TEST I True or False

1. _______________Resource plan is part of management planning


2. _______________Identifying the risks is not a good management strategy
3. _______________communication shall be done every month it is called tool box meeting
4. ________________Procurement plan is buying of materials and services in the future
5. _______________ Punch lists is part of quality plan
6. _______________ Assisting the client where to get funds is financial planning
7. ______________ In project turn overs, the need to test and commissioning all equipment’s is
not needed because there is already a warranty
8. _______________ We need to invests in equipment to ensure good quality of workmanship
9. _______________ The project management group shall be owner-oriented kind of management
10. _______________ Monitoring until the end of construction is needed for occupancy permit

Test II

Multiple Choice:

1._________________ he/she is in-charge in approving occupancy permit of the building after the
construction

a. architect b. building official c. DPWH d. DENR

2. _______________ is in charge in sprinkler approval of the building after construction

a. BFP b. PNP c. Building official d. engineer

3.________________ is in charge with the compliance of building to electrical code

a. BFP b. PNP c. Building official d. engineer

4. ________________ a permit given to the owner when the building is in compliance after the
construction

a. FSIC permit b. Occupancy permit c. Building Permit d. all of the above

5.________________ a permit given to the owner in compliance to fire code of the Philippines

a. FSIC permit b. Occupancy permit c. Building Permit d. all of the above

6.__________________is used to ensure that tiling works has good spacing


a. tile spacer b. plumb bob c. concrete spacer d. all of the above

7.________________ is used to paint steels to avoid rustication

a. red oxide b. grey oxide c. enamel d. all of the above

8. _______________ is a testing done to mechanical ducting to make sure that there is no leakage.

a. smoke tests b. bomb test c. gray test d. all of the above

9._____________is a testing done to water for leakage

a. water test b. hydro test c. megger test d. all of the above

10.____________ used to ensure falling debris from the construction site

a. safety harness b. safety net c. safety boots d. all of the above

TEST III

Enumerate things to consider before turn-overring the site


1.
2.
3.
4.
5.

Enumerate at least five problems encountered in the construction site before turn overring

1.
2.
3.
4.
5.

Essay:

1. The ceiling construction and sprinkler is on-going but the floor tiles are already installed,
what are you going to do to ensure that the tiles will be damaged. In terms of management
strategies what should go first.
2. The tile works has chipped of on it edges, to ensure its quality, what are the things that you
need to consider to ensure its quality

3. Procurement of building material shall be done before the work will be done in construction
to make it more sustainable and efficient in terms of manpower and materials loading.

4. What would you do if the workers are drunk and went to construction site at 10 am late?
they are 4 tile setters and the deadline is two days before the turn over

5. Who is liable if the building collapse the contractor who used substandard materials of or
the engineer in-charge of construction,