Sie sind auf Seite 1von 110

SNAGLIST/DEFECT

ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

1. POOR INSTALLATION OF RUBBER


STRIP

2. INCOMPLETE FINISHING WORKS

3. POOR FINISHING/ EDGES OF DOOR


LEAF

1of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

4. POOR TERMINATION ON ALUMINIUM


CLADDING

4. POOR TERMINATION ON ALUMINIUM


CLADDING

5. DAMAGE RUBBER STRIP

2of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

6.POOR WORKMANSHIP ON PAINTING


WORKS

6.POOR WORKMANSHIP ON PAINTING


WORKS

6.POOR WORKMANSHIP ON PAINTING


WORKS

3of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

7. ACCESS PANEL NOT FLUSH WITH


CEILING SURFACE

8.POOR TERMINATION BETWEEN


CEILING AND WALL PANEL

9.INCOMPLETE FINISHING WORKS ON


TOP OF DOOR LEAF

4of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

9.POOR INSTALLATION OF SCREW


AND DIFFERENT COLOR TONE WITH
BASE PLATE

9.POOR INSTALLATION OF SCREW


AND DIFFERENT COLOR TONE WITH
BASE PLATE

10

10.DAMAGE AND POOR TIMBER


EDGES

5of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

11

# 11
Photo is missing (to refer tagging at site)

12

12. POOR INSTALLATION OF DRAWER


(UNABLE TO CLOSE)

13

13.PATCHY PAINT FINISH AND


SCRIBBLE MARK ON CEILING BOARD
SURFACE

6of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

14

14.EXCESS PAINT ON LIGHT FITTING

15

15.DAMAGE TIMBER EDGES

15.DAMAGE TIMBER EDGES

7of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

16

16.VISIBLE GAP AND POOR


TERMINATION

16.VISIBLE GAP AND POOR


TERMINATION

16.VISIBLE GAP AND POOR


TERMINATION

8of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

17

17.WRONG POSITION OF SWITCH


SOCKET (CENTER OF PANEL)

18

# 18
Photo is missing (to refer tagging at site)

19

19.VISIBLE GAP IN BETWEEN A/C


GRILL AND CEILING BOARD

9of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

20

20.POOR TERMINATION AND


DETAILING

20.POOR TERMINATION AND


DETAILING

20.POOR TERMINATION AND


DETAILING

10of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

21

21.POOR WORKMANSHIP ON CEILING


SURFACE IN BETWEEN FIN WALL

22

22.VISIBLE GAP AND POOR


WORKMANSHIP ON FINISHING WORKS

11of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

22.VISIBLE GAP AND POOR


WORKMANSHIP ON FINISHING WORKS

23

23.VISIBLE GAP AND POOR


WORKMANSHIP ON FINISHING WORKS

24

24.INCOMPLETE FINISHING WORKS

12of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

25

25.VISIBLE GAP IN BETWEEN MIRROR


AND METAL EDGING

26

26.STAIN MARK ON WALLPAPER


SURFACE

27

27.STAIN MARK ON WALLPAPER


SURFACE

13of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

28

28.POOR TERMINATION AND


DETAILING

29

29.INSUFFICIENT WALLPAPER

30

30.STAIN MARK/ DAMAGE ON WD02


SURFACE

14of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

31

31.IMPROPER ELECTRICAL WIRING


INSTALLATION AND VISIBLE GAP

32

32.POOR WORKMANSHIP ON
TERMINATION WORKS

33

33.VISIBLE GAP IN BETWEEN FLOOR


AND WALL PANEL

15of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

34

34.INCOMPLETE INSTALLATION OF
ALUMINIUM CLADDING

35

35.INSUFFICIENT ALUMINIUM
CLADDING

36

36.VISIBLE PIN HOLES

16of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

37

37.POOR WORKMANSHIP OF
GROUTING WORKS (INCONSISTENT
SPACING/GAP)

38

38.POOR TERMINATION OF TIMBER


BENCH AND MIRROR EDGES

39

39.INCOMPLETE FINISHING WORKS

17of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

40

40.POOR INSTALLATION OF METAL


DOOR HANDLE AND VISIBLE SCREW
NOT AS PER DESIGN INTENT

41

41.SWING DOOR UNABLE TO CLOSE

42

42.INCOMPLETE FINISHING WORKS

18of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

43

43.POOR WORKMANSHIP AND


TERMINATION BETWEEN FIN WALL AND
FLOOR SURFACE

44.VISIBLE SCREW NOT AS PER


DESIGN INTENT

45

45.POOR WORKMANSHIP AND


TERMINATION OF WD02

19of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

46

46.UNEVEN CEILING SURFACE (SWING


DOOR)

47

47.IMPROPER ELECTRICAL WIRING


INSTALLATION

48

48.VISIBLE GAP BETWEEN ALUMINIUM


CLAD AND TIMBER BENCH

20of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

49

49. VISIBLE GAP

49.DAMAGE FINISH SURFACE

50

50.DAMAGE EDGES

21of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

51

# 51
Photo is missing (to refer tagging at site)

52

52.FLIMSY ALUMINIUM CLADDING


(IMPROPER INSTALLATION)

53

53.POOR WORKMANSHIP ON CEILING


BOARD SURFACE

22of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

54

54.POOR FINISHING WORK

54.POOR FINISHING WORK

55

55.TERMINATION DETAIL NOT AS PER


DESIGN INTENT

23of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

56

56.POOR FINISH SURFACE/EDGES

57

57.INCOMPLETE FINISHING WORKS

58

58.POOR TERMINATION BETWEEN FIN


WALL AND CEILING BOARD

24of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

59

59.SLIDING DOOR FITTING (BOTTOM


TRACK) SHOULD NOT VISIBLE

60

60.IMPROPER LED LIGHTS


INSTALLATION

61

#61
Photo is missing (to refer tagging at site)

25of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

62

62.INCONSISTENT GAP

63

63.POOR INSTALLATION OF
MOUNTING SCREW AND DIFFERENT
COLOR TONE WITH BASE PLATE

64

64.POOR FINISH SURFACE

26of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

65

65.PATCHY PAINT FINISH

66

66.POOR INSTALLATION OF DOOR


SHELVES

67

67.DAMAGE ON FINISH SURFACE

27of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

68

68.SCRATCH MARK/ DAMAGE ON


FINISH SURFACE

68.SCRATCH MARK/ DAMAGE ON


FINISH SURFACE

69

69.UNACCEPTABLE WELD JOINT

28of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

70

70.METAL DOOR HANDLE


PROTRUDING OUT FROM TIMBER
SURFACE

71.POOR INSTALLATION OF METAL


DOOR HANDLE

72

29of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

73

73.SWITCHES NOT PROPERLY


INSTALLED

74

74.VISIBLE GAP

74.VISIBLE GAP

30of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

75

75.IMPROPER ELECTRICAL WIRING


INSTALLATION

76

76.POOR ALIGNMENT OF DOOR


SHELVES

77

77.FLIMSY DOOR SHELVES

31of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

78

78.IMPROPER ELECTRICAL WIRING


INSTALLATION

79

79.IMPROPER ELECTRICAL WIRING


INSTALLATION

80

80.VISIBLE GAP AND IMPROPER


ELECTRICAL WIRING

32of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

81

81.POOR TERMINATION

82

82.POOR WORKMANSHIP ON CEILING


SURFACE (UNEVEN)

83

83.VISIBLE GAP AND POOR


TERMINATION

33of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

84

#84
Photo is missing (to refer tagging at site)

85

#85
Photo is missing (to refer tagging at site)

86

86.POOR INSTALLATION OF LOCKSET


FITTINGS

34of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

87

87.INCOMPLETE FINISHING WORKS

87.INCOMPLETE FINISHING WORKS

88

88.POOR INSTALLATION OF METAL


DOOR HANDLE AND UNACCEPTABLE
VISIBLE SCREW

35of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

88.POOR INSTALLATION OF METAL


DOOR HANDLE AND UNACCEPTABLE
VISIBLE SCREW

89

89.DAMAGE TIMBER SURFACE

90

90.SWING DOOR UNABLE TO CLOSE

36of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

91

91.VISIBLE GAP BETWEEN FLOOR


AND WALL PANEL

92

92.IMPROPER ELECTRICAL WIRING


INSTALLATION

93

93.IMPROPER LIGHT FITTINGS


INSTALLATION

37of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

93.IMPROPER LIGHT FITTINGS


INSTALLATION

94

94.TOP AND BOTTOM PANEL DOES


NOT ALIGN

95

95.POOR ALIGNMENT ON GROOVE


LINE

38of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

96

96.POOR TERMINATION BETWEEN


WALL AND FLOOR

97

97.DAMAGE TIMBER SURFACE

98

98.VISIBLE GAP ON BETWEEN A/C


GRILL AND CEILING BOARD

39of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

99.POOR WORKMANSHIP ON
TERMINATION WORKS

100

100.VISIBLE GAP BETWEEN LIGHT


FITTINGS AND CEILING BOARD
SURFACE

101

102

101.SWING DOOR UNABLE TO CLOSE


102.POOR WORKMANSHIP ON EDGES
OF TIMBER FINISH

40of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

103

103.INCOMPLETE ELECTRICAL
FITTINGS

104

104.POOR INSTALLATION ON METAL


DOOR HANDLE

105

105.INCOMPLETE FINISHING WORKS

41of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

106

106.INCOMPLETE INSTALLATION OF
MOUNTING SCREW

107

107.DAMAGE ON CEILING BOARD


(DOWNLIGHT)

108

108.POOR TIMBER EDGES

42of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

109

109.TOP AND BOTTOM PANEL DOES


NOT ALIGN/PARALLEL

110

110.VISIBLE GAP BETWEEN WALL AND


FLOOR

111

111.INCONSISTENT GAP BETWEEN


METAL AND TIMBER SURFACE

43of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

112

112.TIMBER SHELVE NOT FIXED


PROPERLY (LOOSE)

113

113.VISIBLE GAP ON METAL STRIP

114

114.POOR INSTALLATION OF LIGHT


FITTINGS

44of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

115

115.POOR TERMINATION AND


GROUTING WORKS

116

116.IMPROPER LIGHT FITTINGS


INSTALLATION

117

117.ACCESS PANEL NOT FLUSH WITH


CEILING SURFACE

45of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

118

118.POOR TERMINATION OF GROOVE


LINE

119

119.POOR WORKMANSHIP ON
PAINTING WORK

120

120.DAMAGE TIMBER EDGES

46of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

121

121.INCOMPLETE FINISHING WORKS

122

122.POOR INSTALLATION OF LIGHT


FITTINGS

123

123.POOR WORKMANSHIP ON SILICON


WORKS

47of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

124

124.POOR WORKMANSHIP ON SILICON


WORKS

125

125.POOR WORKMANSHIP ON
PAINTING WORKS

125.POOR WORKMANSHIP ON
PAINTING WORKS

48of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

126

126.POOR WORKMANSHIP ON
GROOVE LINE

127

127.POOR WORKMANSHIP ON
PAINTING WORKS

128

128.IMPROPER LIGHT FITTINGS


INSTALLATION

49of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

129

129.STAIN MARK ON WD02 SURFACE

130

130.VISIBLE GAP ON METAL STRIP

131

131.DAMAGE ON TIMBER EDGES

50of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

132

132.POOR INSTALLATION OF TIMBER


PANEL

133

133.VISIBLE GAP BETWEEN FLOOR


AND WALL PANEL

134

134.POOR TERMINATION OF TIMBER


PANEL

51of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

135

135.INCONSISTENT GAP

136

136.TIMBER SHELVES NOT FLUSH


WITH METAL FRAME

137

137.POOR INSTALLATION OF DRAWER

52of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

138

138.POOR TERMINATION BETWEEN


METAL AND CEILING BOARD

139

134.POOR TERMINATION OF TIMBER


PANEL

139.TOP AND BOTTOM PANEL DOES


NOT ALIGN/PARALLEL

53of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

140

140.DAMAGE TIMBER EDGES AND


VISIBLE GAP BETWEEN FLOOR AND
WALL PANEL

141

141.EXCESS PAINT ON CEILING


SURFACE

142

142.VISIBLE GAP IN BETWEEN


MIRROR AND METAL EDGING

54of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

142.VISIBLE GAP IN BETWEEN


MIRROR AND METAL EDGING

142.VISIBLE GAP IN BETWEEN


MIRROR AND METAL EDGING

143

143.POOR WORKMANSHIP ON FINISH


SURFACE (CEILING BOARD)

55of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

144

144.UNEVEN SURFACE OF CEILING


SURFACE

145

145.VISIBLE GAP IN BETWEEN


MIRROR AND METAL EDGING

146

146.POOR WORKMANSHIP ON
TERMINATION WORKS

56of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

147

147.INCOMPLETE FINISHING WORK

147.INCOMPLETE FINISHING WORK

148

148.UNEVEN FINISH SURFACE

57of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

149

149.POOR ALIGNMENT ON GROOVE


LINE

150

150.DAMAGE EDGES AND POOR


ALIGNMENT OF TIMBER PANEL

151

151.POOR WORKMANSHIP ON
TERMINATION WORKS

58of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

152

#152
Photo is missing (to refer tagging at site)

153

153.POOR INSTALLATION ON METAL


DOOR HANDLE

154

154.POOR WORKMANSHIP ON TIMBER


EDGES

59of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

155

155.POOR INSTALLATION OF SHELVES


(UNABLE TO CLOSE PROPERLY)

156

156.POOR WORKMANSHIP ON
PAINTING WORKS

157

157.VISIBLE GAP BETWEEN LIGHT


FITTING AND CEILING BOARD

60of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

158

#158
Photo is missing (to refer tagging at site)

159

159.DAMAGE ON TIMBER EDGES

160

160.UNEVEN SURFACE BETWEEN


TIMBER AND STONE FINISH (LIPPAGE)

61of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

161

161.STAIN MARK ON TIMBER


SURFACE

162

162.UNEVEN SURFACE BETWEEN


TIMBER AND STONE FINISH (LIPPAGE)

163

163.UNEVEN SURFACE BETWEEN


TIMBER AND STONE FINISH (LIPPAGE)

62of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

164

164.INCOMPLETE INSTALLATION OF
SANITARY FITTINGS

164.INCOMPLETE INSTALLATION OF
SANITARY FITTINGS

165

165.POOR TERMINATION AND


DETAILING

63of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

166

166.POOR WORKMANSHIP AND


DETAILING

167

167.INCONSISTENT SIZE OF STONE


(CEILING NOT LEVELLED)

168

168.UNEVEN STONE FINISH (LIPPAGE)

64of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

169

169.CHIPPED STONE EDGES

170

170.INCOMPLETE INSTALLATION OF
ALUMINIUM CLADDING

170.INCOMPLETE INSTALLATION OF
ALUMINIUM CLADDING

65of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

171

171. INCOMPLETE INSTALLATION OF


ALUMINIUM CLADDING

172

172.INCOMPLETE FITTINGS

173

173.UNEVEN TIMBER SURFACE AND


INCOMPLETE FINISHING WORKS

66of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

174

174.DAMAGE EDGES

175

175.DRAWER UNABLE TO CLOSE


PROPERLY

176

176.POOR INSTALLATION OF FITTING


(NOT ALIGN)

67of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

177

177.MIRROR HEATER (TO CLARIFY


ACCEPTANCE LEVEL OF
TEMPERATURE)

178

178.POOR ALIGNMENT ON INSTALLED


SWITCH SOCKET

179

179.POOR WORKMANSHIP ON SILICON


WORKS

68of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

179.POOR DETAILING AND


INCOMPLETE FINISHING WORKS

180

180.IMPROPER ELECTRICAL WIRING


INSTALLATION

181

181.VISIBLE GAP ON CEILING


SURFACE (DOWNLIGHT)

69of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

182

182.ACCESS PANEL NOT PROPERLY


INSTALLED

183

183.INCOMPLETE INSTALLATION OF
SANITARY FITTINGS

184

#184
Photo is missing (to refer tagging at site)

70of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

185

185.POOR SILICON WORKS

186

186.VANITY COUNTER STEEL


FRAMING NOT AS PER DESIGN INTENT

187

187.VANITY LEGS NOT AS PER DESIGN


INTENT

71of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

188

188.IMPROPER ELECTRICAL WIRING


INSTALLATION

189

189.INCOMPLETE FITTINGS

190

190.POOR INSTALLATION OF SCREW


AND DIFFERENT COLOR TONE WITH
BASE PLATE

72of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

191

191.IMPROPER LIGHT FITTINGS AND


ELECTRICAL WIRING INSTALLATION

192

192.DRAWER UNABLE TO CLOSE


PROPERLY

193

193.DAMAGE AND STAIN MARK ON


ACCESS PANEL

73of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

194

194.IMPROPER LIGHT FITTINGS AND


ELECTRICAL WIRING INSTALLATION

195

195.POOR WORKMANSHIP ON
MOUNTING FOR CABINET FRAMING

196

196.POOR INSTALLATION OF DIGITAL


DISPLAY

74of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

197

197.VISIBLE GAP IN BETWEEN METAL


MOSAIC FINISH AND FITTINGS

198

198.VISIBLE GAP IN BETWEEN METAL


MOSAIC FINISH AND FITTINGS

199

199.POOR INSTALLATION OF SHOWER


MIXER

75of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

200

200.POOR WORKMANSHIP ON
SHOWER HOLDER INSTALLATION

201

201.IMPROPER METAL EDGING


INSTALLATION (VISIBLE GAP)

202

202.IMPROPER METAL EDGING


INSTALLATION (SILICON)

76of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

203

#203 0
Photo is missing (to refer tagging at site)

204

#204
Photo is missing (to refer tagging at site)

205

#205
Photo is missing (to refer tagging at site)

77of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

206

206.INCOMPLETE FINISHING WORKS

207

207.IMPROPER LIGHT FITTINGS AND


ELECTRICAL WIRING INSTALLATION

208

208.POOR WORKMANSHIP ON
PAINTING WORKS (LED LIGHT)

78of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

209

209.INCOMPLETE FINISHING WORKS

210

210.POOR WORKMANSHIP ON SILICON


WORKS

211

211.POOR WORKMANSHIP ON SILICON


WORKS

79of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

212

212.POOR WORKMANSHIP ON SILICON


WORKS

213

213.INCOMPLETE FITTINGS
INSTALLATION

214

80of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

215

215.POOR WORKMANSHIP ON
GROUTING WORKS

216

216.POOR WORKMANSHIP ON
GROUTING WORKS

217

217.POOR WORKMANSHIP ON SILICON


WORKS AND VISIBLE GAP ON WALL
EDGING

81of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

218

218.POOR WORKMANSHIP ON FLOOR


FINISH INSTALLATION (LIPPAGE)

219

219.INCONSISTENT SPACING (GAP)

220

220.POOR WORKMANSHIP ON FLOOR


FINISH INSTALLATION (LIPPAGE)

82of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

221

221.POOR WORKMANSHIP ON FLOOR


FINISH INSTALLATION (LIPPAGE)

222

222.DAMAGE SURFACE AT THE


BOTTOM OF SLIDING DOOR

223

223.POOR WORKMANSHIP ON FLOOR


FINISH INSTALLATION (LIPPAGE)
224.CHIPPED STONE EDGES

83of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

224

224.CHIPPED/DAMAGE STONE EDGES

225

225.INCOMPLETE GROUTING WORKS

226

226. INCOMPLETE TERMINATION


WORKS

84of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

227

227. UNEVEN FLOOR SURFACE


BETWEEN TIMBER AND STONE FINISH

228

228. VISIBLE GAP AT TIMBER EDGES

229

229. VISIBLE GAP AT TIMBER EDGES

85of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

230

230.POOR WORKMANSHIP ON FLOOR


FINISH INSTALLATION (LIPPAGE)

231

231.POOR WORKMANSHIP ON FLOOR


FINISH INSTALLATION (LIPPAGE)

232

232.POOR WORKMANSHIP ON FLOOR


FINISH INSTALLATION (LIPPAGE)

86of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

233

TERMINATE

233

TERMINATE

234

POOR WORKMANSHIP ON PAINTING


WORKS

87of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

235

235.UNACCEPTABLE TERMINATION
AND DETAILING

236

236. POOR INSTALLATION OF LOCKSET


(UNABLE TO CLOSE)

237

237. STAIN MARK, DAMAGE EDGES AND


ACCESS PANEL NOT PROPERLY
INSTALLED

88of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

238

238. SCRIBBLE MARK ON FINISH


SURFACE

239

239. DAMAGE TIMBER EDGES

240

240. POOR WORKMANSHIP ON


PATCHING UP/ PAINTING WORKS
(EXCESS PAINT)

89of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

241

241. VISIBLE/ INCONSISTENT GAP


BETWEEN WALL PANEL AND WALL
FINISH SURFACE

242

242. POOR WORKMANSHIP ON


PATCHING UP/ PAINTING WORKS
(EXCESS PAINT)

243

243. VISIBLE GAP ON DOWNLIGHT


FITTINGS

90of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

244

244. POOR WORKMANSHIP ON


PATCHING UP/ PAINTING WORKS
(EXCESS PAINT)

245

245. INCOMPLETE FINISHING WORKS


ON TOP OF DOOR LEAF

246

246. STAIN MARK ON LOCKSET

91of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

247

247. CHIPPED STONE EDGES

248

248. CHIPPED STONE EDGES

249

249. CHIPPED STONE EDGES

92of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

250

250. CHIPPED STONE EDGES

251

251. IMPROPER ELECTRICAL WIRING


INSTALLATION

251. POOR DETAILING AND


TERMINATION (AT THE BACK OF
MIRROR)

93of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

252

252.Visible gap between wall panel and


wall finish

253

IMPROPER ELECTRICAL WIRING


INSTALLATION

254

254. CHIPPED STONE EDGES

94of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

255

255. IMPROPER ELECTRICAL WIRING


INSTALLATION

256

256. POOR WORKMANSHIP ON


PATCHING UP/ PAINTING WORKS
(EXCESS PAINT)

257

257. IMPROPER ELECTRICAL WIRING


INSTALLATION

95of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

258

258.VISIBLE GAP BETWEEN WALL


PANEL AND FLOOR FINISH

259

#259
Photo is missing (to refer tagging at site)

260

260. DAMAGE TIMBER EDGES

96of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

261

261. STAIN/ SCRATCH MARK ON


LOCKSET

262

262. INCOMPLETE FINISHING WORK


AND TERMINATION

263

263. VISIBLE GAP AND OVERCUT STONE

97of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

263. VISIBLE GAP AND OVERCUT STONE

264

264. VISIBLE GAP

265

265. VISIBLE CRACK LINE

98of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

266

266. SWITCH SOCKET CLASHING WITH


RESERVED TOILET PAPER HOLDER
(UNCOORDINATED WORKS)

267

267. STAIN MARK ON FINISH WALL


SURFACE / POOR WORKMANSHIP

268

POOR WORKMANSHIP ON SILICON


WORKS

99of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

269

POOR FIXING AND TERMINATION OF


MIRROR (TOP)

270

270. LEVER HANDLE CLASHING WITH


BASIN

271

271.INCOMPLETE INSTALLATION OF
RUBBER STOPPER (SMOKE SEAL)

100of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

272

272. VISIBLE GAP BETWEEN FLOOR


AND WALL PANEL

273

273. IMPROPER ELECTRICAL WIRING


INSTALLATION

274

274. POOR WORKMANSHIP ON


FINISHING WORKS (GROOVE LINE)

101of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

275

275. POOR WORKMANSHIP AND


TERMINATION

276

276. INCOMPLETE GROUTING AND


INCONSISTENT GAP

277

277. POOR ALIGNMENT (TV CABINET)

102of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

277. POOR ALIGNMENT (TV CABINET)

278

278. INCONSISTENT GAP

279

279. VISIBLE GAP BETWEEN FLOOR


AND WALL PANEL

103of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

280

280. IMPROPER ELECTRICAL WIRING


INSTALLATION

281

281. IMPROPER LED INSTALLATION

282

282.VISIBLE GAP BETWEEN FLOOR


AND WALL PANEL

104of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

283

283. INCONSISTENT AND VISIBLE GAP

284

284. IMPROPER ELECTRICAL WIRING


INSTALLATION

285

285.POOR WORKMANSHIP ON
PATCHING UP/ PAINTING WORKS
(EXCESS PAINT)

105of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

286

286.VISIBLE GAP BETWEEN LIGHT


FITTING AND CEILING BOARD

287

287.DAMAGE ON BOARD SURFACE

288

288. INCONSISTENT SPACING/GAP


BETWEEN FIN WALL AND TIMBER
BENCH

106of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

289

289. INCOMPLETE FINISHING WORK


(BOTTOM BENCH)

290

290. POOR WORKMANSHIP OF TIMBER


BENCH (BATHTUB)

107of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

1. DIMENSION OF TIMBER CHAIR NOT


AS PER DESIGN DRAWING

2. MISSING NYLON GLIDE

3. POOR INSTALLATION OF SCREW AND


DIFFERENT COLOR IS NOT
ACCEPTABLE

108of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

4. DIMENSION OF TIMBER CHAIR NOT


AS PER DESIGN DRAWING

5. POOR TERMINATION AND VISIBLE


GAP

6. MISSING NYLON GLIDE

109of 110
SNAGLIST/DEFECT
ARCHITECTURAL INSPECTION

VENUE : Level 9 ( Park Suite - Hotel Mockup) Attendance :


DATE : 31-07-2019 CHAM PEI KUAN (I.D) RSP
TIME : 9.00am MR. SHABRI (I.O.W) RSP
SYED (QC ARC)/ MR. OOI (ASST.MANAGER) SUJV

Verification
NO Images Description
SUJV RSP

3. POOR INSTALLATION OF SCREW AND


DIFFERENT COLOR IS NOT
ACCEPTABLE

8. INCOMPLETE INSTALLATION

9. SCRATCH MARK TIMBER SURFACE

110of 110