FLOW METER
FE VENTURI TUBE
FE VORTEX METER (REMOTE TX)
FE WEDGE METER

DRP001-OUF-PRO-U-000-001 Page 26 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

FF ORIFICE FLANGES
Instrument Function Code Instrument Description
FFC FLOW RATIO CONTROLLER (SOFT)
FG DP FLOW INDICATOR
FG FLOW SIGHT GLASS
FHS FLOW HAND SWITCH
FI FLOW INDICATION (SOFT)
FI FLOW INDICATOR (HARD)
FI FLOW INDICATOR (HARD) FF
FI VA METER
FICV FLOW REGULATOR W/FLOW INDICATOR
FIT DP FLOW INDICATING TRANSMITTER
FIT DP FLOW INDICATING TRANSMITTER FF
FIT FLOW INDICATING TRANSMITTER
FIT FLOW INDICATING TRANSMITTER CORIOLIS
FIT FLOW INDICATING TRANSMITTER CORIOLIS FF
FIT FLOW INDICATING TRANSMITTER MAGNETIC
FIT FLOW INDICATING TRANSMITTER MAGNETIC FF
FIT FLOW INDICATING TRANSMITTER ULTRASONIC
FIT FLOW INDICATING TRANSMITTER VORTEX
FIT FLOW INDICATING TRANSMITTER VORTEX FF
FIT FLOW INDICATING XMTR MASS FLOW FF
FIT FLOW INDICATING XMTR POSITIVE DISPL FF
FIT FLOW INDICATING XMTR ULTRASONIC FF
FIT FLOW TRANSMITTER MAGNETIC FF
FIT FLOW TRANSMITTER MASSFLOW
FIT U/S FLOW INDICATING TRANSMITTER
FIT VA METER W/TRANSMITTER
FL FLASH LIGHT
FO RESTRICTION ORIFICE
FQ FLOW TOTALISER (SOFT)
FQC FLOW TOTALISING CONTROLLER (SOFT)
FQI FLOW TOTALISING INDICATOR (SOFT)
FSH FLOW SWITCH HIGH
FSHH FLOW SWITCH HIGH HIGH
FSL FLOW SWITCH LOW
FSLL FLOW SWITCH LOW LOW
FUY SOLENOID VALVE
FV FLOW CONTROL VALVE
FV FLOW CONTROL VALVE FF
FY FLOW CONTROL OUTPUT
FY FLOW DCS FUNCTION
FY FLOW DCS FUNCTION (SOFT)
FY FLOW I/P CONVERTER
FY FLOW SIGNAL ISOLATOR

DRP001-OUF-PRO-U-000-001 Page 27 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

FY FLOW SOLENOID VALVE


Instrument Function Code Instrument Description
FZLC FLOW VALVE POS. INDICATOR CLOSED (SOFT)
FZLO FLOW VALVE POS. INDICATOR OPEN (SOFT)
FZSC FLOW VALVE POSITION SWITCH CLOSED
FZSO FLOW VALVE POSITION SWITCH OPEN
FZT FLOW VALVE POSITION TRANSMITTER
HA MISCELLANEOUS ALARM (SOFT)
HC HAND CONTROLLER (HARD)
HC HAND CONTROLLER (SOFT)
HI TANK INDICATION
HS HAND SWITCH
HS HAND SWITCH (START)
HS HAND SWITCH (STOP)
HS SELECTOR SWITCH (SOFT)
HV HAND CONTROL VALVE
HV HAND CONTROL VALVE FF
HY HAND CONTROL OUTPUT (HARD)
HY HAND I/P CONVERTER
HY HAND SOLENOID VALVE
HZI DAMPER POSITION INDICATION (SOFT)
HZI DAMPER POSITION INDICATOR (HARD) FF
HZL POSITION STATUS (SOFT)
HZLC HAND VALVE POS. INDICATOR CLOSED (SOFT)
HZLO HAND VALVE POS. INDICATOR OPEN (SOFT)
HZSC HAND VALVE POSITION SWITCH (CLOSE)
HZSO HAND VALVE POSITION SWITCH (OPEN)
HZT DAMPER POSITION TRANSMITTER FF
IC CURRENT CONTROLLER (SOFT)
IIS CURRENT INDICATION (SOFT)
II CURRENT INDICATOR
IN IN-CIRCUIT T.V.
INT INTERCOM/SPEAKER
IT CURRENT TRANSMITTER
ITS CURRENT TRANSMITTER (SOFT)
ITF CURRENT TRANSMITTER FF
JB JB/MR
JI POWER INDICATION (SOFT)
JT POWER TRANSMITTER
JTS POWER TRANSMITTER (SOFT)
KA MISCELLANEOUS ALARM (SOFT)
KC TIMER CONTROLLER (SOFT)
KE KEY PHASOR PROBE
KEY KEYING DEVICE
KI SPEED INDICATION (SOFT)

DRP001-OUF-PRO-U-000-001 Page 28 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

KT KEY PHASOR TRANSMITTER


Instrument Function Code Instrument Description
KV ON/OFF VALVE FF
KY TIMER CALCULATION (SOFT)
LA LEVEL ALARM (SOFT)
LAH LEVEL ALARM HIGH (HARD)
LAH LEVEL ALARM HIGH (SOFT)
LAHH LEVEL ALARM HIGH HIGH (HARD)
LAHH LEVEL ALARM HIGH HIGH (SOFT)
LAL LEVEL ALARM LOW (HARD)
LAL LEVEL ALARM LOW (SOFT)
LALL LEVEL ALARM LOW LOW (SOFT)
LC LEVEL CONTROLLER (SOFT)
LCV LEVEL REGULATOR
LDAH DIFFERENTIAL LEVEL ALARM HIGH (HARD)
LDI DIFFERENTIAL LEVEL INDICATOR (SOFT)
LE LEVEL CAPACITANCE PROBE
LE LEVEL ELEMENT GAMMA RAY
LE LEVEL ELEMENT RADAR
LE LEVEL ELEMENT ULTRASONIC
LE LEVEL PROBE
LG LEVEL GAUGE
LG LEVEL GAUGE MAGNETIC
LG LEVEL GLASS
LGW LEVEL GAUGE STILLING WELL
LHS LEVEL HAND SWITCH
LI LEVEL ESD TRIP OUTPUT
LI LEVEL INDICATOR
LI LEVEL INDICATOR (HARD)
LI LEVEL INDICATOR (HARD) FF
LI LEVEL INDICATOR (SOFT)
LI TANK SIDE MONITOR
LIT DP LEVEL INDICATING TRANSMITTER
LIT DP LEVEL INDICATING TRANSMITTER FF
LIT LEVEL INDICATING TRANSMITTER
LIT LEVEL INDICATING TRANSMITTER CAPACITANCE
LIT LEVEL INDICATING TRANSMITTER DISPLACER
LIT LEVEL INDICATING TRANSMITTER GAMMA RAY
LIT LEVEL INDICATING TRANSMITTER GWR
LIT LEVEL INDICATING TRANSMITTER GWR FF
LIT LEVEL INDICATING TRANSMITTER RADAR
LIT LEVEL INDICATING TRANSMITTER RADAR FF
LIT LEVEL INDICATING TRANSMITTER SERVO
LIT LEVEL INDICATING TRANSMITTER ULTRASONIC
LIT LEVEL INDICATING XMTR CAPACITANCE FF

DRP001-OUF-PRO-U-000-001 Page 29 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

LIT LEVEL INDICATING XMTR DISPLACER FF


Instrument Function Code Instrument Description
LIT LEVEL INDICATING XMTR ULTRASONIC FF
LLH ALARM LAMP
LSH LEVEL SWITCH HIGH
LSHH LEVEL SWITCH HIGH HIGH
LSL LEVEL SWITCH LOW
LSLL LEVEL SWITCH LOW LOW
LV LEVEL CONTROL VALVE FF
LW LEVEL STILLING WELL
LY DCS FUNCTION (SOFT)
LY LEVEL CONTROL OUTPUT
LY LEVEL DCS FUCTION (SOFT)
LY LEVEL DCS FUNCTION
LY LEVEL I/P CONVERTER
LY LEVEL SIGNAL ISOLATOR
LY LEVEL SOLENOID VALVE
LY SELECTOR SWITCH
LZLC LEVEL VALVE POS. INDICATOR CLOSED (SOFT)
LZLO LEVEL VALVE POS. INDICATOR OPEN (SOFT)
LZSC LEVEL VALVE POSITION SWITCH CLOSED
LZSO LEVEL VALVE POSITION SWITCH OPEN
ME MEASURING DEVICE
MHS HAND SWITCH
MHS HAND SWITCH (SOFT)
MHSC HAND SWITCH (SOFT)
MHSC MOV CLOSE COMMAND
MHSC MOV HAND SWITCH CLOSE
MHSO MOV HAND SWITCH OPEN
MHSO MOV OPEN COMMAND
MHSS MOV STOP COMMAND
MIC MICROPHONE
MON MONITOR
MOV MOTOR OPERATED VALVE
MOV MOTOR OPERATED VALVE FF
MZL POSITION STATUS (SOFT)
MZLC MOV CLOSED POSITION LAMP
MZLC POSITION STATUS (SOFT)
MZLO MOV OPEN POSITION INDICATION (SOFT)
MZLO MOV OPEN POSITION LAMP
MZLO POSITION STATUS (SOFT)
MZLO POSITION SWITCH (SOFT)
MZSC MOV POSITION SWITCH (CLOSE)
MZSO MOV OPEN POSITION SWITCH
MZSO MOV POSITION SWITCH (OPEN)

DRP001-OUF-PRO-U-000-001 Page 30 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

NAV NAVIGATION DEVICE


Instrument Function Code Instrument Description
NHQ MOTOR RUNNING HOURS (SOFT)
NHS MOTOR START RELAY
NHS MOTOR STOP RELAY
NII MOTOR CURRENT INDICATION (SOFT)
NIT CURRENT TRANSMITTER
NJI MOTOR POWER INDICATION (SOFT)
NKQ MOTOR RUNNING HOURS (SOFT)
NSC MOTOR SPEED REFERENCE
NSI MOTOR SPEED FEEDBACK
NUY MOTOR TRIP OUTPUT
NXA MOTOR AVAILABLE STATUS (SOFT)
NXA MOTOR FAULT STATUS (SOFT)
NXA MOTOR STATUS INDICATION (SOFT)
NXA MOTOR TRIP CCT HEALTHY (SOFT)
NXA MOTOR TRIP STATUS (SOFT)
NXI MOTOR STATUS LAMP
NXL MOTOR AVAILABLE STATUS
NXL MOTOR RUN STATUS
NXL MOTOR VSD READY
NZT CURRENT TRANSDUCER
PA PRESSURE ALARM (SOFT)
PAH PRESSURE ALARM HIGH (HARD)
PAH PRESSURE ALARM HIGH (SOFT)
PAHH PRESSURE ALARM HIGH HIGH
PAL PRESSURE ALARM LOW (HARD)
PAL PRESSURE ALARM LOW (SOFT)
PALL PRESSURE ALARM LOW LOW
PC PERSONAL COMPUTER
PC PRESSURE CONTROLLER (SOFT)
PCV PRESSURE REGULATOR
PCV PRESSURE REGULATOR (PILOT OPERATED)
PDAH DIFF PRESSURE ALARM HIGH (HARD)
PDAH DIFF PRESSURE ALARM HIGH (SOFT)
PDAHH DIFF PRESSURE ALARM HIGH HIGH (SOFT)
PDAL DIFF PRESSURE ALARM LOW (HARD)
PDAL DIFF PRESSURE ALARM LOW (SOFT)
PDALL DIFF PRESSURE ALARM LOW LOW
PDC DIFF PRESSURE CONTROLLER (SOFT)
PDCV DIFF PRESSURE REGULATOR
PDG DIFF PRESSURE GAUGE
PDI DIFF PRESSURE INDICATION (HARD) FF
PDI DIFF PRESSURE INDICATION (SOFT)
PDI DIFF PRESSURE INDICATOR (HARD) FF

DRP001-OUF-PRO-U-000-001 Page 31 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

PDIT DIFF PRESSURE INDICATING TRANSMITTER


Instrument Function Code Instrument Description
PDIT DIFF PRESSURE INDICATING TRANSMITTER FF
PDSH DIFF PRESSURE SWITCH HI
PDSL DIFF PRESSURE SWITCH LOW
PDSLL DIFF PRESSURE SWITCH LOW LOW
PDV DIFF PRESSURE CONTROL VALVE
PDV DIFF PRESSURE CONTROL VALVE FF
PDY DIFF PRESSURE I/P CONVERTER
PG PRESSURE GAUGE
PI PRESSURE INDICATION (SOFT)
PI PRESSURE INDICATOR
PI PRESSURE INDICATOR (HARD) FF
PIT PRESSURE INDICATING TRANSMITTER
PIT PRESSURE INDICATING TRANSMITTER FF
PP PRESSURE TEST POINT
PR PRESSURE RECORDER
PR PRINTER
PSE PRESSURE/VACUUM RUPTURE DISC
PSE PRESSURE RELIEF RUPTURE DISK
PSH PRESSURE SWITCH HIGH
PSHH PRESSURE SWITCH HIGH HIGH
PSL PRESSURE SWITCH LOW
PSLL PRESSURE SWITCH LOW LOW
PSV PRESSURE RELIEF VALVE
PSV PRESSURE/VACUUM RELIEF VALVE
PSXA RUPTURE ALARM
PSXS RUPTURE INDICATION
PV PRESSURE CONTROL VALVE
PV PRESSURE CONTROL VALVE FF
PW POWER SUPPLY
PY CCS FUNCTION (SOFT)
PY PRESSURE DCS FUNCTION (SOFT)
PY PRESSURE I/P CONVERTER
PY PRESSURE SOLENOID VALVE
PY SIGNAL MULTIPLIER
PZLC PRESS. VALVE POS. INDIC. CLOSED (SOFT)
PZLO PRESS. VALVE POS. INDIC. OPEN (SOFT)
PZSC PRESSURE VALVE POSITION SWITCH CLOSED
PZSO PRESSURE VALVE POSITION SWITCH OPEN
QC HEAT DUTY CONTROLLER
QFC HEAT DUTY RATIO CONTROLLER
QV HEAT DUTY CONTROL VALVE
QV QUANTITY CONTROL VALVE
QY HEAT DUTY DCS FUNCTION

DRP001-OUF-PRO-U-000-001 Page 32 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

REL RELAY UNIT


Instrument Function Code Instrument Description
RO RESTRICTION ORIFICE
SC SPEED CONTROL (SOFT)
SE SPEED ELEMENT
SI SPEED INDICATION (SOFT)
SP SPLITTER
SPEL ELECTRICAL
ST SPEED TRANSMITTER
ST SPEED XMTR FF
SUY SPEED ESD TRIP SIGNAL
SV SPEED CONTROL VALVE
SY SPEED CONTROL OUTPUT
TA TEMPERATURE ALARM (SOFT)
TAH TEMPERATURE ALARM HIGH (HARD)
TAH TEMPERATURE ALARM HIGH (SOFT)
TAHH TEMPERATURE ALARM HIGH HIGH
TAL TEMPERATURE ALARM LOW (HARD)
TAL TEMPERATURE ALARM LOW (SOFT)
TALK TALK BACK
TALL TEMPERATURE ALARM LOW LOW
TB TERMINATOR BLOCK
TC TEMPERATURE CONTROLLER
TC TEMPERATURE CONTROLLER (SOFT)
TCV TEMPERATURE REGULATOR
TDC DIFF. TEMPERATURE CONTROLLER (SOFT)
TDC TEMPERATURE DIFFERENTIAL CONTROLLER
TDI DIFF. TEMPERATURE INDICATOR (HARD)
TDI DIFF. TEMPERATURE INDICATOR (HARD) FF
TDI DIFF. TEMPERATURE INDICATOR (SOFT)
TDV DIFF. TEMPERATURE CONTROL VALVE
TDV DIFF. TEMPERATURE CONTROL VALVE FF
TDY DIFFERENTIAL TEMPERATURE DCS FUNCTION
TE DUAL ELEMENT RTD
TE DUPLEX / DUAL THERMOCOUPLE
TE MULTIPOINT TEMPERATURE ELEMENT
TE MULTIPOINT THERMOCOUPLE
TE OPTICAL PYROMETER
TE RESISTANCE TEMPERATURE DEVICE (RTD)
TE SKIN THERMOCOUPLE
TE THERMOCOUPLE
TG BIMETALLIC THERMOMETER
TGW THERMOWELL
THS DCS HAND SWITCH
TI TEMPERATURE INDICATION (SOFT)

DRP001-OUF-PRO-U-000-001 Page 33 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

TI TEMPERATURE INDICATOR (HARD) FF


Instrument Function Code Instrument Description
TIC TEMPERATURE INDICATING CONTROLLER
TIT TEMPERATURE INDICATING TRANSMITTER
TIT TEMPERATURE INDICATING TRANSMITTER FF
TP TAPE
TP TERMINATOR
TSH TEMPERATURE SWITCH HIGH
TSHH TEMPERATURE SWITCH HIGH HIGH
TSL TEMPERATURE SWITCH LOW
TSLL PRESSURE INDICATOR (SOFT)
TSV THERMAL RELIEF VALVE
TT TEMPERATURE XMTR
TT TEMPERATURE XMTR FF
TU TEMPERATURE MULTIFUNCTION
TUY TEMPERATURE FINAL ELEMENT
TV TEMPERATURE CONTROL VALVE FF
TW TEMPERATURE STILLING WELL
TW THERMOWELL
TY TEMPERATURE CONTROL OUTPUT
TY TEMPERATURE DCS FUCTION (SOFT)
TY TEMPERATURE DCS FUNCTION (DCS)
TY TEMPERATURE I/P CONVERTER
TY TEMPERATURE SOLENOID VALVE
TZLC TEMP. VALVE POS. INDIC. CLOSED (SOFT)
TZLO TEMP. VALVE POS. INDIC. OPEN (SOFT)
TZSC TEMPERATURE POSITION SWITCH CLOSED
TZSO TEMPERATURE POSITION SWITCH OPEN
UHS DCS STROKE TESTING
UHS RESET HAND SWITCH
UHS STATUS SWITCH
UHS TRIP HAND SWITCH
UHSC HAND SWITCH CLOSE
UHSO HAND SWITCH OPEN
UL LAMP
US TEST CLOSE
UV ON/OFF VALVE
UY ESD TRIP SIGNAL
UY SHUTDOWN COMMAND
UY SOLENOID VALVE
UY VALVE POSITIONER
UZL POSITION STATUS (SOFT)
UZLC VALVE CLOSED POSITION LAMP
UZLC VALVE POSITION INDICATOR CLOSED (SOFT)
UZLC VALVE POSITION SWITCH CLOSED

DRP001-OUF-PRO-U-000-001 Page 34 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

UZLO VALVE OPEN POSITION LAMP


Instrument Function Code Instrument Description
UZLO VALVE POSITION INDICATOR OPEN (SOFT)
UZSC VALVE POSITION SWITCH CLOSED
UZSO VALVE POSITION SWITCH OPEN
UZT POSITION TRANSMITTER
VC VIBRATION CONTROL
VD VIDEO
VE AXIAL VIBRATION PROBE (Z-AXIS)
VE KEY PHASOR PROBE
VE PROXIMITY PROBE
VE PROXIMITY PROBE (RADIAL)
VE RADIAL VIBRATION PROBE (X-AXIS)
VE RADIAL VIBRATION PROBE (Y-AXIS)
VE VIBRATION PROBE
VFD VIRTUAL FIELD DEVICE
VI PROXIMITY INDICATION (SOFT)
VI VIBRATION INDICATION (SOFT)
VS PROXIMITY SWITCH
VS VIBRATION SWITCH
VT AXIAL VIBRATION XMTR
VT KEY PHASOR XMTR
VT PROXIMITY TRANSMITTER
VT RADIAL VIBRATION XMTR (X-AXIS)
VT RADIAL VIBRATION XMTR (Y-AXIS)
VT VIBRATION TRANSMITTER
VT VIBRATION XMTR FF
VUY ESD TRIP SIGNAL
VXE RADIAL VIBRATION PROBE (X-AXIS)
VXI VIBRATION INDICATION (SOFT)
VXS RADIAL VIBRATION SWITCH
VXT RADIAL VIBRATION TRANSMITTER (X-AXIS)
VY PROXIMITY MONITOR
VY VIBRATION RELAY
VYE RADIAL VIBRATION PROBE (Y-AXIS)
VYI VIBRATION INDICATION (SOFT)
VYS RADIAL VIBRATION SWITCH
VYT RADIAL VIBRATION TRANSMITTER (Y-AXIS)
WC LOAD CONTROLLER (SOFT)
WC WEIGHT CONTROL (SOFT)
WE LOAD CELL
WI LOAD INDICATION (HARD)
WI LOAD INDICATION (SOFT)
WI WEIGHT INDICATION (SOFT)
WIT WEIGHT INDICATING XMTR

DRP001-OUF-PRO-U-000-001 Page 35 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

WIT WEIGHT INDICATING XMTR FF


Instrument Function Code Instrument Description
WY LOAD CONTROL OUTPUT
WY LOAD INDICATION OUTPUT
XA STATUS ALARM
XHS HAND SWITCH
XHS HAND SWITCH (SOFT)
XHS IGNITER RETRACT
XHSC HAND SWITCH (SOFT)
XHSC VALVE CLOSE COMMAND
XHSO VALVE OPEN COMMAND
XHSS VALVE STOP COMMAND
XI STATUS INDICATION
XL RUNNING STATUS LAMP
XS DCS FUNCTION (SOFT)
XV CONTROL VALVE
XV CONTROL VALVE (HART)
XV IGNITER
XV ON/OFF VALVE
XV ON/OFF VALVE FF
XY DCS FUNCTION (SOFT)
XY SOLENOID VALVE
XZLC VALVE CLOSED POSITION LAMP
XZLO VALVE OPEN POSITION LAMP
XZSC IGNITER POSITION IN
XZSC LIMIT SWITCH (CLOSE)
XZSO IGNITER POSITION OUT
XZSO LIMIT SWITCH (OPEN)
XZSO VALVE OPEN POSITION SWITCH
ZC POSITION CONTROL (SOFT)
ZI POSITION INDICATOR (SOFT)
ZL LOCAL POSITION INDICATION
ZL POSITION STATUS (SOFT)
ZLO POSITION STATUS OPEN
ZS POSITION SWITCH
ZSO POSITION SWITCH OPEN
ZT POSITION TRANSMITTER

Notes:

1. Company shall be consulted for additional Instrumentation Symbols and/or combinations.

2. For all switches, the S is in the second location, alarms or annunciating devices replace the S with
A.

For example: PSH = Pressure switch high activates PAH = Pressure alarm high

3. The Alarm suffix H and L may be omitted in undefined cases.

DRP001-OUF-PRO-U-000-001 Page 36 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

4. Additional suffices may be added to further clarify alarm functions. For example:

PDAHH = Pressure Differential Alarm High High

PDSHHH = Pressure Differential Switch High High High

F&G
F&G Item Description
Function Code
GADFA Aspirated Smoke Detector Fault Alarm (HSSD)
GADHA Aspirated Smoke Detector High Alarm (HSSD)
GAD Aspirated Smoke Detector (HSSD)
GCAM Camera (I.E CCTV) INCL. HEAT SENSING/FLAME FLICKER FREQUENCY/PTZ
GDV Deluge Valve
GDZLC Deluge Valve Position Lamp Closed
GDZLO Deluge Valve Position Lamp Open
GDZSC Deluge Valve Position Switch Closed
GDZSO Deluge Valve Position Switch Open
GDZT Deluge Valve Position Transmitter
GFAB Fire Alarm Beacon
GFAS Fire Alarm Siren
GFDAA Fire Extinguishant Discharge Alarm Audible
GFDAV Fire Extinguishant Discharge Alarm Visual
GFDIR Fire Detector Infra-Red
GFDUI Fire Detector Combined UV/IR
GFDUV Fire Detector Ultra Violet
GGCA Gas Combustible Alarm Audible
GGCB Gas Combustible Beacon
GGCD Gas Combustible Detector
GGDOR Gas Detector Open Path Receiver
GGDOT Gas Detector Open Path Transmitter
GGTB Gas Toxic Alarm Audible
GGTB Gas Toxic Beacon
GGTD Gas Toxic Detector
GHDL Heat Detector Linear
GHDP Heat Detector Point
GMAC Manual Alarm Callpoint
GDO Oxygen Depletion Detector
GSDI Smoke Detector Ionisation
GSDO Smoke Detector Optical

DRP001-OUF-PRO-U-000-001 Page 37 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

8.6. APPENDIX 6: (COMPANY’s & CONTRACTOR’s Area Code)

Area Code Area


010 Common Area
020 Interconnecting Rack Area
030 Utilities Area
040 Export & Truck Loading Area
050 Product Export Pipelines
060 Non-Process Areas
070 Crude Oil Storage Area
080 Product Storage Area
090 Intermediate Storage Area
100 LPG Storage & Associated Facilities
110 Waste Water Treatment Plant
120 Refinery Flare Area

8.7. APPENDIX 7: (Construction Area – Split WBS)

Split WBS Split WBS Description Broad_WBS Description

010.01  Common  Common Area 


020.01  North Side Interconnecting Pipe Rack  Interconnecting Rack Area 
020.02  South Side Interconnecting Pipe Rack  Interconnecting Rack Area
030.01  Common  Utilities Area 
030.02  Unit Piperack  Utilities Area
030.03  Natural Gas Reception Facilities  Utilities Area
030.04  Cooling Water System  Utilities Area 
030.05  Desalinated Water Systems  Utilities Area
Demineralized Water, Potable Water & Service 
030.06  Water  Utilities Area
Demineralized Water, Potable Water & Service 
030.21  Water  Utilities Area
030.07  Instrument Air, Plant Air   Utilities Area
030.08  Nitrogen Generation System  Utilities Area
Boiler Feed Water System, Steam Generation and 
030.09  Condensate  Utilities Area
Boiler Feed Water System, Steam Generation and 
030.22  Condensate  Utilities Area
030.10  Refinery Fuel Systems & Chemical System  Utilities Area
030.11  Fire Fighting System  Utilities Area
030.12  Substation S400  Utilities Area
030.13  Substation S490  Utilities Area
030.14  Substation S491  Utilities Area
030.15  Substation S495 & EDG  Utilities Area
030.16  Local Control Station LCS‐016  Utilities Area
030.17  Substation S610  Utilities Area 

DRP001-OUF-PRO-U-000-001 Page 38 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

Split WBS Split WBS Description Broad_WBS Description


Export & Truck Loading 
040.01  Common  Area 
Export & Truck Loading 
040.02  Diesel Truck Loading  Area 
Export & Truck Loading 
040.03  Sulphur Pelletization and Refinery Sulphur Loading  Area 
Export & Truck Loading 
040.04  Refinery Coke Loading and Storage  Area
Export & Truck Loading 
040.05  Substation S660  Area
Export & Truck Loading 
040.06  Substation S635  Area
Export & Truck Loading 
040.07  Local Control Station LCS‐014  Area
Export & Truck Loading 
040.08  Local Control Station LCS‐013  Area
Export & Truck Loading 
040.09  Buildings (640BG‐001 & 003)  Area
Export & Truck Loading 
040.10  Buildings (640BG‐002)  Area
050.01  Common  Product Export Pipelines 
Common, Warehouse, Gate house & General 
060.01  Buildings (Common)  Non‐Process Areas 
060.2  Substation S930  Non‐Process Areas 
060.3  Substation S940  Non‐Process Areas 
060.04  Central Control Building  Non‐Process Areas 
060.05  Administrative Building & Maintenance Centre  Non‐Process Areas 
060.06  Administrative Building & Maintenance Centre  Non‐Process Areas 
070.01  Common  Crude Oil Storage Area 
070.02  Crude Oil Storage  Crude Oil Storage Area
070.03  Substation S700  Crude Oil Storage Area 
080.01  Common  Product Storage Area 
080.02  Diesel Product Storage  Product Storage Area
080.03  Naptha Product Storage  Product Storage Area
080.04  Jet A1 Product Storage  Product Storage Area
090.01  Common  Intermediate Storage Area 
090.02  HSFO Intermediate Storage  Intermediate Storage Area 
090.03  Combined Diesel & HCU Feed Intermediate Storage  Intermediate Storage Area 
090.04  Straight Run Kerosene Intermediate Storage  Intermediate Storage Area 
DHT Feed LCGO & HCU Feed HCGO Intermediate  Intermediate Storage Area 
090.05  Storage 
090.06  Flushing Oil Intermediate Storage  Intermediate Storage Area 
090.07  Heavy Slop & Light Slop Intermediate Storage  Intermediate Storage Area 
090.08  Coker Naptha Intermediate Storage  Intermediate Storage Area 
090.09  Substation S550  Intermediate Storage Area 
090.10  Substation S710  Intermediate Storage Area 

DRP001-OUF-PRO-U-000-001 Page 39 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

Split WBS Split WBS Description Broad_WBS Description


090.11  Local Control Station LCS‐012  Intermediate Storage Area 
LPG Storage & Associated 
100.01  Common  Facilities 
LPG Storage & Associated 
100.02  LPG Storage Bullets  Facilities 
Waste Water Treatment 
110.01  Common  Plant 
Waste Water Treatment 
110.02  Waste Water Treatment Package  Plant 
Waste Water Treatment 
110.03  Hazardous, Non Hazardous, Radioactive Storage  Plant 
Waste Water Treatment 
110.04  Interconnecting  Sleeperway 
Plant 
Waste Water Treatment 
110.05  Substation S570  Plant 
Waste Water Treatment 
110.06  Local Control Station LCS‐015  Plant 
120.01  Common  Refinery Flare Area 
120.02  Unit Piperack, Flare & KO Drums  Refinery Flare Area 
120.03  Substation S530  Refinery Flare Area 
120.04  Local Control Station LCS‐011  Refinery Flare Area 

8.8. APPENDIX 8 (COMPANY’s Telecom Equipment Code)

EQUIPMENT
EQUIPMENT DESCRIPTION
CODE

CLOSED CIRCUIT TELEVISION (CCTV) SYSTEM

DCAM CCTV CAMERA

DMON CCTV DISPLAY-MONITOR

DCC CCTV CONTROLLER

PUBLIC ADDRESS (PA) SYSTEM

DLS PA LOUDSPEAKER

DLSA PA LOUDSPEAKER SYSTEM A

DLSB PA LOUDSPEAKER SYSTEM B

DEOL PA END-OF-LINE UNIT

DEOLA PA END-OF-LINE UNIT SYSTEM A

DEOLB PA END-OF-LINE UNIT SYSTEM B

DXL PA FLASHING-BEACON

DRP001-OUF-PRO-U-000-001 Page 40 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

EQUIPMENT
EQUIPMENT DESCRIPTION
CODE

DXLA PA FLASHING-BEACON SYSTEM A

DXLB PA FLASHING-BEACON SYSTEM B

DPC PA ACCESS-PANEL

DMDF PA MAIN DISTRIBUTION FRAME

DMDFA PA MAIN DISTRIBUTION FRAME SYSTEM A

DMDFB PA MAIN DISTRIBUTION FRAME SYSTEM B

TELEPHONE / LOCAL AREA NETWORK (LAN)

DTL TELEPHONE SET

DSKT LAN OUTLET

DIDF TELEPHONE IDF

DRFU TELEPHONE RINGER AND FLASHER-UNIT

RADIO SYSTEM

DMBC MULTI-BATTERY CHARGER

DSBC SINGLE-BATTERY CHARGER

DRC RADIO-OPERATOR CONSOLE

DAC ANTENNA COUPLER (AUTOMATIC TUNING UNIT)

DFR OPERATOR FIXED-RADIO

DTR RADIO REPEATER

DBR RADIO BASE-STATION

DWAP WIRELESS ACCESS-POINT

METEOROLOGICAL SYSTEM

DWE WIND SENSOR

DPE PRESSURE SENSOR

DTHE TEMPERATURE & HUMIDITY SENSOR

DVWE VISIBILITY AND PRESENT WEATHER SENSOR

DRP001-OUF-PRO-U-000-001 Page 41 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

EQUIPMENT
EQUIPMENT DESCRIPTION
CODE

DRG RAIN GAUGE

DRS RADIATION SHIELD

DMS METEOROLOGICAL SENSOR

TELECOMMUNICATION EQUIPMENT CODES (MISCELLANEOUS)

D TELECOM (GENERAL) EQUIPMENT

DE TELECOM ELECTRONIC EQUIPMENT SHELF

DPP COPPER PATCH-PANEL

DWS TELECOM WORKSTATION

DFP FIBER-OPTIC PATCH-PANEL

DH TELECOM EQUIPMENT-CABINET

DSW ETHERNET SWITCH

DA ANTENNA & SUPPORTS

DIE TELECOM INTERFACE-EQUIPMENT

TELECOMMUNICATION JUNCTION BOX (J/B) CODES


JB CODE JB DESCRIPTION
JBPA PA J/B
JBPAA PA J/B SYSTEM A
JBPAB PA J/B SYSTEM B
JBTV CCTV J/B
JBFB PA FLASHING-BEACON J/B
JBFBA PA FLASHING-BEACON J/B SYSTEM A
JBFBB PA FLASHING-BEACON J/B SYSTEM B
JBAP PA ACCESS-PANEL J/B
JBTL TELEPHONE J/B
JBTS TELECOM-SYSTEM J/B
JBRC RADIO-OPERATOR-CONSOLE J/B
JBMS METEOROLOGICAL-SYSTEM J/B
DFSB FIBER-OPTIC SPLICE BOX

TELECOMMUNICATION CABLE CODES

DRP001-OUF-PRO-U-000-001 Page 42 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

CABLE
TYPE OF CABLE
CODE
DU TELECOM COPPER CABLE
DX COAXIAL CABLE
DF FIBER-OPTIC CABLE

8.9. APPENDIX 9: (COMPANY’s System Code - Fluid)

FLUID CODE DESCRIPTION


ACD ACID
AOC ACCIDENTALLY OIL CONTAMINATED WATER SEWER
AML LEAN AMINE
AMR RICH AMINE
AS ACID SEWER
BDC BLOWDOWN – COLD
BDH BLOWDOWN – HOT
BDS BLOWDOWN – STEAM CONDENSATE
BDW BLOWDOWN – HYDROCARBONS & WATER
BFW BOILER FEED WATER
BOW BLOWDOWN WATER
BRW BRINE WATER
BWH BOILER FEED WATER HP
BWL BOILER FEED WATER LP
BWM BOILER FEED WATER MP
BWV BOILER FEED WATER VHP
CAA 50% WT CAUSTIC
CAC Approx 10% WT CAUSTIC
CAD Approx 3% WT CAUSTIC
CAE 20% WT CAUSTIC
CAR COMBUSTION AIR
CAT CATALYST
CDM CLOSED DRAIN AMINE
CDR CAUSTIC DRAIN
CFD CHEMICAL FEED
CHD CLOSED HYDROCARBON DRAIN (DCU ONLY)
CKE COKE
CO2 CARBON DIOXIDE
CS CHEMICAL SEWER
CSS CLEAN STORM SEWER
CWR COOLING WATER RETURN
CWS COOLING WATER SUPPLY
DEW DESALTER EFFLUENT WATER
DIS DILUTION STEAM
DMW DEMINERALIZED WATER
DRS DRAINS
DSW DESALINATED WATER
DW DRINKING (POTABLE) WATER
FG FUEL GAS (GAS GENERATED IN PROCESS UNITS)
FLO FLUSHING OIL
FO FUEL OIL
FPF FIRE PROTECTION - FOAM SYSTEM
FWS FIRE WATER
HC HYDROCARBONS
HCS HEAVY CRACKED SLOP OIL

DRP001-OUF-PRO-U-000-001 Page 43 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

HFL HIGH PRESSURE FLARE


HFO HEAVY FLUSHING OIL (DCU ONLY)
HPS HIGH PRESSURE STEAM
HOS HOT OIL SYSTEM
HRG HYDROGEN RICH GAS
HSO HEAVY SLOP OIL
HYD HYDROGEN
IA INSTRUMENT AIR
LCS LIGHT CRACKED SLOP OIL
LFL LOW PRESSURE FLARE
LFO LIGHT FLUSHING OIL (DCU ONLY)
LO LUBE OIL
LPS LOW PRESSURE STEAM
LSO LIGHT SLOP OIL
MDA METHYL DIETHANOLAMINE (MDEA)
MET METHANOL
MPS MEDIUM PRESSURE STEAM
NG NATURAL GAS
NGP NATURAL GAS FOR PILOTS
NI NITROGEN (DRY) GAS
NIL NITROGEN LIQUID
OFS OIL FREE SEWER
OG OFF GAS
OWS OILY WATER SEWER
PA PLANT AIR
PR PROCESS
PRA DECOKING AIR (PROCESS AIR)
PW PROCESS WATER
QO QUENCH OIL
QW QUENCH WATER
REH REFRIGERATION – HIGH TEMPERATURE
REL REFRIGERATION – LOW TEMPERATURE
RFG REFINERY FUEL GAS
SAN SANITARY WATER
SCA SPENT CAUSTIC
SCC STEAM CONDENSATE – POTENTIALLY CONTAMINATED
SCH STEAM CONDENSATE – HIGH PRESSURE
SCL STEAM CONDENSATE – LOW PRESSURE
SCM STEAM CONDENSATE – MEDIUM PRESSURE
SCO STEAM CONDENSATE-NON CONTAMINATED
SCP STEAM CONDENSATE – PUMPED
SEG SEAL GAS
SEO SEAL OIL
SFL SOUR GAS FLARE
SOG SOUR GAS
SOW SOUR WATER
SSW STRIPPED SOUR WATER
SUL SULPHUR
SVV STEAM VENTS
SW SERVICE WATER
SWD SOUR WATER DRAIN (SWS,CSW & SRU ONLY)
SWR SEA WATER RETURN
SWS SEA WATER SUPPLY
TFL TANK FLARE

DRP001-OUF-PRO-U-000-001 Page 44 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

TRM VESSEL/EQUIPMENT TRIM


TRW TREATED / WATER TREATING-CHEMICAL WASTE
VNT VENTS GAS (ATMOSPHERE)
VPS VERY HIGH PRESSURE STEAM

INSTRUMENT
SYSTEMS DESCRIPTION
AQMS AIR QUALITY MANAGEMENT SYSTEM
BMS BURNER MANAGEMENT SYSTEM
CAFS CLEAN AGENT FIRE SUPPRESSION
CMS CUSTODY METERING SYSTEMS
DCS DISTRIBUTED CONTROL SYSTEM
ESD EMERGENCY SHUTDOWN SYSTEM
FACP FIRE ALARM CONTROL PANEL
FGS FIRE & GAS SYSTEM
LDS LEAK DETECTION SYSTEM
MCM MACHINE CONDITION MONITORING SYSTEM
PLC PROGRAMMABLE LOGIC CONTROLLER
TCCS TURBO MACHINERY & COMPRESSOR CONTROL SYSTEM
TGS TANK GAUGING SYSTEM
AAM ADVANCED ALARM MANAGEMENT
AMADAS ANALYZER MANAGEMENT & DATA ACQUISITION SYSTEM
CEMS CONTINUOUS EMISSIONS MONITORING SYSTEM
FAS FIRE ALARM SYSTEM
ICS INTEGRATED CONTROL SYSTEM
LIMS LABORATORY INFORMATION MANAGEMENT SYSTEM
OMAS OIL MOVEMENT AUTOMATION SYSTEM
OTS OPERATOR TRAINING SYSTEM
RTIMS REAL TIME INFORMATION MANAGEMENT SYSTEM
SOE SEQUENCE OF EVENTS
TAS TERMINAL AUTOMATION SYSTEM

8.10. APPENDIX 10: (COMPANY’s Vendor Document Requirement List Code – VDRL Code)

Document Type Code Vendor Document Type Description


A00 DEFAULT EXTERNAL
A06 PROCESS DATA SHEETS
A09 UTILITY PLANT DATA SHEETS
A15 VESSEL DATA SHEETS
A20 HEAT EXCHANGER DATA SHEETS
A30 ROTATING EQUIPMENT DATA SHEETS
A32 ROTATING EQUIPMENT PERFORMANCE CURVES
A35 MECHANICAL HANDLING DATA SHEETS
A60 INSTRUMENT DATA SHEETS (SETS)
A64 INSTRUMENT SYSTEM DETAILS ELECTRONIC REVIEW
A93 COSHH DATA SHEETS
B06 PROCESS DESCRIPTIONS
B07 DCS GRAPHICS

DRP001-OUF-PRO-U-000-001 Page 45 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

Document Type Code Vendor Document Type Description


B08 COMPLEX CONTROL SCHEMES
B09 UTILITY CONSUMPTIONS
B18 CATHODIC PROTECTION SYSTEM INSTALLATION,
SCHEMATICS, LAYOUT DRAWINGS
C06 PROCESS CALCULATIONS
C09 UTILITY CALCULATIONS
C15 VESSEL CALCULATIONS
C20 HEAT EXCHANGER CALCULATIONS
C30 ROTATING EQUIPMENT CALCULATIONS
C40 CIVIL/STRUCTURAL CALCULATIONS
C59 STRESS CALCULATIONS
D06 CATHODIC PROTECTION SYSTEM MATERIALS /
EQUIPMENT DATA SHEETS
D15 VESSEL DETAIL DRAWINGS
D20 HEAT EXCHANGER DETAIL DRAWINGS
D30 ROTATING EQUIPMENT SECTIONS / DETAILS
D35 MECHANICAL HANDLING DETAILS
D40 STEELWORK DETAILS/FIREPROOFING
D43 LOADING OF G DIAGRAMS
D48 BUILDING SERVICES DETAILS
D52 ISOMETRICS/PIPING DETAILS
D58 NOZZLE LOAD DATA SHEETS/DRAWINGS
INSTRUMENT ANALYSER HOUSE GENERAL
D61
ARRANGEMENTS
INSTRUMENT DOCUMENTS/DRAWINGS SUPPLIED
D62
INTERFACE
D64 SYSTEMS EQUIPMENT DETAILS/DATA SHEETS
INSTRUMENT DOCUMENTS/DRAWINGS -
D69
INSTRUMENT REVIEW
D70 MOTOR DATA SHEETS
D72 ELECTRICAL DOCUMENTS/DRAWINGS/INTERFACE
D75 TELECOMS DRAWINGS/DATA
ELECTRICAL DOCUMENTS/DRAWINGS ELECTRONIC
D79
REVIEW
D80 INTERNAL LINING DETAILS
D81 PIPING VALVE DETAILS
D90 PACKAGE UNIT COMPONENT DETAILS
D92 MISC OFFLINE EQUIPMENT DETAILS
E13 CATHODIC PROTECTION SYSTEM TEST FACILITIES
SCHEDULE
E93 CONCESSION REQUESTS
F23 CATHODIC PROTECTION SYSTEM DETAILED DESIGN
& CALCULATIONS
CATHODIC PROTECTION SYSTEM SURVEYS (SOIL
F28 RESISTIVITY, PRE-DESIGN, CIPS, DCVG, AC
MITIGATION) PROCEDURES AND REPORTS
F45 CATHODIC PROTECTION SYSTEM INSTALLATION AND
COMMISSIONING PROCEDURES
F50 FLOW DIAGRAMS

DRP001-OUF-PRO-U-000-001 Page 46 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

Document Type Code Vendor Document Type Description


F61 INSTRUMENT AIR DISTRIBUTION DIAGRAMS
G14 CATHODIC PROTECTION SYSTEM COMMISSIONING
REPORT
G15 VESSEL GENERAL ARRANGMENTS (00)
G16 VESSEL GENERAL ARRANGMENTS (NON 00)
G17 VESSELS FOR PROCESS REVIEW
G20 HEAT EXCHANGER GENERAL ARRANGMENTS
HEAT EXCHANGER GENERAL ARRANGMENTS
G21
(SUPPLER REVIEW)
G31 ROTATING EQUIPMENT GENERAL ARRANGMENTS
G36 MECHANICAL HANDLING GENERAL ARRANGMENTS
G39 AGITATOR/MIXER GENERAL ARRANGMENTS
G43 FOUNDATION PLANS
G46 HOIST/TROLLEY/LIFT GENERAL ARRANGMENTS
G49 BUILDING GENERAL ARRANGMENTS
G51 VENDOR PLOT PLANS
G54 IN LINE PIPING ITEM GENERAL ARRANGMENTS
IN LINE INSTRUMENT GENERAL ARRANGMENTS /
G61
OUTLINES
G64 SYSTEM EQUIPMENT - GENERAL ARRANGMENTS
ELECTRICAL ENGINEERING REQUIRED GENERAL
G71
ARRANGMENTS
PACKAGE UNIT COMPONENT GENERAL
G91
ARRANGMENTS
G92 MISC OFFLINE EQUIPMENT GENERAL ARRANGMENTS
H12 FACTORY ACCEPTANCE AND PERFORMANCE TEST
PROCEDURE
H40 HOIST/TROLLEY DETAILS
I94 INSTALLATION / MAINTENANCE INSTRUCTIONS
J06 FACTORY ACCEPTANCE TEST REPORTS AND
PERFORMANCE TEST RESULTS
J95 SUBORDERS & INDEX 4
K85 PRODUCTION PROGRAMME
L01 VENDOR DOCUMENT INDEX
L30 LUBRICANTS LIST
L57 LINE LISTS/TERMINATION SCHEDULES
L60 INSTRUMENT LISTS
M20 HEAT EXCHANGER PARTS LIST
M30 ROTATING EQUIPMENT PARTS LIST
M35 MECHANICAL HANDLING PARTS LIST
M40 VENDOR'S CIVIL BILL OF QUANTITIES
M69 INSTRUMENT BILLS OF MATERIAL
M79 ELECTRICAL BILLS OF MATERIAL
M95 SPARE PARTS (COMMISSIONING)
N95 SPARE PARTS (OPERATING)
O94 OPERATING INSTRUCTIONS/MANUALS
P40 FABRICATION PROCEDURES
P64 SYSTEMS EQUIPMENT- FAT PROCEDURE

DRP001-OUF-PRO-U-000-001 Page 47 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

Document Type Code Vendor Document Type Description


P80 NDE/NDT PROCEDURES/PRESS.TEST
P82 INSULATION/PAINTING PROCEDURES
P88 FABRICATION/WELD PROCEDURES
P96 ERECTION PROCEDURES
Q02 INSPECTION & TEST PLAN (ITP)
Q93 QUALITY ASSURANCE DOCUMENTS
R72 ELECTRICAL STUDY REPORTS
R80 MATERIAL SELECTION
R96 LIFTING STUDIES
S81 PIPE SPECIFICATIONS
S82 INSULATION/PAINTING SPECIFICATIONS
T97 PACKING/TRANSPORT/STORAGE
U99 OPERATING AND MAINTENANCE INDEX
V99 OPERATING AND MAINTENANCE
W99 MANUFACTURING RECORD BOOK
X99 MANUFACTURING RECORD BOOK INDEX
Y69 INSTRUMENT ASSURANCE CERTIFICATES
Y79 ELECTRICAL ASSURANCE CERTIFICATES
Y99 SYSTEMS MANUALS
Z97 NOISE DATA, CERTIFICATES, REPORTS
Z98 CERTIFICATES OF CONFORMITY/TEST CERTIFICATES

8.11. APPENDIX 11: (CONTRACTOR’s Phase Code)

Code Description
E Engineering
P Procurement
C Construction
T Pre-commissioning & Commissioning
S Project Management

DRP001-OUF-PRO-U-000-001 Page 48 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

8.12. APPENDIX 12: (CONTRACTOR’s Discipline Code)

Code Description
T0 Temporary Facility
J0 Mechanical
J1 Stationary
J2 Machinery
H0 Piping
H1 Fire Fighting
H2 Stress
D0 Painting
B0 Insulation
A0 Civil
Q1 Building
Q2 Structure
N0 Electrical
K0 Instrument
T1 Telecom
R0 HVAC
W0 Commissioning
S0 Process
L0 HSE
V0 QA/QC
V1 Inspection
X0 Support
Y2 Material
Z0 Project Management
P0 Procurement Management
P1 Purchasing
P2 Expediting
P3 Logistics
C0 Construction Management
F0 Pipeline

DRP001-OUF-PRO-U-000-001 Page 49 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

8.13. APPENDIX 13: (CONTRACTOR’s Document Type Code)

Code Description
B Design Criteria, Design Philosophies & Basis
C Calculation
D Drawing / Diagram / Alignment Sheet
E Datasheet
G Regulatory Submissions
H Computer Models
K Communication
L List
M Maintenance, Operation, Repair, and Technical Manuals
P Procedure and Plan
Q Certifications and Warranties
R Reports, Technical Studies & Assessments
S Specification
T Evaluation Sheet
X Purchase Orders and Requisitions
Y Contractual Document

DRP001-OUF-PRO-U-000-001 Page 50 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

8.14. APPENDIX 14: (CONTRACTOR’s Sub-Document Type Code)

Sub Type
Sub Type Description
Code
AAP Analyzer Room Arrangement Plan
ACT Action List
AFF General Affairs
AGC Agreement with Client
AGF Fuel Supply Agreement
AGL Long Term Service Agreement
AGO Agreement with Other Party
AGP Power Purchase Agreement
AGS Agreement with Subcontractor
AIR Air Dispersion Study
ALI Pipeline Alignment Drawing
ALM Fire Alarm Plan
ANL FW Surge Analysis Report
APP Instrument Air Piping Plan
APR Review and Approval Procedure
ATH Regulatory Authorization List
AUD Audit Procedure
AVL Approved Vendor List
BDG Calculation Sheet For Building
BED Basic Engineering Design Data
BFD Block Flow Diagram
BLK Cable Block Diagram
BOM Bill of Material / Material Take Off
BUD Project Budget Plan
CAB Cable Schedule
CBA Collective Bargaining Agreement for Power Plant
CBE Commercial Bid Evaluation
CER Regulatory Certificates
CFR Cost Forecasting Report
CHE Catalyst & Chemical Summary
CHG Change Control/Management Procedure
CLO Construction Closing Phase
CLR Clarification Sheet
CND Instrument Connection Detail
CNE Fire & Gas Cause & Effect Chart
CNN Instrument Connection List
COD Coordination Procedure
COM Communication Plan
COP Commissioning Procedure & Plan
COR Close Out Report
COS Cost Summary
CPP Cathodic Protection Plan
CPR Construction Productivity Report
CRI Criticality Rating Procedure
CRR Corrosion Protection Study Report

DRP001-OUF-PRO-U-000-001 Page 51 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

Sub Type
Sub Type Description
Code
CTN Contract Trend Notice
CTR Constructability Review
CWT Cooling Tower Drawing
DAC Discipline Acceptance Certificate
DAY Daily Report
DCA Contract Design Change/Concession Authorization
DCT HVAC Duct / Piping Plan
DEF System Definition for Process
DEL Deliverable List
DEM Demolition Plan
DHS Design HSE Report
DIK Calculation Sheets for DIKE
DOC Instruction for Vendor Documentation
DRN Calculation Sheets for Drainage
DRU Cable Drum Schedule
DSC Process Description
DYN Dynamic Simulation Report
EFF Effluent Summary List
EHT Electric Heat Tracing Plan
ELV Equipment Setting Elevation List
ENV Environment Procedure
EQF Calculation Sheets for Equipment Foundation
EQP Equipment List
ESD Excess, Shortage, Damage Report
ESR Expediting Status Report
EVC Evacuation Plan
EXC Construction Execution Phase
EXE Execution Plan
EXP Site Explanation Report
FAC Temporary Facility Drawing
FCP Field Control Procedure
FDC Field Design Change Procedure
FDN Steel Structure Foundation Drawing
FEN Calculation Sheets for Fence & Gate
FGL Fire & Gas Equipment Location Drawing
FIR Fire-scenario Envelope Drawing
FIX Lighting Fixture Schedule
FLO Flow Assurance Study
FMC Field Material Control Procedure
FNC Assessment of Subcontractor's Finance Status
FPE Equipment List for Fire Potential
FRR Field Revision Request List
GAD AG Piping General Arrangement Drawing
GDC General Design Criteria
GDL Gas Detector Location Plan
GND Grounding Plan
GNL General Note & Legend

DRP001-OUF-PRO-U-000-001 Page 52 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

Sub Type
Sub Type Description
Code
HAZ List of Hazardous Source
HBD Heat Balance Diagram
HIN HVAC Instrument List
HKP Hook-Up Detail
HLT Health Procedure
HMB Heat & Material Balance
HOV Handover Procedure
HPD Hydraulic Profile
HSE HSE Report
HVA HVAC Calculation for Building
HYD Hydraulic Calculation Sheet
ILL Illumination Calculation
INC Insulation Coordination Study
IND Instrument Index
INF Project Information Management Plan
INQ Inquiry Plan
INS Job Instruction
INT Interface Management Plan
INU Insurance Policy
INV Invoice Document
IOL I/O list
IRC Inspection Release Certificate
ISC Intrinsic Safety Circuit Calculation
ISO Isometric Drawing
ISR Inquiry Status Report
ITB ITB Summary
ITI Information Technology Implementation Plan
ITL Interlock Description
ITP Inspection and Test Plan for Temporary Facility
ITR Inspection and Test Report for Pre-commissioning
JPR Job Performance Report
JVI JV Invoicing Procedure
KEY Instrument Key Plan
KOM Kick-Off Meeting Material / MOM
LAB Laboratory Layout Drawing
LAY Site Laydown Area Drawing
LGD Logic Diagram
LGT Lighting Plan
LIN Line List
LOC Location Plan / Drawing
LOD Flare Load Summary
LOP Loop Diagram
LOS Electrical Load Summary
MAI Maintenance Training & Manuals
MAR Material Approval Request for Building
MCC M/C Certification
MCP Instrument Main Cable Plan

DRP001-OUF-PRO-U-000-001 Page 53 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

Sub Type
Sub Type Description
Code
MCW Instrument Main Cable Way
MDC Mechanical Design Criteria
MDD 3D Model Data
MHR Material Handling Report
MIL Project Milestone
MLD Missing, Loss, Damage, Change
MMC Minutes of Meeting (Client)
MMF Minutes of Meeting (Interface)
MMI Minutes of Meeting (Internal)
MML Minutes of Meeting (Licensor)
MMS Minutes of Meeting (Subcontractors)
MMV Minutes of Meeting (Vendors)
MOB Manpower Mobilization & Demobilization Plan
MOD 3D Model Review & Studies
MRN Marine Drawing
MRR Material Receiving Report
MSC Construction 3 Month Schedule
MSD Material Selection Diagram
MSP Material Selection & Corrosion Philosophy
MTD Method Statements for Commissioning
MTH Monthly Progress Report
NAR Control Narrative
NCR Shop Non Conformance Report
NOZ Water Spray Nozzle Arrangement Drawing
NSC Notice of System Completion
NUM Document Numbering Procedure
ODR Deodour Drawing
ONM Operation & Maintenance Engineering
OPR Operation Training & Manuals
ORA Operability Readiness and Assurance Plan
ORF Orifice Calculation
ORG Organization Chart
PAK Packing Procedure
PAY Monthly Subcontractor Payment Record
PCP Pre-commissioning Procedure & Plan
PCS Package Control Scheme
PDS Process Datasheet
PER Performance Report
PFD Process Flow Diagram
PHL Design Philosophy
PID Marked-up P&ID
PIG Intelligent Pigging Philosophy
PIL Calculation Sheets for Pile
PIM Pre-Inspection Meeting MOM
PIP Piping Calculation Report
PIR Inspection Report
PIT Calculation Sheets for Pit & Pond

DRP001-OUF-PRO-U-000-001 Page 54 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

Sub Type
Sub Type Description
Code
PLA Calculation Sheet For Local Platform & Support
PLN Project Planning & Scheduling Procedure
PLO Plot Plan
PLR Plant Layout & Spacing Review Drawing
PLU Plumbing System Drawing/Diagram
PLY Piping Layout Drawing & Details
PNL Lighting Panelboard Schedule
POW Power Plan
PPC Physical Progress & Milestone Completion Certificate
PPD Fire Fighting Piping Plan Drawing
PPS Piping Study Report
PQS Pre-Qualification For Subcontract
PRE Construction Preparation Phase
PRG Progress Procedure
PRS Preservation Assessment Record
PRT Earthing and Lightning Protection Calculation
PSD Process Safeguarding Diagram
PSP Instrument Pipe Sleeve Plan
PSR Procurement Status Report
PST Piping Stress Analysis
PUN Punch List
QAP Quality Assurance Plan
QCP Quality Control Procedure
QCR Quality Records
QSR Inspection Status Report
RAC Calculation Sheet For Piperack
RAD Radiation Calculation Report
RBS Relief and Blowdown Summary
REC Project Documentary
REQ Requisition
REV Engineering Revision Instruction
RFC RFC (Ready For Commissioning)
RFI RFISU (Ready For Initial Start-Up)
RFQ Request for Quotation package
RFS RFSU (Ready For Start-Up)
RIG Rigging Calculations
RLY Relay Coordination Report
ROD Calculation Sheets for Road & Paving
ROU Route Survey & Routing Selection Report
RSK Schedule Risk Analysis Report
RUT Route Survey Report
SAF Safety Procedure
SAM Sample Calculation Sheet
SCH Project Schedule
SCM Fire & Gas Overall Schematic Diagram
SCR Site Check Result Report
SDD Support Detail Drawing

DRP001-OUF-PRO-U-000-001 Page 55 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

Sub Type
Sub Type Description
Code
SEC Security Procedure
SEG Segment Calculation
SEQ Safety Equipment
SET Alarm & Trip Set Point List
SFL Safety & Fire Extinguisher Location Drawing
SHP Shipping Procedure
SHR HR
SHT Calculation Sheet For Shelter
SIL SIL Verification Report
SIM Process Simulation Native File
SIT Site Preparation Drawing
SIZ Equipment Sizing Calculation
SLD Single Line Diagram
SLP Calculation Sheets for Sleeper
SOA Start-up & Operation Assistance Report
SOI Soil Improvement Drawing
SOW Scope of Work for Supplying Materials
SPC Specification
SPE Special Item List
SPL Commissioning Spare Part List
SQR Procedure for Supplier Quality Record
SSC Startup & Shutdown Curve
SSR Shipping Status Report
SSU Piping Special Support Drawing
STA Calculation Sheets for Stationary
STB Transient Stability Study
STD Standard and Typical Drawing
STL Steel Shop Drawing & Details
STM Scope Tracking and Management Plan
STR Calculation Sheet For Structure
STS Support Standard Drawing
STT Steam Tracing Plan
SUB Subcontractor List
SUG Surge Analysis
SUM I/O Summary
SUR Calculation Sheets for Local Support Foundation
SYM Instrument Symbol and Notes
SYS HVAC System Drawing / Diagram
TAG 3D Model Review Tag Report
TAX TAX
TBE Technical Bid Evaluation
TCH Calculation Sheets for Trench & Duct Bank
TDB TDB (Technical Data Book)
TDS Equipment Data Sheet
TIE Tie-in Drawing
TOV Turn-Over Notices / List
TQR Technical Query

DRP001-OUF-PRO-U-000-001 Page 56 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

Sub Type
Sub Type Description
Code
TRN Training Report
TRY Tray, Duct bank, Trench Sizing Calculation
TST Test Procedure
UFD Utility Flow Diagram
UGC U/G Composite Drawing
UGP UG Piping General Arrangement Drawing
UTL Utility Station Location Plan
VER FEED Verification Report
VLD Validation Plan
VPI Vendor Print Index & Schedule
VPO Purchase Order
VSC Valve Sizing Calculation
VVL Valve List
WBD Water Balance Diagram
WBS Work Breakdown Structure
WGH Weight Control Procedure
WIR Control Room Wiring Plan
WKY Weekly Progress Report
WOP Piping Work Procedure
WOR Workshop for Contract Management
WPS Welding Procedure Specification / Performance Qualification
WRP R d
Instrument Wiring Plan
WRR Project Warranty Plan
WSC Construction 3 Week Schedule
ZON Fire Area & Fire Zone Drawing
GAP Pipeline General Arrangement Drawing
HTD H d
Hydrostatic iTest
T Diagram
Di
PCR Pipeline Calculation Report
PLF Pipeline Layout Drawing
DSH Data Sheet
PSF Pipeline Stress Analysis
PNR Pipeline Reports
PRM Pipeline Route Map
PAD Pipeline Approach Drawing
PLD Pipeline Schematic Diagram
PLS Pipeline Schedule
STF Pipeline Detail Drawing
STP Pipeline Typical Drawing
TFA Telecom FO Core Allocation
TBL Telecom Block Diagram
TFC Telecom FO Calculation
TPC Telecom PAGA Calculation
TIS Telecom Installation
TIT Telecom Interconnection
TCL Telecom Conceptual Layout
TEL Telecom Equipment & Cable Layout
TMT Telecom MTO

DRP001-OUF-PRO-U-000-001 Page 57 of 58 Rev: B4


Duqm Refinery Project – EPC Package 2 DOCUMENT NUMBERING PROCEDURE

Sub Type
Sub Type Description
Code
TRF Telecom RFQ
TSC Telecom Schedule
TSP Telecom Specification
TST Telecom Study
TTB Telecom TBE
ZZZ Undefined Document

DRP001-OUF-PRO-U-000-001 Page 58 of 58 Rev: B4