PREVENTIVE MAINTENANCE SCHEDULE

Date Location
Unit Type
4160V SWITCHGEAR ROOM 4TR CEILING MOUNTED
4160V SWITCHGEAR ROOM 4TR CEILING MOUNTED
4160V SWITCHGEAR ROOM 4TR CEILING MOUNTED
JUN 1
4160V SWITCHGEAR ROOM 4TR CEILING MOUNTED
4160V SWITCHGEAR ROOM 4TR CEILING MOUNTED
4160V SWITCHGEAR ROOM 4TR CEILING MOUNTED
SWITCHGEAR UNIT 1 8TR VRV
SWITCHGEAR UNIT 2 8TR VRV
JUN 3 BATTERY ROOM 4TR CEILING MOUNTED
BATTERY ROOM 4TR CEILING MOUNTED
460V SWITCHGEAR ROOM 8TR AHU
460V SWITCHGEAR ROOM 8TR AHU
MAIN POWER BLDG. UNIT 2 12.8TR VRV
JUN 4 MAIN POWER BLDG. UNIT 2 12.8TR VRV
MAIN POWER BLDG. UNIT 2 12.8TR VRV
MAIN POWER BLDG. UNIT 2 12.8TR VRV
460V SWITCHGEAR UNIT 2 4TR CEILING MOUNTED
460V SWITCHGEAR UNIT 2 4TR CEILING MOUNTED
JUN 6 4160V SWITCHGEAR UNIT 2 4TR CEILING MOUNTED
4160V SWITCHGEAR UNIT 2 4TR CEILING MOUNTED
MAIN POWER BLDG. UNIT 2 ELEV. 9 12.8TR VRV
MAIN POWER BLDG. UNIT 2 ELEV. 9 12.8TR VRV
MAIN POWER BLDG. UNIT 2 ELEV. 9 12.8TR VRV
JUN 7 MAIN POWER BLDG. UNIT 2 ELEV. 9 12.8TR VRV
4160V SWITCHGEAR UNIT 2 4TR CEILING MOUNTED
4160V SWITCHGEAR UNIT 2 4TR CEILING MOUNTED
BATTERY ROOM 4TR CEILING MOUNTED
BATTERY ROOM 4TR CEILING MOUNTED
JUN 8 CONDENSATE WATER CONVERTER RM. 4TR CEILING MOUNTED
CONDENSATE WATER CONVERTER RM. 4TR CEILING MOUNTED
CONDENSATE WATER CONVERTER RM. 4TR CEILING MOUNTED
CONDENSATE WATER CONVERTER RM. 4TR CEILING MOUNTED
1.6TR CEILING MOUNTED
JUN 10 1.6TR CEILING MOUNTED
EXCITATION ROOM 8TR AHU
EXCITATION ROOM 8TR AHU
9.5TR VRV
PREVENTIVE MAINTENANCE SCHEDULE
JUN 11 9.5TR VRV
PT ROOM 3TR CEILING MOUNTED
PT ROOM 3TR CEILING MOUNTED
ELEV. 5 UNIT 2 SWAS 4TR CEILING MOUNTED
ELEV. 5 UNIT 2 SWAS 4TR CEILING MOUNTED
ELEV. 5 UNIT 2 SWAS 4TR CEILING MOUNTED
JUN 13 ELEV. 5 UNIT 2 SWAS 4TR CEILING MOUNTED
ELEV.9 UNIT 2 7.1TR VRV
ELEV.9 UNIT 3 7.1TR VRV
CHLORINATION UNIT 2 7.5TR FLOOR MOUNTED
UNIT 2 CONFERENCE ROOM 4TR CEILING MOUNTED
JUN 14 UNIT 2 CONFERENCE ROOM 3TR CEILING MOUNTED
ELEV. 9 PANTRY UNIT 2 2TR CEILING MOUNTED
ELEV. 9 UNIT 2 12.5TR VRV
ELEV. 9 UNIT 2 11.3TR VRV
SAFETY OFFICE 3TR CASSETTE
JUN 15 ELEV. 9 12.5TR VRV
ELEV. 9 UNIT 2 12.5TR VRV
EE ROOM 4TR CEILING MOUNTED
EE ROOM 4TR CEILING MOUNTED
EE ROOM 4TR CEILING MOUNTED
JUN 17 EE ROOM 4TR CEILING MOUNTED
EE ROOM 4TR CEILING MOUNTED
EE ROOM 4TR CEILING MOUNTED
FLY ASH UNIT 2 ESP SWITCHGEAR RM. 5TR CEILING MOUNTED
FLY ASH UNIT 2 ESP SWITCHGEAR RM. 5TR CEILING MOUNTED
JUN 18 FLY ASH UNIT 2 ESP SWITCHGEAR RM. 9.5TR VRV
FLY ASH UNIT 2 ESP SWITCHGEAR RM. 8TR AHU
FLY ASH UNIT 2 CONTROL RM. 3TR CEILING MOUNTED
FLY ASH UNIT 2 ESP SWITCHGEAR RM. 11TR VRV
FLY ASH UNIT 2 CONTROL RM. 1.5HP WINDOW TYPE
JUN 19 CEMS 1 2HP WINDOW TYPE
CEMS 2 2HP WINDOW TYPE
PANTRY ASH HANDLING UNIT 1 2TR CASSETTE
CONTROL ROOM ASH HANDLIN UNIT 1 3TR CEILING MOUNTED
SWITCHGEAR ROOM ASH HANDLING UNIT 1 3TR CEILING MOUNTED
JUN 20 FLY ASH UNIT 2 ESP SWITCHGEAR RM. 8TR AHU
FLY ASH UNIT 2 ESP SWITCHGEAR RM. 4TR CEILING MOUNTED
ASH HANDLING UNIT 1 8TR VRV
PREVENTIVE MAINTENANCE SCHEDULE
ASH HANDLING UNIT 1 13TR VRV
SWITCHGEAR ROOM ASH HANDLING UNIT 1 4TR CEILING MOUNTED
JUN 21 SWITCHGEAR ROOM ASH HANDLING UNIT 1 4TR CEILING MOUNTED
SWITCHGEAR ROOM ASH HANDLING UNIT 1 4TR CEILING MOUNTED
SWITCHGEAR ROOM ASH HANDLING UNIT 1 8TR AHU
ASH HANDLING UNIT 1 8TR VRV
ASH HANDLING UNIT 1 8TR VRV
JUN 22 ENG. OFFICE MAIN POWER BLDG. UNIT 2 2.5TR CEILING MOUNTED
TSD MAIN POWER BLDG. UNIT 2 2.5TR CEILING MOUNTED
CONFERENCE RM MAIN POWER BLDG. UNIT 2 3TR CASSETTE
CONFERENCE RM MAIN POWER BLDG. UNIT 2 3TR CASSETTE
ASSAY BLDG. SWITCHGEAR RM. 8TR AHU
JUN 24 ASSAY BLDG. SWITCHGEAR RM. 8TR AHU
ASSAY BLDG. SWITCHGEAR RM. 8TR AHU
ASSAY BLDG. SWITCHGEAR RM. 8TR AHU
ASSAY BLDG. SWITCHGEAR RM. 8TR AHU
ASSAY BLDG. SWITCHGEAR RM. 8TR AHU
JUN 25 ASSAY BLDG. SWITCHGEAR RM. 8TR AHU
ASSAY BLDG. SWITCHGEAR RM. 8TR AHU
ASSAY BLDG. 1.5TR WALL MOUNTED
ASSAY BLDG. 1.5TR WALL MOUNTED
ASSAY BLDG. 2TR WALL MOUNTED
JUN 26 ASSAY BLDG. 4TR CEILING MOUNTED
ASSAY BLDG. 2ND FLR. SULFUR ANALYSIS 4TR CEILING MOUNTED
ASSAY BLDG. ELEMENTAL ANALYSIS RM. 3TR CEILING MOUNTED
ASSAY BLDG. PANTRY 1.5TR CEILING MOUNTED
ASSAY BLDG. DOCUMENTS 2TR CEILING MOUNTED
JUN 27 ASSAY BLDG. OIL ANALYSIS RM. 2TR CEILING MOUNTED
ASSAY BLDG. MANAGER'S OFFICE 2TR WALL MOUNTED
ASSAY BLDG. STORAGE RM 1.5 WALL MOUNTED
ASSAY BLDG. OIL ANALYSIS RM. 4TR CEILING MOUNTED
ASSAY BLDG. CALORIMETER RM. 4TR CEILING MOUNTED
JUN 28 ASSAY BLDG. ATMOSPHERE 2TR CASSETTE
ASSAY BLDG. PLANT LABORATORY 1.5TR WALL MOUNTED
ASSAY BLDG. CHEMICAL STORAGE RM. 3TR CEILING MOUNTED
ASSAY BLDG. 12.7TR VRF
ASSAY BLDG. 12.7TR VRF
JUN 29
ASSAY BLDG. 12TR VRF
ASSAY BLDG. 12TR VRF
PREVENTIVE MAINTENANCE SCHEDULE
ASSAY BLDG. 12TR VRF
ASSAY BLDG. 12.7TR VRF
ASSAY BLDG. 12TR VRF
JUL 1 ASSAY BLDG. 11TR VRV
ASSAY BLDG. 12.7TR VRF
ASSAY BLDG. 12TR VRF
ASSAY BLDG. HEATING RM. 4TR CEILING MOUNTED
ASSAY BLDG.HEATING RM. 4TR CEILING MOUNTED
ASSAY BLDG. WATER BALANCE RM 2 2TR WALL MOUNTED
JUL 2
ADMIN SERVER RM. 5TR CEILING MOUNTED
ADMIN 2ND FLR. HALLWAY 8TR AHU
ADMIN 2ND FLR. IT ROOM 1.5TR WALL MOUNTED
OPERATION MGRS. OFFICE 1.5TR WALL MOUNTED
JUL 3 PLANT MANAGER'S OFFICE 1.5TR WALL MOUNTED
TRANSFER TOWER 3 2TR WALL MOUNTED
DM WATER TREATMENT PLANT 2TR WALL MOUNTED
WASTE WATER TREATMENT ROOM 2TR WALL MOUNTED
MAINTENANCE TOOL ROOM 1HP WALL MOUNTED
JUL 4 MAINTENANCE BLDG. 5TR FLOOR MOUNTED
WEIGHING SCALE 1HP WINDOW TYPE
GUARD HOUSE GROUND FLOOR 1.5TR WALL MOUNTED
GUARD HOUSE SECOND FLOOR 3/4TR WALL MOUNTED
GUARD HOUSE SECOND FLOOR 1HP WINDOW TYPE
JUL 5 WAREHOUSE 1HP WINDOW TYPE
NETWORK RELAY OFFICE 2TR CASSETTE
WAREHOUSE 3/4TR WALL MOUNTED
NETWORK RELAY COMMUNICATION RM. 4TR CEILING MOUNTED
NETWORK RELAY 8TR VRV
JUL 6 NETWORK RELAY COMMUNICATION RM. 3TR CEILING MOUNTED
CANTEEN 1.5TR WALL MOUNTED
CANTEEN 1.5TR WALL MOUNTED
MAINTENANCE ELECTRICAL RM. 2TR WALL MOUNTED
MAINTENANCE 5TR FLOOR MOUNTED
JUL 8 ADMIN MEETING RM. 3TR CASSETTE
ADMIN CONFERENCE RM. 2TR CASSETTE
ADMIN LOBBY 1.5TR CASSETTE
ADMIN PROCUREMENT RM. 1.5TR CASSETTE
JUL 9 ADMIN ACCOUNTING RM. 1.5TR CASSETTE
CANTEEN WALL MOUNTED
PREVENTIVE MAINTENANCE SCHEDULE
CANTEEN WALL MOUNTED
CANTEEN 0.8 TR WALL MOUNTED
UNIT 1 DUTY SHIFT OFFICE 2TR WALL MOUNTED
UNIT 1 EE ROOM 4TR CEILING MOUNTED
JULY 10 UNIT 1 12.75TR VRF
UNIT 1 11TR VRV
CANTEEN 1TR WALL MOUNTED
UNIT 1 11TR VRV
UNIT 1 11TR VRV
JULY 11 UNIT 1 EE ROOM 4TR CEILING MOUNTED
UNIT 1 EE ROOM 4TR CEILING MOUNTED
UNIT 1 EE ROOM 4TR CEILING MOUNTED
UNIT 1 AC CONDITIONING RM 3TR CEILING MOUNTED
UNIT 1 I & C RM. 1.5TR WALL MOUNTED
JULY 12 UNIT 1 AC CONDITIONING RM 3TR CEILING MOUNTED
UNIT 1 INSTRUMENT PANEL RM 4TR CEILING MOUNTED
HALLWAY CR 2TR CASSETTE
UNIT 1 8TR VRV
UNIT 1 SWITCHGEAR RM 4TR CEILING MOUNTED
JULY 13 UNIT 1 SWITCHGEAR RM 4TR CEILING MOUNTED
UNIT 1 SWITCHGEAR RM 8TR AHU
UNIT 1 SWITCHGEAR RM 8TR AHU
UNIT 1 CHEMICAL RM 1TR WALL MOUNTED
UNIT 1 12.8TR VRV
JULY 16 UNIT 1 12.8TR VRV
UNIT 1 VRF
UNIT 1 VRF
UNIT 1 VRF
UNIT 1 12.7TR VRF
JULY 17 CANTEEN 1TR WALL MOUNTED
CANTEEN WALL MOUNTED
CANTEEN WALL MOUNTED
ADMIN 13TR VRV
ADMIN 12.7TR VRF
JULY 18 ADMIN 1.5TR WALL MOUNTED
ADMIN CSR 1.3TR WALL MOUNTED
ADMIN CLINIC 1.3TR WALL MOUNTED
ADMIN 0.8TR WALL MOUNTED
JULY 19
ADMIN GROUND FLR. HALLWAY 8TR AHU
PREVENTIVE MAINTENANCE SCHEDULE
UNIT 1 VRF
UNIT 1 VRF
UNIT 1 12.8TR VRV
UNIT 1 BATTERY RM 4TR CEILING MOUNTED
UNIT 1 SWITCHGEAR RM 4TR CEILING MOUNTED
JULY 20 UNIT 1 SWITCHGEAR RM 8TR AHU
UNIT 1 SWITCHGEAR RM 8TR AHU
UNIT 1 SWITCHGEAR RM 4TR CEILING MOUNTED
UNIT 1 SWITCHGEAR RM 4TR CEILING MOUNTED
UNIT 1 SWITCHGEAR RM 4TR CEILING MOUNTED
JULY 22 UNIT 1 SWITCHGEAR RM 4TR CEILING MOUNTED
UNIT 1 DC DISTRIBUTION RM 4TR CEILING MOUNTED
UNIT 1 BATTERY RM 4TR CEILING MOUNTED
UNIT 1 DC DISTRIBUTION RM 4TR CEILING MOUNTED
UNIT 1 SWITCHGEAR RM 4TR CEILING MOUNTED
JULY 23 UNIT 1 SWITCHGEAR RM 4TR CEILING MOUNTED
UNIT 1 SWITCHGEAR RM 4TR CEILING MOUNTED
UNIT 1 SWITCHGEAR RM 4TR CEILING MOUNTED
UNIT 1 SWITCHGEAR RM 4TR CEILING MOUNTED
UNIT 1 EE ROOM 4TR CEILING MOUNTED
JULY 24 UNIT 1 EE ROOM 4TR CEILING MOUNTED
HALLWAY CR 3TR CASSETTE
PANTRY ELEV. 9 STORAGE 3TR CEILING MOUNTED
STORAGE ELEV.9 3TR CEILING MOUNTED
UNIT 1 CONTROL RM. 4TR CEILING MOUNTED
JULY 25 UNIT 1 CONTROL RM. 8TR AHU
UNIT 1 CONTROL RM. 4TR CEILING MOUNTED
UNIT 1 CONTROL RM. 4TR CEILING MOUNTED
UNIT 1 CONTROL RM. 4TR CEILING MOUNTED
UNIT 1 CONTROL RM. 4TR CEILING MOUNTED
JULY 26 UNIT 1 CONTROL RM. 4TR CEILING MOUNTED
UNIT 1 CONTROL RM. 3TR CEILING MOUNTED
UNIT 1 CONTROL RM. 4TR CEILING MOUNTED
UNIT 1 CONTROL RM. 3TR CEILING MOUNTED
UNIT 1 CONTROL RM. 4TR CEILING MOUNTED
JULY 27 UNIT 1 12.8TR VRV
UNIT 1 12.8TR VRV
UNIT 1 9.5TR VRV
JULY 29 UNIT 1 VRF
PREVENTIVE MAINTENANCE SCHEDULE
ADMIN STAFF RM 3TR CASSETTE
ASSAY CHEMICAL RM. 3TR CEILING MOUNTED
UNIT 1 SWAS 3TR CEILING MOUNTED
MPB UNIT 1 3TR CEILING MOUNTED
MPB UNIT 1 HALLWAY 5TR CASSETTE
PT ROOM 3TR CEILING MOUNTED
JULY 30 PT ROOM 3TR CEILING MOUNTED
TRANSFORMER RM. 8TR CEILING MOUNTED
TRANSFORMER RM. 8TR CEILING MOUNTED
OUTLET 3TR CEILING MOUNTED
JULY 31
OUTLET 3TR CEILING MOUNTED