Site ID 1102304
Site Name SUKAMENAK
BSC / RNC Area BSC_Bandung _2 / Huawei Bandung
BTS / Node B type 3900A / 3900A
Site Configuration □Single 2G □Single 3G √ Co-located 2G/3G /4G
Huawei Wireless Equipment □ 2G (3G Vendor ………..) □3G (2G Vendor……..……) √ 2G / 3G/4G
Subcontractor Company
Subcontractor Supervisor
Installation started date
Installation finished date
Type of Deployment
□Swap Site
√ New Deployment
The board can be plugged and unplugged smoothly. Its panel screws should have
5 appropriate tightness if they exist. √
The jumpers are properly connected according to the sector and master/diversity
6 relation, and are routed in a neat way. √
The cross RF jumper between the RFU which are in the same sector should be
√
7 installed perfectly.
The feeder cables should not have obvious bending and twisting and bare copper
2 appearance. √
The connector of feeder cable is made in a standard way without any loose
3 connection. √
The connection between antenna support and tower should be reliable and firm.
4 The connection between antenna and its support should also be reliable and firm. √
The azimuth and tilt angle of the installed antenna must accord with design
5 specifications. √
The labels of communication cables, feeder cables and jumper should be stuck
and tied according to specifications. The labels should be arranged in an orderly
9 √
way with same direction.
The jumper of the antenna should be tied along the rail of the support to the steel
10 frame of the power. √
11 Jumper cable must connect tightly with the connector of the board (RFU)
√
The labels of the antenna system can be easily identified. The color rings are
12 stuck correctly according to the requirements. √
3. Others
No Check content YES NO N/A
The installation tools accord with the antistatic requirements.
1 √
Check that all installation and packing materials have been removed from the site
2 √
The equipment room should be neatness and tidy. Discarded packing materials
3 should be cleaned. Spare parts should be arranged in a tidy way after installation. √
C. ELECTRICAL CHECK
Type of Deployment
√ New Deployment
□Module Expansion
□Existing Power Check
Remarks: If 2G and 3G is combine cabinet, the power check only applies to BTS Power Rack.
D. ANTENNA AND FEEDERS INFORMATION
Cell 0 40 70 2 2
Cell 1 40 180 2 2
Cell 2 40 300 2 2
* put checkmark if applicable
Feeder Length 50 50 50
Cell 0 40 80 2 2
Cell 1 40 180 2 2
Cell 2 40 300 2 2
* put checkmark if applicable
Feeder Length 50 50 50
E. SITE CLEANING
2. The rest of materials sent back to warehouse and inform person in charge. √
The site area/container keys should be available and secure.
3. √
F. HANDOVER DOCUMENTS
Yes No NA
√ □ □ Is the equipment inventory at the site in hard and soft copy?
(Attached with DN or PO)
G. CONCLUSION SUMMARY
Yes No NA
√ □ □ Does the inspection indicate that Commissioning can start?
H. FINAL DECISION
√ Accepted □Conditionally accepted □Rejected
Site ID 102304
Site Name SUKAMENAK
Severity
Item No.
Date to Date
Cosmetic
be Responsible
Description * Cleared** Supervisor
Minor
Major
cleared Group*
Approved by:
Name: Name:
Project Manager Operation Maintenance
Name:
Technical Branch Manager
PICTURE BTS
View Tower View Site