Sie sind auf Seite 1von 4

Capstone project planing

Name of students: ISHAQ KHAN Enrollment No :- 1715580057

Name of program:- E-E-I-5

Semester :- 5

Course title and code:- Capstone project ( 22050 )

Title of the capstone project :- Automatic temperature controlled system for electrical panel.

A. POs address of the capstone project.(Mension only those performance


POs).

PO 1 > Basic knowledge :-


The fundamental of a electrical energy saving, specialization to the solution of complex
energy saving problems.

PO 2 > Problem Analysis :-


Identify, formulate, review research literature and analyse complex electrical energy saving
problems reaching substantiated conclusions using different energy saving electrical techniques.

PO 3 > Design /development of solutions :-


Design solution for complex electrical energy saving problems and design system components
or processes that meet the specific needs with appropriate consideration for the consumer
electricity bill and power saving.
PO 4 > Conduct investigation of complex problems :-
Use research based knowledge and research methods and techniques including design of working
model, analysis and interpretation to provide valid conclusions.

B. COs address of the capstone project.(Mension only those performance


COs).
 Use the relevant single phase and three phase electrical system, for different applications so
it's used industry , factories and chemical industries.
 Use the relevant single phase and three phase system for different purposes like that water
Cooling system, Metal industry and also it is used oil industries.
 Use the relevant single phase and three phase electrical system for different load condition.
 Only the one purpose for using these project how to save the electricity and save the electricity
bill charges.

C. Other learning outcome achieved through this project.


1.Unit outcomes(Cognitive Domain).

 This model can applied single phase and three phase system and also these panel can applied
large rating of electrical electrical machine and electric motor.
 Large electricity waste is mostly factories, industries and also chemical industry because they
can used of large rating of electrical machine.
 So finally save the electricity when the save of electricity they can also save the electricity
generating resources like that coal, diesel and fuel etc. Because these resources are limited.
2. Practical outcomes ( in Psychomotor Domain).

 This project can be used in different industries and factories so it save the electricity.
 In this project also included the safety purpose, if any fault create the panel the system it
will automatic indicate .
 Faulty condition save the employer for electric shock and electrical hazardous.
 If by any reason electrical leakage and fire problem the system is automatic closed and when
the condition is normal the system is automatic start.
PROGRESSIVE ASSESSMENT (PA) Sheet

S.No. Criteria Max Marks Marks Obtained

1 Problem Identification/Project
Title
2 Industrial survey and 10
Literature review
3 Punctuality and overall
contribution
4 Project Diary
5 Report Writing Including 10
Documentation.
6 Presentation 05
Total 25

Das könnte Ihnen auch gefallen