PT Sumberenergi Sakti Prima

2019
SSP Introduction

PT Sumberenergi Sakti Prima (SSP) incorporate in


2002 always devote themselves to the nation and
state of Indonesia, as well as encourage the
development of national economy by providing
electrical energy high quality, reliable and
environmentally friendly.

Based in Jakarta, Indonesia

Developed and owned (IPP) over 3,000 MW of


combined renewable (solar PV, wind, hydro &
biomass) and conventional power plants (coal-fired &
gas-fired)

PT Sumberenergi Sakti Prima


Our Group’s Business Model
Natural
Resource
Iron Coal Galena

Logistics Trading and


Education

Construction Services Property

Power Plant

Coal-Fired Gas-Fired Hydro Solar Wind


Indonesia Locations
Jeneponto
PLTU Jeneponto
Punagaya, Bangkala,
Jeneponto Regency,
South Sulawesi 92352

Kalimantan
Komp. Perintis
Jl. Bayangkara No. 38
RT. 035 RW. 007
Sungai Ulin, Banjarbaru
Kalimantan Selatan

Tegal Buleud
Kampung Babakan Panjang
II RT 011/003
Desa Buni Asih
Kecamatan Tegal Buleud
Provinsi Jawa Barat

Palembang Bogor Headquarter Jakarta Selatan Cilacap


PLTGU Palembang Blok 1 Kampung KYK Building Office 8, Lantai 9 JL. Lingkar Timur,
Desa Merah Mata, Cikawung Jl. Cideng Barat No. 32-33 SCBD Lot 28 Desa Karang Kandri
Kecamatan Banyuasin, Desa Banyuwangi, Jakarta Pusat 10150 Jl. Senopati Raya No. 8B Kecamatan Kesugihan,
Sumatera Selatan Kecamatan Cigudeg, Tel: +62-21.6385.8999 Jakarta Selatan 12190 Tegalkamulyan,
30119 Kabupaten Bogor, Fax: +62-21.6385.6262 Cilacap Selatan,
Jawa Barat Jawa Tengah
The Biggest IPP In Indonesia ( > 3,000 MW )

No Project Description Capacity Status

1. Cilacap CFSPP (Phase 1) 2 x 300 MW COD 2006

2. Jeneponto CFSPP (Phase 1) 2 x 125 MW COD 2012

3. Cilacap CFSPP (Phase 2) 1 x 660 MW COD 2016

4. Jeneponto CFSPP (Phase 2) 2 x 135 MW COD 2018

5. Palembang Gas-Fired Power Plant 1 x 150 MW COD 2004

6. Cilacap CFSPP (Phase 3) 1 x 1000 MW Under Construction

7. Sumbagsel-1 CFSPP (Mine-Mouth) 2 x 150 MW Under Construction

Total Capacity 3230 MW


PT Asrigita Prasarana

PT ASRIGITA PRASARANA is one of the Gas and


Steam Power Plant Company (PLTGU) located in
Desa Merah Mata, Banyuasin I Palembang.

As an Independent Power Producer company,


PT Asrigita Prasarana aims to develop various
IPP projects within Indonesia & the East
Palembang Project 150 MW GFCC, and now the
company is focusing to supply electric power
for Sumatra Island.

Asrigita Shareholder :
• PT Sumberenergi Sakti Prima
• Chengda
IPP PT Asrigita Prasarana : Natural Gas-Fired Power Plant
Indonesia: Palembang
The Group

PLTGU Palembang (1 x 150 MW)


• Location: Palembang, South Sumatera
• Acquired on April 2003
• First Production: September 2004
• Gas supplied by PT Pertamina (Persero)
• Total Investment : US$ 120 million
PT Sumber Segara Primadaya

The Presence of PT Sumber Segara Primadaya


was initated by the government’s effort in the
year 2000 to free from the economic crisis by
accelerating the economic growth.

This resulted in an enormous increase in


electricity demand. Until 2028, Indonesia will
need thousands of megawatt additional
electricity supply.

S2P Shareholder :
• PT Sumberenergi Sakti Prima
• PT Pembangkitan Jawa-Bali (PJB)
IPP S2P: Coal-Fired Steam Power Plant
Indonesia: Cilacap
[ Energy ]

PLTU Cilacap I (2 x 300 MW)


• Location: Cilacap, South Java
• Development Start : May 2003
• First Production: Janaury 2006
• Total Investment : US$ 534 million

PLTU Cilacap II (1 x 660 MW)


• Development Start : January, 2013
• First Production: June 2016
• Total Investment : US$ 700 million

PLTU Cilacap III (1 x 1000 MW)


• Under Construction, target COD end of 2019
PT Bosowa Energi

Electricity demand in South Sulawesi, which


continues to increase along with high economic
growth above the national average, provides an
opportunity for Bosowa to enter the power
generation business.

Therefore, Bosowa together with SSP which has


experience in power plant established PT
Bosowa Energi to develop Jeneponto CFSPP to
supply electricity in the South Sulawesi region.

The Bosowa Coal Fired Steam Power Plant


(PLTU) is located in Jeneponto. This power plant
is one of the main electricity providers of PT
PLN in the South Sulawesi region.
Bosowa Energi Shareholder :
• PT Sumberenergi Sakti Prima
• PT Bosowa Corporation
IPP Bosowa Energi: Coal-Fired Steam Power Plant
Indonesia: Jeneponto
[ Energy ]
PLTU Jeneponto I (2 x 125 MW)
• Location: Jeneponto, South Sulawesi
• Development Start : 2010
• First Production: 2012
• Total Investment : US$ 250 Million

PLTU Jeneponto II (2 x 135 MW)


• First Production: 2018
• Total Investment: US$ 230 Million
PT D&C Engineering Company

PT. D & C Engineering Company was


incorporated on December 21st, 2007, having
legal domicile in Jakarta, the 1st Indonesian
joint venture integrating power plant
construction, overhaul, commissioning,
operation, maintenance and improvement work
and service

PT. D&C Engineering Company is a high-


technology enterprise has an advantage in
terms of talents, scientific research and cultural
atmosphere. It focuses on electric power
industry, involving in R&D, popularization and
technical service of energy-saving and
environment-friendly hi-tech products. D&C Shareholder :
• PT Sumberenergi Sakti Prima
• Zhejiang Huaye Power Engineering
• Garland Investment
EPC and O&M Services
Milestone

Operation & Maintenance


• O&M of PLTU Cilacap I & II
• O&M of PLTU Jeneponto I & II
• Overhaul: PLTGU Palembang
• Overhaul: PLTU Cilacap I
• Overhaul: PLTU Jeneponto I

Construction
• PLTU Cilacap II & III
• PLTU Jeneponto I & II
• PLTU Kaltim-2

Oil-Saving Improvement Works


• PLTU Labuan (2 x 300 MW)
• PLTU Lontar (3 x 315 MW)
• PLTU Cilacap (2 x 300 MW)
• PLTU Paiton (1 x 660 MW)
• PLTU Indramayu (3 x 300 MW)
Tiny Oil Technology

• Intensify the burning of oil in a very short period of time

• Generates high temperature flame with a mean temperature of 1,500℃ to 2,000 ℃

• More than 90% of oil saving with maturity and stability

• Compatible with any type of PC boiler Flame of Original Burner

• Easily ignite the following coal


Soft coal : 400-600℃
Lean coal : 600-800℃
Anthracite coal : 800-1000℃

• Sufficient combustion & no-slag occurrence Flame of Tiny-oil Burner


Mining: Galena
Indonesia: Padang

Lead Concentrate Zinc Concentrate Copper Concentrate


Pb ≥ 65% Zn ≥ 58% Cu ≥ 22%

Lead Ingot Zinc Oxide


Composition

• Pb 70.02 % wt
• Zn 7.78 % wt
• Cu 1.75 % wt
• As 0.002 % wt
• Hg 0.001 % wt
• Cd 0.056 % wt
• Bi 0.001 % wt
Mining: Iron Sand / Ore
Indonesia: Sukabumi

Iron Sand
• Location: Sukabumi
• 1012.5 Ha
• Location: Padang
• 196 Ha
Iron Ore
• Location: Sukabumi
• 524.6 Ha
PT DNC CMA POESDIKLAT

PT DNC CMA Poesdiklat is engaged in private


techincal education services owning a training
facility/training center and is capable of holding
an education and training to the
employee/internship to become a trained
worker in the electiricity sector.

The course will cover all substances related to


the operation and maintenance of Coal Fired
Steam Power Plant, mainly the practical
aspects, such as applied technology, standard
operating procedures, trouble shooting and
maintenance and asset management as well.
Power Training Center
Indonesia: Cilacap
Power Training Center
• Location: Cilacap, Central Java
• Training Program for Engineer & Operator
of 50 MW to 1,000 MW CFSPP
• PT DNC CMA Poesdiklat Client :
• PT Sumber Segara Primadaya
• PT Bosowa Energi
• PT D&C Engineering
• PT Indonesia Power (IP)
• PT Pembangkitan Jawa-Bali (PJB)
• Pusdiklat KEBTKE (Kementrian ESDM)
Training Simulation

Cilacap, Central Java, Indonesia


PT Sumberenergi Sakti Prima