Sr. No.

Description UOM
A Total Solar PV Plant Capacity kWp
B Solar PV Module
1 Module Make -
2 Module Model -
3 Module Cell Technology -
4 Cell Arrangement -
5 Module Weight Kgs.
6 Module Dimensions mm x mm x mm
7 Module Efficiency %
8 Total No. of Modules Nos.

Electrical Data @ Standard test condition (STC) of irradiance of 1000W/m2, Air Mas

9 Nominal Power Max (Pmax) Wp


10 Voltage at Max Power - Vmpp Volt
11 Current at Max Power - Impp Amp
12 Open Circuit Voltage - Voc Volt
13 Short Circuit Current - Isc Amp
14 Operating temperature Deg C
15 Max. System Voltage as per IEC and UL Volt
16 Max. Series Fuse Rating Amp
17 Power Tolerance W

Electrical Data @ Nominal Operating Cell Temperature (NOCT)of irradiance of 800W


1m/s

18 Nominal Power Max (Pmax) Wp


19 Voltage at Max Power - Vmpp Volt
20 Current at Max Power - Impp Amp

Page 1 of 96
21 Open Circuit Voltage - Voc Volt
22 Short Circuit Current - Isc Amp
General Characteristics
23 Temperature cofficient of Power (Pmax) %/Deg C
24 Temp cofficient of Voltage (Voc) %/Deg C
24 Temp cofficient of Current (Isc) %/Deg C
25 Normal operating cell temperature Deg C

Average relative efficiency between 1000 W/m2


25 %
and 200 W/m2 (Low light performance)

26 No. of Bus Bar Nos.


26 Cell Size mm x mm
27 Cell Encapsulant
27 Front Glass Thickness mm
28 Frame material
28 Junction Box
29 Mechanical Load Test Pa
29 Wind Load Pa
30 Snow Load Pa

30 100% Double EL (Electro luminescence Testing)

31 RFID tags
31 Cable length of Module mm
32 Cross section of Area of Cable mm2
32 Connector type -
33 Back Sheet -
33 Connector IP rating -

34 Module Certifications

Page 2 of 96
34 Module Certifications

35 Product Workmanship & materials Guarantee


-

36 Performance Guarantee

-
C Module Mounting Structure (MMS)
1 Type of Module Mounting Structure -

2 Angle of Tilt Deg

3 Design Wind Speed m/sec


4 Warranty of Module Mounting structure Years

5 Configuration of MMS -

6 Approximate MMS Tonnage per MWp MT/MW


7 Thickness of Hot Dip Galvanization mm
8 Column Post / Pedestal Pole Metallurgy Mandatory
9 Rafter Metallurgy Mandatory
10 Purlin Metallurgy Mandatory

11 Fastener/Hardware Metallurgy Mandatory

12 Column Post / Pedestal Pole Thickness mm


13 Rafter Thickness mm
14 Purlin & Bracking Thickness mm

15 Center to Center Distance in between 2 Rows m

Page 3 of 96
Module mounting system (Like 2 or 3 or 4
17 -
Portrait or Landscape)

DC String Combiner Box / String Monitoring


D
Box
1 No. of String Combiner Boxes Nos.
2 Enclosure Protection -
3 Operating Temperature Range -
4 Max Input Voltage Volt
5 No. of String inputs/combiner box Nos.
6 No. of String outputs/combiner box Nos.
7 Individual String Current Monitoring -
8 Individual String Voltage Monitoring -
9 Input Fuse Protection in each DC input -
10 Input Fuse Protection Rating Amp

11 String Surge Protection Device (DC Input side) -

12 SCADA/PLC Interface -
13 String combiner Box guarantee Years
E Solar Inverter

1 Make -

2 Inverter Type/Model -
3 AC Rating@ PF 1 @ 45 0C KW
4 AC Rating@ PF 1 @ 50 0C KW
Max. DC installation to AC installation Factor @
5 -
45 0 C
Nos of Inverters for Installation
6 Nos.
@ 45 Deg C
7 IP Rating of Inverter -

8 IP protection for Cooling Section -

9 Inverter Cooling system --

Page 4 of 96
10 Noise Level dbA

11 Nominal DC Voltage Volt

12 Start up DC voltage Volt

13 Max DC INPUT Voltage (OC) Volt

14 MPPT Voltage Range Volt

15 Nos of MPPT per Inverter -

16 Max Input Current Amp

17 Nos of DC String Inputs Connection Nos

18 DC disconnection Switch/Isolator -

19 SPD - Surge Protection Device on DC Side Mandatory

20 THDi %

21 Nominal OP Voltage Volt

22 OP Voltage Range Volt

23 OP Frequency HZ

24 Euro Efficiency %

25 Opearting Power Factor -

26 Surge Protection Device on AC Side

27 Reactive Power Control Range -

28 Load/Generation Control Range %

29 Visual Display -

30 SCADA/PLC Interface -

31 Report Format -

32 Web Access for Inverter report -

33 Dimensions (W x H X D) mm x mm x mm

34 Weight Kg

35 Warranty Years

Page 5 of 96
-

-
36 Inverter Certification
-

F Data Logger

1 Scan & Sampling Time -

2 SCADA/PLC Interface -

3 Nos of Inverter Connection Per Data Logger Nos

4 Historical Data Storage Capacity in Data Logger Days

5 Nos of Report Nos

6 Report Customization -

G HT Cable

1 Cable -

2 Fault current KA

3 Voltage Level kV

4 Maximum Operating temperature at Rated Current ºC

5 IS Standard -
Maximum Operating temperature at Short circuit
6 ºC
Current

7 Short Circuit Current for Insulation Screen Amp

8 Cable Type Designation -

Page 6 of 96
9 Conductor Material Grade -

10 Inner Sheath Material -

11 Outer Sheath Material -


12 Armour Material -

13 Insulation Screen Material -

14 Minimum Bending Radius mm

H HT Panel

1 Supply Voltage -

2 Designed Ambient temperature ºC

3 System fault level -

4 Reference Standards -

5 Type of Panel Enclosure -

6 Insulation Level -

7 Maximum Operating temperature ºC

8 Temperature Rise for rated Continuous Current ºC

9 Bus bars -

Page 7 of 96
10 Closing and trip coil voltage -

11 Rated Current at (50 ) degrees -


12 Main Busbar Rating Amp
13 Breaker Type -
14 Breaker Mounting -

15 Breaker Motor Charging

16 Internal arc protection as per IEC 62271-200 KA


17 Panel Color -
I Distribution Transformer

1 Type

2 Rated Capacity -
3 -
Nominal system voltage
4

5 Method of system neutral earthing -


6 Design ambient temperature ºC
7 Standard to be followed -
8 Type of cooling -
Allowable maximum temperature rise at rated
9 ºC
output and fifty
10 Number of winding nos
11 Connections Type -

12 Tap Changer -

13 Percent impedance at Rated Capacity -


14 Design Voltage & Frequency Variation -

15 HV line terminal -

Page 8 of 96
16 LV line terminal -

17 No Load Losses at Principal tap & 75 Deg C % of Rate

18 Load Losses at Principal Tap & 75 Deg C % of Rate

19 Neutral Bushing Rating

Maximum Continuous over loading capacity of


20 transformer without exceeding the specified
winding temperature

21 Efficiency %

J HT Panel CT & PT Specification


1 Insulation class (CT & PT) -
2 Accuracy Class for Metering CT -
3 Accuracy Class for Other Protection CT -
4 CT Current rating Amp

5 CT Spare Core -

6 PT Secondary Rating Volt


7 Minimum Burden for Meter CT VA
8 Minimum Burden for PT VA

Page 9 of 96
Shree Cement Limited (SCL)
Technical Specification of Solar Plant
SCL Requirement Vendor to Filled
2000

As per SCL vendor list Vendor to Specify


- Vendor to Specify
Mono Crystalline - PERC Vendor to Specify
(12x6 = 72 Cells) Vendor to Confirm
- Vendor to Specify
- Vendor to Specify
- Vendor to Specify
- Vendor to Specify

e of 1000W/m2, Air Mass 1.5, Cell temperature of 25 deg C

>=365 Wp Vendor to Specify


- Vendor to Specify
- Vendor to Specify
- Vendor to Specify
- Vendor to Specify
-40 deg C ~ +85 deg C -40 deg C ~ +85 deg C
- Vendor to Specify
- Vendor to Specify
- 0~+(3/5) W Vendor to Confirm

CT)of irradiance of 800W/m2, AM 1.5, Ambient temperature of 20 deg C, Wind speed-

- Vendor to Specify
- Vendor to Specify
- Vendor to Specify

Page 10 of 96
- Vendor to Specify
- Vendor to Specify

- Vendor to Specify
- Vendor to Specify
- Vendor to Specify
- Vendor to Specify

>=95 Vendor to Confirm

5 Vendor to Confirm
- Vendor to Specify
EVA Vendor to Confirm
>=3.2 Vendor to Confirm
Anodized Aluminum Alloy Vendor to Confirm
IP 67 with 3 bypass diodes Vendor to Confirm
>=5400 Vendor to Confirm
>=2400 Vendor to Confirm
>=5400 Vendor to Confirm

Required Vendor to Confirm

Required Vendor to Confirm


- Vendor to Specify
- Vendor to Specify
- Vendor to Specify
3 tier White color PVF Vendor to Confirm
IP67 Vendor to Confirm
IEC 61215 (Design) Vendor to Confirm
IEC 61730 (Fire test) Vendor to Confirm
IEC 61701 (Salt mist-Near Sea) Vendor to Confirm
IEC 62716 (Ammonia) Vendor to Confirm

Page 11 of 96
IEC 60068-2-68 (Sand-Desert Area) Vendor to Confirm
IEC 60068-1 (Salt mist) Vendor to Confirm
IEC 62804 (PID-Potential Induced
Vendor to Confirm
Degradation)

10 years warranty on materials and


Vendor to Confirm
workmanship

25 years linear power output Warranty


with 3% for 1st year degradation and Vendor to Confirm
0.7% from
2 year to 25 year.

Seasonal Tilt Seasonal Tilt

6 Nos. Angle Change Provision


Vendor to Confirm
(5-45)

47 47
5 Years 5

Single Pole with civil embedded Single Pole with civil embedded
column post column post

- Vendor to Specify
As per IS 4759 Min 80 microns
IS 2062 E350 As per IS 2062 E350
IS 2062 E350 As per IS 2062 E350
IS 2062 E350 As per IS 2062 E350

HDG Grade MMS, SS 304 for Module HDG Grade MMS, SS 304 for Module
Mounting Mounting

Minimum 3.2 mm Minimum 3.2 mm


Minimum 2.0 mm Minimum 2.0 mm
Minimum 2.0 mm Minimum 2.0 mm

7.8 Vendor to Confirm

Page 12 of 96
2 Portrait 2 Portrait

- Vendor to Specify
- Vendor to Specify
- Vendor to Specify
- Vendor to Specify
- Vendor to Specify
- Vendor to Specify
- Vendor to Specify
- Vendor to Specify
- Vendor to Specify
- Vendor to Specify

- Vendor to Specify

- Vendor to Specify
- Vendor to Specify

As per SCL vendor list Vendor to Specify

String Inverter Vendor to Specify


- Vendor to Specify
- Vendor to Specify

Max. 1.2 Vendor to Confirm

- Vendor to Specify

> = IP65 Vendor to Confirm

> = IP54 Vendor to Confirm

Forced Air Vendor to Confirm

Page 13 of 96
< 75 Vendor to Confirm

- Vendor to Specify

- Vendor to Specify

- Vendor to Specify

- Vendor to Specify

- Vendor to Specify

- Vendor to Specify

- Vendor to Specify

Required Vendor to Confirm

Type-II Protection Vendor to Confirm

<3 % Vendor to Confirm

- Vendor to Specify

+/-10% Vendor to Specify

50 HZ ± 5 % Vendor to Confirm

Vendor to Specify

>0.95 Vendor to Confirm

Type-II Protection Vendor to Confirm

0.8 Lagging to 0.8 Leading Vendor to Confirm

0 to 100% Vendor to Confirm

Required Vendor to Confirm

Modbus RS 485 / Ethernet Vendor to Confirm

Excel Preferable Vendor to Confirm

Required Vendor to Confirm

- Vendor to Specify

- Vendor to Specify

Min 5 Years Vendor to Confirm

Page 14 of 96
EN 61000-6-2 & 6-4 (For EMC
Vendor to Confirm
Standard)

EN 62109-2 (Safety) Vendor to Confirm

IEC 62109-1/-2 (Safety) Vendor to Confirm

IEC 61683:1999 (For Efficiency) Vendor to Confirm

IEC 60068-2 & 6 (Certificates related


Vendor to Confirm
to relevant Environmental Testing)

IEC 60529 (IP Protection) Vendor to Confirm


IEC 61727 (Grid Regulation) Vendor to Confirm
IEC 62116 (Anti Islanding) Vendor to Confirm

Max 1 min Vendor to Confirm

Modbus RS 485 / Ethernet Vendor to Confirm

- Vendor to Specify

Min 45 Days Vendor to Confirm

Min 10 Vendor to Confirm

Required Vendor to Confirm

Min 3C * 185 Sqmm HT Cable Vendor to Confirm

40 KA for 1 sec Vendor to Confirm

11 kV (UE) / 22 KV ( E ) Vendor to Confirm

90ºC Vendor to Confirm

IS: 7098 P-2,2011 Vendor to Confirm

Maximum 250 Deg C Vendor to Confirm

VTS Vendor to Confirm

A2XFY Vendor to Confirm

Page 15 of 96
Aluminum H4 Grade Vendor to Confirm

Extruded HR PVC Type ST-2, as per IS


Vendor to Confirm
5831

Extruded FRLS PVC Type ST-2 Vendor to Confirm


Galvanized steel flat strip Vendor to Confirm

For Metallic: Copper tape & For Non


Metallic: Semi conducting compound Vendor to Confirm
by extrusion

15 X D ( where D is overall diameter


Vendor to Confirm
of cable )

11 KV +/- 10%, 3 phase, 50Hz ± 5%. Vendor to Confirm

50°C Vendor to Confirm

40KA for 1 sec for 11 KV system. Vendor to Confirm

IS 3427/IEC 60298,IS 12729,IS


Vendor to Confirm
13118/IEC 60056
Metal clad draw out panel type Vendor to Confirm
28 kV (Power Frequency) / 75 kV
Vendor to Confirm
(Switching Impulse

90ºC Vendor to Confirm

As per IEC 62271


(Bus bar temp.=<75 deg C,
Vendor to Confirm
I/C VCB finger contact=<65 deg C
Accessible Parts=<30 deg C)A)

High conductivity, electrolytic copper


continuously rated, air insulated with Vendor to Confirm
PVC sleeving

Page 16 of 96
110 V DC
85 %-110% for closing Vendor to Confirm
70 %-110% for tripping

1250 A Vendor to Confirm


1600 Amp Vendor to Confirm
3P VCB Vendor to Confirm
Cassette/ Trolly Vendor to Confirm

Universal Supply (100-250 Volt AC/DC) Vendor to Confirm

40 kA for 1 sec Vendor to Confirm


RAL 7035 Vendor to Confirm

Oil Type with Inverter Duty & Outdoor


Vendor to Confirm
Application

2000 kVA, 3 Phase, 50 Hz Vendor to Confirm


11 KV/12 KV (HV) Vendor to Confirm

As per Inverter Generation Voltage(LV) Vendor to Confirm

Solid Earthing (LV) or Floating Vendor to Confirm


50 ºC Vendor to Confirm
IS 2026 Vendor to Confirm
ONAN Vendor to Confirm
50º Celcius (Oil) / 55º Celcius
Vendor to Confirm
(Winding)
String - 2 Vendor to Confirm
Dyn 11 Vendor to Confirm
Off Circuit tap changer (5 Tap with 5%
Vendor to Confirm
Step)
8% (No negative tolerance) Vendor to Confirm
±10% (Voltage) & ±5% (Freq) Vendor to Confirm
Cable Terminal Box Suitable for
Vendor to Confirm
3C*185 sqmm HT Cable

Page 17 of 96
Suitable Cable Size As per DDE Vendor to Confirm

Maximum 0.1 % of Rated KVA capacity Vendor to Confirm

Maximum 1.2 % of Rated KVA capacity Vendor to Confirm

As per Phase Bushing Rating Vendor to Confirm

As per IS 6600 Vendor to Confirm

>99% at 50% Load & >98.5% at


Vendor to Confirm
100% Load

Class F or Class H Vendor to Confirm


0.2 S Vendor to Confirm
Min 5 P 20 Vendor to Confirm
150/1 Vendor to Confirm

One for each type (Metering &


Vendor to Confirm
Protection)

110 Vendor to Confirm


Min 10 VA Vendor to Confirm
Min 30 VA Vendor to Confirm

Page 18 of 96
Annex 2

SCL Requirement Vendor to Filled


1600

As per SCL vendor list Vendor to Specify


- Vendor to Specify
Mono Crystalline - PERC Vendor to Specify
(12x6 = 72 Cells) Vendor to Confirm
- Vendor to Specify
- Vendor to Specify
- Vendor to Specify
- Vendor to Specify

- Vendor to Specify
- Vendor to Specify
- Vendor to Specify
- Vendor to Specify
- Vendor to Specify
-40 deg C ~ +85 deg C -40 deg C ~ +85 deg C
- Vendor to Specify
- Vendor to Specify
- 0~+(3/5) W Vendor to Confirm

- Vendor to Specify
- Vendor to Specify
- Vendor to Specify

Page 19 of 96
- Vendor to Specify
- Vendor to Specify

- Vendor to Specify
- Vendor to Specify
- Vendor to Specify
- Vendor to Specify

>=95 Vendor to Confirm

5 Vendor to Confirm
- Vendor to Specify
EVA Vendor to Confirm
>=3.2 Vendor to Confirm
Anodized Aluminum Alloy Vendor to Confirm
IP 67 with 3 bypass diodes Vendor to Confirm
>=5400 Vendor to Confirm
>=2400 Vendor to Confirm
>=5400 Vendor to Confirm

Required Vendor to Confirm

Required Vendor to Confirm


- Vendor to Specify
- Vendor to Specify
- Vendor to Specify
3 tier White color PVF Vendor to Confirm
IP67 Vendor to Confirm
IEC 61215 (Design) Vendor to Confirm
IEC 61730 (Fire test) Vendor to Confirm
IEC 61701 (Salt mist-Near Sea) Vendor to Confirm
IEC 62716 (Ammonia) Vendor to Confirm

Page 20 of 96
IEC 60068-2-68 (Sand-Desert Area) Vendor to Confirm
IEC 60068-1 (Salt mist) Vendor to Confirm
IEC 62804 (PID-Potential Induced
Vendor to Confirm
Degradation)

10 years warranty on materials and


Vendor to Confirm
workmanship

25 years linear power output Warranty


with 3% for 1st year degradation and Vendor to Confirm
0.7% from
2 year to 25 year.

Seasonal Tilt Seasonal Tilt

6 Nos. Angle Change Provision


Vendor to Confirm
(5-48)

47 47
5 Years 5

Single Pole with civil embedded


Single Pole
column post

- Vendor to Specify
As per IS 4759 Min 80 microns
IS 2062 E350 As per IS 2062 E350
IS 2062 E350 As per IS 2062 E350
IS 2062 E350 As per IS 2062 E350

HDG Grade MMS, SS 304 for Module HDG Grade MMS, SS 304 for Module
Mounting Mounting

Minimum 3.2 mm Minimum 3.2 mm


Minimum 2.0 mm Minimum 2.0 mm
Minimum 2.0 mm Minimum 2.0 mm

7.8 Vendor to Confirm

Page 21 of 96
2 Portrait 2 Portrait

- Vendor to Specify
- Vendor to Specify
- Vendor to Specify
- Vendor to Specify
- Vendor to Specify
- Vendor to Specify
- Vendor to Specify
- Vendor to Specify
- Vendor to Specify
- Vendor to Specify

- Vendor to Specify

- Vendor to Specify
- Vendor to Specify

As per SCL vendor list Vendor to Specify

As per SCL vendor list Vendor to Specify


- Vendor to Specify
- Vendor to Specify

Max. 1.2 Vendor to Confirm

- Vendor to Specify

> = IP65 Vendor to Confirm

> = IP54 Vendor to Confirm

Forced Air Vendor to Confirm

Page 22 of 96
< 75 Vendor to Confirm

- Vendor to Specify

- Vendor to Specify

- Vendor to Specify

- Vendor to Specify

- Vendor to Specify

- Vendor to Specify

- Vendor to Specify

Required Vendor to Confirm

Type-II Protection Vendor to Confirm

<3 % Vendor to Confirm

- Vendor to Specify

+/-10% Vendor to Specify

50 HZ ± 5 % Vendor to Confirm

Vendor to Specify

>0.95 Vendor to Confirm

Type-II Protection Vendor to Confirm

0.8 Lagging to 0.8 Leading Vendor to Confirm

0 to 100% Vendor to Confirm

Required Vendor to Confirm

Modbus RS 485 / Ethernet Vendor to Confirm

Excel Preferable Vendor to Confirm

Required Vendor to Confirm

- Vendor to Specify

- Vendor to Specify

Min 5 Years Vendor to Confirm

Page 23 of 96
EN 61000-6-2 & 6-4 (For EMC
Vendor to Confirm
Standard)

EN 62109-2 (Safety) Vendor to Confirm

IEC 62109-1/-2 (Safety) Vendor to Confirm

IEC 61683:1999 (For Efficiency) Vendor to Confirm

IEC 60068-2 & 6 (Certificates related


Vendor to Confirm
to relevant Environmental Testing)

IEC 60529 (IP Protection) Vendor to Confirm


IEC 61727 (Grid Regulation) Vendor to Confirm
IEC 62116 (Anti Islanding) Vendor to Confirm

Max 1 min Vendor to Confirm

Modbus RS 485 / Ethernet Vendor to Confirm

- Vendor to Specify

Min 45 Days Vendor to Confirm

Min 10 Vendor to Confirm

Required Vendor to Confirm

Min 3C * 185 Sqmm HT Cable Vendor to Confirm

40 KA for 1 sec Vendor to Confirm

6.9 kV (UE) / 12 KV ( E ) Vendor to Confirm

90ºC Vendor to Confirm

IS: 7098 P-2,2011 Vendor to Confirm

Maximum 250 Deg C Vendor to Confirm

VTS Vendor to Confirm

A2XFY Vendor to Confirm

Page 24 of 96
Aluminum H4 Grade Vendor to Confirm

Extruded HR PVC Type ST-2, as per IS


Vendor to Confirm
5831

Extruded FRLS PVC Type ST-2 Vendor to Confirm


Galvanized steel flat strip Vendor to Confirm

For Metallic: Copper tape & For Non


Metallic: Semi conducting compound Vendor to Confirm
by extrusion

15 X D ( where D is overall diameter


Vendor to Confirm
of cable )

6.6 KV +/- 10%, 3 phase, 50Hz ± 5%. Vendor to Confirm

50°C Vendor to Confirm

40KA for 1 sec for 6.6 KV system Vendor to Confirm

IS 3427/IEC 60298,IS 12729,IS


Vendor to Confirm
13118/IEC 60056
Metal clad draw out panel type Vendor to Confirm
20 kV (Power Frequency) / 60 kV
Vendor to Confirm
(Switching Impulse
90ºC Vendor to Confirm

As per IEC 62271


(Bus bar temp.=<75 deg C,
Vendor to Confirm
I/C VCB finger contact=<65 deg C
Accessible Parts=<30 deg C)

High conductivity, electrolytic copper


continuously rated, air insulated with Vendor to Confirm
PVC sleeving

Page 25 of 96
110 V DC
85 %-110% for closing Vendor to Confirm
70 %-110% for tripping

1250 A Vendor to Confirm


1600 Amp Vendor to Confirm
3P VCB Vendor to Confirm
Cassette/ Trolly Vendor to Confirm

Universal Supply (100-250 Volt AC/DC) Vendor to Confirm

40 kA for 1 sec Vendor to Confirm


RAL 7035 Vendor to Confirm

Oil Type with Inverter Duty & Outdoor


Vendor to Confirm
Application

1600 kVA, 3 Phase, 50 Hz Vendor to Confirm


6.6 KV/7.2 KV (HV) Vendor to Confirm

As per Inverter Generation Voltage(LV) Vendor to Confirm

Solid Earthing (LV) or Floating Vendor to Confirm


50 ºC Vendor to Confirm
IS 2026 Vendor to Confirm
ONAN Vendor to Confirm
50º Celcius (Oil) / 55º Celcius
Vendor to Confirm
(Winding)
String - 2 Vendor to Confirm
Dyn 11 Vendor to Confirm
Off Circuit tap changer (5 Tap with 5%
Vendor to Confirm
Step)
6.25% (No negative tolerance) Vendor to Confirm
±10% (Voltage) & ±5% (Freq) Vendor to Confirm
Cable Terminal Box Suitable for
Vendor to Confirm
3C*185 sqmm HT Cable

Page 26 of 96
Suitable Cable Size As per DDE Vendor to Confirm

Maximum 0.1 % of Rated KVA capacity Vendor to Confirm

Maximum 1.2 % of Rated KVA capacity Vendor to Confirm

As per Phase Bushing Rating Vendor to Confirm

As per IS 6600 Vendor to Confirm

>99% at 50% Load & >98.5% at


Vendor to Confirm
100% Load

Class F or Class H Vendor to Confirm


0.2 S Vendor to Confirm
Min 5 P 20 Vendor to Confirm
150/1 Vendor to Confirm

One for each type (Metering &


Vendor to Confirm
Protection)

110 Vendor to Confirm


Min 10 VA Vendor to Confirm
Min 30 VA Vendor to Confirm

Page 27 of 96
Sr. No
Supply
A
B
1

10

11

12

13

14

15

16

17

18

19

Page 28 of 96
20

21

22

23

24

25

26

27

28

29

30

31

32

Page 29 of 96
33

34

35

2
3
4

5
6

Page 30 of 96
8
9
10

11

12

13

14

15

16

17

18

19

20

21

22

22(i)

22(ii)

22(iii)

22(iv)

22(v)

22(vi)

D
1
2

Page 31 of 96
3

10

11

12

13

14

15

16

17

18

Page 32 of 96
19

20

21

22

23

24

25

Page 33 of 96
25

26

27

28

29

E
1

6
7

2
3

Page 34 of 96
4

H
1
2

6
7

10

11

Page 35 of 96
12

13

14

15

16

10

11

12

Page 36 of 96
J

10
11

12

13
14

15

16

Page 37 of 96
17

18

19
20

21

22

23

24

25

26

Page 38 of 96
4

5
6
7
8
9

10

11

2
3

T
U

Page 39 of 96
Y

AA

AB

AC
AD

AE

AF

AG

AH

AI
AJ
Remarks
1

Page 40 of 96
Shree Cement Limited (SCL)
SCOPE OF SUPPLY FOR SOLAR PLANT
Description

, Engineering, manufacturing, Supply, Installation, Testing and commissioning of Plant.


PV Module
V Module shall be certified for Fire performance and suitable Safety application class.

V Module front glass Shall be tempered.

V Module front glass Shall be High Transmittance

V Module front glass Shall be Low Iron.

V Module front glass Shall be Heat Strengthened.

V Module front glass Shall be anti reflective coating.

V Module shall be suitable for all climatic conditions.

ar PV Modules aesthetic appearance shall be uniform.

V Module shall be PID resistance.

V Module shall be Salt mist resistance.

V Module shall be Ammonia resistance.

V Module shall be with stand UV radiation.

V Module shall be with Blown sand resistance (for Desert environment).

V Module shall be 100% Dual EL inspected.

V Module shall Anti Soiling surface to minimize power loss from durt and dust.

ar PV Modules shall be suitable for high cement, coal, Ash, clinker dust environment

odule frame is made of corrosion resistant materials, which is electrolytically compatible with the struc
al used for mounting the module.

ive devices against surges at the PV module shall be provided. Low voltage drop bypass and / or at lea
ocking diode(s) shall be provided.

module shall be crystalline type, employing lamination technology using established polymer (EVA) and

Page 41 of 96
Junction box (weather resistant) shall be designed for long life out door operation in harsh environmen

ar modules shall have suitable encapsulation and sealing arrangements to protect the silicon cells from
nment. The arrangement and the material of encapsulation shall be compatible with the thermal expan
ties of the Silicon cells and the module framing arrangement/material. The encapsulation arrangement
complete moisture proofing for the entire life of the solar modules.

module shall perform satisfactorily in relative humidity up to 100% with temperatures between -40 Deg
eg C and with stand gust up to 200km/h from back side of the panel.

GA and data sheet shall be submitted with complete test certificate.

fected Solar panel during transportation and handling etc. shall not be considered for installation and
ement shall be vendor scope.

ete BOM (Bill of Material) with supplier and material for Solar PV module shall be provided.

ncluding module testing procedure) shall be provided.

est reports and I-V curves of All module shall be provided.

tion, Storage manual and O&M cleaning manual shall be submitted.

s right to inspect the module production and testing by own/third party at module manufacturer facility
basis as per standard testing code.
s right for testing of Module at any time during warranty period at own cost on sample basis at any thi
ab as per standard testing code.

g verification of module at site during commissioning shall be in vendor scope.

olar PV Module must have mentioned RFID tags in line with MNRE & GOI requirement and label pasted
module.RFID must be able to withstand in environmental condition for 25 years.

Page 42 of 96
ust have following information
e of Manufacture of PV module.
e of Manufacture of Solar Cells.
th and year of manufacture (Separate for Module and cell).
ntry of Origin (Separate for Module and cell).
urve for module at STC
age, Im, Vm and FF of module.
ue Serial Number and Model No of Module.
and year of Obtaining IEC PV module qualification certificate.
e of lab issuing IEC certificate.

licable BIS certificate of Solar Module shall be provided by Vendor.

Module shall have below minimum testing during final inspection witness (Quantity & acceptance shall
O 2859 sampling plan - Minimum Sampling plan for General Inspection Level - I & Special Inspection Lev

h test (General Inspection Level-I)


est (General Inspection Level-I)
al Inspection (General Inspection Level-I)
und Continuity Test (Special Inspection Level-
lation resistance Test (Special Inspection Level-4)
voltage test (Special Inspection Level-4)
und Continuity Test (Special Inspection Level-
lation resistance Test (Special Inspection Level-4)
voltage test (Special Inspection Level-4)

e mounting structure

MS shall be Seasonal Tilt type with 6 Nos. angle provision so that Angle shall be changed as per season
on for maximum power generation.

hall be designed as per Soil Investigation report of Land.


Purlin, rafter, pole etc.) with Fasteners (for MMS and modules etc.) shall be designed as per module sele
dule mounting structure shall be made of hot dip galvanized

nimum thickness of galvanization shall be as per IS 4759.


tener for MMS shall HDG Grade and for Module Mounting fastener shall be SS 304.

MS shall be designed such a way that it should occupy minimum space without sacrificing the output fr
V panels.

Page 43 of 96
of Civil Foundation for MMS shall be as per relevant IS standard.
onstruction drawing of MMS shall be submitted with along with STAAD analysis.
ad drawing of MMS shall be submitted.
MS shall be designed to allow easy replacement of any module and shall be in line with site requiremen
&M.
MS shall be consist of all required components as per Seasonal Tilt type structure requirement i.e. Pede
orizontal/vertical tubes, Clamps, C channels/connector, Fasteners.
ete BOM (Bill of Material) List of MMS shall be provided.

MS shall be designed such that it should not waved during wind and Solar Panel Tilt angle shall be
ined across the complete structure.

sion of Finished MMS shall be within standard tolerance limits.

d Erection drawing of MMS shall be submitted.

es of Civil work shall be in SCL scope however supervision of work will in your scope to ensuring the wo
ucture requirement.

quired Anchor fastener, Insert plate and Foundation bolt shall be in vendor scope.

nce of the lowest edge of the module from ground shall be 300 mm.

al angle change mechanism shall be provided with appropriate locking & smooth operation

MS should be capable to withstand wind speed as per IS 875 and seismic factor of site.

g Engineering and execution following to be considered for Seamless running of Robotic Cle

module and Module mounting structure shall be compatible with Robotic Cleaning System

mounting structure shall be designed for additional load of Robotic cleaning system( Approx 75 kg)

tallation of Rail of Robotic Cleaning System, MMS Rafter shall be extended by 150 mm (each side - Nor

tween adjacent tables shall be kept maximum 200 mm

e Inclination of adjacent table/modules shall be zero for each row

Modules shall be properly aligned with Zero Offset

conditioning Unit / Inverter System


verter shall have MPPT (Maximum Power Point Tracker).
r Final Output AC Voltage shall be 415 +/- 15% Volt & 50 Hz+/-5%, 4W + PE Configuration

Page 44 of 96
rter shall have to design AC installation capacity @ 45 Deg C ambient temperature (single Inverter cap
e >= 50KW)

erter shall have DC installation to AC installation capacity factor shall be Max 1.2 @ 45 Deg C Ambient
rature.

erter panel body & field Junction Boxes shall be Anti corrosive, Insulated & Shock Proof.

rter cooling shall be air ventilated only

rter shall have inbuilt DC isolation (with string wise DC fuse)

r output AC side Power factor shall be >0.95.

r shall have reactive power control (0.8 Lagging to 0.8 Leading)

Total Harmonic Distortion at inverter output shall be less than 3% as per relevant IEEE/IEC standard
rter should be competent to operate with APFC (Auto Power Factor Controller Capacitor Bank) & VFD
ted load without deteriorate existing system Power Factor (Existing system PF is operating at 0.99).

rter shall have SCADA/PLC interface communication port either Modubus RS 485 or Ethernet. Also all
r & load manager's internal addresses/register detail for control & monitoring to be provided.

rter shall have minimum 5 Years of complete equipment warranty.

um power point tracker (electronic) shall be integrated into the PCU to maximize energy drawn from th
V array. The MPPT shall be microprocessor / micro-controller based to minimize power losses. The effic
MPPT shall not be less than 98% and shall be suitably designed to meet array capacity.

U/Inverter shall be capable of complete automatic operation, including wake up, synchronization,
eneration & reactive power control by means of external command and shut down.

U/Inverter shall include appropriate self protective and self diagnostic features to protect itself and the
rom damage in the event of PCU component failure or from parameters - beyond the PCU’s safe operat
due to internal or external causes. The self-protective features shall not allow any operation from the P
anel to cause the PCU to be operated in a manner which may be unsafe or damaging.

gh voltage and power circuits of the PCU shall be separated from the low voltage and control circuits. A
tors shall be made of stranded copper and suitable insulation shall be used for the power and control c

tection against accidental open circuit, short circuit and reverse polarity at the input shall be provided

Page 45 of 96
U/Inverter shall not produce Electromagnetic Interference (EMI) which may cause malfunctioning of
nic and electrical instruments including communication equipment, which are located within the facilit
he PCU is housed.

osed surfaces of ferrous parts shall be thoroughly cleaned, primed and painted or otherwise suitably
ed to survive a nominal 25 year design life of the unit. The PCU enclosure shall be weatherproof and c
iving intact under all ambient conditions. Moisture condensation and entry of rodents and insects shall
ted in the PCU enclosure (IP65 or better).

nents and circuit boards mounted inside the enclosures shall be clearly identified with appropriate
nent designations, which shall - also serve to identity the items on the supplied drawings.

rs, covers, panels and cable exits shall have gasket or otherwise designed to limit the entry of dust and
re. (IP65 or better)

erter installation with frame & JB to be provided

verter shall be equipped with all below minimum required protection.


t circuit protection.
er voltage,Over Voltage (AC and DC side)
h protection (AC and DC side)
e voltage protection (AC and DC Side).
r current.
r array reverse blocking diode (provided in array junction box).
ated fuse at input and AC rated fuse at output with
e contactor/solid-state switches for safe start-up &
wn of system.
surge current.
r temperature.

ogger & Web access System


be consist of following minimum features.
ute, Hourly, Daily, monthly & Annual Parameter (Parameter mentioned in below list) as per of the solar
power plant.
r Module temperature, Wind Velocity, Humidity and Ambient temperature
r irradiation/isolation - Secondary Standard Pryanometer.
nd DC side voltage and currents,Power, Energy,Power factor (on AC side)
Current Harmonics distortion in the AC side
l Voltage Harmonic distortion in AC side
iency of the inverter and system efficiency
ormance Ratio and Utility Factor of individual Inverter
ient temperature
port display in graphical and tabular both formats.
port generation in at least excel and pdf format.Page 46 of 96
ent Log
ta Logger Online Web Portal accessibility shall be life time FOC basis
power plant.
r Module temperature, Wind Velocity, Humidity and Ambient temperature
r irradiation/isolation - Secondary Standard Pryanometer.
nd DC side voltage and currents,Power, Energy,Power factor (on AC side)
Current Harmonics distortion in the AC side
l Voltage Harmonic distortion in AC side
iency of the inverter and system efficiency
ormance Ratio and Utility Factor of individual Inverter
ient temperature
port display in graphical and tabular both formats.
port generation in at least excel and pdf format.
ent Log
ta Logger Online Web Portal accessibility shall be life time FOC basis

ing Input shall have Minimum 2 Nos. of Spare

nput for String Inverter 2 Nos. shall be considered.

r efficiency curve shall be provided at different loading (Loading % 10,25,50,75,100)_& voltage

s no specific additional requirement for central inverter room except cut out for air ducting and air filte

unction Box; Array Junction Boxes


uired Main Junction Box; Array Junction Boxes
nction boxes shall be dust, vermin and waterproof,Shockproof and made of FRP/Poly carbonate(IP67 or
.
minals shall be connected to copper bus bar arrangement of proper sizes.
nction boxes shall have suitable cable entry points fitted with cable glands of appropriate sizes for both
ng and out going cables.

e markings shall be provided on the bus bar for easy identification and cable ferrules shall be fitted at
ermination points for identification.

ing of the JB’s shall be suitable with adequate safety factor to inter connect the Solar PV array.
Array Box installation with frame to be provided.

nction Box (Between string Inverter & Main ACDB) with MCCB shall be provided

nction Box shall have bottom cable entry with suitable cable gland and all cable should be connected w
e spreader terminal of MCCB

e Cleaning system

ribution pipeline with branch piping in Solar Plant shall be in vendor scope.

quired Nozzles and connector shall be in vendor scope.


l provide water at One point near Solar plant. Water tank, pump shall not be considered in vendor scop

Page 47 of 96
ced Solar module Cleaning Kit with combination of Water spray pipe & cleaning brush (with 4 Mtr Exten
Brush with Brush Holder, Hose pipe, Water supply wall, Y joint if any) Mist Nozzle, Brushes, pipes) shall
scope.

king of Piping shall be as per relevant IS codes.

ed capacity of Water Pump and Storage Tank (At least 3 KL)


er monitoring system shall be consist of Module cell temperature and ambient temperature.
er monitoring
Module system sensor/MWp shall be considered).Weather monitoring system shall
cell Temperature be consis
cell temperature and ambient temperature.
meter
Module forcell
Solar radiation shall
Temperature be Themopile
sensor/MWp type
shall be secondary standardmonitoring
considered).Weather and as persystem
IS 9060.
shall be consis
cell temperature and ambient temperature.
Module cell Temperature sensor/MWp shall be considered).Weather monitoring system shall be consis
cell temperature and ambient temperature.
Module cell Temperature sensor/MWp shall be considered).Weather monitoring system shall be consis
ercell temperature
monitoring andshall
system ambient temperature.
be consist of Anemometer for Wind velocity and Wind direction
Module cell Temperature sensor/MWp shall be considered).Weather monitoring system shall be consis
cell temperature and ambient temperature.
erModule
monitoring system shallsensor/MWp
cell Temperature consist of humidity
shall besensor.
considered).

athering data shall be communicated to Online system.(i.e Data logger, Web access, SCADA/PLC)

s and accessories
uired Cables and accessories for Solar PV plant
cables (AC & DC) shall be supplied conforming to relevant IS & IEC standard only suitable for Solar Plan
bles : polyethylene / Annealed tinned copper, FRLS, Protected against UV rays, suitable for outdoor
ity,Halogen free,
les : FRLS, Armoured, XLPE

e of the cables between String to junction boxes, junction boxes to PCU/Inverter, AC Power interconnec
ll be so selected to keep the voltage drop and losses to the minimum (Voltage drop should be below 2

les tray should be Hot dip galvanized


le laying on tray have to clamp with FRP clamps.

erground cable to be laid with suitable conduit which have proper chemical/mechanical/electrical prop

e of Cable & Cable Tray laying work.

bus cables shall be Screened & Armoured with 2 Pair.

Cable to be Supplied with 11 kV (UE Grade)/As per requirement

Page 48 of 96
le Termination kit shall be supplied along with HT cable.

able insulation level shall be minimum 1 KV (For 415 Volt System) and all DC cable insulation level sha
um 2.5 KV for 1500 Volt System & 1.8 KV for 1000 volt system.

JB with MCCB shall be provided near to Inverter for those Inverters which are not to be connected with
ner box & directly connected to main ACDB (Length > 50 Mtr)

rs which are connecting to combiner boxes must have isolation at combiner box end with MCCB.

cables shall be laid in DWC pipe with all accessories.

ng and Lighting arrestor for protection.

ay structure of the PV yard shall be grounded properly using adequate number of earthing pits. (Nos o
ll be equivalent to nos of Module Row structure).

al casing / shielding of the plant shall be thoroughly grounded to ensure safety of the plant.

g system design to be done as per relent IS / IEC/ IEEE standard suitable for Solar plant considering So
vity as 100 Ohm Mtr - Equivalent resistance for Earthing pit to be design as less than 1 ohm (Minimum
g pits per inverter for AC side to be considered with minimum distance of 6 Mtr between pits & inter
tivity). Also equivalent grid resistance shall below 1 Ohm.

ipment has to be connected with two earthing point to ensure safety.

uired Lighting arrestors. Complete solar plant to be cover by Lighting arrester. Civil design & LA installa

lar PV Plant shall be provided with lightning & over voltage protection.

oxide variastors shall be provided inside the Array Junction Boxes.

e MOV’s (Metal Oxide Variastors) also shall be provided in the Inverter to protect the inverter from Volt

system shall have dedicated minimum 2 nos of earthing pit & having equivalent earth resistance less

A- Lightning Arrester shall have dedicated minimum 2 nos of earthing pit & having equivalent earth
nce less than 1 ohm

CDB, Extensional Panel (LT & HT), Transformer Neutral point, Transformer Body shall have 2 nos of ded
g pits for each equipment.

e, DC side, SCADA & LA earthing system shall be isolated with each system.

Page 49 of 96
y and UPS (with Minimum 4 hrs backup) shall be considered for SCADA and WMS.

A – Hardware & Software

me Data Monitoring facility shall be provided for individual String (DC side Voltage, Current, Power & En
idual inverter (AC Side: Voltage, Current, Power, Energy, Frequency, PF etc. & MPPT Level Voltage, Cur
).

ampling & Recording time shall be less than 5 sec.

& Inverter data logger should have facility to store at least minimum 45 days historical data (includin
ms, Events, Irradiation, Ambient Temperature, cell Temperature, Wind velocity/direction, AC/DC side
ring parameter as mentioned above or any other parameter related to solar plant). The same shall be
ured in SCADA also. SCADA & Inverter data logger should have facility to store at least minimum 45 da
al data (including data of Alarms, Events, Irradiation, Ambient Temperature, cell Temperature, Wind
y/direction, AC/DC side monitoring parameter as mentioned above or any other parameter related to s
The same shall be configured in SCADA also.

nts, Alarms & Fault code of Inverters shall be configured in SCADA.

has to be considered for all above string wise/Inverter wise parameter monitoring including energy me
ACDB, Main ACDB, Extension panel, Grid Incomer meter, DG Meter & Main incomer meter of existing P

ware's viz Engineering, Configuration & graphical/historical etc. shall be provided with valid licence.

kup of original software & algorithm shall be provided.

system shall be designed with minimum 3000 Tag consideration.

pdate time for SCADA shall be less than 5 Sec & Individual MODBUS loop should have maximum 10 de

shall have with minimum 8 GB RAM and above i5 processor. Dual Ethernet Port should be there.
ering station shall have extension provision for separate operating station.

ders (ACDB MCCB/Circuit Breaker including Grid Incomer, ACDB & Extension Panel, DG incomer, Main
r of existing PCC transformer) Status (ON/OFF/Trip) to be incorporated in SCADA.

ion Control of Circuit breakers (ACDB & Extension Panel) shall be considered form SCADA.
alarms/fault and auto emailing of customize reports shall be considered.

rver of SCADA system shall be provided.

ws professional version & latest MS office shall be provided with valid License

Page 50 of 96
rter shall have Auto & manual load (ramp up & cutoff) control facility from 0 to 100% range and power
reactive power control ranging from 0.8 Lagging to 0.8 Leading through Auto & manual external comm
h modubus RS485/Ethernet interface port.

ion & Control philosophy to be consider for DG + Solar & GRID + Solar. The same to be incorporated in
.

r load & Power Factor/Reactive control response time shall be less than 10 sec.
ual Inverter to be controlled including ON/OFF operation from SCADA.
ntroller should be programmable and any logic modification/implementation can be done by user with
duly licensed engineering software shall be provided.

ntroller should have analog & digital input/output signal card with 20% spare channels

Generation should be available in excel which can also be customized as per requirement

ommunication availability for third party communication

App should be available for SCADA System

protector to be provided in all Modbus Loops


ng : ABT meter shall be 0.2 S class at interconnection Point and all multi function meters s
m relevant State & Central metering regulation. Meter to be installed at each outgoing &
er feeder of ACDB/AC Combiner box. Meter at ACDB Outgoing & AC Combiner Incoming/Out
be bi directional type.
PT , all measuring equipment shall confirm relevant State/ Central metering regulation

Monitoring system (SMB) with monitoring of Voltage, Current, Power and Energy of individ
. SMB shall have power up & communicate with SCADA even after solar generation hours
ng/Night hours).
SMB controller should have separate Op to Isolator for Modbus/Ethernet Connection and com
protection unit to be provided at final terminal of all SMB at SCADA Panel.

Extension Panel

side feeder rating above 630 Amp shall have ACB - Air circuit Breaker (EDO Type) with Microprocessor
ion system (LSIG Protection).

rminal Point shall be 415 Volt PCC Level with ACDB - Air Circuit Breaker (EDO Type & LSIG Protection) &
Meter with Moudbus communication facility.

side feeder rating above 400KW @ 415 Volt shall have ACB - Air circuit Breaker (EDO Type) with only w
rocessor base protection system (LSIG Protection).

Page 51 of 96
Multi function Meter with Modbus RS 485 communication facility to be provided for Field AC Combiner/A
ABT Meter to be considered at SCL connectivity point of supply with relevant metering regulatory stan
cation/SCL Requirement.

on and required modification in existing HT terminal point (11 kV & 6.6 kV) : as per provided SLD.
CDB switch gear & Busbar shall be design to withstand 50 KA, 1 Sec fault level.
mbiner & ACDB shall be suitable for outdoor installation.
mbiner shall have MCCB feeder with Thermal Magnetic Protection
hall have all incoming & outgoing feeder with Microprocessor base MCCB with LSIG protection
parate Marshelling box shall be provided for Modbus/Ethernet cable termination. All Meter looping sho
y the vendor.Final termination to be provided. Max. 7 no. meter should be there in one loop.
HT Panel (11 kV & 6.6 kV) shall be provided as per technical specification at Solar Plant Side which sha
Cable In Cable out type).

bution Transformer

Hook Up transformer to be supplied as per technical specification

rmer Neutral CT to be provided in case of Solid Earth System with Rating as per Phase Current
tandby Earth Fault protection tobe provided in case of Solid Earthing System

rmer Marshlling Box shall have Transducer for WTI & OTI remote monitoring in SCADA

utory clearance and approval required from Central/State govt or any other agengy shall be vendor sc
er Statutory fee shall be paid by SCL.

asoning work and Approval from DISCOM/Statutory agencies shall be vendor scope however Statutory f
e paid by SCL.

asoning work and approval for net metering at Grid voltage level shall be in vendor scope however Stat
all be paid by SCL. Net meter, CT & PT including installation shall be in SCL scope.

ete Solar Plant shall be accommodated in Area specified by SCL.


anger boards and identification Tagging for each equipment & Cables etc. as per relevant Standards.

shall call for inspection of equipment (Module, Inverter, SCADA, ACDB/Extension Panel, HT Panel,
ution Transformer, SCB, MMS & HT-LT Cables) during manufacturing and dispatch. Cost of inspection sh
ope. Cost of inspection shall be borne by SCL.

on board, switch gear and Bus-bar at terminal point shall be in vendor scope.

ure for Inverter, SCB, Field ACDB & other outdoor JB shall be provided.

Page 52 of 96
ipment, Field ACDB, Inverter shall be placed such a way that equipment shadow will not come to Solar
.

of Cable Tray/ Conduit Pipe will be in vendor Scope (where-ever required - Overhead/Ground)

r (at least 1 Nos./ 10% of total nos of inverter whichever is higher) shall be considered for sample test
apacity and all other equipment's shall be tested at Rated Capacity during Inspection.

shall be registered with MNRE.

Certification of E&C contractor for CEIG approval shall be taken care by Vendor.
lant Layout will further be explored to maximize the generation during detailed engineering.

le Gantry where ever required will be Vendor scope. (Height of cable gantry shall be atleast 6 mtr.)

4 Nos./MWp Spare Solar Module and 10% or Minimum 01 which ever higher Spare feeder in ACDB sh
ered for each rating

of anchor fastener / Foundation bolt / Insert plate required for Solar Plant shall be considered.

r and all other equipment shall be tested rated capacity at equipment supplier works, In case of equip
r denied to test at rated capacity then the same shall be tested at testing lab approved by MNRE. Cost
shall be borne by vendor.
ety Items I.e. Rubber MATS, Sand Bucket with stand etc. shall be considered.
uired Fire Fighting system / Fire Extinguishers as per Relevant standard for Solar Plant shall be consider

tgarh : Inverter ACDB shall have Single Output Feeder with 1X100% Load flow capacity as per SLD atta

Page 53 of 96
Annex 3
CL)
R PLANT
Vendor to filled

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Page 54 of 96
Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Page 55 of 96
Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm
Vendor to Confirm
Vendor to Confirm

Vendor to Confirm
Vendor to Confirm

Vendor to Confirm

Page 56 of 96
Vendor to Confirm
Vendor to Confirm
Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

ess running of Robotic Cleaning System-

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm
Vendor to Confirm

Page 57 of 96
Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Page 58 of 96
Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Page 59 of 96
Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm
Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm
Vendor to Confirm

Page 60 of 96
Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm
Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm
Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Page 61 of 96
Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Page 62 of 96
Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm
Vendor to Confirm

Vendor to Confirm

Vendor to Confirm
Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Page 63 of 96
Vendor to Confirm

Vendor to Confirm

Vendor to Confirm
Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Page 64 of 96
Vendor to Confirm

Vendor to Confirm
Vendor to Confirm
Vendor to Confirm
Vendor to Confirm
Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm
Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm
Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Page 65 of 96
Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm
Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm
Vendor to Confirm

Vendor to Confirm

Page 66 of 96
Annex_-_4_Scope_E&C_

Annex 4
Shree Cement Limited (SCL)
E&C SCOPE OF SOLAR PLANT

Sr. No Description Vendor to Filled

Erection and commissioning scope

1 Complete Erection and commissioning of Solar PV Plant Vendor to Confirm

2 Complete Erection and commissioning of SCADA System. Vendor to Confirm

Hydra requirement for erection and commissioning and Material Unloading. Hydra requirement for
3 Vendor to Confirm
erection and commissioning and Material Unloading.

Accommodation & Fooding of contractor labor, Supervisor and engineer. Accommodation &
4 Vendor to Confirm
Fooding of contractor labor, Supervisor and engineer.

SCL will provide Electrical connection at one point only, rest of power distribution required will be
5 Vendor to Confirm
in vendor scope. Electricity shall be free of charge.

All consumables required in the work like welding electrodes filler wire, welding material, argon
6 Vendor to Confirm
gas, D.A, LPG, Oxygen.

7 The insurance of your workmen and tools and tackles & Provident Fund of your workmen. Vendor to Confirm
8 Machinery & tools/tackles like welding machine, cutting torch, etc. Vendor to Confirm

Mobilization & demobilization of man power, materials, machinery and tools/tackles at working
9 Vendor to Confirm
site.

Inspection of civil work prior to commencement of erection to check dimension elevation and
10 Vendor to Confirm
correctness of location.

11 Activity chart and Drawings. Vendor to Confirm

12 Erection engineers, supervisor, skilled / unskilled man power for E&C. Vendor to Confirm

13 Site office construction will be in vendor scope however open space will be provided by SCL. Vendor to Confirm

All PPE’S will be in your scope. All men power should be aware with safety rules & regulations of
14 Vendor to Confirm
the SCL.

15 Anything which required for Erection and commissioning of Solar PV Plant Vendor to Confirm

16 All legal formality for deploying of labors shall be in vendor scope only. Vendor to Confirm

17 Delivery of material in erection sequential order. Vendor to Confirm

18 All per-commissioning checks, trial runs of equipment and commissioning of items and equipment. Vendor to Confirm

19 Any pre assemblies of material including solar Panel. Vendor to Confirm

20 Packing of all supply as per scope chart. Vendor to Confirm

21 Foundation bolt and Insert plates required for mounting structure. Vendor to Confirm

22 Unloading of Modules, MMS, Inverter, Transformer, ACDB, E-BOP material at SCL site. Vendor to Confirm

23 Alignment and Fixing of Module mounting structure shall be vendor scope. Vendor to Confirm

24 Alignment and Fixing of Module mounting poles shall be vendor scope. Vendor to Confirm

25 All array layout making shall be in vendor scope. Vendor to Confirm

26 Erection and commissioning shall be done with SCL approved submitted QAP by vendor. Vendor to Confirm

27 Any Anchor fastener bolt required for Module Mounting structure. Vendor to Confirm

28 Approach to be provide on each module for proper operation and maintenance activities. Vendor to Confirm

29 Complete Solar Plant Civil Work shall be considered in Vendor Scope.

29(i) Area leveling, Dressing, Excavation of Solar Plant Vendor to Confirm

29(ii) Civil work Cable Tench work i.e. Sand Filling, Brick work, excavation etc. Vendor to Confirm

Civil work for MMS including Pilling, MMS Alignment, Pile capping, Pile Marking, Total Station for
29(iii) Site Survey. MMS civil work design shall be considered such that MMS column shall be embedded Vendor to Confirm
in ground.

29(iv) Internal Pathway and Road for Solar Plant Vendor to Confirm

Fencing work covering complete Solar Plant, Transformer Area and wherever applicable including
29(v) Vendor to Confirm
gates.

29(vi) Civil work for Equipment foundation i.e. Transformer, Inverters, ACDB, HT Panel, LA,WMS Vendor to Confirm

29(vii) Civil work for Solar Plant Earthing System Vendor to Confirm

Page 67
Annex_-_4_Scope_E&C_

29(viii) Water Drainage System in Solar Plant Area. Vendor to Confirm

29(ix) Painting of All civil structure above ground including MMS pile cap. Vendor to Confirm

All Raw material and consumables i.e. Aggregates, cement,steel, bricks, Sand, shuttering etc. shall
29(x) Vendor to Confirm
be in vendor scope.

All Machinery and equipment's i.e. JCB, Tractor, Augur machine, Auto level, Total Station shall be
29(xi) Vendor to Confirm
vendor scope.

Page 68
Shree Cement Limited (SCL)

TERMINAL POINTS OF SOLAR PL

Sr No Description

Terminal Point

Power Evacuation

Water Supply for Solar Module Cleaning


3
system

4 Electric / Control Power for construction

5 Water construction facility

6 Internet connectivity

69 OF 96
Annex 5
Shree Cement Limited (SCL)

TERMINAL POINTS OF SOLAR PLANT

Terminal Point Vendor to Confirm

Up to Existing HT Panel (11 kV ) Voltage


level) - Approx 800 mtr distance from
Vendor to Confirm
Transformer to near switch yard/Respective
Load Center.

Up to Existing HT Panel (6.6 kV ) Voltage


level) - Approx 800 mtr distance from
Vendor to Confirm
Transformer to near switch yard/ Respective
Load Center.

At One point near Solar Plant Vendor to Confirm

At one point near Solar Plant Vendor to Confirm

At one point near Solar Plant Vendor to Confirm

At One point near Solar Plant within 300


Vendor to Confirm
meter

70 OF 96
Shre
PG
Sr. No. Description UOM
Liquidated Damages for Performance guarantee

Plant Capacity kWp

Solar PV plant
1 Lacs kWh/year
Power generation @ Energy Meter

2 Plant Load Factor (PLF) %

3 LD condition

Remarks

Liquidated Damages for Delay

Delivery of Solar PV plant system (from


1 Weeks
PO date)

Erection and Commissioning of Solar PV


2 Weeks
plant. (from PO date)

LD condition (Erection &


3 -
Commissioning)

Page 71 of 96
The total value of the Liquidated Damages i.e. for delivery & non-
performance will be limited to 10% of the basic order value.

Page 72 of 96
Shree Cement Limited (SCL)
PG & LD OF SOLAR PLANT
SCL Requirement Vendor to Filled

2000

32.587 Vendor to Specify

18.60

1.25% of contract value for


every 1% decrease in
guaranteed Power generation
Vendor to Confirm
and subject to LD of
maximum 10% of contract
value.

No Correction of Solar
Irradiance, Temperature etc
will be allowed. Natural
calamities/Acts of God / force Vendor to Confirm
Majeure/component failure
due to surge from SCL local
GRID shall not considered.

10 Weeks Vendor to Confirm

14 Weeks Vendor to Confirm

1% of contract value for


every 1 full week delay
Vendor to Confirm
subject to LD of maximum
5% of contract value.

Page 73 of 96
Damages i.e. for delivery & non-
0% of the basic order value.

Page 74 of 96
Annex 6
L)

SCL Requirement Vendor to Filled

1600

26.070 Vendor to Specify

18.60

1.25% of contract value for


every 1% decrease in
guaranteed Power generation
Vendor to Confirm
and subject to LD of
maximum 10% of contract
value.

No Correction of Solar
Irradiance, Temperature etc
will be allowed.Natural
calamities/Acts of God / force Vendor to Confirm
Majeure/component failure
due to surge from SCL local
GRID shall not considered.

10 Weeks Vendor to Confirm

14 Weeks Vendor to Confirm

1% of contract value for


every 1 full week delay
Vendor to Confirm
subject to LD of maximum
5% of contract value.

Page 75 of 96
Page 76 of 96
Shre
SC
S.No. Description

1 Solar Panel

2 Solar Inverters

3 LT BREAKERS (ACB/MCCB)

4 FUSES

5 ENERGY METERS

6 ANALOG METERS / DIGITAL METERS

7 JUNCTION BOXES

8 DC CABLES

9 LT POWER CABLES

10 CONTROL CABLE

11 CABLE TRAYS AND ACCESSORIES

12 CABLE GLANDS & CABLE LUGS

13 PUSH BUTTONS & INDICATING LAMPS

Page 77 of 96
14 CONTROL SWITCHES / SELECTOR SWITCHES

15 ANNUCIATION

16 (FACIA WINDOW)

17 TERMINAL BLOCKS (CONTROL)- Wags screwless

18 Ammeter / Voltmeter

19 Lt MCC panel/ Switch gear

20 Anchor Fastener

21 Steel for MMS

22 String combiner box

23 Weather Monitoring

24 Pyranometer (Secondary class)

25 Cable Connectors

26 Lightening Arrester

27 Earthing

28 SCADA / PLC

29 Distribution TRANSFORMER

30 HT POWER CABLES

31 HT Panel

32 MMS

Page 78 of 96
Shree Cement Limited (SCL)
SCL Approved Vendor list
SCL requirement

Renesola / Canadian / Trina / Jinko / JA Solar / Hanwha Q Cells /GCL / WAAREE / Risen / Longi.

SMA / ABB / Schneider / Hitachi / TMEIC / DELTA/Sungrow

L&T/ABB/SIEMENS / SCHNEIDER / C&S / GE.

GE POWER / L&T / SIEMENS / SCHNEIDER / C&S / GE.

SECURE / CONZERV / DIRIS / ENERCON/L&T

AE / IMP / MECO / NIPPON / RISHAB / CONSERV/ SIEMENS.

RITTAL/CEAG(FCG) / PUSHTRON / GOVAN INDUSTRIES/ SPELSBURG / BALIGA/IKE

LAPP / LEONI//Polycab/RR Cables/Siechem/Havells

UNIVERSAL CABLES / POLYCAB / KEI INDUSTRIES LTD / NICCO CORPORATION / CABLE CORPORATION
OF INDIA LTD / R.P.G. CABLE LTD. / GLOSTER / POLYCAB/Havells.

UNIVERSAL CABLES / GLOSTER / POLYCAB / KEI INDUSTRIES LTD / NICCO CORPORATION / CABLE
CORPORATION OF INDIA LTD / R.P.G. CABLE LTD./ FINOLEX CABLE / UNISTAR / HAWELLS.

GLOBE ELECTRICAL INDUSTRIES / RATAN/ METTALITE / INDIANA / TECHNOCRAFT / PREMIER / PATNY/


GK SMITH/IKE/S3 Energy

DOWELLS / COMET.

BCH / L&T / CONCORD CONTROLS / SIEMENS / TEKNIK / SCHNEIDER / ABB.

Page 79 of 96
SWITZER / KAYCEE / ALSTOM / HAVELLS / L& T/ SIEMENS / SALZER.

PROCON / DIGITAL CONTROLS / L&T / ILK / MASSIBUS / ALAN.

ELMEX / PHOENIX / CONNECTWELL / WAGO.

AE / MECO / REISHAB / ENERCON.

ABB/ L&T/ C&S / Schinder/ advance / siemens / NDUSTRIAL SWITCH GEAR & CONTROL (B) PVT.
LTD./Trinity Touch/Hensal

Hilti or equivalent

Jindal / SAIL / JSPL / RINL

Trinity,ABB, Scheinder,RPG, Siemens or equivalent/S3 Energy

Aeron/ Dynalab/ BKC/ Komoline/ Luft/ Kipp & Zonnen/ Hukseflux/ Metone/ Young/ Instrumex

Komoline/ Luft/ Kipp & Zonnen/ Hukseflux / SMIS

Elmex,Ninbo or equivalent

SLI, JMV or Equivalent

Reputed make

ABB/Schneider (IGSS) /Rockwell/DeltaABB/Schneider (IGSS) /Rockwell/Delta

BHARAT BIJILEE/SIEMENS / ABB / VOLTAMP / AREVA / EMCO / CGL/ GE.

POLYCAB / KEI INDUSTRIES LTD / / CABLE CORPORATION OF INDIA LTD / Havells.

ABB/ Schinder / Siemens / GE

Salasar, Ganges, Jackson or Equivalent

Page 80 of 96
Annex 7

Vendor to Filled

Vendor to Confirm
Page 81 of 96
Shree Cement Limited (SCL)

PROJECT TIME LINE OF SOLAR POWER PLAN

Sr.No. Stage

Approval of Major drawings (Civil drawing and Plant


1
layout etc).

2 Major Civil Work

Completion of supply of major equipment like SPV


3
Modules, Module mounting structure and Inverters

4 Installation of all major equipment.

Completion, testing and commissioning of Solar PV


5
power plant

Page 82 of 96
Annex 8

Shree Cement Limited (SCL)

CT TIME LINE OF SOLAR POWER PLANT

SCL Requirement Vendor to Filled

Within 20 Days from order. Vendor to Confirm

PO date +10 weeks Vendor to Confirm

PO date +10 weeks Vendor to Confirm

PO date+12 weeks Vendor to Confirm

PO date+14 weeks Vendor to Confirm

Page 83 of 96
Shree Cement Limited (SCL)

EXCLUSION OF SOLAR PLANT

Sr.No. Description

A Exclusion

1 Water supply

2 Security of Plant

3 Operation and Maintenance of Solar PV plant

4 CCTV Surveillance system

5 Plant Lighting System

6 Soil Investigation

Page 84 of 96
Annex 9

Shree Cement Limited (SCL)

EXCLUSION OF SOLAR PLANT

Vendor to filled

Vendor to Confirm

Page 85 of 96
Annex 10
Shree Cement Limited (SCL)

DRAWINGS AND DOCUMENT OF SOLAR PLANT

Sr.No. Description Vendor to Filled

A General Drawings and Documents

1 Implementation Schedule

2 Overall Plant Layout (With Marking from Total Station)

3 Land Grading and Leveling Plan

4 Shadow Analysis Report

5 GA Layout of Plant (Incl Control Station)

6 Foundation Marking Plan

7 Plant Cable Routing and Trench Layout

8 Earthing/ Pit Marking Layout

9 Plant Piping Layout (Module Cleaning)

10 Stringing Layout

11 Bill of Quantity for Solar PV system

12 Bill of Quantity for Civil Material

13 Quality Assurance Plan (QAP) for Major Equipment and Erection & Commissioning

B Design Calculations

1 PVSyst Report

2 MMS Design Calculation (With Stadd Report)

3 MMS Foundation Design Calculation (With Stadd Report)

4 Electrical/Other Equipment Foundation Design Calculation

5 DC / AC Cable Sizing

6 Earthing / Lightning Calculation

7 Battery and UPS Sizing Calculation

C Drawings
Vendor to Confirm
1 MMS Foundation Drawing

Module Mounting Structure (MMS)


2
Assembly, Fabrication & Erection Drawing (Pdf & Autocad)

3 Electrical/Other Equipment Foundation Drawing

4 Cable & Cable Tray Gantry structural and layout drawing

5 DC Single Line Diagram with Cable Schedule

6 AC Single Line Diagram with Cable Schedule

7 Auxiliary Supply Single Line Diagram with Cable Schedule

8 Earthing Layout

9 SCADA Single Line Diagram/Architecture

10 I & O Summary List Communication

D Equipment Drawings & Documents

1 Civil Construction, Installations & BoQ

2 Electrical Installations & BoQ

3 Module Technical Specification Sheet

4 Inverter Technical Specification Sheet

Inverter efficiency curve shall be provided at different loading (Loading % 10,25,50,75,100)


5
V/S voltage

Page 86 of 96
5 Inverter Transformer Technical Specification Sheet(2 MVA)
Detailed Technical Specification for all the Electrical Equipments/Materials (With Test
6
Certificates)
Solar PV module Data Sheet with Test Certificate, BOM, Flash test reports, QAP (Including
7
module testing procedure), I-V curves, Module Pan file.
8 Installation, Storage manual and O&M cleaning manual shall be submitted.

Progress Report in every fortnights to be provided

Page 87 of 96
Annex_-_11_SLD_2_MW_Unit-2
Annex-10
(Shree Grinding Unit, Suratgarh, Unit-2)

20 / 25 MVA
132/ 11 KV

X
Existing HT Panel - 11 kV

M1
1250 Amp X ABT Bi-Direction Meter
X Vendor Scope
M2
1250 Amp X Non ABT Bi-Directional Meter

2 MVA, 11/ 0.415 KV

415 V or As per Solar Inverter Generation Voltage M3 Non ABT Bi-Directional Meter
Main ACDB

X
MCCB X MCCB MCCB X MCCB X

Inverter /AC Combiner Box


PV PV PV PV
String String String String

Proposed Electrical Schematic Diagram

Page 88
Annex_-_11_SLD_1_6_MW_Unit-1
Annex-11
(Shree Grinding Unit, Suratgarh, Unit-2)

10 / 12.5 MVA
132/ 6.9 KV

X
Existing HT Panel - 6.6 kV

M1
1250 Amp X ABT Bi-Direction Meter
X Vendor Scope
M2
1250 Amp X Non ABT Bi-Directional Meter

1.6 MVA, 6.6/ 0.415 KV

415 V or As per Solar Inverter Generation Voltage M3 Non ABT Bi-Directional Meter
Main ACDB

X
MCCB X MCCB MCCB X MCCB X

Inverter /AC Combiner Box


PV PV PV PV
String String String String

Proposed Electrical Schematic Diagram

Page 89
Shree Cement Limited (SCL)
Annual Maintenance Scope
Sr. No

10

11

12

Page 90 of 96
Shree Cement Limited (SCL)
Annual Maintenance Scope
Description

Cleaning of the Modules shall be done twice a month along with preventive check-up
of the Plant. A team of 3-4 persons along with one Supervisor shall visit for the same
(total 24 visits).

Change of Tilt angle shall be done by Vendor. All required Man Power including Skilled
Supervisor shall be in Vendor Scope.

Preventive Maintenance work shall be carried out by Vendor as per O&M requirement
basis

Vendor shall ensure the competent person during Maintenance work i.e. Module
cleaning, Tilt angle adjustment.

Vendor will be depute competent person for trouble shooting work within 24 Hrs.

Vendor will ensure safety measures while working.

All defective Equipment's & spares will be replaced and repaired as per warranty.

Vendor will ensure standard tool & tackles required for Maintenance work.

Any Lodging and boarding of Person will be Vendor scope.

Installation, DE-Installation and Re-installation of any faulty equipment will be done


Vendor during Maintenance.

Record Keeping/Documentation and History card shall be maintenance by Vendor


during AMC.

AMC shall be started from from date of commissioning of first inverter.

Page 91 of 96
Annex 12

Vendor to Filled

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Vendor to Confirm

Page 92 of 96
Billing breakup of supply - Solar Plant Project

Sr. No. Item Group Milestone

1 Solar Modules Solar Modules

2 MMS - Column Post

3 Structural Steel MMS - Purlin, Rafter, Bracing etc

4 MMS - Fasteners

5 Inverter

6 DC Cable

7 Inverter & Other BOP Items AC Cable

8 Earthing Materials

9 LA

10 LT Panel

11 HT Panel
Electrical Panel, Transformer,
12 Scada, Data Logger, WMS and Transformer
other Inst
13 SCADA

14 Data logger, WMS & other instruments

Billing breakup of E&C - Solar Plant Project

Sr. No. Details

1 Installation of Module Mounting Structure

2 Fixing of Inverter

3 Fixing of Modules

Page 93 of 96
4 Laying of AC & DC Cable, Earthing & LA Installation

5 Installation of SCADA, WMS, Data Logger and Others

6 Installation of LT Panels & HT Panel

7 Transformer

8 Submission of Statutory Approval

Page 94 of 96
Annex-13

% of total value

50%

4%

4%

2%

15%

2%

2%

2%

1%

2%

4%

7%

3%

2%

% of total value

20.0%

10.0%

20.0%

Page 95 of 96
10.0%

10.0%

10.0%

10.0%

10.0%

Page 96 of 96