Beruflich Dokumente
Kultur Dokumente
FIRST EDITION
JULY, 2005
THIS SPECIFICATION IS THE PROPERTY OF NATIONAL IRANIAN OIL ENGINEERING & CONSTRUCTION COMPANY. IT IS CONFIDENTIAL AND ALL RIGHTS
RESERVED TO THE OWNER. NEITHER WHOLE NOR ANY PART OF THIS DOCUMENT MAY BE DISCLOSED TO ANY THIRD PARTY, REPRODUCTED, STORED
IN ANY RETRIEVAL SYSTEM OR TRANSMITTED IN ANY FORM OR BY ANY MEANS WITHOUT THE PRIOR WRITTEN CONSENT OF THE NATIONAL
IRANIAN OIL ENGINEERING & CONSTRUCTION COMPANY.
JULY, 2005 NIOEC-SP-10-04( 0 )
JULY, 2005 NIOEC-SP-10-04( 0 )
REVISION INDEX
REV. REV. REV. REV.
1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5
PAGE PAGE PAGE PAGE
1 26 51 76
2 27 52 77
3 28 53 78
4 29 54 79
5 30 55 80
6 31 56 81
7 32 57 82
8 33 58 83
9 34 59 84
10 35 60 85
11 36 61 86
12 37 62 87
13 38 63 88
14 39 64 89
15 40 65 90
16 41 66 91
17 42 67 92
18 43 68 93
19 44 69 94
20 45 70 95
21 46 71 96
22 47 72 97
23 48 73 98
24 49 74 99
25 50 75 100
NOTES:
1
0 JULY, 2005 Z.GHETMIRI S.M.J.SEYEDI M.R.FARZAM M.A.A.SAJEDI
REV. DATE PREPARED CHECKED APPROVED AUTHORIZED
1
JULY, 2005 NIOEC-SP-10-04( 0 )
1. SCOPE ...................................................................................................................................3
2. REFERENCES......................................................................................................................3
3. UNITS ....................................................................................................................................3
4. GENERAL .............................................................................................................................3
5. MATERIALS ........................................................................................................................4
6. DESIGN APPLICATIONS...................................................................................................5
6.1 FIREPROOFING STRUCTURAL STEEL .......................................................................5
6.2 FIREPROOFING VERTICAL VESSEL SKIRTS ............................................................5
7. SURFACE PREPARATION OF STEEL WORK..............................................................5
8. APPLICATION OF BRICKWORK FIREPROOFING....................................................6
9. APPLICATION OF CONCRETE FIREPROOFING .......................................................6
10. INSPECTION ........................................................................................................................6
2
JULY, 2005 NIOEC-SP-10-04( 0 )
1. SCOPE
2. REFERENCES
Throughout this Specification the following dated and undated standards/codes are referred
to these referenced documents shall, to the extent specified herein, form a part of this
Specification.
For undated references, the latest edition of the referenced document (including any
supplements and amendments) applies. For dated references, the edition cited applies.
The applicability of changes in dated references that occur after the cited date , shall
mutually be agreed upon by NIOEC and the Vender / Contractor.
4. GENERAL
When this specification forms part of contract documents, the contractor shall furnish all
material, tools, equipment, utilities, facilities, scaffolding, etc., and shall perform all labor
and services necessary for the proper execution and completion of all fireproofing for
structural steel or other equipment as shown on the drawings, as specified herein and/ or as
reasonably implied.
3
JULY, 2005 NIOEC-SP-10-04( 0 )
5. MATERIALS
- All fireproofing shall be carried out using concrete or brick as specified and referenced
herein. in tumescent mastics and paints are not acceptable materials. Special fireproofing
concrete may be used with the written approval of N I O E C .
- All fireproofing pured concrete shall meet the requirements of NIOEC-SP-10-01.
Maximum aggregate size shall be 10 mm. the minimum equivalent cube compressive
strength at 28 days shall be 21 N/mm2 and concrete shall have a minimum cement
content of 350 kg/m³.
- All fire proofing gun-applied concrete fine aggregate shall comply with this table and
shall consist of 1 Part cement to 3.5 Part of fine aggregate proportioned by weight the
minimum equivalent cube compressive strength at 28 days shall be 28 N / mm2 .
- Reinforcing fabric for poured concrete fire proofing shall be galvanized weld mesh with
wire size of 100mm× 100mm×25mm
- The gun applied concrete fireproofing shall be reinforced with galvanized steel welded
wire fabric 50 m x 50 mm x 3 mm dia. For all large surface areas e. g. vessel skirts. On
structural steel members material shall be 25 mm x 25 mm x 2 mm galvanized steel welded
wire fabric maintained at 20 mm from profile by the use of 20 mm dia. Carbon steel bars,
suitably located to maintain this distance at all locations.
- Refer to NIOEC standard drawings listed under Para 2.2 for details of application of
various materials.
- Brickwork should be of good quality building brick or second quality firebrick, set in
cement mortar.
4
JULY, 2005 NIOEC-SP-10-04( 0 )
6. DESIGN APPLICATIONS
In all areas subject to fire hazard, all steel columns, supporting equipment, such as
towers, tanks, vessels, exchangers, transfer lines, etc. containing flammable or toxic
materials, shall be fireproofed from the base up to and including beams and cross
members transmitting equipment loads to columns, that is, the equipment support
level. Generally fireproofing need not be carried out higher than 7.5 m above grade.
Refer to NIOEC- SD-1002 for typical pipe rack and air cooler structure arrangement.
6.2.1 Steel skirts of vertical vessels containing hydrocarbons or toxic materials should be
fireproofed according to the table shown:
6.2.2 Vessel skirts shall be fireproofed with manually or pneumatically applied concrete.
Reinforcement shall be applied to fireproofing according to referenced N I O E C
standard drawing.
6.2.4 When standard saddles (saddle height less than 30 centimeters at lowest point) are used
to support horizontal vessels and exchangers these saddles shall not be fireproofed.
Otherwise entire saddle shall be fireproofed.
6.2.5 Main heater columns shall be fireproofed from the top of concrete pier, to within 50
mm of underside of hearth plates. Supporting hearth beams shall be fireproofed.
6.2.6 Local runs of power cables and instrument cables or tubing vital to the emergency
shutdown system of the plant, which must run above ground and pass through areas of
high fire risk, such as adjacent to heaters or hot oil pumps, shall be provided with five
protection in order to give sufficient time in the event of a fire, to enable the unit to be
shut down safety. The design of the protection shall be approved by NIOEC.
6.2.7 Anchor bolts at ground level need not be fireproofed unless specifically requested but
such bolts located above ground level for elevated vessels should be covered with
mortar cement.
- All surfaces to receive fireproofing shall be free from loose flaky rust, loose scale, mud,
oil, grease, or other coatings that would reduce concrete bond.
5
JULY, 2005 NIOEC-SP-10-04( 0 )
- Steelwork which is to be fireproofed by brickwork shall be freed from with scale, rust,
grease and dirt and painted with 2 coats of solvent based bituminous paint. This shall be
applied even if the steel has received a shop priming coat.
- When bricks are used for the protection of vessel skirts, they shall be built close around
the skirt and reinforced with 2 horizontal strands of 2 mm (14 SWG) reinforcing wire in
the mortar between courses at every third course up from the bottom.
- Any unusual details necessary for applying fireproofing to structural steel members shall
be shown on the structural steel drawings.
- Concrete shall be kept moist for seven days to ensure proper curing.
- All fireproofing shall be carried out after completion of the insulation and/or painting of
the vessel/ steel structures. This is to avoid the staining of the fireproofing concrete by
rust run-off when it rains.
10. INSPECTION
NIOEC or its appointed representative reserves the right to inspect the work during all
phases of preparation and application.