RELOKASI DPPU SUPADIO

PONTIANAK

NO. DOK Rev. : 1


LOAD FLOW STUDY
SPD-CAL-003-105 1 dari 5

PROYEK : RELOKASI DPPU SUPADIO

LOKASI : PONTIANAK – KALIMANTAN BARAT

PEMILIK : PT PERTAMINA (PERSERO) – DIREKTORAT

PEMASARAN

KONTRAKTOR : PT. INDRABAS PURNAMA MAKMUR


 
 
 
 
 
 
 
 
 
 
 
 
 
 

1 19 SEPT 16 For Approval


0 18 JULY 16 For Review
DIBUAT DIPERIKSA DISETUJUI
REV. TGL URAIAN
PT INDRABAS PURNAMA MAKMUR
RELOKASI DPPU SUPADIO
PONTIANAK

NO. DOK Rev. : 1


LOAD FLOW STUDY
SPD-CAL-003-105 2 dari 5

 
 
KONTROL REVISI

Rev  Tanggal  Uraian 


0 18 JULY 16 For Review

1 19 SEPTEMBER 16 For Approval

     

     

     

     

     

     

     

     

 
 
 
 
 
 
RELOKASI DPPU SUPADIO
PONTIANAK

NO. DOK Rev. : 1


LOAD FLOW STUDY
SPD-CAL-003-105 3 dari 5

TABLE OF CONTENTS

Section Page

1.  GENERAL ........................................................................................................................ 4 

2.  REFERENCE DOCUMENTS ........................................................................................ 4 

3.  SYSTEM ANALYSIS SOFTWARE .............................................................................. 4 

4.  CALCULATION ............................................................................................................... 4 

5.  SUMMARY OF STUDY.................................................................................................. 5 


RELOKASI DPPU SUPADIO
PONTIANAK

NO. DOK Rev. : 1


LOAD FLOW STUDY
SPD-CAL-003-105 4 dari 5

1. GENERAL

The purpose of this document is to provide load flow study in the RELOKASI DPPU
SUPADIO in Pontianak, Indonesia.

2. REFERENCE DOCUMENTS

Load flow study shall refer to:


a. Electrical Load Data Calculation SPD-CAL-003-104
b. Overall Single Line Diagram SPD-DWG-003-001-A3
c. Electrical Load Summary List SPD-LST-003-001

3. SYSTEM ANALYSIS SOFTWARE

This power load flow study is performed using computer software analysis program
ETAP 12.6.
1

4. CALCULATION

4.1 Calculation Method

The calculation is using load flow analysis which is based on Newton-Raphson


methodology. Load Flow Analysis calculates the bus voltages, branch power factors,
currents, and power flows throughout the electrical system, during steady state
condition.

4.2 Calculation Basis


1

The following are cases for Electrical system:

1) Case-1 (Normal Operation)

This plant is supplied from Grid PLN. All of Loads are energized.

2) Case-2 (Emergency Operation)

This Plant is supplied from Emergency Diesel Generator (redundant). Only


Emergency Loads are running.

The calculation is based on the electrical system shown in Attachment-2.


RELOKASI DPPU SUPADIO
PONTIANAK

NO. DOK Rev. : 1


LOAD FLOW STUDY
SPD-CAL-003-105 5 dari 5

5. SUMMARY OF STUDY

Result power flow and voltage drop can see in table below.

Table 1. Power Flow Summary

Case-1 (Normal) Case-2 (Emergency)


Equipment/Bus
Section V V
kW kVar A PF(%) kW kVar A PF(%)
Bus(%) Bus(%)
MV Switchgear 188 25 5.5 99.1 100.00 - - - - -
MCC Normal 186 22 288.1 99.3 98.76 - - - - -
MCC Emergency 105 53 180.8 89.3 98.76 103 52 177.2 89.3 99.27
EDG-1 - - - - - 104 52 177.2 89.4 100.00

Table 2. Voltage Drop Summary


Power Flow Case-1 Case-2
Voltage (kV)
From To Voltage Drop (%) Voltage Drop (%)
0.38 MV Switchgear MCC Normal 1.24 -
0.38 MV Switchgear MCC Emergency 1.24 -
0.38 EDG-1 MCC Emergency - 0.73

1
RELOKASI DPPU SUPADIO
PONTIANAK

NO. DOK Rev. : 1


LOAD FLOW STUDY
SPD-CAL-003-105 6 dari 7

ATTACHMENT-01
OVERALL SINGLE LINE DIAGRAM
One-Line Diagram - OLV1 (Load Flow Analysis)

GRID 20 KV
1 MVAsc

CB-M1
MV Switchgear 188 kW
20 kV 25 kvar 100%

188 kW
CB-M2 25 kvar DEG-1 DEG-2
120 kW 120 kW

T1
0,4 MVA

CB-L1 CB-L2 CB-L3


Open Open
MCC-N MCC-E
6% 6%
0,38 kV 98,7 0,38 kV 98,7

0 kW 14 kW 24 kW 10 kW 2 kW 0,25 kW 13 kW 18 kW 105 kW 4 kW 14 kW 24 kW 0,25 kW 0,49 kW 22 kW 3 kW 13 kW 2 kW 9 kW 13 kW


73 kvar 8 kvar 12 kvar 6 kvar 1 kvar 0,12 kvar 6 kvar 9 kvar 53 kvar 2 kvar 8 kvar 12 kvar 0,12 kvar 0,24 kvar 11 kvar 1 kvar 6 kvar 1 kvar 4 kvar 6 kvar

CBL-C CBL1-1 CBL1-2 CBL1-3 CBL1-4 CBL1-5 CBL1-6 CBL1-7 CBL2-1 CBL2-2 CBL2-3 CBL2-4 CBL2-5 CBL2-6 CBL2-7 CBL2-8 CBL2-9 CBL2-10 CBL2-11

CB1

CAP1
150 kvar
RP-102 SP-302 SLP-401 DP-501 MOV-02 DB-01 DB-04 WO-01 RP-101 SP-301 MOV-01 A-501 PS-01 BC-01 UPS-01 JP-701 DB-02 DB-03
11 kW 18,5 kW 7,5 kW 3 kW 0,56 kVA 15 kVA 20 kVA 5 kVA 11 kW 18,5 kW 0,56 kVA 1,1 kVA 25 kVA 3 kVA 15 kVA 15 kW 10 kVA 15 kVA

page 1 23:02:52 Sep 18, 2016 Project File: DPPU_ETAP


One-Line Diagram - OLV1 (Load Flow Analysis)

GRID 20 KV
1 MVAsc

CB-M1
MV SwitchgearOpen
20 kV

CB-M2 DEG-1 DEG-2


Open 120 kW 120 kW

104 kW
52 kvar
T1
0,4 MVA

CB-L1 CB-L2 CB-L3


Open Open
MCC-N MCC-E 103 kW 7%
0,38 kV 0,38 kV 52 kvar 99,2

2 kW 14 kW 24 kW 0,25 kW 0,49 kW 22 kW 3 kW 13 kW 2 kW 9 kW 13 kW
1 kvar 8 kvar 12 kvar 0,12 kvar 0,24 kvar 11 kvar 1 kvar 6 kvar 1 kvar 4 kvar 6 kvar

CBL-C CBL1-1 CBL1-2 CBL1-3 CBL1-4 CBL1-5 CBL1-6 CBL1-7 CBL2-1 CBL2-2 CBL2-3 CBL2-4 CBL2-5 CBL2-6 CBL2-7 CBL2-8 CBL2-9 CBL2-10 CBL2-11

CB1
Open

CAP1
150 kvar
RP-102 SP-302 SLP-401 DP-501 MOV-02 DB-01 DB-04 WO-01 RP-101 SP-301 MOV-01 A-501 PS-01 BC-01 UPS-01 JP-701 DB-02 DB-03
11 kW 18,5 kW 7,5 kW 3 kW 0,56 kVA 15 kVA 20 kVA 5 kVA 11 kW 18,5 kW 0,56 kVA 1,1 kVA 25 kVA 3 kVA 15 kVA 15 kW 10 kVA 15 kVA

page 1 23:09:08 Sep 18, 2016 Project File: DPPU_ETAP


RELOKASI DPPU SUPADIO
PONTIANAK

NO. DOK Rev. : 1


LOAD FLOW STUDY
SPD-CAL-003-105 7 dari 7

ATTACHMENT-02
LOAD FLOW STUDY REPORT
Project: DPPU
ETAP Page: 1
12.6.0H
Location: Pontianak Date: 18-09-2016
Contract: SN: IPM
Engineer: GIL Revision: Base
Study Case: LF
Filename: DPPU_ETAP Config.: Normal

Electrical Transient Analyzer Program

Load Flow Analysis

Loading Category (1): Design

Generation Category (1): Design

Load Diversity Factor: None

Swing V-Control Load Total

Number of Buses: 1 0 2 3

XFMR2 XFMR3 Reactor Line/Cable Impedance Tie PD Total

Number of Branches: 1 0 0 0 0 1 2

Method of Solution: Adaptive Newton-Raphson Method

Maximum No. of Iteration: 99

Precision of Solution: 0.0001000

System Frequency: 50.00 Hz

Unit System: Metric

Project Filename: DPPU_ETAP

Output Filename: D:\06. DPPU\04. Calculation\05. LOAD FLOW STUDY\00. ETAP\LF.lfr


Project: DPPU
ETAP Page: 2
12.6.0H
Location: Pontianak Date: 18-09-2016
Contract: SN: IPM
Engineer: GIL Revision: Base
Study Case: LF
Filename: DPPU_ETAP Config.: Normal

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Individual

Cable Resistance: Yes Individual


Project: DPPU
ETAP Page: 3
12.6.0H
Location: Pontianak Date: 18-09-2016
Contract: SN: IPM
Engineer: GIL Revision: Base
Study Case: LF
Filename: DPPU_ETAP Config.: Normal

Bus Input Data

Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

MCC-E 0.380 1 100.0 0.0 0.040 0.021 0.066 0.032

MCC-N 0.380 1 100.0 0.0 0.050 0.027 0.032 -0.060

MV Switchgear 20.000 1 100.0 0.0

Total Number of Buses: 3 0.091 0.049 0.098 -0.028 0.000 0.000 0.000 0.000

Generation Bus Voltage Generation Mvar Limits


ID kV Type Sub-sys % Mag. Angle MW Mvar % PF Max Min

MV Switchgear 20.000 Swing 1 100.0 0.0

0.000 0.000
Project: DPPU
ETAP Page: 4
12.6.0H
Location: Pontianak Date: 18-09-2016
Contract: SN: IPM
Engineer: GIL Revision: Base
Study Case: LF
Filename: DPPU_ETAP Config.: Normal

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift


ID Phase MVA Prim. kV Sec. kV % Z1 X1/R1 + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

T1 3-Phase 0.400 20.000 0.380 4.00 1.50 0 0 0 0 0 4.0000 Dy 0.000


Project: DPPU
ETAP Page: 5
12.6.0H
Location: Pontianak Date: 18-09-2016
Contract: SN: IPM
Engineer: GIL Revision: Base
Study Case: LF
Filename: DPPU_ETAP Config.: Normal

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

T1 2W XFMR MV Switchgear MCC-N 554.70 832.05 1000.00

CB1 Tie Breakr MCC-N MCC-E


Project: DPPU
ETAP Page: 6
12.6.0H
Location: Pontianak Date: 18-09-2016
Contract: SN: IPM
Engineer: GIL Revision: Base
Study Case: LF
Filename: DPPU_ETAP Config.: Normal

LOAD FLOW REPORT

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

MCC-E 0.380 98.760 -0.8 0 0 0.105 0.053 MCC-N -0.105 -0.053 180.8 89.3
MCC-N 0.380 98.760 -0.8 0 0 0.081 -0.031 MV Switchgear -0.186 -0.022 288.1 99.3
MCC-E 0.105 0.053 180.8 89.3
* MV Switchgear 20.000 100.000 0.0 0.188 0.025 0 0 MCC-N 0.188 0.025 5.5 99.1

* Indicates a voltage regulated bus (voltage controlled or swing type machine connected to it)
# Indicates a bus with a load mismatch of more than 0.1 MVA
Project: DPPU
ETAP Page: 7
12.6.0H
Location: Pontianak Date: 18-09-2016
Contract: SN: IPM
Engineer: GIL Revision: Base
Study Case: LF
Filename: DPPU_ETAP Config.: Normal

Bus Loading Summary Report

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

MCC-E 0.380 0.040 0.021 0.065 0.031 0 0 0 0 0.117 89.3 180.8


MCC-N 0.380 0.050 0.027 0.031 -0.058 0 0 0 0 0.209 89.0 321.4
MV Switchgear 20.000 0 0 0 0 0 0 0 0 0.190 99.1 5.5

* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).
# Indicates operating load of a bus exceeds the bus marginal limit ( 95.0% of the Continuous Ampere rating).
Project: DPPU
ETAP Page: 8
12.6.0H
Location: Pontianak Date: 18-09-2016
Contract: SN: IPM
Engineer: GIL Revision: Base
Study Case: LF
Filename: DPPU_ETAP Config.: Normal

Branch Loading Summary Report

Transformer
CKT / Branch Cable & Reactor
Ampacity Loading Capability Loading (input) Loading (output)
ID Type (Amp) Amp % (MVA) MVA % MVA %

T1 Transformer 0.400 0.190 47.4 0.187 46.8

* Indicates a branch with operating load exceeding the branch capability.


Project: DPPU
ETAP Page: 9
12.6.0H
Location: Pontianak Date: 18-09-2016
Contract: SN: IPM
Engineer: GIL Revision: Base
Study Case: LF
Filename: DPPU_ETAP Config.: Normal

Branch Losses Summary Report

Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag

T1 -0.186 -0.022 0.188 0.025 2.0 3.0 98.8 100.0 1.24

2.0 3.0
Project: DPPU
ETAP Page: 10
12.6.0H
Location: Pontianak Date: 18-09-2016
Contract: SN: IPM
Engineer: GIL Revision: Base
Study Case: LF
Filename: DPPU_ETAP Config.: Normal

Alert Summary Report

% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0
Cable 100.0 95.0
Reactor 100.0 95.0
Line 100.0 95.0
Transformer 100.0 95.0
Panel 100.0 95.0
Protective Device 100.0 95.0
Generator 100.0 95.0
Inverter/Charger 100.0 95.0

Bus Voltage
OverVoltage 105.0 102.0
UnderVoltage 95.0 97.0

Generator Excitation
OverExcited (Q Max.) 100.0 95.0
UnderExcited (Q Min.) 100.0
Project: DPPU
ETAP Page: 11
12.6.0H
Location: Pontianak Date: 18-09-2016
Contract: SN: IPM
Engineer: GIL Revision: Base
Study Case: LF
Filename: DPPU_ETAP Config.: Normal

SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

MW Mvar MVA % PF

Source (Swing Buses): 0.188 0.025 0.190 99.13 Lagging

Source (Non-Swing Buses): 0.000 0.000 0.000

Total Demand: 0.188 0.025 0.190 99.13 Lagging

Total Motor Load: 0.091 0.049 0.103 87.99 Lagging

Total Static Load: 0.095 -0.027 0.099 96.23 Leading

Total Constant I Load: 0.000 0.000 0.000

Total Generic Load: 0.000 0.000 0.000

Apparent Losses: 0.002 0.003

System Mismatch: 0.000 0.000

Number of Iterations: 1
Project: DPPU
ETAP Page: 1
12.6.0H
Location: Pontianak Date: 18-09-2016
Contract: SN: IPM
Engineer: GIL Revision: Base
Study Case: LF
Filename: DPPU_ETAP Config.: Emergency

Electrical Transient Analyzer Program

Load Flow Analysis

Loading Category (1): Design

Generation Category (1): Design

Load Diversity Factor: None

Swing V-Control Load Total

Number of Buses: 1 0 1 2

XFMR2 XFMR3 Reactor Line/Cable Impedance Tie PD Total

Number of Branches: 0 0 0 1 0 0 1

Method of Solution: Adaptive Newton-Raphson Method

Maximum No. of Iteration: 99

Precision of Solution: 0.0001000

System Frequency: 50.00 Hz

Unit System: Metric

Project Filename: DPPU_ETAP

Output Filename: D:\06. DPPU\04. Calculation\05. LOAD FLOW STUDY\00. ETAP\LF.lfr


Project: DPPU
ETAP Page: 2
12.6.0H
Location: Pontianak Date: 18-09-2016
Contract: SN: IPM
Engineer: GIL Revision: Base
Study Case: LF
Filename: DPPU_ETAP Config.: Emergency

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Individual

Cable Resistance: Yes Individual


Project: DPPU
ETAP Page: 3
12.6.0H
Location: Pontianak Date: 18-09-2016
Contract: SN: IPM
Engineer: GIL Revision: Base
Study Case: LF
Filename: DPPU_ETAP Config.: Emergency

Bus Input Data

Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

Bus1 0.380 2 100.0 0.0

MCC-E 0.380 2 100.0 0.0 0.040 0.021 0.064 0.031

Total Number of Buses: 2 0.040 0.021 0.064 0.031 0.000 0.000 0.000 0.000

Generation Bus Voltage Generation Mvar Limits


ID kV Type Sub-sys % Mag. Angle MW Mvar % PF Max Min

Bus1 0.380 Swing 2 100.0 0.0

0.000 0.000
Project: DPPU
ETAP Page: 4
12.6.0H
Location: Pontianak Date: 18-09-2016
Contract: SN: IPM
Engineer: GIL Revision: Base
Study Case: LF
Filename: DPPU_ETAP Config.: Emergency

Line/Cable Input Data

Ohms or Siemens/1000 m per Conductor (Cable) or per Phase (Line)


Line/Cable Length

ID Library Size Adj. (m) % Tol. #/Phase T (C) R X Y

Cable1 1,0NCUN4 120 45.0 0.0 1 75 0.186940 0.073000 0.0001499

Line / Cable resistances are listed at the specified temperatures.


Project: DPPU
ETAP Page: 5
12.6.0H
Location: Pontianak Date: 18-09-2016
Contract: SN: IPM
Engineer: GIL Revision: Base
Study Case: LF
Filename: DPPU_ETAP Config.: Emergency

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

Cable1 Cable Bus1 MCC-E 582.57 227.49 625.41 0.0000010


Project: DPPU
ETAP Page: 6
12.6.0H
Location: Pontianak Date: 18-09-2016
Contract: SN: IPM
Engineer: GIL Revision: Base
Study Case: LF
Filename: DPPU_ETAP Config.: Emergency

LOAD FLOW REPORT

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

* Bus1 0.380 100.000 0.0 0.104 0.052 0 0 MCC-E 0.104 0.052 177.2 89.4
MCC-E 0.380 99.274 0.0 0 0 0.103 0.052 Bus1 -0.103 -0.052 177.2 89.3

* Indicates a voltage regulated bus (voltage controlled or swing type machine connected to it)
# Indicates a bus with a load mismatch of more than 0.1 MVA
Project: DPPU
ETAP Page: 7
12.6.0H
Location: Pontianak Date: 18-09-2016
Contract: SN: IPM
Engineer: GIL Revision: Base
Study Case: LF
Filename: DPPU_ETAP Config.: Emergency

Bus Loading Summary Report

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

Bus1 0.380 0 0 0 0 0 0 0 0 0.117 89.4 177.2


MCC-E 0.380 0.040 0.021 0.063 0.031 0 0 0 0 0.116 89.3 177.2

* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).
# Indicates operating load of a bus exceeds the bus marginal limit ( 95.0% of the Continuous Ampere rating).
Project: DPPU
ETAP Page: 8
12.6.0H
Location: Pontianak Date: 18-09-2016
Contract: SN: IPM
Engineer: GIL Revision: Base
Study Case: LF
Filename: DPPU_ETAP Config.: Emergency
Project: DPPU
ETAP Page: 9
12.6.0H
Location: Pontianak Date: 18-09-2016
Contract: SN: IPM
Engineer: GIL Revision: Base
Study Case: LF
Filename: DPPU_ETAP Config.: Emergency

Branch Losses Summary Report

Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag

Cable1 0.104 0.052 -0.103 -0.052 0.8 0.3 100.0 99.3 0.73

0.8 0.3
Project: DPPU
ETAP Page: 10
12.6.0H
Location: Pontianak Date: 18-09-2016
Contract: SN: IPM
Engineer: GIL Revision: Base
Study Case: LF
Filename: DPPU_ETAP Config.: Emergency

Alert Summary Report

% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0
Cable 100.0 95.0
Reactor 100.0 95.0
Line 100.0 95.0
Transformer 100.0 95.0
Panel 100.0 95.0
Protective Device 100.0 95.0
Generator 100.0 95.0
Inverter/Charger 100.0 95.0

Bus Voltage
OverVoltage 105.0 102.0
UnderVoltage 95.0 97.0

Generator Excitation
OverExcited (Q Max.) 100.0 95.0
UnderExcited (Q Min.) 100.0
Project: DPPU
ETAP Page: 11
12.6.0H
Location: Pontianak Date: 18-09-2016
Contract: SN: IPM
Engineer: GIL Revision: Base
Study Case: LF
Filename: DPPU_ETAP Config.: Emergency

SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

MW Mvar MVA % PF

Source (Swing Buses): 0.104 0.052 0.117 89.36 Lagging

Source (Non-Swing Buses): 0.000 0.000 0.000

Total Demand: 0.104 0.052 0.117 89.36 Lagging

Total Motor Load: 0.040 0.021 0.046 88.25 Lagging

Total Static Load: 0.063 0.031 0.070 90.00 Lagging

Total Constant I Load: 0.000 0.000 0.000

Total Generic Load: 0.000 0.000 0.000

Apparent Losses: 0.001 0.000

System Mismatch: 0.000 0.000