SAMPURNA MAS GEOLOGICAL DRILLING LOG Bore Hole No. BH.07
Project : Dermaga PT. Sampoerna Drilling Method : Rotary Bor Machine : Kano II Bor Master : Agus Adiwijaya
Location : Falabisahaya Inclination : Vertical Start : 22 Okt 2019 Log by : Eko Budi
Mangole Utara
Coordinate : X = Depth : 53.00 m Finish : 28 Okt 2019 Checked by : Ma. Akbar Jamil
Y = Elevation :+ m GWL :- Approved by :

Core Ø and Type Barrel


Core Recovery Drilling Fluida Coeficient SPT

Cassing Insered & Ø


Geological Unit
of

Log Lithology

Core Length (cm)


Depth (m)

Depth (m)
Cutting Materias
Not Recovered

RQD (%)

blows / 30 cm
Weather

GWL Permeabilty Graph

Progress (cm)
Date

N Value
DESCRIPTION

Cutting
(cm/sec) (N Value)

Loss (%)
Core

Colour
Graphic

10-2
10-4
10-6
10-8

10
20
30
40
50
0 0
"Top Soil" Karang pecah-pecah, pasir, kerikil, 100 95
1 lanauann, abu-abu 1
3 5 SPT 6
Karang, Pasir, Kerikil, Lanau, Abu-abu
2 2
95 95
3 3 1
Kerikil, Kerakal, Lanauan, Abu-abu 5 5 SPT
4 100 95 4
50 50 UDS
5 5 1
5 SPT

6 50 94 6
22- 23 Oktober 2019

7 5 6 SPT 7 1
Cerah

Lempung, Karang, Abu-abu


8 100 97 8

9 50 50 UDS 9 1
5 3 SPT
10 10
95 95
11 5 6 SPT 11 2

12 100 97 12

13 50 50 DS 13
5 4 SPT
4
Karang pecah-pecah, Lanauan, Abu-abu
14 14
100 97
15 15 7
5 4 SPT
16 16
Karang, Lanauan, Abu-abu 50 95
17 50 50 UDS 17 1
5 5 SPT
18 18
100 80
19 5 2 SPT 19 9

21 m - Ø 89 mm - NW
20 95 95 20

10
24 Oktober 2019

21 5 5 SPT 21
Karang, Lempung, abu-abu
100 93
Cerah

22 Ø 73 mm - SINGLE TUBE CORE BARREL 22


50 50 DS
23 5 5 SPT 23 8

24 95 95 24

25 5 7 SPT 25 8
26 95 95 26

27 5 7 SPT
27
7
100 100
28 28
Karang, Lempung, Pasiran, abu-abu
100 95
29 29 10
25 Oktober 2019

5 5 SPT

30 30
Cerah

97 97
31 3 3 SPT 31 11
32 100 100 32
Lempung, Lanau, Sedikit kulit kerang, Abu-abu
33 50 50 DS 33 15
4 4 SPT
34 34
96 96
35 35 18
4 4 SPT

36 36
26 Oktober 2019

50 50
37 50 50 DS
Cerah

37 17
4 4 SPT

38 38
Lempung, Lanauan, Abu-abu 96 96
39 39 20
4 4 SPT

40 40
97 97
41 3 3 SPT 41 16

42 97 65 42
27 Oktober 2019

43 43 30
Cerah

3 35 SPT

44 44
97 97
45 3 3 SPT 45 32

46 46
100 82
47 47 30
4 18 SPT

48 48
97 97
> 60
28 Oktober 2019

49 3 3 SPT
49
Cerah

50 95 95 50
Batu Lempung, Abu-abu (SW - MW)
51 5 5 SPT
51 > 60

52 97 97 52
END OF HOLE 3 3 SPT > 60
53 53
Sheet : 1 - 2

PT. CAHAYA
SAMPURNA MAS GEOLOGICAL DRILLING LOG Bore Hole No. BH.06
Project : Dermaga PT. Sampoerna Drilling Method : Rotary Bor Machine : Kano II Bor Master : Agus Adiwijaya
Location : Falabisahaya Inclination : Vertical Start : 30 Nov 2019 Log by : Eko Budi
Mangole Utara
Coordinate : X = 775783 Depth : 53.00 m Finish : 4 Okt 2019 Checked by : Ma. Akbar Jamil
Y = 9801179 Elevation :+ m GWL :- Approved by :

Core Ø and Type Barrel


Core Recovery Drilling Fluida Coeficient SPT

Cassing Insered & Ø


Geological Unit
of

Log Lithology

Core Length (cm)


Depth (m)

Depth (m)
Cutting Materias
Not Recovered

RQD (%)

blows / 30 cm
Weather

GWL Permeabilty Graph

Progress (cm)
Date

N Value
DESCRIPTION

Cutting
(cm/sec) (N Value)

Loss (%)
Core

Colour
Graphic

10-2
10-4
10-6
10-8

10
20
30
40
50
0 0
"Top Soil" Karang pecah-pecah, pasir, kerikil, 100 95
1 lanauann, abu-abu 1
1/45 SPT 1/45
2 Karang pecah-pecah, pasir sedang, Sedikit lanau 2
30 Nopember 2019

95 95
3 3 1/45
1/45 SPT
Cerah

4 4
100 95
5 Lanau Kelempungan, Pecahan Karang 5 1/45
1/45 SPT

6 50 94 6
50 50 UDS
7 1/45 SPT 7 1/45
8 100 97 8

9 50 80 9 4/30
2 2 SPT
10 Lanau Kelempungan, sedikt pasir halus, kerikil 10
95 95
11 2 2 SPT 11 4/30

12 100 97 12

13
1 Oktober 2019

13 8/30
4 4 SPT
Cerah

14 55 97 14

15 50 50 DS 15 8/30
4 4 SPT
16 16
50 95
17 17 8/30
4 4 SPT
18 18
100 80
19 Lanau Sedikit lempung, Pecahan karang 5 5 SPT 19 10/30

21 m - Ø 89 mm - NW
20 95 95 20

21 5 5 SPT 21 10/30

22 55 93 Ø 73 mm - SINGLE TUBE CORE BARREL 22

23 7 6 SPT 23 13/30
50 95
24 24
50 50 DS
2 Oktober 2019

25 6 6 SPT 25 12/30
Cerah

26 95 95 26

27 8 8 SPT
27
16/30
100 100
28 28
100 95
29 29 20/30
10 10 SPT

30 30
97 97
31 8 8 SPT 31 16/30
32 100 100 32

33 55 50 33 16/30
8 8 SPT
34 34
96 96
35 35 16/30
3 Oktober 2019

8 8 SPT

36 55 50 36
Cerah

37 55 50 37 15/30
7 8 SPT

38 38
Lempung, Lanauan, Abu-abu 96 96
39 39 32/30
15 17 SPT

40 40
97 97
41 18 18 SPT 41 36/30

42 97 65 42

43 12 12 SPT 43 24/30
44 44
97 97
45 11 11 SPT 45 22/30

46 46
100 82
4 Oktober 2019

47 47 > 60
50 50 SPT
Cerah

48 48
97 97
49 > 60
50 50 SPT
49

50 95 95 50
Batu Lempung, Abu-abu (SW - MW)
51 50 50 SPT
51 > 60

52 97 97 52
END OF HOLE
53 53
Sheet : 1 - 3

PT. CAHAYA
SAMPURNA MAS GEOLOGICAL DRILLING LOG Bore Hole No. BH.09
Project : Dermaga PT. Sampoerna Drilling Method : Rotary Bor Machine : Kano II Bor Master : Agus Adiwijaya
Location : Falabisahaya Inclination : Vertical Start : 6 Okt 2019 Log by : Eko Budi
Mangole Utara
Coordinate : X = 775648 Depth : 30 m Finish : 9 Okt 2019 Checked by : Ma. Akbar Jamil
Y = 9801170 Elevation :+ m GWL : - 1.40 m Approved by :

Core Ø and Type Barrel


Core Recovery Drilling Fluida Coeficient SPT

Cassing Insered & Ø


Geological Unit
of

Log Lithology

Core Length (cm)


Depth (m)

Depth (m)
Cutting Materias
Not Recovered

RQD (%)

blows / 30 cm
Weather

GWL Permeabilty Graph

Progress (cm)
Date

N Value
DESCRIPTION

Cutting
(cm/sec) (N Value)

Loss (%)
Core

Colour
Graphic

10-2
10-4
10-6
10-8

10
20
30
40
50
0 0
"Top Soil" Timbunan, Pasir halus hingga kasar,
terdapat batuan quary diameter 2 cm, kerikil, 100 90
kerakal
1 1 60
-1,40 m 15 40 SPT

55 75
6 Oktober 2019

2 2
Cerah

100 70
3 3 13/30
6 7 SPT

55 75
4 Pasir kasar, sedikit lanauan, cangkang kerang 4

100 75
5 5 4/30
2 2 SPT

55 65
6 6
55 65
45 45 DS
7 7 6/30
4 4 SPT

55 65
8 8
100 70
9 9 3/30
5 5 SPT

55 70
10 10
100 75
Pasir halus sedikit lanau
11 11 '3/60
1 2 SPT
7 oktober 2019

55 75
Cerah

12 12
50 65
Ø 73 mm - SINGLE TUBE CORE BARREL
50 45 DS
13 13 6/30
5 5 SPT

50 65
21 m - Ø 89 mm - NW

14 14
100 65
15 15 17/60
5 5 SPT

Pasir halus hingga kasar, terdapat batuan karang 55 65


16 diameter 10 cm, kerikil, kerakal 16
100 65
17 17 13/60
3 3 SPT

55 75
18 18
100 65
19 19 8/30
4 4 SPT

55 70
20 Pasir kasar sedikit lanau, pecahan karang, kerikil, 20
kerakal 100 67
21 21 8/30
4 4 SPT
8 Oktober 2019

55 70
22 22
Cerah

55 70
50 45 DS
23 23 15/30
7 8 SPT

55 70
24 24

100 70
25 25 15/30
7 8 SPT

55 65
26 Lanau Lempung, sedikit pasir, sedang, pecahan 26
100 65
27 27 13/60
9 Oktober 2019

6 7 SPT
Cerah

55 65
28 28

100 65
29 29 12/30
Lanau sedikit Lempung, sedikit pasir, sedang 6 6 SPT

END OF HOLE 55 80
30 30
Sheet : 1 - 4

PT. CAHAYA
SAMPURNA MAS GEOLOGICAL DRILLING LOG Bore Hole No. BH.02
Project : Dermaga PT. Sampoerna Drilling Method : Rotary Bor Machine : Kano II Bor Master : Agus Adiwijaya
Location : Falabisahaya Inclination : Vertical Start : 10 Okt 2019 Log by : Eko Budi
Mangole Utara
Coordinate : X = 775656 Depth : 30 m Finish : 12 Okt 2019 Checked by : Ma. Akbar Jamil
Y = 9801560 Elevation :+ m GWL : - 0,85 m Approved by :

Core Ø and Type Barrel


Core Recovery Drilling Fluida Coeficient SPT

Cassing Insered & Ø


Geological Unit
of

Log Lithology

Core Length (cm)


Depth (m)

Depth (m)
Cutting Materias
Not Recovered

RQD (%)

blows / 30 cm
Weather

GWL Permeabilty Graph

Progress (cm)
Date

N Value
DESCRIPTION

Cutting
(cm/sec) (N Value)

Loss (%)
Core

Colour
Graphic

10-2
10-4
10-6
10-8

10
20
30
40
50
0 0
"Top Soil" Timbunan, Pasir sedang sampai kasar,
-0,85 m terdapat batuan diameter 7 cm, 100 80
1 1 25/30
10 15 SPT

55 70
2 2
100 70
10 Oktober 2019

3 3 12/30
6 6 SPT
Cerah

55 65
4 Pasir sedang, cangkang kerang, Lepas 4

100 70
5 5 16/30
7 9 SPT

55 70
6 6
55 70
45 45 DS
7 7 27/30
12 15 SPT

55 70
8 8
100 70
9 9 19/30
5 5 SPT

55 65
10 Pasir kasar sedikit lanau, dengan kerikil 10
100 65
11 11 5/30
2 3 SPT
11 oktober 2019

Pasir sedang, Pecahan Karang, Sedikit lanau 55 65


Cerah

12 12
50 70
Ø 73 mm - SINGLE TUBE CORE BARREL
Lanau kepasiran sedikit lempung 50 45 UDS
13 13 8/30
4 4 SPT

50 65
21 m - Ø 89 mm - NW

14 14
Lempung kelanauan sedikit pasir halus 100 70
15 15 13/30
6 7 SPT

55 70
16 Lempung kelanauan pecahan karang 16
100 70
17 17 20/30
10 10 SPT
Lempung, Sedikit lanau, Pecahan karang
55 75
18 18
80 65
20 35 DS
19 19 8/30
4 4 SPT

55 70
20 20
100 65
21 21 55/30
25 30 SPT

55 65
22 22
55 65
50 45 DS
23 Pecahan karang, Lempung, Kerakal sedikit lanau 23 >60
50 50 SPT

55 65
12 Oktober 2019

24 24
Cerah

100 65
25 25 >60
50 50 SPT

55 65
26 26
100 65
27 27 >60
50 50 SPT

55 65
28 28

100 65
29 29 >60
Lanau sedikit Lempung, sedikit pasir, sedang 50 50 SPT

END OF HOLE 55 65
30 30
Sheet : 1 - 5

PT. CAHAYA
SAMPURNA MAS GEOLOGICAL DRILLING LOG Bore Hole No. BH.01
Project : Dermaga PT. Sampoerna Drilling Method : Rotary Bor Machine : Kano II Bor Master : Agus Adiwijaya
Location : Falabisahaya Inclination : Vertical Start : 13 Okt 2019 Log by : Eko Budi
Mangole Utara
Coordinate : X = 775861 Depth : 32 m Finish : 15 Okt 2019 Checked by : Ma. Akbar Jamil
Y = 9801559 Elevation :+ m GWL : - 0,95 m Approved by :

Core Ø and Type Barrel


Core Recovery Drilling Fluida Coeficient SPT

Cassing Insered & Ø


Geological Unit
of

Log Lithology

Core Length (cm)


Depth (m)

Depth (m)
Cutting Materias
Not Recovered

RQD (%)

blows / 30 cm
Weather

GWL Permeabilty Graph

Progress (cm)
Date

N Value
DESCRIPTION

Cutting
(cm/sec) (N Value)

Loss (%)
Core

Colour
Graphic

10-2
10-4
10-6
10-8

10
20
30
40
50
0 0
"Top Soil" Timbunan, Pasir sedang sampai kasar,
terdapat batuan diameter 7 cm, 100 90
-0,95 m
1 1 40/5
10 15 SPT

55 70
2 Tanah timbunan terdiri dari batuan karang sedikit 2
lanau 100 70
3 3 2030
6 6 SPT

55 65
4 4

100 70
5 5 2/30
7 9 SPT

6 55 70 6
55 70
13 Oktober 2019

7 Lanau, sedikit pasir halus 45 45 DS 7 4/30


Cerah

12 15 SPT

8 55 70 8

100 70 4/30
9 9
5 5 SPT

10 55 65 10

100 65 4/30
11 11
2 3 SPT

12 50 45 DS 12
Lanau kepasiran

13 55 70 Ø 73 mm - SINGLE TUBE CORE BARREL


13 4/30

4 4 SPT
14 14
50 65
21 m - Ø 89 mm - NW

Pecahan karang, batuan karang sedikt lanau


100 70
15 15 6/30
6 7 SPT

16 16
55 70

17 100 70 17 4/30
Lanau sedikit lempung, pasir halus
10 10 SPT
18 18
55 75

19 80 65
19 5/30
20 35 DS
4 4 SPT
20 20
55 70
14 oktober 2019

21 21 4/30
100 65
Cerah

Batuan karang pecah, lanau, pasir halus 25 30 SPT


22 22
55 65
23 55 65 23 6/30
50 45 DS

24 50 50 SPT
24
55 65
25 25 6/30
Lanau kepasiran 100 65

26 50 50 SPT 26

55 65
27 50 65 27 4/30
Pasir sedang, sedikit lanau, kerikil, abu-abu
50 45 DS
28 28
50 50 SPT

55 65
15 Oktober 2019

29 29 6/30
Cerah

100 65
30 30
Lempung kelanauan, pasir sedang hingga halus 50 50 SPT

END OF HOLE 55 65 6/30


31 31
Sheet : 1 - 6

PT. CAHAYA
SAMPURNA MAS GEOLOGICAL DRILLING LOG Bore Hole No. BH.03
Project : Dermaga PT. Sampoerna Drilling Method : Rotary Bor Machine : Kano II Bor Master : Agus Adiwijaya
Location : Falabisahaya Inclination : Vertical Start : 15 Okt 2019 Log by : Eko Budi
Mangole Utara
Coordinate : X = 775780 Depth : 30 m Finish : 17 Okt 2019 Checked by : Ma. Akbar Jamil
Y = 9801400 Elevation :+ m GWL : - 1.00 m Approved by :

Core Ø and Type Barrel


Core Recovery Drilling Fluida Coeficient SPT

Cassing Insered & Ø


Geological Unit
of

Log Lithology

Core Length (cm)


Depth (m)

Depth (m)
Cutting Materias
Not Recovered

RQD (%)

blows / 30 cm
Weather

GWL Permeabilty Graph

Progress (cm)
Date

N Value
DESCRIPTION

Cutting
(cm/sec) (N Value)

Loss (%)
Core

Colour
Graphic

10-2
10-4
10-6
10-8

10
20
30
40
50
0 0
"Top Soil" Timbunan, Pasir kasar, kerakal, kerikil,
sedikit lanau lempung, 100 80
-1.00 m
1 Pasir halus hingga sedang 1 4/30
10 15 SPT

55 70
2 2
Pasir sedang, cangkang kerang, Lepas
100 70
3 3 35/30
Timbunan kayu 6 6 SPT

55 65
4 4
55 70
Pasir halus, kerakal, kerikil 45 45 DS
5 5 6/30
7 9 SPT

55 70
6 6
100 70
15 Oktober 2019

7 7 4/30
Pecahan karang, Pasir halus, kerikil, kerakal 12 15 SPT
Cerah

55 65
8 8
100 65
9 9 8/30
5 5 SPT

50 45 DS
10 10
100 65
Pecahan karang, pasir halus hingga sedang
11 11 7/30
2 3 SPT

55 65
12 12
50 65
Ø 73 mm - SINGLE TUBE CORE BARREL
50 65
13 Batuan karang, Pasir halus 13 6/30
4 4 SPT

50 45 DS
21 m - Ø 89 mm - NW

14 14
Pecahan karagn, pasir halus 100 65
15 15 7/30
6 7 SPT

55 65
16 16
100 65
17 Pasir halus hingga sedang, Pecahan karang 17 8/30
10 10 SPT

55 65
18 18
80 65
50 35 DS
19 19 30/30
4 4 SPT

55 70
20 Pasir halus plastisitas padat 20
16 oktober 2019

Cerah

100 65
21 21 7/30
25 30 SPT

55 65
22 22
55 65
Pasir halus hingga sedang 50 45 DS
23 23 9/30
50 50 SPT

55 60
24 24

100 60
25 25 8/30
50 50 SPT
Pasir halus hingga sedang, kerikil, kerakal
55 80
26 26
100 80
27 27 8/30
17 Oktober 2019

50 50 SPT
Cerah

55 80
28 28
Pasir kasar hingga sedang, pecahan karang
100 80
29 29 10/30
50 50 SPT

END OF HOLE 55 81
30 30
Sheet : 1 - 8

PT. CAHAYA
SAMPURNA MAS GEOLOGICAL DRILLING LOG Bore Hole No. BH.10
Project : Dermaga PT. Sampoerna Drilling Method : Rotary Bor Machine : Kano II Bor Master : Agus Adiwijaya
Location : Falabisahaya Inclination : Vertical Start : 20 Okt 2019 Log by : Eko Budi
Mangole Utara
Coordinate : X = 775940 Depth : 30 m Finish : 22 Okt 2019 Checked by : Ma. Akbar Jamil
Y = 9801835 Elevation :+ m GWL : - 1.57 m Approved by :

Core Ø and Type Barrel


Core Recovery Drilling Fluida Coeficient SPT

Cassing Insered & Ø


Geological Unit
of

Log Lithology

Core Length (cm)


Depth (m)

Depth (m)
Cutting Materias
Not Recovered

RQD (%)

blows / 30 cm
Weather

GWL Permeabilty Graph

Progress (cm)
Date

N Value
DESCRIPTION

Cutting
(cm/sec) (N Value)

Loss (%)
Core

Colour
Graphic

10-2
10-4
10-6
10-8

10
20
30
40
50
0 0
"Top Soil" Timbunan, Pasir kasar, kerakal, kerikil, 50 65
Batuan kapur, sedikit lempung rendah
50 70
1 1 25/30
10 15 SPT
-1.57 m
Batuan kapur, sedikit lempung rendah
55 75
2 2

100 75
3 3 6/30
3 3 SPT
Pasir kasar, batuan karang, sedikit lempung
55 65
4 4
50 65
20 Oktober 2019

50 50 DS
Cerah

5 5 7/30
Batuan karang rendah sedikit lempung 3 4 SPT

55 65
6 6

100 65
7 7 14/30
6 8 SPT

55 65
8 Pasir kasar, kerakal, kerikil, sedikit kelanauan, 8
abu-abu
100 65
9 9 10/30
5 5 SPT

Pasir halus, abu-abu 55 70


10 10

100 70
11 11 4/30
Pasir halus, sedikt kelanauan, abu-abu 2 2 SPT

50 50 DS
12 12
100 80 Ø 73 mm - SINGLE TUBE CORE BARREL
13 13 9/30
4 5 SPT

55 65
21 m - Ø 89 mm - NW

14 14
100 65
15 15 9/30
4 5 SPT
21 oktober 2019

55 70
Cerah

16 16
Pasir halus, kerikil, kerakal sedikit lanauan, abu- 100 65
abu
50 50 DS
17 17 10/30
5 5 SPT

55 65
18 18
100 70
19 19 28/30
18 10 SPT

55 70
20 20

100 70
21 21 4/30
2 2 SPT

50 50 DS
22 22

100 65
23 Pasir halus hingga kasar, kerikil, kerakal sedikit 23 15/30
lanauan, abu-abu 9 6 SPT

55 70
24 24
50 70
50 50 DS
25 25 13/30
5 8 SPT
22 Oktober 2019

55 80
Cerah

26 26

100 80
27 27 10/30
6 4 SPT
Pasir kasar hingga halus, kerikil, kerakal , abu-abu
55 80
28 28
100 80
Lanau kelempungan
29 29 18/30
8 10 SPT

END OF HOLE 50 50 DS
30 30