Sie sind auf Seite 1von 1

Risk Assessment/Management Form

Ref:
Section / Dept: civil Activity: Risk Assessment- Location/Area :
Contractor :- Sand Filling

Proba
bility
Proba
Sl Basic Job Potential Consequence Current control measures Init Addition

Resid
ual
Risk rating Ri

risk
bility
N Steps Hazard ial al sk
o. Ris control ra
k measure ti
P E A R P
n E A R
Use stopper at the time of g
unloading

Collapse of No motor boy will stay behind


Unloading of soil/pits,hit to the vehicle and maintained
1 Get Injury/Fatality
safe distance from the vehicle 2 0 0 2 2 4
sand at site aperson,collaps-e
of soil.

Safe access shall be provided


for unloading the sand/soil
Strict supervision to be provided for
the job 1 0 0 0 2 2
Shifting of sand to Slip of iron pan
2 the tunnel from the hand, Get Injury Persons shall be deployed in the job
manually Slip of man with safety shoe , helmet, jacket,
goggles and rubber hand gloves
1 0 0 0 2 2
Workers will provided with full body
Falling from Get Injury due to safety harness
3 Working at height
height fall Take height work permit before
starting the activity
Prepared By Approved By Reviwed By
Contractor Contractor Contractor
Date Date Date

1of1

Das könnte Ihnen auch gefallen