Beruflich Dokumente
Kultur Dokumente
MODELO:
1 DATOS GENERALES
2. PREDIMENCIONAMIENTO
L = 5.00 m
L = 5.00 m
A = 0.5 m
e = 0.2
H = 0.4
h = 0.2
bw = 0.2
Metrado:
Altura = 0.25 mt
Espesor = 0.10 mt
Espaciamiento = 1.00 mt
Volumen = 0.1000 m3 0.30
w Cargas sobre el Acueducto:
Peso propio: Wd = 0.3360 T/m
Peso de Canal: Wd1 = 0.2400 T/m
Peso de Agua: Wa = 0.0563 T/m
Sobrepeso: WL = 0.0002 T/m ( 0.1 TN/m2 * b )
Carga de Inpacto: WI = 0.0001 T/m ( 15.24 / ( L+38 ) * WL)
Wd = 0.95 T/m
Wm = 0.948862591 Tn/m
lm = (L/2*L/2)/(L) = 1.25
L/2 L/2
Md = Wm*lm*L= 5.930391192 Tn-m
lm
4. Diseño Viga:
A = 0.5 m
b = 0.5 m
e = 0.2
h = 0.2 H = 0.4
bw = 0.2
\ b = 0.5 m
As = M / (Fs*j*d)
2* M
d = peralte= = 31.19 cm < H (40 cm) Bien! < 20 cm Bien! (ACTUA COMO VIGA RECTANGULA
fc * k * j * b
Donde:
fc = Esfuerzo de compresión en el concreto = 0.4*f'c = 84
fs = Esfuerzo permisible en el acero = 0.4*fy = 1680
j = Factor adimencional = 1- k/3 = 0.891
k = Factor adimencional = n/(n+r) = 0.326
r = fy / f'c = 20.000
n = Es/Ec 9.661
Es = Modulo de elasticidad del acero = 2100000.000 Kg/ cm2
Ec = Mod.de elasticidad del concreto = 15000 f'c = 217370.651 Kg/ cm3
Recubrimiento ( r ) = 4 cm
Nº de capas de varillas = 1
d= 34.73 cm
Mu = 1.5*Mm + 1.8*Mv = 8.90
f= 0.9
2
é d *1.7 * f ' c * b ù é d *1.7 * f ' c * b ù é Mu *1.7 * f ' c * b ù
- ê- ú - ê- ú - 4* ê ú
ë fy û ë fy û ë f û
As = = 7.12 cm
2
2
é d *1.7 * f ' c * b ù é d *1.7 * f ' c * b ù é Mu *1.7 * f ' c * b ù
- ê- ú+ ê- ú - 4* ê ú
ë fy û ë fy û ë f û
As = = 140.48 cm
2
=> As = 7.12 cm
Verificando la cuantia:
β1 = 0.85
Φ A y B= 1 "
A= 5.07 cm2
Distribución
M(-)= 2.965195596
\ 2 VARILLAS DE 1/2''
Φ= 1/4 "
A= 0.32 cm2
2 Ø=3/8 2 Ø 1 /2 "
L= 5 m
Vm = 2.372156477 Tn
1
0.16 10.160.916
0.16 0.83
0.16 0.75 0.67 0.16
0.16 0.16 0.583 0.50.16 0.417
0.16 0.33 0.16
0.16 0.16 0.25
0.16 0.167
(Tn) 0.083
Vu = 3.558 Tn
A B C
d= 34.73
L/2= 2.5 m
Espaciamiento maximo = 30 cm
\ S= ~ 30 cm
Nº de estribos = 1
S = Av*Fy/3.5/bw = 38.003 cm ~ 40
S< 30 cm
S< 20 cm (bw)
1/4
\ S= 20 cm
e = 0.2
Volado = 0.15 m
ACERO PRINCIPAL:
e= 20 cm
f 'c= 210 kg/cm2
Fy= 4200 kg/cm2
b= 100 cm
r= 0.04
d= 19.96 cm
w= 0.000577503 rb = 0.0213
Cuantia (r) = 0.0000 < 0.021 Bien!
Φ= 3/8 "
A= 0.71 cm2
Φ= 3/8 "
A= 0.71 cm2
ACERO DE REPARTICION:
Φ= 3/8 "
A= 0.71 cm2
ACERO DE TEMPERATURA:
Φ= 3/8 "
A= 0.71 cm2
Espaciamiento (S) = 20 cm ~ 30 cm
Espaciamiento minimo (Smin) = 30 cm
MODELO:
1 DATOS GENERALES
2. PREDIMENCIONAMIENTO
L = 14.00 m
L = 14.00 m
A=1m
e = 0.2
H=1
h = 0.8
bw = 0.4
Metrado:
Altura = 0.25 mt
Espesor = 0.10 mt
Espaciamiento = 1.00 mt
Volumen = 0.1000 m3 0.30
w Cargas sobre el Acueducto:
Peso propio: Wd = 1.2480 T/m
Peso de Canal: Wd1 = 0.2400 T/m
Peso de Agua: Wa = 0.0563 T/m
Sobrepeso: WL = 0.0004 T/m ( 0.1 TN/m2 * b )
Carga de Inpacto: WI = 0.0001 T/m ( 15.24 / ( L+38 ) * WL)
Wd = 2.32 T/m
Wm = 2.317306015 Tn/m
lm = (L/2*L/2)/(L) = 3.5
L/2 L/2
Md = Wm*lm*L= 113.5479948 Tn-m
lm
4. Diseño Viga:
A=1m
b=1m
e = 0.2
h = 0.8 H=1
bw = 0.4
\ b=1m
As = M / (Fs*j*d)
2* M
d = peralte= = 96.49 cm < H (100 cm) Bien!
fc * k * j * b
Donde:
fc = Esfuerzo de compresión en el concreto = 0.4*f'c = 84
fs = Esfuerzo permisible en el acero = 0.4*fy = 1680
j = Factor adimencional = 1- k/3 = 0.891
k = Factor adimencional = n/(n+r) = 0.326
r = fy / f'c = 20.000
n = Es/Ec 9.661
Es = Modulo de elasticidad del acero = 2100000.000 Kg/ cm2
Ec = Mod.de elasticidad del concreto = 15000 f'c = 217370.651 Kg/ cm3
Recubrimiento ( r ) = 4 cm
Nº de capas de varillas = 3
d= 89.65 cm
Mu = 1.5*Mm + 1.8*Mv = 170.32
f= 0.9
2
é d *1.7 * f ' c * b ù é d *1.7 * f ' c * b ù é Mu *1.7 * f ' c * b ù
- ê- ú - ê- ú - 4* ê ú
ë fy û ë fy û ë f û
As = = 54.10 cm
2
2
é d *1.7 * f ' c * b ù é d *1.7 * f ' c * b ù é Mu *1.7 * f ' c * b ù
- ê- ú+ ê- ú - 4* ê ú
ë fy û ë fy û ë f û
As = = 707.92 cm
2
=> As = 54.10 cm
Verificando la cuantia:
β1 = 0.85
Φ A y B= 1 "
A= 5.07 cm2
Distribución
M(-)= 56.77399738
Φ (c)= 1 "
A= 5.07 cm2
\ 3 VARILLAS DE 1 ''
Φ= 3/4 "
A= 2.85 cm2
2 Ø=3/4 2 Ø 1 /2 "
L= 14 m
Vm = 16.22114211 Tn
1
0.16 10.160.916
0.16 0.83
0.16 0.75 0.67 0.16
0.16 0.16 0.583 0.50.16 0.417
0.16 0.33 0.16
0.16 0.16 0.25
0.16 0.167
(Tn) 0.083
Vu = 24.332 Tn
A B C
d= 89.65
L/2= 7 m
Espaciamiento maximo = 30 cm
\ S= ~ 30 cm
Nº de estribos = 3
S = Av*Fy/3.5/bw = 42.753 cm ~ 40
S< 30 cm
S< 40 cm (bw)
3/8
\ S= 30 cm
e = 0.2
Volado = 0.3 m
ACERO PRINCIPAL:
e= 20 cm
f 'c= 210 kg/cm2
Fy= 4200 kg/cm2
b= 100 cm
r= 0.04
d= 19.96 cm
w= 0.001413964 rb = 0.0213
Cuantia (r) = 0.0001 < 0.021 Bien!
Φ= 3/8 "
A= 0.71 cm2
Φ= 3/8 "
A= 0.71 cm2
ACERO DE REPARTICION:
Φ= 3/8 "
A= 0.71 cm2
ACERO DE TEMPERATURA:
Φ= 3/8 "
A= 0.71 cm2
Espaciamiento (S) = 20 cm ~ 30 cm