Consultant:
KHANNA DESIGNERS & CONSULTANTS PVT.LTD.
413, EROS City Square, Sector 49
Gurugram-122018, Haryana
M:9873858396 O: +91 124-4277519
SUMMARY FOR DESIGN DISCHARGE CAPACITY OF BOX CULVERTS
Qc > Qd, Hence, Sufficient culverts have been provided for the catchment.
DICKEN METHOD
Assuming the water flows at about 2.5 cm above the level of the crown at the entry of culvert, the operating head H =
0.025 + 1% of 37 m (length of the culvert) = 0.395 m
Q = A x 4.43 x (H/1+Ke+Kf)1/2 (Eqn. 19.5, IRC :SP:13-2004)
Ke = 0.572 R0.3 (Table 19.1, IRC SP:13-2004)
Kf = 0.00335 x L/R1.25 (Table 19.1, IRC SP:13-2004)
N = No. of cell
L = Length of the culvert
D = Depth of the Box Culvert
R = Hydraulic mean radius = A/P
A = Cross-sectional area of box culvert
P = Wetted perimeter
H = Water head at entry
W = Width of box culvert
1 x 5 x 3.911
N= 1
W= 5.0 m
D= 3.9 m
L= 37.0 m
H= 0.395 m
P= 12.82 m
A= 19.56 m2
R = A/P = 1.53
Ke = 0.65
Kf = 0.07
Q= 41.49 m3 / sec
Check; If Qd < Q = OK
Hence, OK. Sufficient culverts have been provided for the catchment.
CATCHMENT AREA