MEMORANDUM OF GROSS PAYMENTS

1st RA
Name of work: Execution of Re baring, Anchor fixing & Controlled dismantelling work
Client: Coral Realtors (p) Ltd
Contractor: M/s Sainka Constructions
Date of Preparation of Bill: 05-10-2019 Date/Period of Measurements:
S.No. Description Previous bills Since Previous Bill Up to date
Civil Work

Items for which detailed


- 637,356.69 637,356.69
measurements recorded in MB

Total Work done - 637,356.69 637,356.69


IGST (18%) - 114,724.20 114,724.20
Total Amount 752,080.89 752,080.89
Amount Paid - 240,000.00 240,000.00
Total Payable Amount 512,080.89 512,080.89
TS
1st RA

Remarks

As per Accounts
ABSTRACT SHEET (1st RA Bill)
Project Name: Metro world mall cum multiplex
Client Name: Coral Realtors (p) Ltd.
Contractor Name: Sainka Constructions
Quantity
BOQ DESCRIPTION UNIT Rate (Rs.)
Item Upto Previous Bill This Bill Total Qty

Demolishing plain cement concrete


manually/by mechanical means including
1 disposal of material within 50M lead as per CUM 1,500.00 - - -
direction of engineer-in charge

Demolishing reinforced cement comcrete


(RCC) manually/by mechanical means
2 including disposal of material within 50M CUM 3,400.00 - - -
lead as per direction of engineer-in charge

Demolishing reinforced cement comcrete


(RCC) by electrically operated Hilti machines
3 (Breaker) including stacking of steel bars and CUM 3,800.00 - 4.33 4.33
on unserciceable material within 50M lead
as per direction of engineer-in charge

Extra over item No. 2&3 for cutting


reinforcement bars manually / by
4 mechanical means in RCC work (Payment SQM 800.00 - - -
shall be made on X-sectional area of RCC
work as per direction of enginer-in charge
Quantity
BOQ DESCRIPTION UNIT Rate (Rs.)
Item Upto Previous Bill This Bill Total Qty

Controlled demolishing of RCC floor-slabs ,


beams, walls, columns, capitals by mean of
diamond wheel blade floor-saw or by mean
of diamond wired blade wire-saw machine
5 etc. upto thickness/width 150mm-450m m RM 1250.00 - 466.37 466.37
(Note: the rates below and above the
specified thicknes as cited above shall be
finalised on pro-data basis as mutually
agreed between CRPL & SCPL)

Demolishing brick-work manually/by


mechanical means including stacking of
6 steel bars and disposal unserviceable CUM 850.00 - 6.98 6.98
material within 50M lead as per direction of
engineer-in charge

Handling, loading, unloading & complete


disposal of rcc blocks made/formed as a
result of the controlled demolished RCC as
cited in item no-5 to any lift and lead
7 (distance in Km) from the site and inclusive CUM 800.00 - 39.99 39.99
of all rate and expenditure to be made,
whatever it may be up to place of disposal
and unloading etc.
Quantity
BOQ DESCRIPTION UNIT Rate (Rs.)
Item Upto Previous Bill This Bill Total Qty

Extra for lowering down the RCC blocks upto


level of ground/Road level if controlled
8 demolition is done above the height of CUM 2000.00 - - -
ground floor's roof level up to any level and
height at this site

Total
Amount
Upto Previous Bill This Bill Total Amount

- - -

- - -

- 16,471.14 16,471.14

- - -
Amount
Upto Previous Bill This Bill Total Amount

- 582,962.50 582,962.50

- 5,932.06 5,932.06

- 31,991.00 31,991.00
Amount
Upto Previous Bill This Bill Total Amount

- - -

- 637,356.69 637,356.69
Measurement Book
Project Name: Metro World Mall Structure :
Client Name: Coral Realtors RA Bill No. : 1st
Contractor Name: Sainka Constructions
Drawing No.: Prepared By :
Tower Name/Location:

Measurements (In
No.
Meter)
Sr. Lengt Breadt Height/ Quantit
Description Unit
No. h h Depth y
(L) (B) (H/D)

Item Demolishing Reinforcement cement


No-3 operated………. electrical
concrete (RCC)by

Beam at Grid H1-H5/V4 Cum 1 1 4.280 0.400 0.750 1.28

Slab dismantelling 0f s/case ramp @ Cum 1 1 5.700 1.900 0.200 2.17


front side +600 to +1200 level

wall cum 1 1 1.900 0.230 0.230 0.10


RHS Wall
Ramp slab @ level +1200 Cum 1 1 5.900 0.200 0.800 0.94
Deduction (-) Cum -1 0.5 2.000 0.200 0.800 -0.16
Total Cum 4.33
1st

Remark
s
Measurement Book
Project Name: Metro World Mall Structure :
Client Name: Coral Realtors RA Bill No. : 1st
Contractor Name: Sainka Constructions
Drawing No.: Prepared By :
Tower Name/Location:

Measurements (In
No.
Meter)
Sr. Lengt Breadt Height/ Quantit Remark
Description Unit
No. h h Depth y s
(L) (B) (H/D)
Item Controlled demolishing of RCC Floor-
No-5 Slabs…

Slab at Grid H5-V1/H1-V1 to H5/V5-


H1/V5
Horizontal & Vertical cuts between
H1H1' to V1VA etc..
1 HC1 to HC16 Rmt 1 16 1.800 28.80
2 VC1 & VC2 Rmt 1 2 4.650 9.30
3 VC3 & VC4 Rmt 1 2 4.720 9.44
4 VC5 & VC6 Rmt 1 2 3.420 6.84
5 VC7 Rmt 1 1 4.200 4.20
6 VC8, VC9 & VC10 Rmt 1 3 4.500 13.50
7 VC11 Rmt 1 1 4.300 4.30
8 VC12,VC13,VC14,VC15 & VC16 Rmt 1 5 4.420 22.10
9 VC17 toVC21 Rmt 1 5 3.350 16.75
10 HC17 Rmt 1 1 4.410 4.41
11 HC118 to HC21 Rmt 1 4 4.680 18.72
12 HC21A & HC22 Rmt 1 2 4.220 8.44
13 HC23 to HC26 Rmt 1 4 4.680 18.72
14 HC27 & HC28 Rmt 1 2 4.220 8.44
15 HC29B to HC31 Rmt 1 3 4.680 14.04
16 HC32 Rmt 1 1 4.220 4.22
Beam Cutting
Cutting Beam at Grid V4-H5/V4-H5
1 Rmt 1 4 0.450 1.80
(.230 X .450)
Cutting Beam at Grid V1-H1, H1-V2,
2 Rmt 2 4 0.450 3.60
H1-V4, H1-V5 (.300 X .450)
Cutting Beam at Grid H1-V4 to H1-V5 Rmt
3 1 4 0.850 3.40
(.350 X .850)

Service Lift Pit RCC Cutting, Refer


Sheet No-3
Vertical hanging column Rmt 4 2 0.600 4.80
(.230X.600X.700) 4 Nos.
Beam (4 Nos.) Rmt 4 3 0.500 6.00
Slab Cutting (Horizontal) Rmt 1 3 2.100 6.30
Slab Cutting (Horizontal) Rmt 1 3 2.000 6.00
Slab cutting of s/case core ramp at
level +600 to +1200 etc..
Lateral cut in side wall of ramp (RHS) Rmt 1 1 5.500 5.50
@ Between slab at level +1200

Cut @ RHS of ramp slab at Level Rmt 1 1 5.500 5.50


+600

Beam Between V6-H3/H5-V6 Rmt 1 10 0.650 6.50


(.450X.600)
Beam Between H5-V4/H5-V6 Rmt 1 5 0.550 2.75

Slab in Basement
(Refer Sheet No-4)
1 Slab S1 on Grid (A-B/2-3)
VC1 to VC5 Rmt 1 5 5.600 28.00
H15 to H21 Rmt 1 7 4.000 28.00
2 Slab S2 on Grid (A-B/1-2)
VC6 to VC10 Rmt 1 5 5.600 28.00
HC1 to HC7 Rmt 1 7 4.000 28.00
3 Slab S3 on Grid (B-C/2-3)
VC'1 to VC'5 Rmt 1 5 5.400 27.00
HC22 to HC28 Rmt 1 7 4.000 28.00
4 Slab S4 on Grid (B-C/1-2)
VC'6 to VC'10 Rmt 1 5 5.400 27.00
HC8 to HC14 Rmt 1 7 4.000 28.00

Total Rmt 466.37


Measurement Book
Project Name: Metro World Mall Structure :
Client Name: Coral Realtors RA Bill No. : 1st
Contractor Name: Sainka Constructions
Drawing No.: Prepared By :
Tower Name/Location:

Measurements (In
No.
Meter)
Sr. Lengt Breadt Height/ Quantit
Description Unit
No. h h Depth y
(L) (B) (H/D)

Item Demolishing Brick work manually/by


mechanical means including
No-6 stacking……

Brick work of shaft at Grid H8/Y4


(+1200 to (-) 3300)
Side Wall Cum 1 2 0.800 0.230 4.300 1.58
Wall over platform Cum 1 1 2.680 0.230 3.150 1.94
Brick work below lift wall & service
lift
Horizontal wall Cum 1 2 2.100 0.230 1.500 1.45
Deduction (-) Cum 0.7 1 0.700 0.230 1.500 0.17
Vertical wall Cum 1 2 1.570 0.230 1.500 1.08
In Lift well of service lift Cum 1 2 1.540 0.230 0.700 0.50
Cum 1 2 0.800 0.230 0.700 0.26
Total Cum 6.98
1st

Remark
s
Measurement Book
Project Name: Metro World Mall Structure :
Client Name: Coral Realtors RA Bill No. : 1st
Contractor Name: Sainka Constructions
Drawing No.: Sheet No-1 Prepared By :
Tower Name/Location:

Measurements (In
No.
Meter)
Sr. Lengt Breadt Height/ Quantit Remark
Description Unit
No. h h Depth y s
(L) (B) (H/D)

Item Handeling, Loading, Unloading &


No-7 complete disposal of RCC blocks….

1 Slab No- S1 Cum 1 1 1.800 4.650 0.200 1.67


2 Slab No- S2 Cum 1 1 1.800 4.720 0.200 1.70
3 Slab No- S3 Cum 1 1 1.800 3.420 0.200 1.23
4 Slab No- S4 Cum 1 1 4.680 3.370 0.200 3.15
5 Slab No- S5 Cum 1 1 4.680 4.620 0.200 4.32
6 Slab No- S6 Cum 1 1 4.680 4.550 0.200 4.26
Beam
Cutting Beam at Grid V4-H5/V4-H5
1 Cum 1 1 2.870 0.230 0.450 0.30
(.230 X .450)
Cutting Beam at Grid V1-H1, H1-V2,
2 Cum 4 1 1.800 0.300 0.450 0.97
H1-V4, H1-V5 (.300 X .450)
Cutting Beam at Grid H1-V4 to H1-V5 Cum
3 1 1 3.220 0.350 0.850 0.96
(.350 X .850)

Service lift pit RCC


Column (4 Nos.) Cum 4 1 0.600 0.230 0.700 0.39
Beams Cum 1 2 1.640 0.230 0.500 0.38
Cum 1 2 0.800 0.230 0.500 0.18
Slab of Lift Cum 1 1 1.870 1.540 0.200 0.58

Beam Between V6-H3/H5-V6 Cum 1 1 5.820 0.450 0.650 1.70


(.450X.600)
Beam Between H5-V4/H5-V6 Cum 1 1 3.600 0.300 0.550 0.59

Slab in Basement
(Refer Sheet No-4)
1 Slab No- S1 Cum 1 1 5.600 4.000 0.200 4.48
2 Slab No- S2 Cum 1 1 5.600 4.000 0.200 4.48
3 Slab No- S3 Cum 1 1 5.400 4.000 0.200 4.32
4 Slab No- S4 Cum 1 1 5.400 4.000 0.200 4.32
Total Cum 39.99