Y/NALARP
RESIDUAL
ACTION TO BE TAKEN
S/No.
(Refer to
HAZARD HAZARD EFFECT Evaluation CONTROLS RISK
form)
S P R DESCRIBE ACTION MANPOWER S P R
Night:
1. Ensure adequate lighting arrangements
during night to avoid any serious accident.
1.Adequate lightening Welding
1.Recordable 2. Spend more time in the excessive light.
arrangements, Supervisor
1. Poor illumination Injury F 8 10 3. Lighting arrangements should be as per F 4 5 Yes
2. Work in access light. 2. Safety
2. Major accident standards, mean proper fixation, use of
Supervisor
grounding cables and ELCB to be ensured
duly inspected by inspector
1. Snake bite Kit.
1. Don't handle snake yourself, call
Biological Hazards Bite of insect and 2. GCM/TBT
security person
(Snakes, Bees, snake may lead 3. Snake sighting
2. Apply insect repellents Supervisor,
2. wasps, fatal. E 6 9 protocols E 2 4 Yes
3. Don't put hand where you cannot see Safety Watch
mosquitoes & (malaria, Dengue, 4. Insect repellents
4. Avoid working alone
Other insects) Skin allergy) 5. Emergency vehicle
5. Avoid working in poor light areas
with alert driver
GENERAL COMMENTS: Abbreviations
1. TBT will be conducted prior to job start. SPA: Single Person Accountable
2 Proper PPE’s are mandatory for all workers. GCM: General Conversation Meeting
3. Housekeeping of the area should be carried out on prior basis. PA: Performing Authority
4. Supervisor full time must be available. ELCB: Earth Leakage Circuit Breaker
5. Stand by vehicle/Ambulance must be available at site to rescue the victim. DB: Distribution Board
NAME OF TEAM MEMBERS SIGNATURE RISK ASSISMENT APPROVAL
I’m satisfied that the safeguard put in place will reduce the level of Risk to an acceptable level
Muhammad Asif (Project Manager) and the Task/Action is permitted to proceed.
Reviewed by: _________________________
Farhat Ali (HITRA Team Leader)
Date: ________________________ Time: ____________________
Authorizing
HE = Hazard Effect; P = Probability
Signatory: _______________ DATE: ________________