Beruflich Dokumente
Kultur Dokumente
•ã¨ãã - 048
*5784*
P. Pages : 4
Time : Three Hours Max. Marks : 80
_________________________________________________________________
Instructions to Candidates :
1. Do not write anything on question paper except Seat No.
2. Graph or diagram should be drawn with the black ink pen being
used for writing paper or black HB pencil.
3. Students should note, no supplement will be provided.
4. Attempt any two subquestions from each unit.
5. Use of non programmable calculator and standard normal
Distribution function table is allowed.
6. Figures to the right indicate full marks.
UNIT - I
Work element 1 2 3 4 5 6 7 8 9 10
Immediate - 1 2 3 3 3 3 5 4,5,6, 9
Precedence 7,8
Duration (min) 8 6 7 5 5 5 6 7 9 8
2. a) Draw the network diagram for the following. Also calculate various 8
time estimates, total float & project duration. Mark critical path.
Activity 1-2 1-3 1-4 2-3 2-6 3-5 3-6 4-5 5-6
Duration 3 4 14 10 5 4 6 1 1
(days)
Activity Immediate to tm tp
precedence
A - 2 7 12
B - 4 5 6
C A 6 9 12
D A 2 5 8
E B 2 4 6
F B 6 6 12
G D, E 4 5 6
H C 4 5 6
I F 3 5 7
Draw the network. Indirect cost = Rs. 120 per day. Find the optimum
project duration & minimum project cost by crashing.
•ã¨ãã - 048 2
•ã¨ãã - 048
UNIT - III
b) Define Joint stock company. Explain the procedure for forming the 8
joint stock company.
UNIT - IV
4. a) Describe working cycle capital with neat sketch. Also describe the 8
factors affecting the working capital.
b) i) Draw break even chart & show BEP, margin of safety (in Rs. & 4
in units) & angle of incidence.
UNIT - V
***********