Risk Assessment/Management Form

Ref:
Section / Dept: civil Activity: RISK ASSESSMENT-UNLOADING OF
REINFORCEMENT STEEL BY HYDRA

Probabil
ity

Probabil
Risk rating

risk
Ris

ity
Residual
Initi Addit
Basic al ional k
Risk contr rati
Sl.No. Job Potential Hazard Consequence Current Control Measures ng
ol
Steps
meas
P E A R ure
P E A R
1 Unloading of 1 0 0 1 2 2
Fatality/Machine
reinforcement Unauthorized Driving Only authorised person allow for driving
ry Damage
steel by hydra

Deployment only skill labours

Always switch off the engine before leaving from driver


cabin
Failure of operating Fatality/Machine Inspection required as per check list on daily basis
systems ry Damage before starting the operation

Weekly maintenance required and record should be


kept in a registered

Failure of slings
Get injury/Fatality Use of proper tested lifting equipments/devices
/Fixing devices

Deployment only skill workmen

Safety talk required on daily before starting the work

Bursting of hydraulic
Get injury For checking of hose pipe periodical inspection required
hose

All the hose pipe must be purchased as per IS Std.and


correct specification

No Person shall allow under the hanging load of hydra

Unloading of the
reinforcement Only skilled &experienced work men deployed in the job
Personal Injury/Slip of
2 steel (Manualy) Get Injury with safety shoe ,hand gloves ,safety helmet and 1 0 0 1 2 2
materials
shoulder pad while unloading of reinforcement steel

Prepared By Approved By Reviwed By


1of1