Contract Reference

ARCHITECTURAL, CIVIL & PLUMBING CONSTRUCTION CONTRACT


PROJECT : PROPOSED 2 STOREY COMMERCIAL BLDG WITH MEZZANINE
LOCATION : BRGY. SAN JUAN, TAYTAY, RIZAL
OWNER : WILCON DEPOT INC.
SUBJECT : LABOR & CONSUMABLES CONSTRUCTION CONTRACT
CONSTRUCTOR: (NAME OF CONSTRUCTOR)
PRE-BID CONFERENCE: DECEMBER 05, 2019 (THURSDAY) 4:00 P.M.
SUBMISSION OF BID: DECEMBER 12, 2019 (THURSDAY) TIL' 5:00 P.M.
AWARDING OF BID: DECEMBER 16, 2019 (MONDAY)
DATE START: DECEMBER 20, 2019 (FRIDAY)
DATE FINISH: JULY 24, 2020 (FRIDAY)

SCOPE OF WORKS

DIVISION 1. GENERAL REQUIREMENTS


A MOBILIZATION & DEMOBILIZATION
BUILDING PERMIT, OCCUPANCY PERMIT ( Leg Work and Assistance to our
B
Properties and Permits Department)
C TEMPORARY FACILITIES ( Constructor shall Bid for Labor & Materials)
Worker's Barracks & C.R., Airconditioned Wilcon Engr's office & C.R. [Area: 2.4mx6m], Wilcon
1
Warehouse 60 sq.m.[6mx10m]& Contractor Warehouse.
2 TEMPORARY WATER CONNECTION ( Waterline for CR's & Construction Use )
TEMPORARY ELECTRICAL CONNECTION ( Constructor shall Provide Electrical
3
supply for all facilities & construction use )
SAFETY, SECURITY SERVICES AND HOUSEKEEPING ( Safety Standards As Per DOLE
4
Requirements )
5 AS BUILT PLANS
Contractor's Engineer shall encode (CAD . Dwg) approved Shop Drawings for As-built
6 OTHERS (PLEASE SPECIFY)
A. LAY-OUT & STAKE OUT (RELOCATION, TOTAL STATION)
B. MATERIAL TESTING
C. CLEANING & DISPOSAL OF CONSTRUCTION DEBRIS, EXISTING DAMPS AND UNSUITABLE
ITEMS (INCLUDES TREES)
D. SUPPORT EQUIPMENT & MAINTENANCE (INCLUDE COST FOR EXCAVATOR,
LOADER, TRUCKS ETC.)
E. PROJECT BILLBOARD & SIGNAGES
F. PROJECT SITE MANAGEMENT (SUPERVISION & STAFFS)
G. SANITARY FACILITIES
Page 1
Contract Reference
H. MONTHLY FUMIGATION
I. MATERIALS HANDLING AND PROTECTION
J. REGULAR MEETINGS & CONFERENCES
K. TEMPORARY PERIMETER FENCE (2.40m or 8’ HIGH DARK GREEN COLORED
CORRUGATED SHEET OR LONGS SPAN; INCLUDE MATERIALS IN
CONSUMABLES)
D BONDS AND INSURANCES

1 CONTRACTOR ALL RISK INSURANCE (CARI) (100%)

2 PERFORMANCE BOND

3 GUARANTEE BONDS (1 year)

4 SURETY BONDS

DIVISION 1 GENERAL REQUIREMENTS COST SUB-TOTAL :

DIVISION 2. EARTHWORKS & SITE-WORKS (CONSTRUCTOR WILL SUPPLY EXCAVATOR, DUMP TRUCK
A CLEARING AND GRUBBING
DEMOLITION WORKS: Existing Structures on Site
1 Building A
2 Building B
3 Building C
4 Driveway & Drainage
EXCAVATION WORKS & BACKFILL (IMPORTED FILL MATERIALS WILL BE PROVIDED
B
BY OWNER) (CUT, FILL & COMPACTION BY CONSTRUCTOR)
C LINEAR EXCAVATION WORKS (STORM DRAINAGE)
HAULING & DISPOSAL OF ALL UNSUITABLE MATERIALS (THIS INCLUDES WASTE
D MATERIALS FROM OTHER SUB CONSTRUCTORS AND OWNER SUPPLIED
MATERIALS)
EARTH FILL (IMPORTED FILL SHALL BE SUPPLIED BY WILCON OR SOURCED
E
FROM OTHER SUPPLIER)
F LEVELING AND COMPACTION (BASE PREPARATION & TRIMMING)
G SAND BEDDING
H GRAVEL BEDDING ( 100mm Thk )
SOIL POISONING (MAIN BUILDING) (COORDINATE WITH SERVICE PROVIDER
I
PRIOR TO CONCRETING)
J VAPOR BARRIER (POLYETHELYN SHEET OWNER SUPPLY)
K OTHERS (PLEASE SPECIFY)
DIVISION 2 EARTHWORKS & SITEWORKS COST SUB-TOTAL :

DIVISION 3. CONCRETE WORKS (CONSTRUCTOR SHALL BID LABOR AND CONSUMABLES ONLY) (O
A FOUNDATION FOOTING
Page 2
Contract Reference
1 F-1
2 F-2
3 F-3
4 F-4
5 F-5
6 F-6
7 SF-1
B PEDESTAL COLUMN
1 PD-1
2 PD-2
3 PD-3
4 PD-4
5 PD-5
6 PD-6
7 PD-7
8 PD-8
9 PD-9
10 PD-10
11 PD-11
12 PD-12
13 PD-13
14 PD-14
STIFFENER COLUMN (NOTE: STIFFENER CONCRETE COLUMN SHALL BE
C ATTACHED TO ALL PERIMETER STEEL COLUMNS & IN-BETWEEN STEEL
COLUMNS AS PART OF OUR WALL SYTEM)
1 SC
D CONCRETE BEAMS
1 FOOTING TIE BEAM
MID HEIGHT BEAM (NOTE: STIFFENER BEAMS SHALL BE ATTACHED TO ALL
2 PERIMETER STEEL COLUMNS & IN-BETWEEN STEEL COLUMNS AS PART OF
OUR WALL SYTEM, VERIFY LOCATION IN ARCHITECTURAL ELEVATION)
3 PARAPET CAP BEAM
SLAB-ON-FILL (INCLUDES CONCRETE CUTTING FOR THE CONSTRUCTION
E
JOINTS)
1 GROUND FLOOR SLAB ( Trowel Finish Only )
2 MAIN ENTRANCE ( Stair, Landing & Ramp )
SUSPENDED SLAB (INCLUDE SHORING & SCAFFOLDINGS IN CONSUMABLES)
F (NOTE: SEE TYPICAL METAL DECK DETAILS, METAL DECK INCLUDED IN
STEEL STRUCTURE SUPPLY)
1 MEZZANINE (Trowel Finish)
2 SECOND FLOOR (Trowel Finish)
Page 3
Contract Reference
G OTHERS (PLEASE SPECIFY)
1 CISTERN & RAINWATER TANK
a. GBB-1
b. GBB-2
c. SLAB ON GRADE, WALL & SUSPENDED SLAB
2 SEPTIC TANK
a. GBB-1
b. GBB-2
c. SLAB ON GRADE, WALL & SUSPENDED SLAB
3 FIREWALL (8” THK)
4 Vault Room
DIVISION 3 CONCRETING COST SUB-TOTAL :

DIVISION 4. STEEL REINFORCEMENT (CONSTRUCTOR SHALL INCLUDE IN THE QUOTATION COST F


A FOUNDATION FOOTING
1 F-1
2 F-2
3 F-3
4 F-4
5 F-5
6 F-6
7 SF-1
B PEDESTAL COLUMN
1 PD-1
2 PD-2
3 PD-3
4 PD-4
5 PD-5
6 PD-6
7 PD-7
8 PD-8
9 PD-9
10 PD-10
11 PD-11
12 PD-12
13 PD-13
14 PD-14

Page 4
Contract Reference
STIFFENER COLUMN (NOTE: STIFFENER CONCRETE COLUMN SHALL BE
C ATTACHED TO ALL PERIMETER STEEL COLUMNS & IN-BETWEEN STEEL
COLUMNS AS PART OF OUR WALL SYTEM)
1 SC
D CONCRETE BEAMS
1 FOOTING TIE BEAM
MID HEIGHT BEAM (NOTE: STIFFENER BEAMS SHALL BE ATTACHED TO ALL
2 PERIMETER STEEL COLUMNS & IN-BETWEEN STEEL COLUMNS AS PART OF
OUR WALL SYTEM, VERIFY LOCATION IN ARCHITECTURAL ELEVATION)
3 PARAPET CAP BEAM
SLAB-ON-FILL (INCLUDES CONCRETE CUTTING FOR THE CONSTRUCTION
E
JOINTS)
1 GROUND FLOOR SLAB ( Trowel Finish Only )
2 MAIN ENTRANCE ( Stair, Landing & Ramp )
SUSPENDED SLAB (INCLUDE SHORING & SCAFFOLDINGS IN CONSUMABLES)
F (NOTE: SEE TYPICAL METAL DECK DETAILS, METAL DECK INCLUDED IN
STEEL STRUCTURE SUPPLY)
1 MEZZANINE (Trowel Finish)
2 SECOND FLOOR (Trowel Finish)
G OTHERS (PLEASE SPECIFY)
1 CISTERN & RAINWATER TANK
a. GBB-1
b. GBB-2
c. SLAB ON GRADE, WALL & SUSPENDED SLAB
2 SEPTIC TANK
a. GBB-1
b. GBB-2
c. SLAB ON GRADE, WALL & SUSPENDED SLAB
3 FIREWALL (8” THK)
4 Vault Room
DIVISION 4 STEEL REINFORCEMENT COST SUB-TOTAL :

DIVISION 5: FORMWORKS (CONSTRUCTOR QUOTATION SHALL BE INCLUSIVE OF TIE RODS, FOR


A FOUNDATION FOOTING
1 F-1
2 F-2
3 F-3
4 F-4
5 F-5
6 F-6
7 SF-1

Page 5
Contract Reference
B PEDESTAL COLUMN
1 PD-1
2 PD-2
3 PD-3
4 PD-4
5 PD-5
6 PD-6
7 PD-7
8 PD-8
9 PD-9
10 PD-10
11 PD-11
12 PD-12
13 PD-13
14 PD-14
STIFFENER COLUMN (NOTE: STIFFENER CONCRETE COLUMN SHALL BE
C ATTACHED TO ALL PERIMETER STEEL COLUMNS & IN-BETWEEN STEEL
COLUMNS AS PART OF OUR WALL SYTEM)
1 SC
D CONCRETE BEAMS
1 FOOTING TIE BEAM
MID HEIGHT BEAM (NOTE: STIFFENER BEAMS SHALL BE ATTACHED TO ALL
2 PERIMETER STEEL COLUMNS & IN-BETWEEN STEEL COLUMNS AS PART OF
OUR WALL SYTEM, VERIFY LOCATION IN ARCHITECTURAL ELEVATION)
3 PARAPET CAP BEAM
SLAB-ON-FILL (INCLUDES CONCRETE CUTTING FOR THE CONSTRUCTION
E
JOINTS)
1 GROUND FLOOR SLAB ( Trowel Finish Only )
2 MAIN ENTRANCE ( Stair, Landing & Ramp )
SUSPENDED SLAB (INCLUDE SHORING & SCAFFOLDINGS IN CONSUMABLES)
F (NOTE: SEE TYPICAL METAL DECK DETAILS, METAL DECK INCLUDED IN
STEEL STRUCTURE SUPPLY)
1 MEZZANINE (Trowel Finish)
2 SECOND FLOOR (Trowel Finish)
G OTHERS (PLEASE SPECIFY)
1 CISTERN & RAINWATER TANK
a. GBB-1
b. GBB-2
c. SLAB ON GRADE, WALL & SUSPENDED SLAB
2 SEPTIC TANK
a. GBB-1
Page 6
Contract Reference
b. GBB-2
c. SLAB ON GRADE, WALL & SUSPENDED SLAB
3 FIREWALL (8” THK)
4 Vault Room
DIVISION 5: FORM WORKS COST SUB-TOTAL :

DIVISION 6: MASONRY & BUILDING WALL WORKS


A CHB WALL WORKS ( OPTION 1 )
1 CHB Laying ( w/ reinforcement )
a. CHB 6” above parking level
b. CHB 6” below parking level
c. CHB 4” Including Interior Partition
d. Glass Block Installation
e. Louvered Block Installation
2 PLASTERING
a. Interior
b. Exterior
c. Linear Plastering

STANDARD LINTEL BEAM, STIFFENER COLUMN, STIFFENER BEAMS and WALL FOOTING.
3 INCLUDES STANDARD STIFFENER COMUNS AND BEAMS @ TARP. ADS., LINTEL BEAMS AT
DOORS AND WINDOW OPENNINGS, etc. Concreting

STANDARD LINTEL BEAM, STIFFENER COLUMN, STIFFENER BEAMS and WALL FOOTING
4 INCLUDES STANDARD STIFFENER COMUNS AND BEAMS @ TARP. ADS., LINTEL BEAMS AT
DOORS AND WINDOW OPENNINGS, etc. Rebars

STANDARD LINTEL BEAM, STIFFENER COLUMN, STIFFENER BEAMS and WALL FOOTING.
5 INCLUDES STANDARD STIFFENER COMUNS AND BEAMS @ TARP. ADS., LINTEL BEAMS AT
DOORS AND WINDOW OPENNINGS, etc. Formworks

6 OTHERS (PLEASE SPECIFY)


DIVISION 6 OPTION 1: CHB WALL WORKS COST SUB-TOTAL :

Page 7
Contract Reference

B REINFORCED CONCRETE WALL (PLASWALL) WORKS ( OPTION 2 )


Reinforced Concrete Walls (Plaswall 2 Layer of Fiber Cement Board with Dimensions of 3.00m x
1
1.20m x 150mm thk.)

a. Concreting (CONSTRUCTOR SHALL BID LABOR AND CONSUMABLES ONLY)


(OWNER SUPPLY MATERIALS : READY MIX, BOOM PUMP, ADMIX, ETC.)

b. Steel Reinforcement (CONSTRUCTOR SHALL INCLUDE IN THE QUOTATION


COST FOR TIE WIRES, CONCRETE & STEEL BAR SPACERS)
c. Glass Block Installation
d Louvered Block Installation

STANDARD LINTEL BEAM, STIFFENER COLUMN, STIFFENER BEAMS and WALL FOOTING.
2 INCLUDES STANDARD STIFFENER COMUNS AND BEAMS @ TARP. ADS., LINTEL BEAMS AT
DOORS AND WINDOW OPENNINGS, etc. Concreting

STANDARD LINTEL BEAM, STIFFENER COLUMN, STIFFENER BEAMS and WALL FOOTING
3 INCLUDES STANDARD STIFFENER COMUNS AND BEAMS @ TARP. ADS., LINTEL BEAMS AT
DOORS AND WINDOW OPENNINGS, etc. Rebars

STANDARD LINTEL BEAM, STIFFENER COLUMN, STIFFENER BEAMS and WALL FOOTING.
4 INCLUDES STANDARD STIFFENER COMUNS AND BEAMS @ TARP. ADS., LINTEL BEAMS AT
DOORS AND WINDOW OPENNINGS, etc. Formworks

5 OTHERS (PLEASE SPECIFY)


DIVISION 6 OPTION 2: REINFORCED CONCRETE WALL WORKS COST SUB-TOTAL :

DIVISION 7: STRUCTURAL STEEL WORKS (STEEL IS PRE-PAINTED, RETOUCH PAINT BY CONSTRUCT


A Structural Primary Members (Built – Up & Hot Rolled Members)
B Structural Secondary Members (Purlins & Girts)
C Cable Bracings, Angular Bracings and Accessories
D Sag Arrestors (Sag Rods)
E Anchor Bolts, Connection Nuts & Bolts, Screws and Accessories
F Connection Nuts & Bolts
G 0.75mm Thk Steel Decking
80 microns epoxy enamel paint. Color: White (RETOUCHING OF DAMAGE PAINT ONLY;
H
Paint Supplied by Owner)
I Entrance Canopy (Included in Primary Members)
J Receiving Canopy (Included in Primary Members)
K Stairs @ Employee's Locker (Included in Primary Members)
M Stairs @ Selling Area (Included in Primary Members)
N Fire Exit Stairs (Included in Primary Members)

Page 8
Contract Reference
DIVISION 7: STRUCTURAL STEEL WORKS COST SUB-TOTAL :
OTHERS
M ADVERTISEMENT FRAMES
1 TARPAULINE AD FRAMES
N INDOOR UNITS AIRCON PLATFORMS (COORDINATE WITH MECHANICAL)
O OTHERS (PLEASE SPECIFY)
3 FIRE EXIT STAIRS
OTHER STEEL WORKS COST SUB-TOTAL :

DIVISION 8: ROOFING WORKS (CONSUMABLES: TEKSKREW AND SEALANT) (OWNER WILL PROVID
MAIN BUILDING INSTALLATION
A
(WILCON WILL PROVIDE ROLL FORMING MACHINE ON-SITE)
1 Ga#24 Prepainted Spanlock Roofing (1/40” thk)
2 1.2mm Stainless Gutter / Valley Gutter / Side Gutter
3 Ga#24 Prepainted Ridge Roll (1/40” thk)
4 Ga#24 Prepainted Side Flashing (1/40” thk)
5 Roof Insulation
6 Gutter Hanger
7 Wire Mesh Gauge22 Insulator Support
8 Tig-Welding Of Stainless Gutter Joints
9 OTHERS (PLEASE SPECIFY)
B ENTRANCE AND RECEIVING CANOPY
1 Ga#24 Prepainted Spanlock Roofing
2 0.6mm Prepainted Apron & Wall Flashing
3 Roof Insulation
4 Gutter Hanger
5 Wire Mesh Gauge22 Insulator Support
C OTHERS (PLEASE SPECIFY)
DIVISION 8: ROOFING WORKS COST SUB-TOTAL :

DIVISION 9: ARCHITECTURAL & FINISHING WORKS


A CEILING FINISHES ( 4mm thk. ficem board on metal furring frame )
1 Customer CR
2 Employee CR
3 Spot Ceiling Above Lobby
4 Employee's Area (Mezzanine)
5 Admin & Sales Areas which are indicated in the Interior Layout
6 Entrance Canopy
B DRYWALL PARTITION ( 9mm thk ficem board on metal frame )
Page 9
Contract Reference
1 Dry wall – Exposed @ Store Area
2 Warehouse Dry Wall Partitions with Transluscent Materials on top
3 All Drywall Partitions Indicated in the interior layout
C STEEL MATTING WITH ANGULAR FRAMING
D ALUMINUM COMPOSITE PANEL W/ SUB-FRAME
E CUSTOMER MAIN ENTRANCE
F FLOOR HARDENING @ GROUND FLOOR
G FRAMELESS DOOR INCLUDING TRANSOM
H FACADE FIXED WINDOWS TEMPERED GLASS ON ALUMINUM FRAME
I INSTALLATION OF STEEL DOORS, PVC WINDOWS & WOODEN DOORS
1 Steel Doors ( 1.0m x 2.1m)
2 Steel Louver Door ( 1.0m x 2.1m / 2 panels )
3 Steel Roll-Up Door ( 3.0m x 4.0m )
4 Fire Exit Doors( 1.0m x 2.1m)
5 PVC Windows (1.50m x 1.20m)
6 Awning Windows (0.610 x 0.410)
6 Wooden Doors (0.9 x 2.10m)
J TILING WORKS
1 Customer CR and Ante Room (including counter tops and slop sinks)
2 Employee CR (including counter tops and slop sinks)
3 Admin & Sales Areas which are indicated in the Interior Layout
4 Show Room Floor Tiles as Indicated in Interior Layout
5 Main Entrance and Lions' Stand
6 Ramp (Warehouse, Rough Finish)
7 Living Dining and Kitchen (Store Area)
DIVISION 9: ARCHITECTURAL & FINISHING WORKS COST SUB-TOTAL :

DIVISION 10: PAINTING WORKS ( 1Coat – Primer, And 2 - Coats – Final Top Coating ) ( Include all

A INTERIOR Wall Painting (Boysen Flat latex primer, and Semi Gloss Latex Top Coat)

B EXTERIOR Wall Painting (Boysen Acrytex primer, and Arcytex Top Coat)

C INCLUDES ALL STEEL SURFACES (1 Coat–Primer, and 2-Coats – Final Top Coating)

1 MAIN BUILDING (trusses, struts, sagrods, cross bracing & plates)


2 Stairs to Mezzanine Selling Area
3 Stairs to Employee's Locker Area
4 Fire Exit Stairs
5 STEELDECK SURFACES
6 DRYWALL PARTITION FRAMING
Page 10
Contract Reference
7 AD FRAMES
8 INDOOR AIR CON PLATFORMS
9 ALL STEEL COLUMNS AND BEAMS
D FICEM BOARD SURFACES (Ceiling and Walls)
1 Customer CR
2 EMPLOYEE'S LOCKER ROOM
3 EMPLOYEE'S CR
4 DRY WALL PARTITION BOARD
E STEEL DOORS (Fire Exit, Steel Doors, Louvered Doors)
F MAIN ENTRANCE CANOPY
DIVISION 10: PAINTING WORKS COST SUB-TOTAL :

DIVISION 11: PLUMBING WORKS


A PLUMBING FIXTURES
B WATER LINE
C SEWER LINE & VENTILATION LINE
D STORM DRAINAGE / DOWNSPOUTS
E GROUND DRAINAGE( HDPE PIPE/CONCRETE PIPE )
F FIRE HOUSE CABINET / DRY STANDPIPE
G CATCH BASINS, MANHOLE, AREA DRAINS
H WATER PROOFING
1 COMFORT ROOMS
2 CISTERN
PLUMBING WORKS COST SUB-TOTAL :

DIVISION 12: SITE DEVELOPMENT


A CONCRETING (Broom Finish)
1 Front Parking Pavement
2 Left Side Set Back
4 Rear Side Set Back
B REINFORCEMENTS
1 Parking Pavement
2 Left Side Set Back
3 Right Side Set Back
4 Rear Side Set Back
C FORMWORKS
1 Parking Pavement
D MASONRY WORKS (CHB LAYING, REBAR, & PLASTERING)
1 Plant Boxes
Page 11
Contract Reference
2 Main Entrance
3 Lions' Stand
D LANDSCAPING

E PERIMETER FENCE (LEFT, REAR & RIGHT SIDE) (3.00m Above Retaining Wall)

1.a 3M High Standard CHB Concrete Fence (See Standard Detail)


a. Left Side
b. Rear Side
1 Excavation
2 Sand Bedding & Gravel Bedding
3 Concreting
4 CHB Laying
5 Reinforcement Bars
6 Formworks (For Standard Columns & Beams)
7 Plastering (Kustura Outside, Plastering Inside)
8 Painting
F EXTERIOR DRAINAGE SYSTEM (up to property line)
1 Excavation
2 Sand Bedding
3 Pipe Laying
4 Catch Basin
5 Catch Basin Manhole
6 Backfill & Compaction
G OTHERS (PLEASE SPECIFY)
1 Parking Area & Frontage Development
a. Concrete wheel stopper w/ painting
b. Pedestrian Lane w/ painting
c. Parking Slot Painting Including PWD
d. Street Lighting Posts
e. Bollard Posts
2 PYLON SIGNAGE
a. High
b. Low
3 Employees ENTRANCE / EXIT CANOPY
4 Electrical
a. Temporary Electrical Post
SITE DEVELOPMENT COST SUB-TOTAL :

Page 12
Contract Reference
TOTAL LABOR AND CONSUMABLES
+12% VAT
GRAND TOTAL

FINAL CONTRACT

( PLEASE FILL-UP THIS FORM RELIGIOUSLY, EXCEPT OTHERS AND “


( OTHER SCOPES OF WORKS FOUND ON BID PLANS, BUT NOT REFLECTE

GENERAL COND
A INCLUSIVES
1 VAT inclusive
2 Wilcon Strictly impose a Construction Period of (6) Six months
Down payment will be released upon signing of construction contract & submission of required
3
documents 10%
Welding test will be conducted by Wilcon(assistance on access & clearing for the test area by
4
Contractor)

5 Cutting of slab shall commence 24hrs. After completion of concreting(concrete cutter by contractor)

6 95% FDT on structure fill is required.


Civil Constructor is responsible to assist the unloading/loading of construction materials, debris,
7
backload materials etc.
8 Constructor is responsible to cleanliness, good housekeeping at work area
9 Constructor to sort-out construction materials in proper order
10 Concrete vibrator is required on concreting works
11 Curing tank for concrete sample
Constructor Shall Provide Their Own Wires for their Electrical Tools and Equipements Because Wilcon
12 will be onlyproviding panel board where The Contractor Can be able to tap heir Electrical Tools and
Equipements

ACTUAL UNIT (VOLUME, AREA, LINEAR METER, KG, ETC.) ADJUSTMENTS


13 SHALL BE COMPENSATED ACCORDINGLY UPON VERIFICATION OF THE
ARCHITECT)

B EXCLUSIONS :

BUILDING, OCCUPANCY & OTHER PERMITS by the owner

Page 13
Contract Reference
WILCON CORPO
TECHNICAL QUERIES:(Architectural plans, Plumbing & Structural plans) 634-
8387 local 1625

AR. NISSI DEL ROSARIO 0917-820-8417


AR. OLGA MAY CARCEDO 0917-856-8746
AR. EDYJOB E. RIVERA 0917-841-0683
AR. JOSE ROGER M. BARATA 0921-549-6189
AR. JESUS B. IRINGAN 0917-841-5979

CONFORME:

WILLIAM T. BELO
CHAIRMAN
( THIS DOCUMENT SHALL SERVE AS AN OFFICIAL C

Page 14
Contract Reference

ZANINE

M.
P.M.

COST OF LABOR COST OF CONSUMABLES


UNIT COST AMOUNT UNIT COST AMOUNT
QTY. UOM QTY. UOM
(PHP) (PHP) (PHP) (PHP)

1.00 LOT - - - -

WILCON WILCON
- - - - - - - -
1.00 LOT - -
- -
WILCON WILCON
WILCON WILCON

1.00 LOT - - -
-
WILCON WILCON
1.00 LOT - - - -
- - - - - - - -
1.00 LOT - - - -
WILCON WILCON

1.00 LOT - - - -

1.00 LOT - - - -
1.00 LOT - - - -
1.00 LOT - - - -
1.00 LOT - - - -
Page 15
Contract Reference
1.00 LOT - - - -
1.00 LOT - - - -
1.00 LOT - - - -

1.00 LOT 1.00 LM

- - - - - - - -

1.00 LOT - - - -

1.00 LOT - - - -

1.00 LOT - - - -

1.00 LOT - - - -

AVATOR, DUMP TRUCK AND OTHER NECESSARY EQUIPMENTS)


1.00 LOT - - - -

1.00 LOT - - - -
CU.M. SQ.M.

1.00 LOT - - - -

OTHERS OTHERS
SQ.M. SQ.M.
SQ.M. SQ.M.
SQ.M. SQ.M.
OTHERS OTHERS
SQ.M. SQ.M.
SQ.M. SQ.M.

ONSUMABLES ONLY) (OWNER SUPPLY MATERIALS : READY MIX, BOOM PUMP, ADMIX, ETC.)
- - - - - - - -
Page 16
Contract Reference
CU.M. CU.M.
CU.M. CU.M.
CU.M. CU.M.
CU.M. CU.M.
CU.M. CU.M.
CU.M. CU.M.
CU.M. CU.M.
- - - - - - - -
CU.M. CU.M.
CU.M. CU.M.
CU.M. CU.M.
CU.M. CU.M.
CU.M. CU.M.
CU.M. CU.M.
CU.M. CU.M.
CU.M. CU.M.
CU.M. CU.M.
CU.M. CU.M.
CU.M. CU.M.
CU.M. CU.M.
CU.M. CU.M.
CU.M. CU.M.

- - - - - - - -

CU.M. CU.M.
- - - - - - - -
CU.M. CU.M.

CU.M. CU.M.

CU.M. CU.M.
- - - - - - - -
SQ.M. SQ.M.
SQ.M. SQ.M.

- - - - - - - -

CU.M. CU.M.
CU.M. CU.M.
Page 17
Contract Reference
- - - - - - - -
- - - - - - - -
CU.M. CU.M.
CU.M. CU.M.
CU.M. CU.M.
- - - - - - - -
CU.M. CU.M.
CU.M. CU.M.
CU.M. CU.M.
CU.M. CU.M.
CU.M. CU.M.

E QUOTATION COST FOR TIE WIRES, CONCRETE & STEEL BAR SPACERS)
- - - - - - - -
KG KG
KG KG
KG KG
KG KG
KG KG
KG KG
KG KG
- - - - - - - -
KG KG
KG KG
KG KG
KG KG
KG KG
KG KG
KG KG
KG KG
KG KG
KG KG
KG KG
KG KG
KG KG
KG KG

Page 18
Contract Reference

- - - - - -
- -
KG KG
- - - - - - - -
KG KG

KG KG

KG KG
- - - - - - - -
KG KG
KG KG

- - - - - - - -

KG KG
KG KG
- - - - - - - -
- - - - - - - -
KG KG
KG KG
KG KG
- - - - - - - -
KG KG
KG KG
KG KG
KG KG
KG KG

VE OF TIE RODS, FORM WORKS, SHORINGS, & SCAFFOLDINGS)


- - - - - - - -
SQ.M. SQ.M.
SQ.M. SQ.M.
SQ.M. SQ.M.
SQ.M. SQ.M.
SQ.M. SQ.M.
SQ.M. SQ.M.
SQ.M. SQ.M.

Page 19
Contract Reference
- - - - - - - -
SQ.M. SQ.M.
SQ.M. SQ.M.
SQ.M. SQ.M.
SQ.M. SQ.M.
SQ.M. SQ.M.
SQ.M. SQ.M.
SQ.M. SQ.M.
SQ.M. SQ.M.
SQ.M. SQ.M.
SQ.M. SQ.M.
SQ.M. SQ.M.
SQ.M. SQ.M.
SQ.M. SQ.M.
SQ.M. SQ.M.

- - - - - - -
-
SQ.M. SQ.M.
- - - - - - - -
SQ.M. SQ.M.

SQ.M. SQ.M.

SQ.M. SQ.M.
- - - - - - - -
SQ.M. SQ.M.
SQ.M. SQ.M.

- - - - - - - -

SQ.M. SQ.M.
SQ.M. SQ.M.
- - - - - - - -
- - - - - - - -
SQ.M. SQ.M.
SQ.M. SQ.M.
SQ.M. SQ.M.
- - - - - - - -
SQ.M. SQ.M.
Page 20
Contract Reference
SQ.M. SQ.M.
SQ.M. SQ.M.
SQ.M. SQ.M.
SQ.M. SQ.M.

- - - - - - - -
SQ.M. SQ.M.
SQ.M. SQ.M.
SQ.M. SQ.M.
SQ.M. SQ.M.
SQ.M. SQ.M.
- - - - - - - -
SQ.M. SQ.M. Php12.50
SQ.M. SQ.M. Php12.50
L.M. L.M. Php12.50

CU.M. CU.M.

KG KG

SQ.M. SQ.M.

- -

Page 21
Contract Reference

- - - - - - -
-

SQ.M. CU.M.

KG. KG.

SQ.M. SQ.M.
SQ.M. SQ.M.

CU.M. CU.M.

KG KG

SQ.M. SQ.M.

- -

PAINT BY CONSTRUCTOR)
753.43 MT 753.43 MT
60.10 MT 60.10 LOT
35.57 MT 35.57 LOT
1.00 LOT 1.00 MT
1.00 LOT 1.00 LOT
1.00 LOT 1.00 LOT
8,563.00 SQ.M. 8,563.00 SQ.M.

1.00 LOT 1.00 LOT

- - - included - - - included
- - - included - - - included
- - - included - - - included
- - - included - - - included
- - - included - - - included

Page 22
Contract Reference

- - -
- - - - - - - -
- - - - - - - -
2.00 Sets - - - -
OTHERS OTHERS
- -
Sets - - - -
- - -

(OWNER WILL PROVIDE ROLL FORMING MACHINE ON SITE AND STEEL COIL)

- - - - - - - -

6,952.00 SQ.M. 6,952.00 SQ.M.


L.M. L.M.
L.M. L.M.
L.M. L.M.
SQ.M. SQ.M.
Sets SQ.M.
SQ.M. SQ.M.
L.M. L.M.
- -
- - - - - - - -
SQ.M. SQ.M.
LM LM
SQ.M. SQ.M.
Sets SQ.M.
SQ.M. SQ.M.
- -

- - - - - - - -
59.00 SQ.M. 59.00 SQ.M.
37.00 SQ.M. 37.00 SQ.M.
40.00 SQ.M. 40.00 SQ.M.
240.00 SQ.M. 240.00 SQ.M.
300.00 SQ.M. 300.00 SQ.M.
25.00 SQ.M. 25.00 SQ.M.
- - - - - - - -
Page 23
Contract Reference
350.00 SQ.M. 350.00 SQ.M.
250.00 SQ.M. 250.00 SQ.M.
180.00 SQ.M. 180.00 SQ.M.
50.00 SQ.M. 50.00 SQ.M.
OTHERS OTHERS
OTHERS OTHERS
OTHERS OTHERS
OTHERS OTHERS
OTHERS OTHERS
- - - - - - - -
4.00 Sets 4.00 Sets
1.00 Sets 1.00 Sets
1.00 Sets 1.00 Sets
10.00 Sets 10.00 Sets
2.00 Sets 2.00 Sets
1.00 Sets 1.00 Sets
2.00 Sets 2.00 Sets
- - - - - - - -
59.00 SQ.M. 59.00 SQ.M.
37.00 SQ.M. 37.00 SQ.M.
300.00 SQ.M. 300.00 SQ.M.
650.00 SQ.M. 650.00 SQ.M.
100.00 SQ.M. 100.00 SQ.M.
4.00 SQ.M. 4.00 SQ.M.
1,000.00 SQ.M. 1,000.00 SQ.M.

Coating ) ( Include all Parts of Existing Building )

SQ.M. SQ.M.

SQ.M. SQ.M.

- - - - - - - -

SQ.M. SQ.M.
SQ.M. SQ.M.
SQ.M. SQ.M.
SQ.M. SQ.M.
SQ.M. SQ.M.
SQ.M. SQ.M.
Page 24
Contract Reference
SQ.M. SQ.M.
SQ.M. SQ.M.
SQ.M. SQ.M.
- - - - - - - -
SQ.M. SQ.M.
SQ.M. SQ.M.
SQ.M. SQ.M.
SQ.M. SQ.M.
Sets Sets
SQ.M. SQ.M.

Sets SQ.M.
LM SQ.M.
LM LM
LM LM
LM LM
OTHERS OTHERS
Sets Sets
- - - - - - - -
SQ.M. SQ.M.
SQ.M. SQ.M.

- - - - - - - -
2,458.00 SQ.M. 2,458.00 SQ.M.
405.00 SQ.M. 405.00 SQ.M.
199.00 SQ.M. 199.00 SQ.M.
- - - - - - - -
KG KG
KG KG
KG KG
KG KG
- - - - - - - -
SQ.M. SQ.M.
- - - - - - - -
SQ.M. SQ.M.
Page 25
Contract Reference
SQ.M. SQ.M.
SQ.M. SQ.M.
OTHERS OTHERS

- - - - - - - -

- - - - - - - -
160.00 LM 160.00 LM
53.00 LM 53.00 LM
CU.M CU.M
CU.M CU.M
CU.M CU.M
SQ.M. SQ.M.
KG KG
SQ.M. SQ.M.
SQ.M. SQ.M.
SQ.M. SQ.M.
- - - - - - - -
CU.M CU.M
CU.M CU.M
LM LM
PCS PCS
PCS PCS
CU.M CU.M
- - - - - - - -
- - - - - - - -
LM LM
LM LM
SQ.M. SQ.M.
Sets Sets
1.00 L.S. 1.00 L.S.
- - - - - - - -
1.00 L.S. 1.00 L.S.
1.00 L.S. 1.00 L.S.
1.00 L.S. 1.00 L.S.
- - - - - - - -
1.00 L.S. 1.00 L.S.

Page 26
Contract Reference

Php0.12

LY, EXCEPT OTHERS AND “ – “ AREAS, INCOMPLETE INPUT WILL NOT BE ACCEPTED )
LANS, BUT NOT REFLECTED IN THIS FORM SHALL BE INCLUDED IN THE FINAL CONTRACT)

GENERAL CONDITIONS
CONSUMABLES INLUDED IN THIS CONTRACT / BIDFORM
REBAR WORKS
a. G.I. Tie Wire #16

STRUCTURAL STEEL

a. Welding rod(WIPWELD 6011 OR NIHON WELD 6011)

b. Oxygen & LPG

c. Tig welding coil & shielding gas(ELECTRODE WIRE SS304)

ROOFING WORKS

a. Tekscrew
b. UV Resistant Silicon Sealant (ABC construction sealant or equivalen
c. Duct Tape
PAINTING WORKS

a. Roller & Brush

b. Sandpaper & Masking Tape

c. Basahan & Newspaper

PLUMBING WORKS
a. PVC solvent cement & teflon tape(NELTEX)
ALL FORMWORKS; SHORINGS & SCAFFOLDINGS ARE CONSIDER
CONSUMABLES
a. Nails ( CWN and Concrete Nails )

Page 27
Contract Reference
WILCON CORPORATION

ADDRESS BID TO
ARCH. NISSI B. DEL ROSARIO
PROJECT MANAGER: ENGR. ISAGANI V. ROBLES
A.V.P. NICHOLAS AGBING
ENGINEERING DEPT. 5TH FLOOR WILCON BUILDING #90 E.RODRIGUEZ JR. AVE., UGON NORTE LIBIS Q.C.
L SERVE AS AN OFFICIAL CONTRACT UPON APPROVAL OF OWNER )

Page 28
Contract Reference

TOTAL

Page 29
Contract Reference

EQUIPMENTS)

DY MIX, BOOM PUMP, ADMIX, ETC.)


-
Page 30
Contract Reference

Page 31
Contract Reference
-
-

& STEEL BAR SPACERS)


-

Page 32
Contract Reference

-
-

CAFFOLDINGS)
-

Page 33
Contract Reference
-

-
-

Page 34
Contract Reference

Page 35
Contract Reference

-
-
-
-
-

Page 36
Contract Reference

NE ON SITE AND STEEL COIL)

-
Page 37
Contract Reference

Page 38
Contract Reference

Page 39
Contract Reference

Page 40
Contract Reference

WILL NOT BE ACCEPTED )


DED IN THE FINAL CONTRACT)

CONSUMABLES INLUDED IN THIS CONTRACT / BIDFORM


REBAR WORKS
a. G.I. Tie Wire #16

STRUCTURAL STEEL

a. Welding rod(WIPWELD 6011 OR NIHON WELD 6011)

b. Oxygen & LPG

c. Tig welding coil & shielding gas(ELECTRODE WIRE SS304)

ROOFING WORKS

a. Tekscrew
b. UV Resistant Silicon Sealant (ABC construction sealant or equivalent)
c. Duct Tape
PAINTING WORKS

a. Roller & Brush

b. Sandpaper & Masking Tape

c. Basahan & Newspaper

PLUMBING WORKS
a. PVC solvent cement & teflon tape(NELTEX)
ALL FORMWORKS; SHORINGS & SCAFFOLDINGS ARE CONSIDERED
CONSUMABLES
a. Nails ( CWN and Concrete Nails )

Page 41
Contract Reference

LDING #90 E.RODRIGUEZ JR. AVE., UGON NORTE LIBIS Q.C.


OWNER )

Page 42