AUPO UPO
Itanagar sub Division Itanagar sub Division
Dept of UD & Housing, Itanagar Dept of UD & Housing, Itanagar
ABSTRACT OF COST ( Dismantling)
ABSTRACT OF COST
(CPWD Code paragraph-81)
STATE: A.P Division:CCD
Branch: UD&H
a) Bituminous courses
cum 207 321.75 66602.25
AUPO UPO
Itanagar sub Division Itanagar sub Division
Dept of UD & Housing, Itanagar Dept of UD & Housing, Itanagar
ABSTRACT OF COST
(CPWD Code paragraph-81)
STATE: A.P Division:CCD
Branch: UD&H
AUPO UPO
Itanagar sub Division Itanagar sub Division
Dept of UD & Housing, Itanagar Dept of UD & Housing
Itanagar.
Details of Measurement
(CPWD Code paragraph-81)
STATE: Arunachal Pradesh Division:CCD
Branch: Urban Development & Housing
a) longitudinal bar ( 8mm dia. Hysd bar) 800 4.99 @ 0.395kg/M Kg 1576.84
b) transverse bar ( 8mm dia. Hysd bar) 1000 2.99 @ 0.395kg/M Kg 1181.05
c) Dowel Bar (20mm dia bar) 1980 0.45 @ 2.470kg/M Kg 2200.77
d) Tie bar(10mm) 220 0.3 @ 0.620kg/M Kg 40.92
total 4999.58
add 5% wastage 249.979
G/total 5249.56 Kg
Say 5.25 tonnes
5 Plain Cement Concrete shouldering 1:2:4 2 100 0.5 0.1 cum 10
AUPO UPO
Itanagar sub Division Itanagar sub Division
Dept of UD & Housing, Itanagar Dept of UD & Housing, Itanagar
Theoritical Consumption statement
Name of Work: NH52A to to Tourism office Via Election office Division: Itanagar
SH: RCC Road from NH 52A to Tourism office
Aggregate
Description of Qty. Cement Aggregate 20mm Sand
Sl. No. Unit 40mm
Items ececuted T.C Qty. T.C Qty. T.C Qty. T.C Qty.
1 Dry lean
concrete sub- 310.00 Cum 0.220 68.20 - - 0.24 74.40 0.470 145.70
base in 1:3:6
RCC pavement
2 600.00 Cum 0.400 240.00 - - 0.85 510.00 0.425 255.00
in 1:1.5:3 CC
PCC shouldering
3 216.00 Cum 0.320 69.12 - - 0.22 47.52 0.445 96.12
in 1:2:4
AUPO UPO
Itanagar sub Division Itanagar sub Division
Dept of UD & Housing, Itanagar Dept of UD & Housing, Itanagar
Carriage Analysis statement Anex.- I
Distance
Sub-head and cover(K Rate(Rs./
Sl No items of work Lead m) Quantity Unit unit/km Amount (in Rs.) Remarks
AUPO UPO
Itanagar sub Division Itanagar sub Division
Dept of UD & Housing, Itanagar Dept of UD & Housing, Itanagar
ABSTRACT OF COST
4 FoothPath with side ralling over cover slab 995m Rs. 3,478,606.53
Total Rs. 11,291,882.98
Add 3% contingencies Rs. 338,756.49
1%cess Rs. 112,918.83
4% VAT Rs. 451,675.32
G/Total Rs. 12,195,233.62
Say Rs. 11,300,000.00
UPO ASW
Itanagar sub Division Capital Complex Division
Dept of UD & Housing, Itanagar Dept of UD & Housing, Itanagar
DY. Director
Capital Complex Division
Dept of UD & Housing, Itanagar
ABSTRACT OF COST
(CPWD Code paragraph-81)
STATE: A.P Division:CCD
Branch: UD&H
AUPO UPO
Itanagar sub Division Itanagar sub Division
Dept of UD & Housing, Itanagar Dept of UD & Housing, Itanagar
Details of Measurement
(CPWD Code paragraph-81)
STATE: A.P Division:CCD
Branch: UD&H
Item
No particular of work No. length breath height unit quantity
1 Earth work in excavation in soils containing 50%
or more of shingle or small size boulders upto
30 cm size including banking in 20 cm layers
and breaking clods, ramming and dressing up
for the purpose of making embankments or
filling up ground depressions lead upto 50 m
and lift
upto 1.50 m.
1 10 1.1 0.5 cum 5.50
2
Providing and laying in foundations and plinth
cement concrete 1 : 5 : 10 (1 cement : 5 coarse
sand : 10 graded stone aggregate 40 mm
nominal size) excluding the cost of centring and
shuttering. 1 10 1 0.1 cum 1.00
3 Full Brick work with best available local bricks
in foundations and plinth in cement mortar 1:4
(1 cement : 4 fine sand). 2 10 0.23 0.5 cum 2.30
4 Reinforced 1 : 2:4cement concrete in
suspended floors, roofs, landings and balconies
upto floor two level including finishing and
plastering the exposed surface with cement
mortar 1 : 3 (1 cement : 3 fine sand) of
thickness not exceeding 6 mm to give a smooth
an
a)Drain cover slab 10 1.2 1 0.1 cum 1.20
ii) Transverse reinforcement bar( 8mm dia bar) 80 0.95 @ 0.395kg/M Kg 30.02
Total 61.82
Add 5% for wastage 3.09
G/total 126.73
6 12 mm cement plastering in 1:4CM
top of drain 2 10 0.23 - sqm 4.6
inside 2 10 - 0.55 sqm 11
bed of drain 1 10 0.4 - sqm 4
total 19.6
7 Neat cement punning
top of drain 2 10 0.23 - sqm 4.6
inside 2 10 - 0.55 sqm 11
bed of drain 1 10 0.4 - sqm 4
total 19.6
AUPO UPO
Itanagar sub Division Itanagar sub Division
Dept of UD & Housing, Itanagar Dept of UD & Housing, Itanagar
Theoritical Consumption statement
Name of work: C/o compound wall at childrens's park cum community centre at P-sector Itanagar Division: Itanagar
Descripti Cement Aggregate 40mm Aggregate 20mm Sand
Qty.
Sl. No. on of Unit
ececuted T.C Qty. T.C Qty. T.C Qty. T.C Qty.
Items
CC
1 80.00 Cum 0.130 10.40 0.65 52.00 - - 0.470 37.60
1:5:10
Full brick
2 work in 184.00 Cum 0.095 17.48 - - - - 0.267 49.13
1:4
RCC
3 work in 96.00 Cum 0.220 21.12 - - 0.24 23.04 0.470 45.12
1:2:4
12 mm
cement
6 plasterin 1568.00 sqm 0.05470 85.77 - - - - 0.030 47.04
g in
1:4CM
Neat
6 cement 1568.00 sqm 0.009 13.33 0.02 31.36 0.015 24.15
punning
Total 148.10 MT 52.00 Cum 54.40 Cum 203.04
AUPO UPO
Itanagar sub Division Itanagar sub Division
Dept of UD & Housing, Itanagar Dept of UD & Housing, Itanagar
Carriage Analysis statement Anex. II
Dista
nce
Sl Sub-head and cover Rate(Rs./u Amount (in
No items of work Lead (Km) Quantity Unit nit/km Rs.) Remarks
3 Aggregate
Up to 5.00km 1 52.00 cum 122.62 6376.24
40mm
( Lead 20Km ) 5.00to 10.00km 5 52.00 cum 9.99 2597.4
10.00to 20.00km 10 52.00 cum 8.44 4388.8
4 Aggregate
Up to 5.00km 1 54.40 cum 122.62 6670.53
20mm
( Lead 20Km ) 5.00to 10.00km 5 54.40 cum 9.99 2717.28
10.00to 20.00km 10 54.40 cum 8.44 4591.36
AUPO UPO
Itanagar sub Division Itanagar sub Division
Dept of UD & Housing, Itanagar Dept of UD & Housing, Itanagar
Details of Measurement
(CPWD Code paragraph-81)
STATE: A.P Division:CCD
Branch: UD&H
AUPO UPO
Itanagar sub Division Itanagar sub Division
Dept of UD & Housing, Itanagar Dept of UD & Housing, Itanagar
Abstract of cost
(CPWD Code paragraph-81)
STATE: A.P Division:CCD
Branch: UD&H
AUPO UPO
Itanagar sub Division Itanagar sub Division
Dept of UD & Housing, Itanagar Dept of UD & Housing, Itanagar
Theoritical Consumption statement
AUPO UPO
Itanagar sub Division Itanagar sub Division
Dept of UD & Housing, Itanagar Dept of UD & Housing, Itanagar
Carriage Analysis statement Anex. III
Name of Work: NH52A to to Tourism office Via Election office Division: Itanagar
SH: Road from NH52A to Tourism office( road side drain with cover)
Sub-head
and items of Distance Rate(Rs./uni
Sl No work Lead cover(Km) Quantity Unit t/km Amount (in Rs.) Remarks
3 Aggregate
Up to 5.00km 1 13.10 cum 122.62 1605.92
20mm
( Lead 20Km )
5.00to 10.00km 5
13.10 cum 9.99 654.18
10.00to 20.00km 10 13.10 cum 8.44 1105.36
AUPO UPO
Itanagar sub Division Itanagar sub Division
Dept of UD & Housing, Itanagar Dept of UD & Housing, Itanagar