Department of Economic Affairs
Ministry of Finance, Government of India

This Report provides information on all infrastructure projects in the database across pre-defi ned set of parameters and following coverage criteria:
Government Infrastructure Projects (PPP) that were either under 'Pre-construction Stage', 'Under Construction' or 'Operation and Maintenance Stage' as on April 1,
2011 or 'Awarded' thereafter and with Project Cost >INR 5 crore.
Government Infrastructure Projects (Traditional Procurement) that were under 'Pre-construction Stage', or 'Under Construction' as on April 1, 2012 or 'Awarded'
thereafter and with Project Cost >INR 50 crore; and
Private Sector Projects that were under 'Pre-construction Stage', or 'Under Construction' as on April 1, 2012 or 'Awarded' thereafter and with Project Cost >INR 50 crore.
Information available as on 15 November 2019

Project Total Project Cost


# Project Name Type Sector Sub-Sector Location Status Date Of Award
Authority (in Rs Crore)

1 Solar Power (Khajuri) Private Sector Energy Renewable Chhattisgarh Suryachakra T erminated 50.00 28-Oct-2010
Project Infrastructure Projects energy (grid) MSM Solar
India Private
Limited

2 Four/six laning of Raipur- Government Infrastructure T ransport Roads and Chhattisgarh Ministry of Pre- 1,548.88 Not Available
Bilaspur section of NH 200 Projects (PPP) bridges Road construction
from km 0.000 to km T ransport and Stage
127.650 in Chhattisgarh Highways
on BoT (T oll) basis *

3 Implementation of Government Infrastructure Water Solid waste Chhattisgarh Bilaspur Pre- 25.41 19-Feb-2017
common municipal solid Projects (PPP) Sanitation management Municipal construction
waste management facility Corporation Stage
with a capacity of 180 T PD
at Kacchar *

4 Augmentation of Water Government Infrastructure Water Water supply Chhattisgarh Municipal Pre- 163.50 28-Jul-2017
Supply Scheme in Raipur* Projects (T raditional Sanitation pipeline Corporation, construction

Procurement) Raipur Stage

5 Implementation of 72 MLD Government Infrastructure Water Water supply Chhattisgarh Municipal Pre- 242.73 29-Nov-2016
Bhilai water supply scheme Projects (T raditional Sanitation pipeline Corporation, construction
under Amrut scheme* Procurement) Bhilai Stage

6 T wo laning of 71.1 km, Government Infrastructure T ransport Roads and Chhattisgarh Public Works Pre- 353.02 07-Jun-2016
Masania Kala- Projects (T raditional bridges Department, construction
Rengapali/Odisha Border Procurement) Chhattisgarh Stage
NH-200 under NHDP-IV*

7 Road Upgradation Government Infrastructure T ransport Roads and Chhattisgarh Public Works Pre- 335.70 16-Dec-2015
(Katghora-Shivnagar) Projects (T raditional bridges Department, construction
Project Procurement) Chhattisgarh Stage

8 Road Upgradation Government Infrastructure T ransport Roads and Chhattisgarh Public Works Pre- 215.13 16-Dec-2015
(Shivnagar-Ambikapur) Projects (T raditional bridges Department, construction
Project Procurement) Chhattisgarh Stage

9 KSK Mahanadi Power Co Government Infrastructure Energy Electricity Chhattisgarh Operation 14,969.00 Not Available
Limited Projects (PPP) generation and
(grid) Maintenance
Stage

10 Nawapara coal based Government Infrastructure Energy Electricity Chhattisgarh Chhattisgarh Operation 2,844.00 Not Available
power project, Raigarh Projects (PPP) generation State and
(grid) Electricity Maintenance
Board Stage
Project Total Project Cost
# Project Name Type Sector Sub-Sector Location Status Date Of Award
Authority (in Rs Crore)

11 Construction,O&M of Durg Government Infrastructure T ransport Roads and Chhattisgarh National Operation 123.00 05-Nov-1997
bypass on NH6 in Madhya Projects (PPP) bridges Highways and
Pradesh on BOT basis Authority of Maintenance
India (NHAI) Stage

12 Road Upgradation Government Infrastructure T ransport Roads and Chhattisgarh Public Works Operation 26.53 02-Mar-2002
(Bilaspur-Katghora-Korba- Projects (PPP) bridges Department, and
Champa) Project Chhattisgarh Maintenance
Stage

13 "DEFC",O&M of end of Durg Government Infrastructure T ransport Roads and Chhattisgarh National Operation 464.00 01-Dec-2006
bypass - Projects (PPP) bridges Highways and
Chhattisgarh/Maharashtra Authority of Maintenance
border sec. NH6 under India (NHAI) Stage
NHDP 3A on(BOT ) basis

14 300 MW T hermal power Government Infrastructure Energy Electricity Chhattisgarh Operation 3,828.00 Not Available
plant in Chattisgarh Projects (PPP) generation and
(grid) Maintenance
Stage

15 T hermal Power Project in Government Infrastructure Energy Electricity Chhattisgarh Athena Operation 8,464.00 Not Available
Janjgir-Champa District Projects (PPP) generation Chhattisgarh and
(grid) Power Maintenance
Limited (ACPL) Stage

16 Four -laning of Orrisa Government Infrastructure T ransport Roads and Chhattisgarh National Operation 1,234.00 25-Jan-2012
border to Aurang section of Projects (PPP) bridges Highways and
NH-6 from km 88 to km Authority of Maintenance
239 in Chattisgarh on India (NHAI) Stage
DBFOT (T oll) basis

17 Raigarh coal based Government Infrastructure Energy Electricity Chhattisgarh Operation 9,415.00 Not Available
thermal power project. Projects (PPP) generation and
(grid) Maintenance
Stage

18 Acme Raipur Solar Power Government Infrastructure Energy Renewable Chhattisgarh Operation 207.00 Not Available
Pvt. Ltd. Projects (PPP) energy (grid) and
Maintenance
Stage

19 Gangrel Dam T oe Small Government Infrastructure Energy Renewable Chhattisgarh Chhattisgarh Operation 7.00 Not Available
Hydro Power Project Projects (PPP) energy (grid) State and
Renewable Maintenance
Energy Devp Stage
Agency

20 VISA Raigarh Power Project Government Infrastructure Energy Electricity Chhattisgarh Operation 3,930.00 Not Available
Phase I Projects (PPP) generation and
(grid) Maintenance
Stage

21 GMR Chhattisgarh Energy Government Infrastructure Energy Electricity Chhattisgarh Operation 11,543.00 Not Available
Private limited (GCEPL) - Projects (PPP) generation and
Coal based power plant (grid) Maintenance
located in Raikheda Stage

22 Jangir Champa caol based Government Infrastructure Energy Electricity Chhattisgarh Operation 688.00 Not Available
power project Projects (PPP) generation and
(grid) Maintenance
Stage

23 Jindal Tamnar Power Government Infrastructure Energy Electricity Chhattisgarh Operation 13,410.00 Not Available
Plant Phase I and II Projects (PPP) generation and
(grid) Maintenance
Stage
Project Total Project Cost
# Project Name Type Sector Sub-Sector Location Status Date Of Award
Authority (in Rs Crore)

24 Raipur-Aurang NH-6 Road Government Infrastructure T ransport Roads and Chhattisgarh National Operation 190.00 13-Oct-2005
Project Projects (PPP) bridges Highways and
Authority of Maintenance
India (NHAI) Stage

25 Recreation Park & Government Infrastructure Social and T ourism Chhattisgarh Raipur Operation 25.00 17-Sep-2010
Swimming Pool (Raipur) Projects (PPP) Commercial Development and
Project Infrastructure Authority Maintenance
Stage

26 Construction of flyover at Government Infrastructure T ransport Roads and Chhattisgarh Urban Completed 65.77 Not Available
Maharana Pratap chowk in Projects (T raditional bridges Administration
length of 1.6 km Procurement) &
Development,
Chhattisgarh

27 Durg-Rajnandgaon DL 3rd Government Infrastructure T ransport Railway track, Chhattisgarh South East Completed 231.00 Not Available
Railway Line Project Projects (T raditional tunnel, Central

Procurement) viaducts, Railway


bridges

28 Salka Road-Khongsara DL Government Infrastructure T ransport Railway track, Chhattisgarh South East Completed 144.00 Not Available
Railway Line Project Projects (T raditional tunnel, Central

Procurement) viaducts, Railway


bridges

29 T ransmission Line (Lara Government Infrastructure Energy Electricity Chhattisgarh Power Grid Completed 400.47 05-Aug-2015
ST PS-I) Project Projects (T raditional transmission Corporation of

Procurement) India Limited

30 Coal Based Power (Raipur) Private Sector Energy Electricity Chhattisgarh GMR Completed 11,016.00 Not Available
Project Infrastructure Projects generation Chhattisgarh
(grid) Energy Private
Limited

31 Implementation of rural Government Infrastructure Energy Electricity Chhattisgarh Chhattisgarh Completed 93.25 29-Oct-2016
electrification works in Projects (T raditional transmission State Power
Bilaspur district - DDUGJY Procurement) Distribution
Company
Limited

32 Implementation of rural Government Infrastructure Energy Electricity Chhattisgarh Chhattisgarh Completed 105.14 08-Mar-2017
electrification works in Projects (T raditional transmission State Power
Bilaspur under IPDS Procurement) Distribution
Company
Limited

33 Implementation of rural Government Infrastructure Energy Electricity Chhattisgarh Chhattisgarh Completed 74.06 22-Aug-2016
electrification works in Projects (T raditional transmission State Power
Durg under IPDS Procurement) Distribution
Company
Limited

34 Implementation of rural Government Infrastructure Energy Electricity Chhattisgarh Chhattisgarh Completed 60.33 22-Aug-2016
electrification works in Projects (T raditional transmission State Power
Raigarh &Rajnandgaon Procurement) Distribution
under IPDS Company
Limited

35 Khodri-Anuppur GC Railway Government Infrastructure T ransport Railway track, Chhattisgarh South East Completed 386.00 Not Available
Line Project Projects (T raditional tunnel, Central

Procurement) viaducts, Railway


bridges
Project Total Project Cost
# Project Name Type Sector Sub-Sector Location Status Date Of Award
Authority (in Rs Crore)

36 T wo-laning with paved Government Infrastructure T ransport Roads and Chhattisgarh Ministry of Completed 314.99 07-Jun-2016
shoulder of NH-200 (New Projects (T raditional bridges Road
NH-49) on Banari village- Procurement) T ransport and
Masania Kala village, 62.6 Highways
km under NHDP-IV

37 Ucchpinda Coal Based Private Sector Energy Electricity Chhattisgarh RKM Powergen Completed 10,377.33 30-Nov-2009
Power Project Infrastructure Projects generation Private Limited
(grid)

38 Laying of Raigarh-Saraipali Government Infrastructure Energy Electricity Chhattisgarh Chhattisgarh Completed 57.52 21-Feb-2011
& Bemetara-Mungeli Projects (T raditional transmission State Power
transmission lines in Procurement) T ransmission
length of 140 CKM in Company
Bilaspur Limited

39 Road Upgradation Government Infrastructure T ransport Roads and Chhattisgarh Public Works Completed 79.47 27-Aug-2011
(Bilaspur-Raipur) Project Projects (T raditional bridges Department,

Procurement) Chhattisgarh

40 Road Upgradation Government Infrastructure T ransport Roads and Chhattisgarh Public Works Completed 52.70 04-Jun-2010
(Wadrafnagar-Janakpur- Projects (T raditional bridges Department,
Balangi) Project Procurement) Chhattisgarh

41 Sipat T ransmission Line - Government Infrastructure Energy Electricity Chhattisgarh Power Grid Completed 110.00 03-Mar-2006
Stage I Projects (T raditional transmission Corporation of

Procurement) India Limited

42 Sipat-Seoni-Chhegaon- Government Infrastructure Energy Electricity Chhattisgarh Power Grid Completed 2,730.00 Not Available
Ambazari T ransmission Projects (T raditional transmission Corporation of
Line Procurement) India Limited

43 Construction of six lane Government Infrastructure T ransport Roads and Chhattisgarh Public Works Completed 65.87 03-Oct-2013
road in length of 9.5 km Projects (T raditional bridges Department,
between Vidhan Sabha Procurement) Chhattisgarh
Chowk (T ekari) to Dhaneli
in Raipur

44 Sipat Power Project Stage II Government Infrastructure Energy Electricity Chhattisgarh NT PC Limited Completed 4,039.70 Not Available

Projects (T raditional generation

Procurement) (grid)

45 Common User T erminal Private Sector Energy Oil/ Gas/ LNG Chhattisgarh IOT Completed 342.20 Not Available
(Raipur) Project Infrastructure Projects Storage Infrastructure
and Energy
Services
Limited

46 Implementation of rural Government Infrastructure Energy Electricity Chhattisgarh Chhattisgarh Completed 75.54 08-Mar-2017
electrification works at Projects (T raditional transmission State Power
Raipur city-I and II under Procurement) Distribution
IPDS Company
Limited

47 Biomass Based Power Private Sector Energy Renewable Chhattisgarh Shanti G D Completed 70.00 Not Available
(Korba) Project Infrastructure Projects energy (grid) Ispat and
Power Private
Limited

48 Raipur Durg Expressway Government Infrastructure T ransport Roads and Chhattisgarh National Completed 114.00 01-May-2003

Projects (PPP) bridges Highways


Authority of
India (NHAI)
Project Total Project Cost
# Project Name Type Sector Sub-Sector Location Status Date Of Award
Authority (in Rs Crore)

49 Coal Based Power (Janjgir- Private Sector Energy Electricity Chhattisgarh DB Power Completed 6,640.00 12-Oct-2012
Champa) Project Infrastructure Projects generation (Madhya
(grid) Pradesh)
Limited

50 Upgradation of Jagdalpur- Government Infrastructure T ransport Roads and Chhattisgarh Public Works Completed 51.13 24-May-2010
Konta road in length of 34 Projects (T raditional bridges Department,
km Procurement) Chhattisgarh

51 Laying of Bisharampur- Government Infrastructure Energy Electricity Chhattisgarh Chhattisgarh Completed 65.85 16-Apr-2008
Balrampur, Kanker- Projects (T raditional transmission State Power
Kondagaon & Kondagaon- Procurement) T ransmission
Jagdalpur in 260 CKM in Company
Chhattisgarh Limited

52 Setting up of 132 kV Government Infrastructure Energy Electricity Chhattisgarh Chhattisgarh Completed 52.86 16-Apr-2011
substations at Patan & Projects (T raditional transmission State Power
Chhuri in Durg and Korba Procurement) T ransmission
Company
Limited

53 Setting up of 65 MW coal Private Sector Energy Electricity Chhattisgarh Vandana Completed 390.00 01-Jun-2012
based power unit in Infrastructure Projects generation Vidhyut
Bilaspur (grid) Limited

54 Setting up of 100 MW Private Sector Energy Electricity Chhattisgarh Spectrum Coal Completed 200.00 30-Dec-2008
Ratija Coal Based Power Infrastructure Projects generation and Power
Project (grid) Limited

55 Korba - III Power Government Infrastructure Energy Electricity Chhattisgarh Power Grid Completed 199.16 Not Available
T ransmission System Projects (T raditional transmission Corporation of
Project Procurement) India Limited

56 Kosarteda Irrigation Government Infrastructure Water Irrigation Chhattisgarh Water Completed 154.65 Not Available
Project Projects (T raditional Sanitation (dams, Resources

Procurement) channels, Department,


embankments, Chhattisgarh
etc.)

57 Mongra Barrage Project Government Infrastructure Water Irrigation Chhattisgarh Water Completed 2,046.55 03-Mar-2005

Projects (T raditional Sanitation (dams, Resources

Procurement) channels, Department,


embankments, Chhattisgarh
etc.)

58 Sutiyapat Irrigation Project Government Infrastructure Water Irrigation Chhattisgarh Water Completed 98.62 Not Available

Projects (T raditional Sanitation (dams, Resources

Procurement) channels, Department,


embankments, Chhattisgarh
etc.)

59 Establishment of pooling Government Infrastructure Energy Electricity Chhattisgarh Power Grid Completed 1,961.87 31-May-2011
station at Champa & Projects (T raditional transmission Corporation of
Raigarh for IPP Generation Procurement) India Limited
Project in Chhattisgarh-B

60 Establishment of pooling Government Infrastructure Energy Electricity Chhattisgarh Power Grid Completed 1,719.52 31-Dec-2010
station at Raigarh (Kotra) Projects (T raditional transmission Corporation of
& Raipur in Chhattisgarh Procurement) India Limited

61 Setting up of 10 MW solar Private Sector Energy Renewable Chhattisgarh Azure Power Completed 102.00 30-Jun-2014
based power unit in Durg Infrastructure Projects energy (grid) India Private
district Limited
Project Total Project Cost
# Project Name Type Sector Sub-Sector Location Status Date Of Award
Authority (in Rs Crore)

62 Airport (Raipur) Project - Government Infrastructure T ransport Airports Chhattisgarh Airports Completed 131.50 19-Sep-2008
Expansion Projects (T raditional Authority of

Procurement) India (AAI)

63 Substation (Sarona) Government Infrastructure Energy Electricity Chhattisgarh Chhattisgarh Completed 190.00 12-Sep-2012
Project Projects (T raditional transmission State Power

Procurement) T ransmission
Company
Limited

64 Coal Based Power Private Sector Energy Electricity Chhattisgarh SLB Energy Completed 812.50 31-May-2008
(Katghora) Project Infrastructure Projects generation Private Limited
(grid)

65 Rejected Coal Based Power Private Sector Energy Electricity Chhattisgarh Maruti Clean Completed 1,459.00 31-Jul-2011
(Bandakhar) Project Infrastructure Projects generation Coal & Power
(grid) Limited

66 Road Upgradation Government Infrastructure T ransport Roads and Chhattisgarh Public Works Completed 51.17 24-May-2010
(Kameshwarnagar- Projects (T raditional bridges Department,
Ramchandrapur-Lurgi) Procurement) Chhattisgarh
Project

67 Road Upgradation (Rogda- Government Infrastructure T ransport Roads and Chhattisgarh Public Works Completed 56.27 08-Mar-2013
Birgahani) Project Projects (T raditional bridges Department,

Procurement) Chhattisgarh

68 Road Upgradation (Sakti- Government Infrastructure T ransport Roads and Chhattisgarh Public Works Completed 55.35 22-Mar-2013
Malkharoda-Chhapora- Projects (T raditional bridges Department,
Dabhara) Project Procurement) Chhattisgarh

69 Road Upgradation Government Infrastructure T ransport Roads and Chhattisgarh Public Works Completed 52.48 24-May-2010
(T ongpal-Pakela) Project Projects (T raditional bridges Department,

Procurement) Chhattisgarh

70 Marwa T endubhata Coal Government Infrastructure Energy Electricity Chhattisgarh Chhattisgarh Completed 8,500.00 31-Dec-2008
Based Power Project Projects (T raditional generation State Power

Procurement) (grid) Generation


Company
Limited

71 T ransmission Line (Korba Government Infrastructure Energy Electricity Chhattisgarh Chhattisgarh Completed 65.20 16-Mar-2011
Khedamara-Marwa) Project Projects (T raditional transmission State Power

Procurement) T ransmission
Company
Limited

72 T ransmission Line (Churi- Government Infrastructure Energy Electricity Chhattisgarh Chhattisgarh Completed 58.07 05-Jun-2009
Bilaspur) Project Projects (T raditional transmission State Power

Procurement) T ransmission
Company
Limited

73 T ransmission Line (Korba- Government Infrastructure Energy Electricity Chhattisgarh Chhattisgarh Completed 259.19 10-Jun-2009
Khedamara) Project Projects (T raditional transmission State Power

Procurement) T ransmission
Company
Limited

74 T ransmission Line Government Infrastructure Energy Electricity Chhattisgarh Chhattisgarh Completed 304.34 24-Apr-2010
(Marwa-Raipur) Project Projects (T raditional transmission State Power

Procurement) T ransmission
Company
Limited
Project Total Project Cost
# Project Name Type Sector Sub-Sector Location Status Date Of Award
Authority (in Rs Crore)

75 Water Supply Scheme Government Infrastructure Water Water supply Chhattisgarh Public Health Completed 80.12 Not Available
(Bilaspur) - Augmentation Projects (T raditional Sanitation pipeline Engineering

Procurement) Department,
Chhattisgarh

Total 131,045.00

Note: Zero indicates information not available.

These reports are based on data received from relevant Project Authorities and is being updated on a best endeavor basis. Contact project sponsoring authorities to seek
additional details.

# - The project may have additional details that are pertinent. Kindly check the 'Any Other Information' field for further details.
* - Updated status for the project is not available.

Das könnte Ihnen auch gefallen