WBS TASK

1 RCC Building 3 Storey


1.1 Pre Construction Documentation
1.1.1 Site visit and inspection
1.1.2 Contract
1.1.3 Estimation
1.1.4 Land Scaping
1.1.5 Designing and Approvals
1.2 Site Prepration
1.2.1 Site Clearing
1.2.1.1 Shrubs and Trees Removal
1.2.1.2 Thining
1.2.2 Earth Shaping
1.2.2.1 Grading
1.2.2.2 Layout
1.2.2.3 Excavation
1.3 Foundation
1.3.1 EXcavation
1.3.2 Concrete Foundation base
1.3.3 Foundation Brick Work
1.3.4 Plinth Beam
1.3.5 DPC
1.3.6 Sand Filling
1.4 Structure
1.4.1 Frame
1.4.1.1 Column
1.4.1.1.1For Ground Floor
1.4.1.1.2For G+1 Floor
1.4.1.2 Brick Work
1.4.1.2.1For Ground Floor
1.4.1.2.2For G+1 Floor
1.4.1.3 Slab
1.4.1.3.1For Ground Floor
1.4.1.3.2For G+1 Floor
1.4.2 Staircase
1.4.3 Walls & Barriers
1.4.3.1 Interior Partition Wall Brick Work (1 brick thick )
1.4.3.2 Outer house Wall Brick work (2 Brick thick )
1.4.3.3 Balcony walls & handrails
1.4.4 Lintel
1.4.4.1 For Ground Floor Doors & windows
1.4.4.2 For G+1 Floor Doors & windows
1.4.5 Roof
1.4.5.1 Install Shealthing
1.4.5.2 Lay Shingles
1.5 Finish Work
1.5.1 Interior
1.5.1.1 Walls
1.5.1.1.1Plastering
1.5.1.1.2Painting
1.5.1.1.3Wall boards
1.5.1.2 Ceiling
1.5.1.3 Floor
1.5.1.3.1Tiling
1.5.1.3.2Carpeting
1.5.2 Exterior
1.5.2.1 Roof
1.5.2.1.1Water Proof Membrane
1.5.2.1.2Insulation and Fill
1.5.2.2 Walls
1.5.2.2.1Painting
1.5.2.2.2Water Proof Insulation
1.6 Services
1.6.1 Plumbing
1.6.1.1 Sewer Pipes
1.6.1.2 Water Pipe Lines
1.6.2 Electrical
1.6.2.1 Wiring
1.6.2.2 Switch boards installation
1.6.2.3 Lighting
1.6.3 Saftey and Security
1.6.3.1 Fire Protection
1.6.3.2 Access Control
1.6.4 Gas Pipelines
1.6.5 Ventilation
1.6.5.1 Fans
1.6.5.2 HVAC
1.6.5.3 Air Conditioner
1.7 Close Out
1.7.1 Complete inspection
1.7.2 Handover