(ENGINEERING WORK) PHOTOMOUNT

Poject name 132KV D/C XLPE CABLE FROM 220/132/33 kV GIS SS ERRAGADDA TO PROPOSED 132/33 kV GIS SS NIMS - 3A
SECTION name JB # 3 ~ NIMS SS Length 1500 m Date 25.03.18 to 31.05.18

Name Trench Digging Name Rock cutting Name Rock cutting


Tricky Digging of Trench 2m width, 1.8m depth Tricky Tricky

Name Trench Digging Name Trench Digging Name Road Crossing Night Excavation
Panjagutta Model House beside Panjagutta Central beside Metro
Tricky Tricky Tricky Panjagutta Flyover Down side
Metro Pillar Pillar
(ENGINEERING WORK) PHOTOMOUNT
Poject name 132KV D/C XLPE CABLE FROM 220/132/33 kV GIS SS ERRAGADDA TO PROPOSED 132/33 kV GIS SS NIMS - 3A

SECTION name JB # 3 ~ NIMS SS Length 1500 m Date 25.03.18 to 31.05.18

Name Cable Drum Setting Name Cable Laying Name Cable Laying
Cable Passing HDD 80 Mtr Length at
Tricky Tricky The depth from ground level is 1.7m Tricky
Model house Panjagutta

Name Cable Laying Name Winch Machine Name Cable Laying


Cable Laying at Bajaj Electronics Joint Bay Area Winch Machine
Tricky Tricky Tricky Panjagutta Metro Station JB Area
Panjagutta Arrange
(ENGINEERING WORK) PHOTOMOUNT
Poject name 132KV D/C XLPE CABLE FROM 220/132/33 kV GIS SS ERRAGADDA TO PROPOSED 132/33 kV GIS SS NIMS - 3A
SECTION name JB # 3 ~ NIMS SS Length 1500 m Date 25.03.18 to 31.05.18

Name Horizontal Direction Drilling Name Road Crossing Arrange Name Road Crossing Arrange
Tricky HDD Arrange Model House Tricky 200mm HDPE Pipe with Concrete Tricky NIMS Hospital Area

Name Joint Bay PCC Arrange Name Pre Cast Joint Bay Cable Passing Name Road Crossing area Cable Passing
Tricky Model House, Panjagutta Tricky Panjagutta Metro Station Downside Tricky Panjagutta Metro Station U turn
(ENGINEERING WORK) PHOTOMOUNT
Poject name 132KV D/C XLPE CABLE FROM 220/132/33 kV GIS SS ERRAGADDA TO PROPOSED 132/33 kV GIS SS NIMS - 3A
SECTION name JB # 3 ~ NIMS SS Length 0 Date 25.03.18 to 31.05.18

Name Safety Barication Arrange Name Cable Laying Name Cable Laying
Tricky Panjagutta Metro Station area Tricky The depth from ground level is 1.7m Tricky Cable Passing NIMS Substation

Name Concrete Tile Name One foot back filling Name Completion
Tricky Concrete Tiles of size 850X300X50 Tricky After tiles Warning tape Arrange Tricky Backfilling completed upto ground level