Sie sind auf Seite 1von 1

GE Power & Water

TOC Layout Schedule Simplification Performance Operability Controls/UX Appendix

Contents
INTRODUCTION 4.0 PERFORMANCE
4.1 Heat Recovery Steam Generator Enhancements
1.0 LAYOUT 4.2 600°C (1112°F) Main Steam and Reheat Steam
1.1 Layout for Single-Shaft Plants Temperatures
1.2 Layout for Multi-Shaft Configuration 4.3 Fuel Heating to 226°C (440°F)
1.3 Single-Shaft vs. 1x1 Multi-Shaft 4.4 Two Pressure Condenser for Steam Turbines
with 4-Flow Low Pressure Sections
1.4 Preferred Steam Turbine Exhaust Direction
1.5 Compact Gas Turbine Building for
Multi-Shaft Configurations 5.0 OPERABILITY
5.1 Plant Hot Starts in 30 minutes or less
2.0 SCHEDULE 5.2 Plant Shutdown Purge Credit
2.1 Project Schedules for Single-Shaft and 5.3 SSS Clutch for Single-Shaft Applications
Multi-Shaft Plants
2.2 Modularized Gas Turbine Enclosure 6.0 CONTROLS/USER EXPERIENCE (UX)
2.3 Steam Turbine Installation and 6.1 Digital Bus Technology for Instrumentation
Constructability Features and Controls
2.4 Lube Oil System Flush Features 6.2 Plant AutoStart
6.3 State-of-the-Art Human-Machine Interfaces
3.0 SIMPLIFICATION 6.4 Plant Level Alarm Management and Fault
3.1 Electric Inlet Guide Vane and Variable Tolerant Protection Systems
Stator Vane Actuators 6.5 Intelligent Dual Control Redundancy
3.2 Pressure Atomized Liquid Fuel System
3.3 Factory Commissioning of Accessory Skids APPENDIX
3.4 Consolidated Plant Electrical Room Appendix A Requirements and Constraints
3.5 Water Mist Fire Protection Appendix B Plant Functions
Appendix C Physical Implementation
Appendix D Definitions and Acronyms
Appendix E Document Creation and Revision List

© 2015 General Electric 1 GE Proprietary Information

Das könnte Ihnen auch gefallen