Revision History
03-12-17 O1
24-12-17 A1
01-05-18 B1
30-05-18 A2
26-09-18 B2
12-02-19 B3
Related Documents
Holds
Term Comment
TABLE OF CONTENTS
5.0. RESPONSIBILITY...................................................................................................................................... 5
1.0. PURPOSE
The purpose of this procedure is to summarize the numbering schemes applied to different types of
documents and drawings generated during the life cycle of Duqm Refinery Project.
CONTRACTOR shall apply to each document the numbering system as per COMPANY’s
requirement and CONTRACTOR’s Internal Document Numbering, all the details of documents
numbering are explained in the following sections. CONTRACTOR’s Internal Document Numbers is
included herein for COMPANY’s reference.
2.0. SCOPE
This procedure encompasses all controlled documentation applicable to Duqm Refinery Project
including technical documents, drawings and general documents issued by Petrofac International Ltd
and its vendors/subcontractors.
3.1. DEFINITIONS
VENDOR: All companies, firms, bodies, entities and partnerships providing Goods for
the project.
SUBCONTRACTOR: All companies, firms and partnerships to whom any part of the Work has
been subcontracted by CONTRACTOR.
3.2. ACRONYMS
4.0. REFERENCES
5.0. RESPONSIBILITY
Document Originator is responsible for ensuring that the document is numbered in accordance with
the requirements of this procedure.
Document Controller is responsible for accurately identifying the correct folder, where the issued
documents are stored.
Project Director has overall responsibility for ensuring the implementation of this procedure.
All project technical documents and drawings shall be numbered in accordance with this procedure.
Project document and drawing numbers shall not be duplicated under any circumstances.
If the numbering segment is alphabetical, and there is no expressly-intended value to fill the required
number of fields, leave blank space(s) except as otherwise specified in this procedure.
If the numbering segment is numeric, and there is no expressly-intended value to fill the required
number of fields, add a leading zero(s) except as otherwise specified in this procedure.
All project documents are to include a revision code and revision status in the appropriate space on
the title sheet as per the below table:
All documents (not drawings) that are revised at all revisions shall show changes and additional text
highlighted in yellow. The front page shall not include any yellow marking and/or text added to explain
what yellow marking means.
Drawing revisions shall be annotated with revision clouds. In addition, revision clouds shall be used to
identify any changes made to P&IDs subsequent to those used in the Preliminary HAZOP reviews.
For the changes made to the document but under same revision, the numeric sequence number shall
be used to differentiate the document revisions (e.g. A1, A2, A3…etc)
The Vendor document/Drawing revision shall start with O1, O2, O3... and after final approval by
PSJV it will be submitted in B1 (IFD) / R1/S1 (IFC) and Z1 (As-built) as per document nature.
The Subcontractor document/Drawing revisions shall start with O1, O2, O3... and after final approval by
PSJV/Company it will be submitted in B1 (IFD) / R1/S1 (IFC) and Z1 (As-built) as per document nature,
except for Engineering drawings for building subcontractors. For Engineering drawings from building
subcontractor internal revision shall be followed between subcontractor and contractor as O1A, O1B, R1A,
R1B..etc.
Sequence numbers for shared Units between EPC1 Contractor and EPC2 Contractor shall follow the
below reserved blocks of numbers.
Process Units EPC Contractor shall use 0001-0499
Offsite & Utilities EPC Contractor shall use 0500-0999
These documents include specifications, procedures, reports, design criteria, technical standards,
system descriptions, requisitions, non-deliverables, calculations and engineering lists which shall be
numbered according to the following convention.
Example: (DRP001-OUF-TSD-E-000-123)
OUF: Originating party of the document (Utilities & Offsite EPC Contractor)
TSD: Document type which can be selected from Appendix 1 in this procedure
E: Discipline Type (Electrical) which can be selected from Appendix 2 in this procedure
000: Unit Code which can be selected from Appendix 3 in this procedure, and for General documents
unit code shall be 000. In Case of any document which is applicable to multiple units, unit number
000(Common to all Units) shall be used.
123: This is the sequence number of the document which shall be from 001 to 999.
Appendix 3 Appendix 4
Example: (DRP001-OUF-DSH-R-500P-071)
OUF: Originating party of the document (Utilities & Offsite EPC Contractor)
R: Discipline Code (Rotating) which can be selected from Appendix 2 in this procedure
500: Unit Code (Seawater System) which can be selected from Appendix 3 in this procedure
P: Equipment Code (Pump) which can be selected from Appendix 4 in this procedure
071: This is the sequence number of the document which shall be from 001 to 099.
Notes:
- Datasheet sequence number shall match the equipment item tag sequence number.
- If the equipment is located within a train, the first digit of the 3 digit sequence number indicates
the train number. Units not arranged as trains will use “0” (zero) as the first digit of the sequence
number.
- Equipment Tag sequence numbers for Units split between EPC Contractors shall use the below
reserved blocks of numbers. See EPC Scope of Work documents for details of shared units.
Appendix 3 Constant
Example: (DRP001-OUF-DSH-R-500SPI-060)
OUF: Originating party of the document (Utilities & Offsite EPC Contractor)
R: Discipline Code (Rotating) which can be selected from Appendix 2 in this procedure
500: Unit Code (Seawater System) which can be selected from Appendix 3 in this procedure
060: This is the sequence number of the document which shall be from 001 to 999.
Specialty Items Sequence number defined by Process (number range from 001 to 399).
Specialty Items Sequence number defined by Piping MTO selection (number range from 400 to
999).
Instruments, Relief Valves, Control Valves (Modulating Services), Operated On/Off Valves
individual datasheets shall be numbered according to the following convention:
ISA
Project Document Discipline Sequence Suffix
Abbreviation Unit Code Function
No. Type Code Code Number Number
Code Code
DRP001 OUF DSH X XXX XXXX NNN XX
(001-999)
Example: (DRP001-OUF-DSH-K-500-PDAH-674-AA)
OUF: Originating party of the document (Utilities & Offsite EPC Contractor)
K: Discipline Code (Instrumentation) which can be selected from Appendix 2 in this procedure
500: Unit Code (Seawater System) which can be selected from Appendix 3 in this procedure
PDAH: Instrument Function Code (Diff Pressure Alarm High) which can be selected from Appendix
5 in this procedure
674: This is the sequence number of the document which shall be from 001 to 999
AA: Redundancy Code which can be selected from AA to ZZ except “I” and “O”
Notes:
8000 series tag number is for Incoming and Outgoing Battery Limit P&IDs
- If the instrument is associated with trained units, the first of the four digits in the sequence
number shall be used to differentiate, i.e. 1 = Train 1, 2 = Train 2, etc.
- For instrument data sheets with multiple tag numbers shown on the data sheet, use the
instrument type and MTAG for the instrument number.
Example: (DRP001-OUF-DSH-K-100-MTAGTI-3001)
Individual datasheets for Instruments, Relief Valves, Control Valves (Modulating Services),
Operated On/Off Valves shall be combined and issued as a binder of datasheets. The numbering
scheme for datasheet binder shall be as below.
Example: (DRP001-OUF-DSH-K-500-001)
OUF: Originating party of the document (Utilities & Offsite EPC Contractor)
K: Discipline Code (Instrumentation) which can be selected from Appendix 2 in this procedure
500: Unit Code (Seawater System) which can be selected from Appendix 3 in this procedure
001: This is the sequence number of the document which shall be from 001 to 999
Electrical Equipment & Piping datasheets shall be numbered according to the following
convention.
Example: (DRP001-OUF-DSH-E-490-001)
OUF: Originating party of the document (Utilities & Offsite EPC Contractor)
E: Discipline Code (Electrical) which can be selected from Appendix 2 in this procedure
490: Unit Code (Electrical Power Distribution) which can be selected from Appendix 3 in this
procedure
001: This is the sequence number of the document which shall be from 001 to 099.
System oriented documents such as Instrument Loop Diagrams, Instrument Wiring Diagrams and
System Descriptions shall be numbered according to the following convention:
Unit Code
Project Discipline Document System Sequence Sheet
Abbreviation & Area
No. Code Type Code Code Number Number
Code Code
DRP001 OUF XXXYYY X XXX XXXX NNN NNN
Appendix6
Example: (DRP001-OUF-500010-E-CWD-FACP-001-001)
OUF: Originating party of the document (Utilities & Offsite EPC Contractor)
500: Unit Code (Seawater System) which can be selected from Appendix 3 in this procedure
010: Area Code (Common) which can be selected from Appendix 6 in this procedure
E: Discipline Code (Electrical) which can be selected from Appendix 2 in this procedure
CWD: Document type code (Combined Wiring Diagram) which can be selected from Appendix 1 in
this procedure
FACP: System Code (Fire Alarm Control Panel) which can be selected from Appendix 9 in this
procedure
001: This is the sequence number of the document which shall be from 001 to 999
Drawings, diagrams and sketches shall be numbered according to the following convention:
Unit Code
Project Discipline Document Sequence Sheet
Abbreviation & Area
No. Code Type Code Number Number
Code Code
DRP001 OUF XXXYYY X XXX NNN NNN
Appendix6
Example: (DRP001-OUF-500010-P-PP-003-001)
OUF: Originating party of the document (Utilities & Offsite EPC Contractor)
500: Unit Code (Seawater System) which can be selected from Appendix 3 in this procedure
010: Area Code (Common) which can be selected from Appendix 6 in this procedure
P: Discipline Code (Piping) which can be selected from Appendix 2 in this procedure
PP: Document type code (Plot Plan) which can be selected from Appendix 1 in this procedure
003: This is the sequence number of the document which shall be from 001 to 999
For P&IDs the last digit of the Area # shall indicate the train number, if applicable. In addition to
that, following table shall be applied to assign the sequence number:
Example: (DRP001-OUF-400010-U-PID-505-001)
OUF: Originating party of the document (Utilities & Offsite EPC Contractor)
400: Unit Code (Potable /Service Water) which can be selected from Appendix 3 in this procedure
010: Area Code (Common) which can be selected from Appendix 6 in this procedure (Note- for
Process P&IDs, 000 shall be used in place of area code)
U: Constant
PID: Document type code (P&ID) which can be selected from Appendix 1 in this procedure
505: This is the sequence number of the document which shall be from 500 to 699
Note: The drawing sequence number for Unit 920 – Interconnecting P&IDs shall be split as
follows between the two EPC Contractors:
6.7.2. Isometrics
Appendix7
Note: Sequence number shall be same as number used in the Line Number.
Example: (920020.01-FWS-0097-01)
920: Unit Code (Interconnecting Rack) which can be selected from Appendix 3 in this procedure
020.01: Split WBS (North Side Interconnecting Pipe Rack) which can be selected from Appendix 7
in this procedure
FWS: System Code-Fluid (Fire water System) which can be selected from Appendix 9 in this
procedure
0097: This is the sequence number of the isometric which shall be same as number used in the
Line Number.
Appendix7
Note: Sequence number shall be same as number used in the Line Number.
Example: (920U020.01-FWS-0097-01)
920: Unit Code (Interconnecting Rack) which can be selected from Appendix 3 in this procedure
020.01: Split WBS (North Side Interconnecting Pipe Rack) which can be selected from Appendix 7
in this procedure
FWS: System Code-Fluid (Fire water System) which can be selected from Appendix 9 in this
procedure
0097: This is the sequence number of the isometric which shall be same as number used in the
Line Number.
General Notes:
On receipt of the first issue of a Vendor Document, it will be allocated a unique Document
Sequence Number by the Document Management Group. This number must be clearly shown on
all subsequent issues of the document by the Vendor.
Example: (DPR001-OUF-PSCI-M98-17-P256-DA-A06-0057-001)
A06: Vendor Document Code (Process Data Sheet) which can be selected from Appendix 10 in this
procedure
0057: This is the sequence number of the document which shall be from 0001 to 9999
Subcontractor documents shall be numbered in accordance with this procedure (6.1 – 6.7) with
addition of subcontractor code (3 Digits Code).
Example: (DRP001-OUF-ABC-TSD-E-000-123)
OUF: Originating party of the document (Utilities & Offsite EPC Contractor)
TSD: Document type which can be selected from Appendix 1 in this procedure
E: Discipline Type (Electrical) which can be selected from Appendix 2 in this procedure
000: Unit Code which can be selected from Appendix 3 in this procedure, and for General documents
unit code shall be 000
123: This is the sequence number of the document which shall be from 001 to 999.
Constant Constant Subcon Code Appendix 3 & 6 Appendix 2 Appendix 1(001-999) (001-999)
Example: (DRP001-OUF-ABC-900060-E-TSD-123)
OUF: Originating party of the document (Utilities & Offsite EPC Contractor)
GAD: Document type which can be selected from Appendix 1 in this procedure
E: Discipline Type (Electrical) which can be selected from Appendix 2 in this procedure
900: Unit Code which can be selected from Appendix 3 in this procedure, and for General documents
unit code shall be 000
060: Area Code which can be selected from Appendix 6 in this procedure
123: This is the sequence number of the document which shall be from 001 to 999.
These documents include specifications, procedures, reports, design criteria, technical standards,
system descriptions, requisitions, calculations and engineering lists which shall be numbered
according to the following convention.
All documents shall be numbered beginning with CONTRACTOR's code (13 Digits Code) and
COMPANY's document numbering will be followed except “DRP001-OUF”.
Note:
001 to 300 for JV common documents (General document which already made on the FEED
stage will follow same numbering)
8.0. APPENDICES
Code Discipline
A Technical Information Management
B HVAC
C Civil/Structural/Architectural
D Telecoms
E Electrical
F Fluid Systems
G Project Control & ITC
H Furnaces
I Estimating
J Process Control
K Instrumentation/Controls
L Subcontractors / Construction
M Mechanical
N Procurement
P Plan Design & Piping
Q Quality
R Rotating Equipment
S Marine
T Process
U Project
V Vessel & Tanks
W Materials (Technology)
X Heat Exchangers
Y Pipelines
Z Safety
UTILITIES
Water Systems & Chemical Systems
400 Potable Water, Service Water NL
410 Cooling Water System NL
420 Demin Water System NL
450 Refinery Fuel Systems NL
460 Plant and Instrument Air NL
470 Nitrogen System NL
480 Chemicals Systems: Caustic, Sulphuric Acid NL
500 Seawater System NL
510 Desalination Unit NL
Code Equipment
A Flares
AE Air-Cooled Heat Exchanger
AH Analyser Shelter
AR Arm
B Boiler
BDV Blow Down Vaporizer
BN Bunker
BR Burner
BAT Battery
BD Bus Duct
BG Building, Warehouse, Admin building, Fire station
C Column / Tower
CN Overhead cranes, Electric Hoists, etc
CNT Canister
CNV Conveyor
CR Control Room
CPI Corrugated Plate Interceptor
CT Cooling Towers
DA Deaerator
DR Dryer
DS Desuperheater
All types of Heat Exchanger except air coolers, e.g., shell & tube Heat
E Exchanger, Cold Box, Plate and Frame, Double Pipe, Platefin Heat Exchanger,
Process heater (electric)
EG Emergency Diesel Generator
F Cracking Furnace or Fired Heater or Incinerators
G Generator
J Eductors / Ejectors
K Compressor, Blower, Fan, Expander
LA Loading Arm
LCS Local Control Station
LRS Local Refuge Shelter
ME Machinery, Elevator
M Motor
MCC Motor control centre
MX Mixers
N Agitators
NET Neutral earthing transformer
NER Neutral earthing resistor
P Pump
PDB Power distribution board
PK Unit / Package equipment (Where the details are not yet known)
PNL Panel
Code Equipment
Q Civil Structure, Water Basins, Sump, Dikes, Ponds, Pits, API separator
R Reactor
S Filter, Coalescer and Strainer
SIL Silencer
SK Stack
SPI Specialty Item
SS Substation
SWG Switchgear
T Steam Turbine, Gas Turbine, Hydraulic Turbine
TK Tank
TX Transformer
UPS Uninterruptible Power Supply
V Drum, Vessel
W Weigher
Miscellaneous (e.g. Fire water monitor, Foam generators, deluge skid, Pig
Z
receiver/launcher)
FF ORIFICE FLANGES
Instrument Function Code Instrument Description
FFC FLOW RATIO CONTROLLER (SOFT)
FG DP FLOW INDICATOR
FG FLOW SIGHT GLASS
FHS FLOW HAND SWITCH
FI FLOW INDICATION (SOFT)
FI FLOW INDICATOR (HARD)
FI FLOW INDICATOR (HARD) FF
FI VA METER
FICV FLOW REGULATOR W/FLOW INDICATOR
FIT DP FLOW INDICATING TRANSMITTER
FIT DP FLOW INDICATING TRANSMITTER FF
FIT FLOW INDICATING TRANSMITTER
FIT FLOW INDICATING TRANSMITTER CORIOLIS
FIT FLOW INDICATING TRANSMITTER CORIOLIS FF
FIT FLOW INDICATING TRANSMITTER MAGNETIC
FIT FLOW INDICATING TRANSMITTER MAGNETIC FF
FIT FLOW INDICATING TRANSMITTER ULTRASONIC
FIT FLOW INDICATING TRANSMITTER VORTEX
FIT FLOW INDICATING TRANSMITTER VORTEX FF
FIT FLOW INDICATING XMTR MASS FLOW FF
FIT FLOW INDICATING XMTR POSITIVE DISPL FF
FIT FLOW INDICATING XMTR ULTRASONIC FF
FIT FLOW TRANSMITTER MAGNETIC FF
FIT FLOW TRANSMITTER MASSFLOW
FIT U/S FLOW INDICATING TRANSMITTER
FIT VA METER W/TRANSMITTER
FL FLASH LIGHT
FO RESTRICTION ORIFICE
FQ FLOW TOTALISER (SOFT)
FQC FLOW TOTALISING CONTROLLER (SOFT)
FQI FLOW TOTALISING INDICATOR (SOFT)
FSH FLOW SWITCH HIGH
FSHH FLOW SWITCH HIGH HIGH
FSL FLOW SWITCH LOW
FSLL FLOW SWITCH LOW LOW
FUY SOLENOID VALVE
FV FLOW CONTROL VALVE
FV FLOW CONTROL VALVE FF
FY FLOW CONTROL OUTPUT
FY FLOW DCS FUNCTION
FY FLOW DCS FUNCTION (SOFT)
FY FLOW I/P CONVERTER
FY FLOW SIGNAL ISOLATOR
Notes:
2. For all switches, the S is in the second location, alarms or annunciating devices replace the S with
A.
For example: PSH = Pressure switch high activates PAH = Pressure alarm high
4. Additional suffices may be added to further clarify alarm functions. For example:
F&G
F&G Item Description
Function Code
GADFA Aspirated Smoke Detector Fault Alarm (HSSD)
GADHA Aspirated Smoke Detector High Alarm (HSSD)
GAD Aspirated Smoke Detector (HSSD)
GCAM Camera (I.E CCTV) INCL. HEAT SENSING/FLAME FLICKER FREQUENCY/PTZ
GDV Deluge Valve
GDZLC Deluge Valve Position Lamp Closed
GDZLO Deluge Valve Position Lamp Open
GDZSC Deluge Valve Position Switch Closed
GDZSO Deluge Valve Position Switch Open
GDZT Deluge Valve Position Transmitter
GFAB Fire Alarm Beacon
GFAS Fire Alarm Siren
GFDAA Fire Extinguishant Discharge Alarm Audible
GFDAV Fire Extinguishant Discharge Alarm Visual
GFDIR Fire Detector Infra-Red
GFDUI Fire Detector Combined UV/IR
GFDUV Fire Detector Ultra Violet
GGCA Gas Combustible Alarm Audible
GGCB Gas Combustible Beacon
GGCD Gas Combustible Detector
GGDOR Gas Detector Open Path Receiver
GGDOT Gas Detector Open Path Transmitter
GGTB Gas Toxic Alarm Audible
GGTB Gas Toxic Beacon
GGTD Gas Toxic Detector
GHDL Heat Detector Linear
GHDP Heat Detector Point
GMAC Manual Alarm Callpoint
GDO Oxygen Depletion Detector
GSDI Smoke Detector Ionisation
GSDO Smoke Detector Optical
EQUIPMENT
EQUIPMENT DESCRIPTION
CODE
DLS PA LOUDSPEAKER
DXL PA FLASHING-BEACON
EQUIPMENT
EQUIPMENT DESCRIPTION
CODE
DPC PA ACCESS-PANEL
RADIO SYSTEM
METEOROLOGICAL SYSTEM
EQUIPMENT
EQUIPMENT DESCRIPTION
CODE
DH TELECOM EQUIPMENT-CABINET
CABLE
TYPE OF CABLE
CODE
DU TELECOM COPPER CABLE
DX COAXIAL CABLE
DF FIBER-OPTIC CABLE
INSTRUMENT
SYSTEMS DESCRIPTION
AQMS AIR QUALITY MANAGEMENT SYSTEM
BMS BURNER MANAGEMENT SYSTEM
CAFS CLEAN AGENT FIRE SUPPRESSION
CMS CUSTODY METERING SYSTEMS
DCS DISTRIBUTED CONTROL SYSTEM
ESD EMERGENCY SHUTDOWN SYSTEM
FACP FIRE ALARM CONTROL PANEL
FGS FIRE & GAS SYSTEM
LDS LEAK DETECTION SYSTEM
MCM MACHINE CONDITION MONITORING SYSTEM
PLC PROGRAMMABLE LOGIC CONTROLLER
TCCS TURBO MACHINERY & COMPRESSOR CONTROL SYSTEM
TGS TANK GAUGING SYSTEM
AAM ADVANCED ALARM MANAGEMENT
AMADAS ANALYZER MANAGEMENT & DATA ACQUISITION SYSTEM
CEMS CONTINUOUS EMISSIONS MONITORING SYSTEM
FAS FIRE ALARM SYSTEM
ICS INTEGRATED CONTROL SYSTEM
LIMS LABORATORY INFORMATION MANAGEMENT SYSTEM
OMAS OIL MOVEMENT AUTOMATION SYSTEM
OTS OPERATOR TRAINING SYSTEM
RTIMS REAL TIME INFORMATION MANAGEMENT SYSTEM
SOE SEQUENCE OF EVENTS
TAS TERMINAL AUTOMATION SYSTEM
8.10. APPENDIX 10: (COMPANY’s Vendor Document Requirement List Code – VDRL Code)
Code Description
E Engineering
P Procurement
C Construction
T Pre-commissioning & Commissioning
S Project Management
Code Description
T0 Temporary Facility
J0 Mechanical
J1 Stationary
J2 Machinery
H0 Piping
H1 Fire Fighting
H2 Stress
D0 Painting
B0 Insulation
A0 Civil
Q1 Building
Q2 Structure
N0 Electrical
K0 Instrument
T1 Telecom
R0 HVAC
W0 Commissioning
S0 Process
L0 HSE
V0 QA/QC
V1 Inspection
X0 Support
Y2 Material
Z0 Project Management
P0 Procurement Management
P1 Purchasing
P2 Expediting
P3 Logistics
C0 Construction Management
F0 Pipeline
Code Description
B Design Criteria, Design Philosophies & Basis
C Calculation
D Drawing / Diagram / Alignment Sheet
E Datasheet
G Regulatory Submissions
H Computer Models
K Communication
L List
M Maintenance, Operation, Repair, and Technical Manuals
P Procedure and Plan
Q Certifications and Warranties
R Reports, Technical Studies & Assessments
S Specification
T Evaluation Sheet
X Purchase Orders and Requisitions
Y Contractual Document
Sub Type
Sub Type Description
Code
AAP Analyzer Room Arrangement Plan
ACT Action List
AFF General Affairs
AGC Agreement with Client
AGF Fuel Supply Agreement
AGL Long Term Service Agreement
AGO Agreement with Other Party
AGP Power Purchase Agreement
AGS Agreement with Subcontractor
AIR Air Dispersion Study
ALI Pipeline Alignment Drawing
ALM Fire Alarm Plan
ANL FW Surge Analysis Report
APP Instrument Air Piping Plan
APR Review and Approval Procedure
ATH Regulatory Authorization List
AUD Audit Procedure
AVL Approved Vendor List
BDG Calculation Sheet For Building
BED Basic Engineering Design Data
BFD Block Flow Diagram
BLK Cable Block Diagram
BOM Bill of Material / Material Take Off
BUD Project Budget Plan
CAB Cable Schedule
CBA Collective Bargaining Agreement for Power Plant
CBE Commercial Bid Evaluation
CER Regulatory Certificates
CFR Cost Forecasting Report
CHE Catalyst & Chemical Summary
CHG Change Control/Management Procedure
CLO Construction Closing Phase
CLR Clarification Sheet
CND Instrument Connection Detail
CNE Fire & Gas Cause & Effect Chart
CNN Instrument Connection List
COD Coordination Procedure
COM Communication Plan
COP Commissioning Procedure & Plan
COR Close Out Report
COS Cost Summary
CPP Cathodic Protection Plan
CPR Construction Productivity Report
CRI Criticality Rating Procedure
CRR Corrosion Protection Study Report
Sub Type
Sub Type Description
Code
CTN Contract Trend Notice
CTR Constructability Review
CWT Cooling Tower Drawing
DAC Discipline Acceptance Certificate
DAY Daily Report
DCA Contract Design Change/Concession Authorization
DCT HVAC Duct / Piping Plan
DEF System Definition for Process
DEL Deliverable List
DEM Demolition Plan
DHS Design HSE Report
DIK Calculation Sheets for DIKE
DOC Instruction for Vendor Documentation
DRN Calculation Sheets for Drainage
DRU Cable Drum Schedule
DSC Process Description
DYN Dynamic Simulation Report
EFF Effluent Summary List
EHT Electric Heat Tracing Plan
ELV Equipment Setting Elevation List
ENV Environment Procedure
EQF Calculation Sheets for Equipment Foundation
EQP Equipment List
ESD Excess, Shortage, Damage Report
ESR Expediting Status Report
EVC Evacuation Plan
EXC Construction Execution Phase
EXE Execution Plan
EXP Site Explanation Report
FAC Temporary Facility Drawing
FCP Field Control Procedure
FDC Field Design Change Procedure
FDN Steel Structure Foundation Drawing
FEN Calculation Sheets for Fence & Gate
FGL Fire & Gas Equipment Location Drawing
FIR Fire-scenario Envelope Drawing
FIX Lighting Fixture Schedule
FLO Flow Assurance Study
FMC Field Material Control Procedure
FNC Assessment of Subcontractor's Finance Status
FPE Equipment List for Fire Potential
FRR Field Revision Request List
GAD AG Piping General Arrangement Drawing
GDC General Design Criteria
GDL Gas Detector Location Plan
GND Grounding Plan
GNL General Note & Legend
Sub Type
Sub Type Description
Code
HAZ List of Hazardous Source
HBD Heat Balance Diagram
HIN HVAC Instrument List
HKP Hook-Up Detail
HLT Health Procedure
HMB Heat & Material Balance
HOV Handover Procedure
HPD Hydraulic Profile
HSE HSE Report
HVA HVAC Calculation for Building
HYD Hydraulic Calculation Sheet
ILL Illumination Calculation
INC Insulation Coordination Study
IND Instrument Index
INF Project Information Management Plan
INQ Inquiry Plan
INS Job Instruction
INT Interface Management Plan
INU Insurance Policy
INV Invoice Document
IOL I/O list
IRC Inspection Release Certificate
ISC Intrinsic Safety Circuit Calculation
ISO Isometric Drawing
ISR Inquiry Status Report
ITB ITB Summary
ITI Information Technology Implementation Plan
ITL Interlock Description
ITP Inspection and Test Plan for Temporary Facility
ITR Inspection and Test Report for Pre-commissioning
JPR Job Performance Report
JVI JV Invoicing Procedure
KEY Instrument Key Plan
KOM Kick-Off Meeting Material / MOM
LAB Laboratory Layout Drawing
LAY Site Laydown Area Drawing
LGD Logic Diagram
LGT Lighting Plan
LIN Line List
LOC Location Plan / Drawing
LOD Flare Load Summary
LOP Loop Diagram
LOS Electrical Load Summary
MAI Maintenance Training & Manuals
MAR Material Approval Request for Building
MCC M/C Certification
MCP Instrument Main Cable Plan
Sub Type
Sub Type Description
Code
MCW Instrument Main Cable Way
MDC Mechanical Design Criteria
MDD 3D Model Data
MHR Material Handling Report
MIL Project Milestone
MLD Missing, Loss, Damage, Change
MMC Minutes of Meeting (Client)
MMF Minutes of Meeting (Interface)
MMI Minutes of Meeting (Internal)
MML Minutes of Meeting (Licensor)
MMS Minutes of Meeting (Subcontractors)
MMV Minutes of Meeting (Vendors)
MOB Manpower Mobilization & Demobilization Plan
MOD 3D Model Review & Studies
MRN Marine Drawing
MRR Material Receiving Report
MSC Construction 3 Month Schedule
MSD Material Selection Diagram
MSP Material Selection & Corrosion Philosophy
MTD Method Statements for Commissioning
MTH Monthly Progress Report
NAR Control Narrative
NCR Shop Non Conformance Report
NOZ Water Spray Nozzle Arrangement Drawing
NSC Notice of System Completion
NUM Document Numbering Procedure
ODR Deodour Drawing
ONM Operation & Maintenance Engineering
OPR Operation Training & Manuals
ORA Operability Readiness and Assurance Plan
ORF Orifice Calculation
ORG Organization Chart
PAK Packing Procedure
PAY Monthly Subcontractor Payment Record
PCP Pre-commissioning Procedure & Plan
PCS Package Control Scheme
PDS Process Datasheet
PER Performance Report
PFD Process Flow Diagram
PHL Design Philosophy
PID Marked-up P&ID
PIG Intelligent Pigging Philosophy
PIL Calculation Sheets for Pile
PIM Pre-Inspection Meeting MOM
PIP Piping Calculation Report
PIR Inspection Report
PIT Calculation Sheets for Pit & Pond
Sub Type
Sub Type Description
Code
PLA Calculation Sheet For Local Platform & Support
PLN Project Planning & Scheduling Procedure
PLO Plot Plan
PLR Plant Layout & Spacing Review Drawing
PLU Plumbing System Drawing/Diagram
PLY Piping Layout Drawing & Details
PNL Lighting Panelboard Schedule
POW Power Plan
PPC Physical Progress & Milestone Completion Certificate
PPD Fire Fighting Piping Plan Drawing
PPS Piping Study Report
PQS Pre-Qualification For Subcontract
PRE Construction Preparation Phase
PRG Progress Procedure
PRS Preservation Assessment Record
PRT Earthing and Lightning Protection Calculation
PSD Process Safeguarding Diagram
PSP Instrument Pipe Sleeve Plan
PSR Procurement Status Report
PST Piping Stress Analysis
PUN Punch List
QAP Quality Assurance Plan
QCP Quality Control Procedure
QCR Quality Records
QSR Inspection Status Report
RAC Calculation Sheet For Piperack
RAD Radiation Calculation Report
RBS Relief and Blowdown Summary
REC Project Documentary
REQ Requisition
REV Engineering Revision Instruction
RFC RFC (Ready For Commissioning)
RFI RFISU (Ready For Initial Start-Up)
RFQ Request for Quotation package
RFS RFSU (Ready For Start-Up)
RIG Rigging Calculations
RLY Relay Coordination Report
ROD Calculation Sheets for Road & Paving
ROU Route Survey & Routing Selection Report
RSK Schedule Risk Analysis Report
RUT Route Survey Report
SAF Safety Procedure
SAM Sample Calculation Sheet
SCH Project Schedule
SCM Fire & Gas Overall Schematic Diagram
SCR Site Check Result Report
SDD Support Detail Drawing
Sub Type
Sub Type Description
Code
SEC Security Procedure
SEG Segment Calculation
SEQ Safety Equipment
SET Alarm & Trip Set Point List
SFL Safety & Fire Extinguisher Location Drawing
SHP Shipping Procedure
SHR HR
SHT Calculation Sheet For Shelter
SIL SIL Verification Report
SIM Process Simulation Native File
SIT Site Preparation Drawing
SIZ Equipment Sizing Calculation
SLD Single Line Diagram
SLP Calculation Sheets for Sleeper
SOA Start-up & Operation Assistance Report
SOI Soil Improvement Drawing
SOW Scope of Work for Supplying Materials
SPC Specification
SPE Special Item List
SPL Commissioning Spare Part List
SQR Procedure for Supplier Quality Record
SSC Startup & Shutdown Curve
SSR Shipping Status Report
SSU Piping Special Support Drawing
STA Calculation Sheets for Stationary
STB Transient Stability Study
STD Standard and Typical Drawing
STL Steel Shop Drawing & Details
STM Scope Tracking and Management Plan
STR Calculation Sheet For Structure
STS Support Standard Drawing
STT Steam Tracing Plan
SUB Subcontractor List
SUG Surge Analysis
SUM I/O Summary
SUR Calculation Sheets for Local Support Foundation
SYM Instrument Symbol and Notes
SYS HVAC System Drawing / Diagram
TAG 3D Model Review Tag Report
TAX TAX
TBE Technical Bid Evaluation
TCH Calculation Sheets for Trench & Duct Bank
TDB TDB (Technical Data Book)
TDS Equipment Data Sheet
TIE Tie-in Drawing
TOV Turn-Over Notices / List
TQR Technical Query
Sub Type
Sub Type Description
Code
TRN Training Report
TRY Tray, Duct bank, Trench Sizing Calculation
TST Test Procedure
UFD Utility Flow Diagram
UGC U/G Composite Drawing
UGP UG Piping General Arrangement Drawing
UTL Utility Station Location Plan
VER FEED Verification Report
VLD Validation Plan
VPI Vendor Print Index & Schedule
VPO Purchase Order
VSC Valve Sizing Calculation
VVL Valve List
WBD Water Balance Diagram
WBS Work Breakdown Structure
WGH Weight Control Procedure
WIR Control Room Wiring Plan
WKY Weekly Progress Report
WOP Piping Work Procedure
WOR Workshop for Contract Management
WPS Welding Procedure Specification / Performance Qualification
WRP R d
Instrument Wiring Plan
WRR Project Warranty Plan
WSC Construction 3 Week Schedule
ZON Fire Area & Fire Zone Drawing
GAP Pipeline General Arrangement Drawing
HTD H d
Hydrostatic iTest
T Diagram
Di
PCR Pipeline Calculation Report
PLF Pipeline Layout Drawing
DSH Data Sheet
PSF Pipeline Stress Analysis
PNR Pipeline Reports
PRM Pipeline Route Map
PAD Pipeline Approach Drawing
PLD Pipeline Schematic Diagram
PLS Pipeline Schedule
STF Pipeline Detail Drawing
STP Pipeline Typical Drawing
TFA Telecom FO Core Allocation
TBL Telecom Block Diagram
TFC Telecom FO Calculation
TPC Telecom PAGA Calculation
TIS Telecom Installation
TIT Telecom Interconnection
TCL Telecom Conceptual Layout
TEL Telecom Equipment & Cable Layout
TMT Telecom MTO
Sub Type
Sub Type Description
Code
TRF Telecom RFQ
TSC Telecom Schedule
TSP Telecom Specification
TST Telecom Study
TTB Telecom TBE
ZZZ Undefined Document