Daily Progress Report

POWERGRID CORPORATION OF INDIA LIMITED


Date: 08.05.2019 Section: Bramhapuri (Tower pkg-3)

Project- 800 kV HVDC Raigarh- Pugalur TL Contractor- TATA Projects Ltd

Tower No. and Inspection Inspection Observation Inspection


Week No. Date Call No Action required Punch Point No. Remarks ( If any )
Tower Type Stage Quality Status

1. Pit Dimensions : OK
2. Quality of FA : OK & CA : OK TPL to ensure :
3. Steel Binding & Quantity : OK 1. Excavated soil to be dumped 2.0
4. Excavation : Excavated soil dumped at 1.0 meter meter away from edge of pit.
36/0(D+0) away from edge of pit.
18 08.05.2019 1 Foundation Acceptable NA NA
WET 5. B/B- 18146 mm, Diagonal- 25662 mm(Template).
6. Cement: ACC/PPC/Mar/2019 .
Today's status : Casting of Frustum Box, Step Box of
Pit- B & D Completed.

Cement Stacking at 36/0 FA at 36/0 CA at 36/0

Page 1 of 5
Daily Progress Report
POWERGRID CORPORATION OF INDIA LIMITED
Date: 08.05.2019 Section: Bramhapuri (Tower pkg-3)

Project- 800 kV HVDC Raigarh- Pugalur TL Contractor- TATA Projects Ltd

Tower No. and Inspection Inspection Observation Inspection


Week No. Date Call No Action required Punch Point No. Remarks ( If any )
Tower Type Stage Quality Status

Reinforcement Measurement at 36/0 Reinforcement Binding at 36/0 Diagonal Measurement at 36/0

Vibrator Workability at 36/0 Cube's at 36/0 Casting at 36/0

Page 2 of 5
Daily Progress Report
POWERGRID CORPORATION OF INDIA LIMITED
Date: 08.05.2019 Section: Bramhapuri (Tower pkg-3)

Project- 800 kV HVDC Raigarh- Pugalur TL Contractor- TATA Projects Ltd

Tower No. and Inspection Inspection Observation Inspection


Week No. Date Call No Action required Punch Point No. Remarks ( If any )
Tower Type Stage Quality Status

TPL to ensure :
1. Excavated soil to be dumped 2.0
meter away from edge of pit.
1. Pit Dimensions : U/P.
2. Undercut to be Done according
Today's status : Excavation of Pit- A, B, C & D
to given Dimensions in Drawing.
18 08.05.2019 2 62/1 Foundation Completed, Dressing of Pit U/P, Undercut not done Acceptable NA NA
Properly.

Pit Dressing U/P at 62/1 Under cutting is in under progress at 62/1 Under cutting is in under progress at 62/1

1. Backfilling : OK
2. Tower Nut/Bolts : U/P
TPL To Ensure:
3. Tower parts stacking : OK
Proper Loading/Unloading of 1. Mark No. 927 & 2293
18 08.05.2019 3 71/0 Erection 4. Tower materials : OK WIP NA
Materials to avoid any Damage to (Angle) Found Bend.
5. Availability of supervisor & safety officer: Yes.
Tower Members.
6. Mark No. 927 & 2293 (Angle) Found Bend.
Today's status : +36 Mtr. Section is U/P.

Page 3 of 5
Daily Progress Report
POWERGRID CORPORATION OF INDIA LIMITED
Date: 08.05.2019 Section: Bramhapuri (Tower pkg-3)

Project- 800 kV HVDC Raigarh- Pugalur TL Contractor- TATA Projects Ltd

Tower No. and Inspection Inspection Observation Inspection


Week No. Date Call No Action required Punch Point No. Remarks ( If any )
Tower Type Stage Quality Status

Angle Found Bend Angle Found Bend 1st Section Completed at 71/0

1. Backfilling : OK
2. Earthing done : Yes
3. Availability of supervisor & safety officer : Yes
4. Availability of ground rollers & wooden blocks :
18 08.05.2019 4 74/0-75/0 Stringing WIP NA NA NA
Yes
Today's status: Preparation U/P for Conductor
Paying Out.

Page 4 of 5
Daily Progress Report
POWERGRID CORPORATION OF INDIA LIMITED
Date: 08.05.2019 Section: Bramhapuri (Tower pkg-3)

Project- 800 kV HVDC Raigarh- Pugalur TL Contractor- TATA Projects Ltd

Tower No. and Inspection Inspection Observation Inspection


Week No. Date Call No Action required Punch Point No. Remarks ( If any )
Tower Type Stage Quality Status

Pilot Paying Out Completed at 74/0-75/0