144+737 Length of
Sl. no. Descriptio Unit No. Length Width Height Qty. Input Data
1 Earthwork cu.m.
i General data
(i) MCW No. of Spa
Abutment 2 5.2 25.4 2.1 554.736 Skew angle
Pier 1 4 17.3 4.1 283.72
Return/ Retaining wal 4 10 7 1.1 308 Skew facto
1146.456 No. of car
2 PCC M-15 gcu.m. Total width
(i) MCW
Abutment 2 5.2 25.4 0.1 26.416 Thk of Leve
Pier 1 4 17.3 0.1 6.92
Retaining Wall 4 10 7 0.1 28
61.336 Abutment Foundation (AL1,AL2
3 R.C.C. M-3cu.m. No. of Abu
(i) MCW
Abutment Width of A
Straight Portion 2 5 25.2 0.5 126 Length of
Slant Portion 2 8 25.2 0.75 302.4
Pier
Straight Portion 1 3.8 17.1 0.5 32.49
Slant Portion 1 2.31 17.1 0.6 23.701
484.591 Length of
4 R.C.C. M-3cu.m. Straight he
4 9.8 6.8 0.5 133.28 Slant Heigh
4 9.8 3.9 0.7 107.016
Sub Structure
240.296 Length of
5 R.C.C. M-3cu.m. Thickness
Abutment 2 25.2 0.9 0.385 17.464 Thk. of Dir
Pier 1 17.1 0.82 2.885 40.453
Water Cut area in pie 1 0.528 (Area) 2.885 1.523
59.44 Thickness
6 R.C.C. M-3cu.m. Abutment C
Return wall
0 10 0.5 0.4 0 Abutment
4 10 0.8 1.085 34.72 Abutment
0 5 0.5 0.8 0 Abutment C
Abutment C
Independent Retainin 0 9.8 3.5 0.65 0
75.6
15 75mm thick
cum 2 17 11.5 0.075 29.325
29.325
16 Drainage sNr. 2 4 8
17 Filter med Cum
On Abutment A1 and 2 25.2 0.6 1.5 45.36
Independent Retainin 4 10 0.6 1.5 36
Return Wall 4 5 0.6 1.5 18
99.36
18 Backfillin Cum
On Abutment A1 and 2 25.2 0.69 1.2 41.902
On Returnwall 4 10 0.69 1.2 33.255
75.157
19 Weep HoleNr.
On Abutment A1 and 0 0
Return wall 24 24
24
20 Stone Pitching
In Front o cum 0 0 25.2 0.3 0
Quadrate Scum 4 5.65 0.3 6.782
6.782
21 Filter Material Underneath Pitching
3.391
3011.207
5m 250
Input Data
General data A1 A2 P1 P2
2
0 FRL 100 100 100 100
0.35
1.165
0.5
Detail of Piers
1
3.8
17.1
17.1
0.82
0.5
0.6
17.1
0.82
2.885
25.2
0.82
0.3
0.3
r 1.8
s 2
15
15