TABLE OF CONTENTS
Section Page
1. GENERAL
The purpose of this document is to provide load flow study in the RELOKASI DPPU
SUPADIO in Pontianak, Indonesia.
2. REFERENCE DOCUMENTS
This power load flow study is performed using computer software analysis program
ETAP 12.6.
1
4. CALCULATION
This plant is supplied from Grid PLN. All of Loads are energized.
5. SUMMARY OF STUDY
Result power flow and voltage drop can see in table below.
1
RELOKASI DPPU SUPADIO
PONTIANAK
ATTACHMENT-01
OVERALL SINGLE LINE DIAGRAM
One-Line Diagram - OLV1 (Load Flow Analysis)
GRID 20 KV
1 MVAsc
CB-M1
MV Switchgear 188 kW
20 kV 25 kvar 100%
188 kW
CB-M2 25 kvar DEG-1 DEG-2
120 kW 120 kW
T1
0,4 MVA
CBL-C CBL1-1 CBL1-2 CBL1-3 CBL1-4 CBL1-5 CBL1-6 CBL1-7 CBL2-1 CBL2-2 CBL2-3 CBL2-4 CBL2-5 CBL2-6 CBL2-7 CBL2-8 CBL2-9 CBL2-10 CBL2-11
CB1
CAP1
150 kvar
RP-102 SP-302 SLP-401 DP-501 MOV-02 DB-01 DB-04 WO-01 RP-101 SP-301 MOV-01 A-501 PS-01 BC-01 UPS-01 JP-701 DB-02 DB-03
11 kW 18,5 kW 7,5 kW 3 kW 0,56 kVA 15 kVA 20 kVA 5 kVA 11 kW 18,5 kW 0,56 kVA 1,1 kVA 25 kVA 3 kVA 15 kVA 15 kW 10 kVA 15 kVA
GRID 20 KV
1 MVAsc
CB-M1
MV SwitchgearOpen
20 kV
104 kW
52 kvar
T1
0,4 MVA
2 kW 14 kW 24 kW 0,25 kW 0,49 kW 22 kW 3 kW 13 kW 2 kW 9 kW 13 kW
1 kvar 8 kvar 12 kvar 0,12 kvar 0,24 kvar 11 kvar 1 kvar 6 kvar 1 kvar 4 kvar 6 kvar
CBL-C CBL1-1 CBL1-2 CBL1-3 CBL1-4 CBL1-5 CBL1-6 CBL1-7 CBL2-1 CBL2-2 CBL2-3 CBL2-4 CBL2-5 CBL2-6 CBL2-7 CBL2-8 CBL2-9 CBL2-10 CBL2-11
CB1
Open
CAP1
150 kvar
RP-102 SP-302 SLP-401 DP-501 MOV-02 DB-01 DB-04 WO-01 RP-101 SP-301 MOV-01 A-501 PS-01 BC-01 UPS-01 JP-701 DB-02 DB-03
11 kW 18,5 kW 7,5 kW 3 kW 0,56 kVA 15 kVA 20 kVA 5 kVA 11 kW 18,5 kW 0,56 kVA 1,1 kVA 25 kVA 3 kVA 15 kVA 15 kW 10 kVA 15 kVA
ATTACHMENT-02
LOAD FLOW STUDY REPORT
Project: DPPU
ETAP Page: 1
12.6.0H
Location: Pontianak Date: 18-09-2016
Contract: SN: IPM
Engineer: GIL Revision: Base
Study Case: LF
Filename: DPPU_ETAP Config.: Normal
Number of Buses: 1 0 2 3
Number of Branches: 1 0 0 0 0 1 2
Adjustments
Apply Individual
Tolerance Adjustments /Global Percent
Cable Length: No
Apply Individual
Temperature Correction Adjustments /Global Degree C
Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic
Total Number of Buses: 3 0.091 0.049 0.098 -0.028 0.000 0.000 0.000 0.000
0.000 0.000
Project: DPPU
ETAP Page: 4
12.6.0H
Location: Pontianak Date: 18-09-2016
Contract: SN: IPM
Engineer: GIL Revision: Base
Study Case: LF
Filename: DPPU_ETAP Config.: Normal
Branch Connections
MCC-E 0.380 98.760 -0.8 0 0 0.105 0.053 MCC-N -0.105 -0.053 180.8 89.3
MCC-N 0.380 98.760 -0.8 0 0 0.081 -0.031 MV Switchgear -0.186 -0.022 288.1 99.3
MCC-E 0.105 0.053 180.8 89.3
* MV Switchgear 20.000 100.000 0.0 0.188 0.025 0 0 MCC-N 0.188 0.025 5.5 99.1
* Indicates a voltage regulated bus (voltage controlled or swing type machine connected to it)
# Indicates a bus with a load mismatch of more than 0.1 MVA
Project: DPPU
ETAP Page: 7
12.6.0H
Location: Pontianak Date: 18-09-2016
Contract: SN: IPM
Engineer: GIL Revision: Base
Study Case: LF
Filename: DPPU_ETAP Config.: Normal
* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).
# Indicates operating load of a bus exceeds the bus marginal limit ( 95.0% of the Continuous Ampere rating).
Project: DPPU
ETAP Page: 8
12.6.0H
Location: Pontianak Date: 18-09-2016
Contract: SN: IPM
Engineer: GIL Revision: Base
Study Case: LF
Filename: DPPU_ETAP Config.: Normal
Transformer
CKT / Branch Cable & Reactor
Ampacity Loading Capability Loading (input) Loading (output)
ID Type (Amp) Amp % (MVA) MVA % MVA %
Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag
2.0 3.0
Project: DPPU
ETAP Page: 10
12.6.0H
Location: Pontianak Date: 18-09-2016
Contract: SN: IPM
Engineer: GIL Revision: Base
Study Case: LF
Filename: DPPU_ETAP Config.: Normal
% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0
Cable 100.0 95.0
Reactor 100.0 95.0
Line 100.0 95.0
Transformer 100.0 95.0
Panel 100.0 95.0
Protective Device 100.0 95.0
Generator 100.0 95.0
Inverter/Charger 100.0 95.0
Bus Voltage
OverVoltage 105.0 102.0
UnderVoltage 95.0 97.0
Generator Excitation
OverExcited (Q Max.) 100.0 95.0
UnderExcited (Q Min.) 100.0
Project: DPPU
ETAP Page: 11
12.6.0H
Location: Pontianak Date: 18-09-2016
Contract: SN: IPM
Engineer: GIL Revision: Base
Study Case: LF
Filename: DPPU_ETAP Config.: Normal
MW Mvar MVA % PF
Number of Iterations: 1
Project: DPPU
ETAP Page: 1
12.6.0H
Location: Pontianak Date: 18-09-2016
Contract: SN: IPM
Engineer: GIL Revision: Base
Study Case: LF
Filename: DPPU_ETAP Config.: Emergency
Number of Buses: 1 0 1 2
Number of Branches: 0 0 0 1 0 0 1
Adjustments
Apply Individual
Tolerance Adjustments /Global Percent
Cable Length: No
Apply Individual
Temperature Correction Adjustments /Global Degree C
Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic
Total Number of Buses: 2 0.040 0.021 0.064 0.031 0.000 0.000 0.000 0.000
0.000 0.000
Project: DPPU
ETAP Page: 4
12.6.0H
Location: Pontianak Date: 18-09-2016
Contract: SN: IPM
Engineer: GIL Revision: Base
Study Case: LF
Filename: DPPU_ETAP Config.: Emergency
Branch Connections
* Bus1 0.380 100.000 0.0 0.104 0.052 0 0 MCC-E 0.104 0.052 177.2 89.4
MCC-E 0.380 99.274 0.0 0 0 0.103 0.052 Bus1 -0.103 -0.052 177.2 89.3
* Indicates a voltage regulated bus (voltage controlled or swing type machine connected to it)
# Indicates a bus with a load mismatch of more than 0.1 MVA
Project: DPPU
ETAP Page: 7
12.6.0H
Location: Pontianak Date: 18-09-2016
Contract: SN: IPM
Engineer: GIL Revision: Base
Study Case: LF
Filename: DPPU_ETAP Config.: Emergency
* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).
# Indicates operating load of a bus exceeds the bus marginal limit ( 95.0% of the Continuous Ampere rating).
Project: DPPU
ETAP Page: 8
12.6.0H
Location: Pontianak Date: 18-09-2016
Contract: SN: IPM
Engineer: GIL Revision: Base
Study Case: LF
Filename: DPPU_ETAP Config.: Emergency
Project: DPPU
ETAP Page: 9
12.6.0H
Location: Pontianak Date: 18-09-2016
Contract: SN: IPM
Engineer: GIL Revision: Base
Study Case: LF
Filename: DPPU_ETAP Config.: Emergency
Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag
Cable1 0.104 0.052 -0.103 -0.052 0.8 0.3 100.0 99.3 0.73
0.8 0.3
Project: DPPU
ETAP Page: 10
12.6.0H
Location: Pontianak Date: 18-09-2016
Contract: SN: IPM
Engineer: GIL Revision: Base
Study Case: LF
Filename: DPPU_ETAP Config.: Emergency
% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0
Cable 100.0 95.0
Reactor 100.0 95.0
Line 100.0 95.0
Transformer 100.0 95.0
Panel 100.0 95.0
Protective Device 100.0 95.0
Generator 100.0 95.0
Inverter/Charger 100.0 95.0
Bus Voltage
OverVoltage 105.0 102.0
UnderVoltage 95.0 97.0
Generator Excitation
OverExcited (Q Max.) 100.0 95.0
UnderExcited (Q Min.) 100.0
Project: DPPU
ETAP Page: 11
12.6.0H
Location: Pontianak Date: 18-09-2016
Contract: SN: IPM
Engineer: GIL Revision: Base
Study Case: LF
Filename: DPPU_ETAP Config.: Emergency
MW Mvar MVA % PF
Number of Iterations: 1