SUB-TOTAL 50,778.00
XII PLUMBING WORKS
4" dia. PVC Pipe 8.00 pcs. 870.00 6,960.00
3" dia. PVC Pipe 26.00 pcs. 650.00 16,900.00
2" dia. PVC Pipe 18.00 pcs. 305.00 5,490.00
3/4" dia. PVC Pipe 5.00 pcs. 138.00 690.00
1/2" dia. PVC Pipe 17.00 pcs. 85.00 1,445.00
4" dia. PVC Elbow 4.00 pcs. 65.00 260.00
3" dia. PVC Elbow 19.00 pcs. 45.00 855.00
2" dia. PVC Elbow 17.00 pcs. 22.00 374.00
3/4" dia. PVC Elbow 3.00 pcs. 12.00 36.00
1/2" dia. PVC Elbow 15.00 pcs. 10.00 150.00
4" dia. PVC Tee 3.00 pcs. 115.00 345.00
3"X2" dia. PVC-Y 14.00 pcs. 85.00 1,190.00
2" dia. PVC Tee 4.00 pcs. 30.00 120.00
3/4"X1/2" dia. PVC Tee 2.00 pcs. 15.00 30.00
4" dia. PVC Clean out 3.00 pcs. 50.00 150.00
3" dia. PVC Clean out 5.00 pcs. 30.00 150.00
Vulca seal 1lit. 3.00 pcs. 250.00 750.00
PVC Cement (Neltex) 100cc 5.00 pcs. 70.00 350.00
SUB-TOTAL 36,245.00
XIII KITCHEN SINK, WASH BASIN & TOILET BOWL
Sink ( Stainless) 1.00 pcs. 1,900.00 1,900.00
Toilet Bowl w/ Flush/ Set 3.00 pcs. 9,000.00 27,000.00
SUB-TOTAL 28,900.00
XIV PAINTING WORKS lumpsum 120,000.00
TOTAL 2,019,801.00
SUMMARY:
TOTAL MATERIALS …………………...………….……………………….
2,019,801.00
TOTAL LABOR COST………………………….…………………………….
1,211,880.60
SUB-TOTAL……………………….……………...…..…………………………
3,231,681.60
ENGINEERING SUPERVISION……………..………………………….……
161,584.08
MISCELLANEOUS, CONTINGENCIES, ETC…………….……………..
64,633.63
TOTAL PROJECT COST ……...….……………………...…………...……………….
3,457,899.31