Control & Relay Protection Philosophy for
400kV Dholera Sub-Station (400/220/66/33kV)
Isolator system
400kV System: - Three isolator configuration (Two Bus isolators and a Line/TRF
isolator) Integrated in GIS switch gear module
220kV System: - Three isolator configuration (Two Bus isolators and a Line/TRF
isolator) Integrated in GIS switch gear module
66kV System: - Three isolator configuration (Two Bus isolators and a Line/TRF
isolator) Integrated in GIS switch gear module
33kV System: - Three isolator configuration (Two Bus isolators and a Line/TRF
isolator) Integrated in GIS switch gear module
B) Control Voltage
220V DC
400kV - Control & Protection Panels (suitable for GIS switchgear module) to be
mounted in 400kV Control Room adjacent to 400kV GIS Building.
220kV - Control & Protection Panels (suitable for GIS switchgear module) to be
mounted in 220kV Control Room adjacent to 220kV GIS Building.
66kV - Control & Protection Panels (suitable for GIS switchgear module) to be
mounted in 66kV Control Room adjacent to 33kV GIS Building.
33kV - Control & Protection Panels (suitable for GIS switchgear module) to be
mounted in 33kV Control Room adjacent to 33kV GIS Building
11kV - Control & Protection Panels (suitable for conventional switchgear
module) to be mounted in 33 kV Control Room
D) PLCC panels
Page 1 of 7
GETCO / E / 4S - 410/ PP - 015 – 1A / R0 Dt. 21.10.2019
F) Nos. of 220kV Bays & Bus Bar Protection
BCUs shall have sufficient Input-Outputs (over and above 20% spare) to incorporate all Input-
Outputs of GIS module (as per LCC scheme approval) as well as C&P Panel. In case of non-
availability of sufficient I/Os, extra BCUs shall be provided to fulfill the requirement. Same shall be
considered as single set of BCU and same set shall be considered for spares also (highest
configuration).
Page 2 of 7
GETCO / E / 4S - 410/ PP - 015 – 1A / R0 Dt. 21.10.2019
33kV Feeders 1 Directional O/C & E/F Protection Numerical Relay with IEC 61850
Protocol
2 Local Breaker Backup (LBB) Integrated in Directional O/C-E/F
Protection. Protection Relay
Page 3 of 7
GETCO / E / 4S - 410/ PP - 015 – 1A / R0 Dt. 21.10.2019
B) Transformer Protection
400/220kV Transformer 1 Differential Protection Numerical Relay with IEC
61850 Protocol
2 Restricted Earth Fault Protection Numerical Relay with IEC
61850 Protocol
3 Directional O/C & E/F Protection Numerical Relay with IEC
(HV side) 61850 Protocol
4 Directional O/C & E/F Protection Numerical Relay with IEC
(LV side) 61850 Protocol
5 Over Fluxing Protection
- 400kV side -Integrated in Differential
Protection
Page 4 of 7
GETCO / E / 4S - 410/ PP - 015 – 1A / R0 Dt. 21.10.2019
7 Buchholz Relay Integrated in Transformer.
Auxiliary relay in protection panel.
8 Pressure Relief Devices Integrated in Transformer.
Auxiliary relay in protection panel.
9 Oil & Wdg. Temp. Alarm & Integrated in Transformer.
Tripping Auxiliary relay in protection panel.
10 OLTC Oil Surge Relay Integrated in Transformer.
Auxiliary relay in protection panel.
11 Oil Level Low Alarm Integrated in Transformer.
Auxiliary relay in protection panel.
12 Transformer Cooling Trouble Integrated in Transformer.
Auxiliary relay in protection panel.
13 Fire Protection System Integrated in Transformer.
Auxiliary relay in protection panel.
220/33kV Transformer 1 Differential Protection Numerical Relay with IEC
61850 Protocol
2 Restricted Earth Fault Protection Numerical Relay with IEC
(on HV & LV side) 61850 Protocol
3 Directional O/C & E/F Protection Numerical Relay with IEC
(HV side) 61850 Protocol
4 Directional O/C & E/F Protection Numerical Relay with IEC
(LV side) 61850 Protocol
5 Over Fluxing Protection Integrated in Differential
Protection
6 Local Breaker Backup (LBB)
Protection
- 220kV side - Integrated in Differential
Protection and Bus Bar
Protection Relay
Page 5 of 7
GETCO / E / 4S - 410/ PP - 015 – 1A / R0 Dt. 21.10.2019
3 Non-Directional O/C & E/F
Protection
- 66kV side - Numerical Relay with IEC 61850
Protocol
Page 6 of 7
GETCO / E / 4S - 410/ PP - 015 – 1A / R0 Dt. 21.10.2019
2 Local Breaker Backup (LBB) Integrated in Non Dir. O/C
Protection. & E/F Protection and Bus
Bar protection.
220kV Bus Coupler 1 Non Directional O/C & E/F Numerical Relay with IEC
Protection 61850 Protocol
2 Local Breaker Backup (LBB) Integrated in Non Dir. O/C
Protection. & E/F Protection and Bus
Bar protection.
66kV Bus Coupler 1 Non Directional O/C & E/F Numerical Relay with IEC
Protection 61850 Protocol
2 Local Breaker Backup (LBB) Integrated in Non Dir. O/C &
Protection. E/F Protection
33kV Bus Coupler 1 Non Directional O/C & E/F Numerical Relay with IEC
Protection 61850 Protocol
2 Local Breaker Backup (LBB) Integrated in Non Dir. O/C &
Protection. E/F Protection
E) Bus Sectionalizer Protection
220kV Bus Sectionalizer 1 Non Directional O/C & E/F Numerical Relay with IEC
Protection 61850 Protocol
2 Local Breaker Backup (LBB) Integrated in Non Dir. O/C
Protection. & E/F Protection and Bus
Bar protection.
33kV Bus Sectionalizer 1 Non Directional O/C & E/F Numerical Relay with IEC
Protection 61850 Protocol
2 Local Breaker Backup (LBB) Integrated in Non Dir. O/C &
Protection. E/F Protection
F) Bus Bar Protection
400kV Bus Bar 1 Bus Differential Protection Numerical Relay with IEC 61850
(Single scheme) Protocol
17 Bays, Extendable up to 24
Bays (i.e. Control Unit – 24 Bays)
220kV Bus Bar 1 Bus Differential Protection Numerical Relay with IEC 61850
(Single scheme) Protocol
15 Bays, Extendable up to 28
Bays (i.e. Control Unit – 28 Bays)
66kV Bus Bar 1 Shall be obtained via GOOSE Integrated in O/C-E/F
application of IEC 61850 Protection Relays with
compatible Relays without IEC 61850 Protocol
providing any additional relays.
(Over current feature of Relay
shall be utilized for GOOSE
publish and subscribe for decision
making and accordingly trip / block
GOOSE message to respective
IEDs.)
G) Disturbance Recorder & Event Loggers.
Integrated feature of protective relays is used to provide the information about the Disturbance and
to log the events.
H) GPS based Time Synchronizing Equipment
400kV Substation is to be provided with IEC 61850 compatible Global Positioning System based
Time Synchronizing Equipment to synchronize all the protections.
Page 7 of 7