SAUDI ARAMCO TEST REPORT
Coating Equipment Check Sheet SATR-H-2004 30-Apr-17 MECH
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

NOTE: THIS FORM TO BE USED IN CONJUNCTION WITH SAIC-H-2013 OR SAIC-H-2026

UNIT NUMBER
EQUIPMENT REMARKS
1 2 3 4
A. Compressors
Capacity
No. of Manifold Outlet
Size of Air Hose
Gauges
Grounding
Oil Leaks
Air Hose condition
Air hose connections
Outlet connections and valves
(1-1/2" or 2")

B. Air Storage Drum

Size/Capacity (Manufacturer
stamped in accordance with
ASME Sec. VIII D1, Unfired
Pressure Vessels, Ref. SAES-H-
001, Para. 5.4.1.4)
Pressure Test Certificate
Revalidation Test
Relief Valve Calibration
Pressure Gauges
C. Blasting Pots : Type
Capacity
Condition of Pot
Mixing Valves
Oil & Moisture traps
Air Hose Size
Air hose condition
D. Blasting Hose:
Size (3 to 4 times nozzle orifice)
Anti-static Hose
Couplings & Safety Pins
Deadman Switch fitted
E. Blast Nozzles
Size
Condition

Saudi Aramco: Company General Use


F. FBE Powder Application Equipment For FBE Coating of Field Girth Welds (SAIC-H-2013)
Condition of Induction Coil Heater
Powder Application Equipment

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 30-Apr-2017 - REV. 2015.03.00 (Standards Cutoff - March 2015) Rev. 2015.03.00 31-Mar-15
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
Coating Equipment Check Sheet SATR-H-2004 30-Apr-17 MECH
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

F. Airless Spray System


Spray pump Type/Model
Pressure Ratio
No. of Spare filters
Hand Set
Liquid Line Size
Hand Set Condition
Gauges
Spray Gun Tip Size
Condition of Reversible
No. of Machines on Site
Spare Hand Set
Spare Tip
Tools
G. Conventional Spray System
Air supply hose connection
Oil & Moisture Separator
Spray Hand Set
Condition of Paint Mixers
H. Paint Mixers
Type
Size

REMARKS:

REFERENCE DOCUMENTS:
1.SAES-H-001, Coating selection and application Requirements for Industrial plant Equipments, (10 Apr 2011)
2.SAES-H-002, Internal and External Coatings for steel pipeline and piping, (02 June 2012)
3.SAES-H-003, Protective Coatings for Industrial Concrete Structures , (25 Sep 2012)
4.SAES-H-004,Protective Coating selection and application Requirements for offshore structures and facilities, (07 July 2010)
5. SSPC, Steel Structures Painting Council, (Latest Edition)
Contractor / Third-Party Saudi Aramco
Technician Performing Test* PMT Representative
Name, Title, Department, Test Performed Successfully and Results are Acceptable: T&I Witnessed QC Record Reviewed Work Verified
Company, Initials and Name, Initials and Date:
Date:

QC Inspector PID Representative


Witnessed Test Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Implementation of Test and Analysis of Results Y = YES N = NO F = FAILED