SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME DHIYA NORTH # 5 (2" GASLINE)
SAS QC
Sl no# Description Category Status Date Closed Signature
2 Hydro-test package
Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Mr.Cletus Ferrao Name: Mr.Sadiq Hussain
Signature Signatur
Date Date
017460
" GASLINE)
OXY QC
Signature
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2012-24000017460
Date SAS
Sl no# Description Category Status CONSTRUCTION
Closed SIGNATURE
Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Mr.Cletus Ferrao Name: Mr.Sadiq Hussain
Signature Signatur
Date Date
017460
EAST-02 (PART-
SAS QC
Signature
Seeh Al-Sarya Engineering LLC.
Reinstatement Report
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-2400001746
WADILATHAM TESTING
SYSTEM INSTRUMENT AIR (TP/SPR/AI/01) PROJECT NAME FACILITIES (V-9090)
3 Test limit and red line markup to be done and P& ID drawings
to be updated
Signature Signature
Date Date
2011-24000017460
HAM TESTING
S (V-9090)
Signature
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460
SAS QC
Sl no# Description Category Status Date Closed Signature
2 Hydro-test package A
Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain/Moinul Hassan
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460
,TIE IN SPOOL
1,14
OXY QC
Signature
1196883 SWL-CA-2011-24000017460
1203745
SAS QC
Sl no# Description Category Status Date Closed Signature
2 Hydro-test package
Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain/Moinul Hassan
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460
INJECTION LINE
OXY QC
Signature
SWL-CA-2011-24000017460
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460
SAS QC
Sl no# Description Category Status Date Closed Signature
2 Hydro-test package
Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain/Moinul Hassan
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460
WATER
S-1062)PART-2
OXY QC
Signature
1203936
SWL-CA-2011-24000017460
1203745
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460
SAS QC
Sl no# Description Category Status Date Closed Signature
2 Hydro-test package A
Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Mr MITHUN.R.S Name: Mr.MOINUL SYED
Position QA/QC inspector Position QA/QC Engineer
Signature Signature
Date Date
017460
E RE-ROUTING AT
OXY QC
Signature
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460
SAS QC
Sl no# Description Category Status Date Closed Signature
2 Hydro-test package
Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Moinul Hassan/Sadiq hussain
Position QA/QC Engineer PositionQA/QC Engineer
Signature Signatur
Date Date
017460
SWL-CA-2011-24000017460
IFOLD(SAS
SAS QC
Sl no# Description Category Status Date Closed Signature
2 Hydro-test package A
Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain/Moinul Hassan
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460
,TIE IN SPOOL
1,14
OXY QC
Signature
1196883 SWL-CA-2011-24000017460
1203745
SAS QC
Sl no# Description Category Status Date Closed Signature
2 Hydro-test package A
Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain/Moinul Hassan
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460
,TIE IN SPOOL
7,8,9,10
OXY QC
Signature
1196883 SWL-CA-2011-24000017460
1203745
SAS QC
Sl no# Description Category Status Date Closed Signature
2 Hydro-test package
Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain/Moinul Hassan
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460
IE IN
1024)
OXY QC
Signature
SWL-CA-2011-24000017460
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460
2 Hydro-test package A
Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain/Moinul Hassan
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460
,TIE IN SPOOL
3&4,TP5,TP13
OXY QC
Signature
1196883 SWL-CA-2011-24000017460
1203745
SAS QC
Sl no# Description Category Status Date Closed Signature
2 Hydro-test package A
Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain/Moinul Hassan
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460
OXY QC
Signature
1196883 SWL-CA-2011-24000017460
1203745
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460
SAS QC
Sl no# Description Category Status Date Closed Signature
2 Hydro-test package
Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain/Moinul Hassan
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460
INJECTION LINE
OXY QC
Signature
SWL-CA-2011-24000017460
1203745
Seeh Al-Sarya Engineering LLC.
Reinstatement Report
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-2400001746
WADILATHAM TESTING
SYSTEM WELL HEAD PRODUCTION (TP/SPR/PH/02) PROJECT NAME FACILITIES (V-9090)
2 Gasket verification
Signature Signature
Date Date
2011-24000017460
HAM TESTING
S (V-9090)
Signature
Seeh Al-Sarya Engineering LLC.
Reinstatement Report
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-2400001746
WADILATHAM TESTING
SYSTEM PROCESS GAS (TP/SPR/PG/03) PROJECT NAME FACILITIES (V-9090)
2 Gasket verification
Signature Signature
Date Date
2011-24000017460
HAM TESTING
S (V-9090)
Signature
Seeh Al-Sarya Engineering LLC.
Reinstatement Report
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-2400001746
WADILATHAM TESTING
SYSTEM PROCESS LIQUID (TP/SPR/PL/04) PROJECT NAME FACILITIES (V-9090)
2 Gasket verification
Signature Signature
Date Date
2011-24000017460
HAM TESTING
S (V-9090)
Signature
Seeh Al-Sarya Engineering LLC.
Reinstatement Report
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-2400001746
WADILATHAM TESTING
SYSTEM PROCESS GAS (TP/SPR/PG/05) PROJECT NAME FACILITIES (V-9090)
2 Gasket verification
Signature Signature
Date Date
2011-24000017460
HAM TESTING
S (V-9090)
Signature
Seeh Al-Sarya Engineering LLC.
Reinstatement Report
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-2400001746
WADILATHAM TESTING
SYSTEM VENT LINE (TP/SPR/VL/06) PROJECT NAME FACILITIES (V-9090)
2 Gasket verification
Signature Signature
Date Date
2011-24000017460
HAM TESTING
S (V-9090)
Signature
Seeh Al-Sarya Engineering LLC.
Reinstatement Report
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-2400001746
Prepared By:
Name: Selva kumar
Signature
Date
2011-24000017460
WAD NORTH 12
Signature
Seeh Al-Sarya Engineering LLC.
LINE WALK PUNCH LIST
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO.
Prepared By:
Name: Selva kumar
Signature
Date
WAD 4
Signature
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460
SAS QC
Sl no# Description Category Status Date Closed Signature
2 Hydro-test package
Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Moinul Hassan/Sadiq hussain
Position QA/QC Engineer PositionQA/QC Engineer
Signature Signatur
Date Date
017460
SWL-CA-2011-24000017460
AH 4" FLOW
-1034)
OXY QC
Signature
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460
SAS QC
Sl no# Description Category Status Date Closed Signature
2 Hydro-test package
Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain/Moinul Hassan
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460
ATERINJECTION
OXY QC
Signature
SWL-CA-2011-24000017460
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460
SAS QC
Sl no# Description Category Status Date Closed Signature
2 Hydro-test package
Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain/Moinul Hassan
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460
AS LINE (SAS-
OXY QC
Signature
SWL-CA-2011-24000017460
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460
2 Hydro-test package
Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain/Moinul Hassan
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460
NE AND TIE IN
N SPOOL(SAS-
OXY QC
Signature
SWL-CA-2011-24000017460
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460
SAS QC
Sl no# Description Category Status Date Closed Signature
2 Hydro-test package
Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain/Moinul Hassan
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460
LINE (PART6)SAS-
OXY QC
Signature
SWL-CA-2011-24000017460
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460
SAS QC
Sl no# Description Category Status Date Closed Signature
2 Hydro-test package
Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain/Moinul Hassan
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460
INJECTION LINE
OXY QC
Signature
SWL-CA-2011-24000017460
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460
SAS QC
Sl no# Description Category Status Date Closed Signature
2 Hydro-test package
Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain/Moinul Hassan
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460
INJECTION LINE
OXY QC
Signature
SWL-CA-2011-24000017460
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460
SAS QC
Sl no# Description Category Status Date Closed Signature
2 Hydro-test package
Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain/Moinul Hassan
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460
LINE (PART-
OXY QC
Signature
SWL-CA-2011-24000017460
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460
SAS QC
Sl no# Description Category Status Date Closed Signature
2 Hydro-test package
Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain/Moinul Hassan
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460
"WATER
RT-5)SAS-1024
OXY QC
Signature
SWL-CA-2011-24000017460
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460
SAS QC
Sl no# Description Category Status Date Closed Signature
2 Hydro-test package
Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain/Moinul Hassan
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460
"WATER
RT-4)SAS-1024
OXY QC
Signature
SWL-CA-2011-24000017460
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460
SAS QC
Sl no# Description Category Status Date Closed Signature
2 Hydro-test package
Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain/Moinul Hassan
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460
"WATER
RT-1)SAS-1024
OXY QC
Signature
SWL-CA-2011-24000017460
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460
SAS QC
Sl no# Description Category Status Date Closed Signature
2 Hydro-test package
Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain/Moinul Hassan
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460
"WATER
RT-3)SAS-1024
OXY QC
Signature
SWL-CA-2011-24000017460
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460
2 Hydro-test package
Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain/Moinul Hassan
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460
" WATER
M WELL PAD
OXY QC
Signature
SWL-CA-2011-24000017460
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460
SAS QC
Sl no# Description Category Status Date Closed Signature
2 Hydro-test package
OXY QC
Signature
SWL-CA-2011-24000017460
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460
SAS QC
Sl no# Description Category Status Date Closed Signature
2 Hydro-test package
Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain/Moinul Hassan
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460
OXY QC
Signature
SWL-CA-2011-24000017460
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460
SAS QC
Sl no# Description Category Status Date Closed Signature
2 Hydro-test package
Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain/Moinul Hassan
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460
OXY QC
Signature
SWL-CA-2011-24000017460
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460
SAS QC
Sl no# Description Category Status Date Closed Signature
2 Hydro-test package
Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Moinul Hassan/Sadiq hussain
Position QA/QC Engineer PositionQA/QC Engineer
Signature Signatur
Date Date
017460
SWL-CA-2011-24000017460
OXY QC
Signature
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460
SAS QC
Sl no# Description Category Status Date Closed Signature
2 Hydro-test package
Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain/Moinul Hassan
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460
ATERINJECTION
OXY QC
Signature
SWL-CA-2011-24000017460
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460
2 Hydro-test package
Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Moinul Hassan/Sadiq hussain
Position QA/QC Engineer PositionQA/QC Engineer
Signature Signatur
Date Date
017460
SWL-CA-2011-24000017460
G WADIASWAD
WAD
AS 1013)
OXY QC JADWAL 006 FLOWLINE ROAD CROSSING REPLACEMENT
Signature
TIE IN FROM EXISTING WADIASWAD NORTH-8 TO
WADIASWAD NORTH MANIFOLD
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460
SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME JADWAL 32,4 " FLOW LINE (PART -2
SAS QC
Sl no# Description Category Status Date Closed Signature
2 Hydro-test package
Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Moinul Hassan/Sadiq hussain
Position QA/QC Engineer PositionQA/QC Engineer
Signature Signatur
Date Date
017460
SWL-CA-2011-24000017460
SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME JALAL 51,4" FLOW LINE
Date SAS
Sl no# Description Category Status Closed CONSTRUCTIONSI
GNATURE
5 Jt 75 in sleeper to be move B
SWL-CA-2011-24000017460
W LINE
SAS QC
Signature
Sand duneto be remove from jt 99 to 105,jt 119 to 121,jt 135 to150,j222 to j230,j233 to j235
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460
SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME JALAL 51,4" FLOW LINE
Date SAS
Sl no# Description Category Status Closed CONSTRUCTIONSI
GNATURE
Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By:
Name: Selva kumar
Position QA/QC Engineer
Signature
Date
00017460
SWL-CA-2011-24000017460
W LINE
SAS QC
Signature
Seeh Al-Sarya Engineering LLC.
CHECK LIST FOR WATER INJECTION HOOK UP
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-240000174
SAS SAS QC
Sl no# Description Checked ok CONSTRUCTION Signature
Signature
Prepared By:
Name: Selva kumar
Position QA/QC Engineer
Signature
Date
-2011-24000017460
REMARK
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460
SAS QC
Sl no# Description Category Status Date Closed Signature
Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.SADIQ HUSSAIN
Position QA/QC Engineer PositionQA/QC Engineer
Signature Signatur
Date Date
017460
SWL-CA-2011-24000017460
OXY QC
Signature
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460
SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME JALAL 51,2" GAS LINE
SAS QC
Sl no# Description Category Status Date Closed Signature
2 Hydro-test package
Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Sadiq hussain
Position QA/QC Engineer PositionQA/QC Engineer
Signature Signatur
Date Date
017460
SWL-CA-2011-24000017460
OXY QC
Signature
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460
SAS QC
Sl no# Description Category Status Date Closed Signature
2 Hydro-test package
Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Mr.Selva kumar Name: Mr.MOINUL SYED
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460
SPOSAL
REA 800,AL
0865)
OXY QC
Signature
SWL-CA-2011-24000017460
SYSTEM CONSTRUCTION OF FLOW LINE PROJECT NAME JALAL EAST-24,4" FLOW LINE
SAS QC
Sl no# Description Category Status Date Closed Signature
Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Mr.Selva kumar Name: Mr.MOINUL SYED
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460
OW LINE
OXY QC
Signature
SWL-CA-2011-24000017460
SAS QC
Sl no# Description Category Status Date Closed Signature
2 Hydro-test package
Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Mr.Selva kumar Name: Mr.MOINUL SYED
Position QA/QC Engineer Position QA/QC Engineer
Signature Signature
Date Date
017460
JECTION FLOW
OXY QC
Signature
SWL-CA-2011-24000017460
1198481
SAS QC
Sl no# Description Category Status Date Closed Signature
2 Hydro-test package
Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Saddiq hussain
Position QA/QC Engineer PositionQA/QC Engineer
Signature Signatur
Date Date
017460
SWL-CA-2011-24000017460
01
OXY QC
Signature
Seeh Al-Sarya Engineering LLC.
Line Walk Punch-List
CLIENT OCCIDENTAL OF OMAN INC. CONTRACT NO. SWL-CA-2011-24000017460
SAS QC
Sl no# Description Category Status Date Closed Signature
2 Hydro-test package
Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Mithun thilakraj Name: Mr.Moinul Hassan/Sadiq hussain
Position QC inspector PositionQA/QC Engineer
Signature Signatur
Date Date
017460
SWL-CA-2011-24000017460
SAS QC
Sl no# Description Category Status Date Closed Signature
2 Hydro-test package
Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Moinul Hassan/Sadiq hussain
Position QA/QC Engineer PositionQA/QC Engineer
Signature Signatur
Date Date
017460
SWL-CA-2011-24000017460
IFOLD(SAS
SAS QC
Sl no# Description Category Status Date Closed Signature
2 Hydro-test package
Note:
Punch-List Category "A" - To Be Completed Prior To Hydro-Test
Punch-List Category "B" - Can Be Attended After Hydro-Test
Prepared By: Approved By:
Name: Selva kumar Name: Mr.Moinul Hassan/Sadiq hussain
Position QA/QC Engineer PositionQA/QC Engineer
Signature Signatur
Date Date
017460
SWL-CA-2011-24000017460