Annexure 1 - Drawings
Yugasoft PAGE: 1 of 91
Design work has been carried out based on the design information provided by the
consultant vide their drawing SAPL/725/SHANTHA/ST-01 and sketches.
i) Self Weight of Beams as Generated internally by the software. The slab thickness
has been assumed as 150mm.
2 2
ii) A Superimposed Load of 4.75kN/m for Floor and 6.85kN/m for Roof has been
Considered in the design.
2 2
iii) Live Load of 10kN/m on floor and 3kN/m on Roof as been considered in the
design
1.2.1 CONCRETE
2
Chara. Strength of Rein. Steel fy = 415 N/mm
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
2.0 LOADS
2.1 Dead Load
2.1.1 Dead Load on Floor slab
32.8 m
B= 74.7 m
ELEVATION 28.7 m PLAN
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
74690
FACE C
28
FACE A
FACE B
95500
1
FACE D
A Z
Yugasoft PAGE : 5 of 91
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
X
0.5 0.7
Z
FACE C FACE C
FACE A
FACE A
FACE B
FACE B
0.7
0.2
0.5
0.5
FACE D FACE D
0.5 0.2
0.20
0.50
+ 0.20
0.40
0.5 0.7
Yugasoft PAGE : 6 of 91
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
2.3.5.2 WL2 Load Case 8 ( Wind in +ve X Direction with Internal -ve Pressure)
0.20
0.90
0.00
- 0.20
0.5 0.3
2.3.5.3 WL3 Load Case 9 ( Wind in +ve Z Direction with Internal +ve Pressure)
0.50
0.70
0.70
+ 0.20
0.2 0.4
2.3.5.4 WL4 Load Case 10 ( Wind in +ve Z Direction with Internal -ve Pressure)
0.30
0.50
0.50
- 0.20
0.2 0.0
Yugasoft PAGE : 7 of 91
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
2.3.5.5 WL5 Load Case 11 ( Wind in -ve X Direction with Internal +ve Pressure)
0.70
0.40
0.50
+ 0.20
0.5 0.7
2.3.5.6 WL6 Load Case 12 ( Wind in -ve X Direction with Internal -ve Pressure)
0.70
0.00
0.90
- 0.20
0.5 0.3
2.3.5.7 WL7 Load Case 13 ( Wind in -ve Z Direction with Internal +ve Pressure)
0.50
0.70
0.70
+ 0.20
0.7 0.5
Yugasoft PAGE : 8 of 91
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
2.3.5.8 WL8 Load Case 14 ( Wind in -ve Z Direction with Internal -ve Pressure)
0.50
0.30
- 0.20
0.30
0.7 0.9
2.4 SEISMIC LOAD (BY RESPONSE SPECTRUM METHOD : IS 1893 ( Part 1) : 2002)
Area Supported No LL 0n
Dead Roof & Total
Sl: HEIGHT Floor Roof
Levels Load 50% of LL Load
No (m) area area (kg) on (kg)
(m2) (m2) Floor(kg)
1 L+ 0.00 0.00 0.00 1395.64 0.00 1395.6
2 L+ 5.60 5.60 941.36 7263.68 4706.80 11970.5
3 L+ 5.60 5.60 0.00 941.36 8234.36 0.00 8234.4
Selfweight of Beams & Columns form STAAD SELFWEIGHT
16783.9
Command
Seismic Weight Of the Building = 38384kN
Yugasoft PAGE : 10 of 91
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Base Shear VB = Ah x W
= 1599.4
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
16.4 m 12.30 m
Type of Lt. Sup. Mid Span Center Suppt Mid Span Rt. Sup.
Loading kNm kNm kNm kNm kNm
Self Weight -586 +522 -829 -582 +216 -369
Finishes -80 +54 -88 -45 +24 -63
Live Load -602 +601 -955 -731 +245 -329
Wind Load ±61 ±12 ±38 ±46 ±14 ±73
Seismic Ld ±196 ±37 ±121 ±146 ±44 ±233
Type of Lt. Sup. Mid Span Center Suppt Mid Span Rt. Sup.
Loading kN kN kN kN kN
Self Weight +285 0 -315 +242 0 -208
Finishes +33 0 -34 +24 0 -27
Live Load +315 0 -358 +285 0 -3
Wind Load ±6 0 ±6 ±10 0 ±10
Seismic Ld ±19 0 ±19 ±31 0 ±31
Yugasoft PAGE: 12 of 91
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
16.4 m 12.30 m
Type of Lt. Sup. Mid Span Center Suppt Mid Span Rt. Sup.
Loading kNm kNm kNm kNm kNm
Self Weight -654 +531 -743 -572 +208 -396
Finishes -87 +56 -78 -55 +20 -59
Live Load -611 +607 -872 -696 +241 -372
Wind Load ±42 ±13 ±15 ±15 ±16 ±48
Seismic Ld ±135 ±44 ±47 ±52 ±54 ±161
Type of Lt. Sup. Mid Span Center Suppt Mid Span Rt. Sup.
Loading kN kN kN kN kN
Self Weight +294 0 -305 +239 0 -211
Finishes +34 0 -33 +25 0 -26
Live Load +324 0 -348 +279 0 -226
Wind Load ±3 0 ±3 ±5 0 ±5
Seismic Ld ±11 0 ±11 ±17 0 ±17
Yugasoft PAGE: 13 of 91
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Prestressing Steel
Provide 2 Nos of Cable Consisting of 19 Nos of 12.7mm Strand 7 Ply
Factored BM Mf = γf X (Msw+MF+MLL)
(From STAAD Analysis Results) = 1.5 X (586 + 80 + 602)
= 1902.37 kNm
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Where,
Maximum principal tensile stress ft = 0.24 f ck
= 1.518 N/mm 2
Effective Prestress Force Pe = 0.8 x0.75 xAp xf p
= 4262kN
Comp. Stress at Centroidal axis Pe
f cp =
due to Prestress A
f cp = 4.736 N/mm 2
∴ V co = 1711.4 kN
For section cracked in flexure
f
V cr = 1 − 0.55 pe ζ 0 bd + M 0 V
f p M
f pe = 1136.4 N/mm 2
Ap
100 = 0.59
bd
ζ = 0.5424 N/mm 2
I
M0 = 0.8 f pt
Y
f pt = 4.74 - 5.8723
= -1.14 N/mm 2
3
I = bD /12
4
= 42187500000 mm
Y = 375 mm
M0 = 102.3 kNm
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
0.1bd f ck = 402.2 kN
So Vcr = 402.2 kN
Shear Strength lesser of Vcr/Vco Vc = 402.2 kN
Factored Shear Force V = 949.5 kN
Asv V − Vc
=
sv 0.87 f v d t
V -V c = 547.2 kN
dt Min. of 530 or (750-30-10-16)
dt = 694 mm
0.87 x f v x d t = 250569 N/mm
A sv = 314.16 sq.mm
sv = 144 mm
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Asv 0.4
Minimum Reinforcement = ≥
bsv 0.87 f y
A sv = 314.16 sq.mm
Sv = 236.31 mm
2
Area of the Cross Section A = 900000 mm
3
Section Modulus of the section Z = 112500000 mm
Bending Moment Me = 1464.09 kNm
BM due to Selfweight Msw = 586.16 kNm
M 30 M 40 M 60
fck
fci = 0.8 X fck
= 32 N/mm 2
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Pi Pie Msw
- + < 3.00
A Z Z
Stress at Top
Pi Pie Msw
+ - < 15.47
A Z Z
M 30 M 40 M 60
fck
Stress at Bottom
Pe Pee Me
- + < 12.67
A Z Z
Stress at Top
Pe Pee Me
+ - < 3.00
A Z Z
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Prestressing Steel
Factored BM Mf = γf X (Msw+MF+MLL)
(From STAAD Analysis Results) = 1.5 X (522 + 54 + 601) Refer Page of
= 1765.52 kNm
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Where,
Maximum principal tensile stress ft = 0.24 f ck
= 1.518 N/mm 2
Effective Prestress Force Pe = 0.8 x0.75 xAp xf p
= 4262kN
Comp. Stress at Centroidal axis Pe
f cp =
due to Prestress A
f cp = 4.736 N/mm 2
∴ V co = 1711.4 kN
For section cracked in flexure
f
V cr = 1 − 0.55 pe ζ 0 bd + M 0 V
f p M
f pe = 1136.4 N/mm 2
Ap
100 = 0.56
bd
ζ = 0.5316 N/mm 2
I
M0 = 0.8 f pt
Y
f pt = 4.74 - 7.0089
= -2.27 N/mm 2
3
I = bD /12
4
= 42187500000 mm
Y = 375 mm
M0 = 204.6 kNm
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
0.1bd f ck = 425.0 kN
So Vcr = 425.0 kN
Shear Strength lesser of Vcr/Vco Vc = 425.0 kN
Factored Shear Force V = 0.0 kN
Asv V − Vc
=
sv 0.87 f v d t
V -V c = *****
dt Min. of 560 or (750-30-10-16)
dt = 694 mm
0.87 x f v x d t = 250569 N/mm
A sv = 314.16 sq.mm
sv = NOT APPLICABLE
PROVIDE MINIMUM. SHR.
REINFORCEMENT
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Asv 0.4
Minimum Reinforcement = ≥
bsv 0.87 f y
A sv = 314.16 sq.mm
Sv = 236.31 mm
2
Area of the Cross Section A = 900000 mm
3
Section Modulus of the section Z = 112500000 mm
Bending Moment Me = 1214.40 kNm
BM due to Selfweight Msw = 522.26 kNm
M 30 M 40 M 60
fck
fci = 0.8 X fck
= 32 N/mm 2
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Pi Pie Msw
- + < 3.00
A Z Z
Stress at Bottom
Pi Pie Msw
+ - < 15.47
A Z Z
M 30 M 40 M 60
fck
Stress at Top
Pe Pee Me
- + < 12.67
A Z Z
Stress at Bottom
Pe Pee Me
+ - < 3.00
A Z Z
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Prestressing Steel
Factored BM Mf = γf X (Msw+MF+MLL)
(From STAAD Analysis Results) = 1.5 X (829 + 88 + 955)
= 2807.88 kNm
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Where,
Maximum principal tensile stress ft = 0.24 f ck
= 1.518 N/mm 2
Effective Prestress Force Pe = 0.8 x0.75 xAp xf p
= 4262kN
Comp. Stress at Centroidal axis Pe
f cp =
due to Prestress A
f cp = 4.736 N/mm 2
∴ V co = 1711.4 kN
For section cracked in flexure
f
V cr = 1 − 0.55 pe ζ 0 bd + M 0 V
f p M
f pe = 1136.4 N/mm 2
Ap
100 = 0.50
bd
ζ = 0.5100 N/mm 2
I
M0 = 0.8 f pt
Y
f pt = 4.74 - 9.6609
= -4.93 N/mm 2
3
I = bD /12
4
= 42187500000 mm
Y = 375 mm
M0 = 443.3 kNm
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
0.1bd f ck = 478.1 kN
So Vcr = 506.3 kN
Shear Strength lesser of Vcr/Vco Vc = 506.3 kN
Factored Shear Force V = 1059.9 kN
Asv V − Vc
=
sv 0.87 f v d t
V -V c = 553.6 kN
dt Min. of 630 or (750-30-10-16)
dt = 694 mm
0.87 x f v x d t = 250569 N/mm
A sv = 314.16 sq.mm
sv = 142 mm
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Asv 0.4
Minimum Reinforcement = ≥
bsv 0.87 f y
A sv = 314.16 sq.mm
Sv = 236.31 mm
2
Area of the Cross Section A = 900000 mm
3
Section Modulus of the section Z = 112500000 mm
Bending Moment Me = 1992.99 kNm
BM due to Selfweight Msw = 829.00 kNm
M 30 M 40 M 60
fck
fci = 0.8 X fck
= 32 N/mm 2
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Pi Pie Msw
- + < 3.00
A Z Z
Stress at Top
Pi Pie Msw
+ - < 15.47
A Z Z
M 30 M 40 M 60
fck
Stress at Bottom
Pe Pee Me
- + < 12.67
A Z Z
Stress at Top
Pe Pee Me
+ - < 3.00
A Z Z
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Prestressing Steel
Factored BM Mf = γf X (Msw+MF+MLL)
(From STAAD Analysis Results) = 1.5 X (582 + 45 + 731)
= 2038.17 kNm
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Where,
Maximum principal tensile stress ft = 0.24 f ck
= 1.518 N/mm 2
Effective Prestress Force Pe = 0.8 x0.75 xAp xf p
= 4262kN
Comp. Stress at Centroidal axis Pe
f cp =
due to Prestress A
f cp = 4.736 N/mm 2
∴ V co = 1711.4 kN
For section cracked in flexure
f
V cr = 1 − 0.55 pe ζ 0 bd + M 0 V
f p M
f pe = 1136.4 N/mm 2
Ap
100 = 0.50
bd
ζ = 0.5100 N/mm 2
I
M0 = 0.8 f pt
Y
f pt = 4.74 - 9.6609
= -4.93 N/mm 2
3
I = bD /12
4
= 42187500000 mm
Y = 375 mm
M0 = 443.3 kNm
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
0.1bd f ck = 478.1 kN
So Vcr = 531.7 kN
Shear Strength lesser of Vcr/Vco Vc = 531.7 kN
Factored Shear Force V = 826.4 kN
Asv V − Vc
=
sv 0.87 f v d t
V -V c = 294.7 kN
dt Min. of 630 or (750-30-10-16)
dt = 694 mm
0.87 x f v x d t = 250569 N/mm
A sv = 314.16 sq.mm
sv = 267 mm
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Asv 0.4
Minimum Reinforcement = ≥
bsv 0.87 f y
A sv = 314.16 sq.mm
Sv = 236.31 mm
2
Area of the Cross Section A = 900000 mm
3
Section Modulus of the section Z = 112500000 mm
Bending Moment Me = 1504.35 kNm
BM due to Selfweight Msw = 582.20 kNm
M 30 M 40 M 60
fck
fci = 0.8 X fck
= 32 N/mm 2
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Pi Pie Msw
- + < 3.00
A Z Z
Stress at Top
Pi Pie Msw
+ - < 15.47
A Z Z
M 30 M 40 M 60
fck
Stress at Bottom
Pe Pee Me
- + < 12.67
A Z Z
Stress at Top
Pe Pee Me
+ - < 3.00
A Z Z
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Prestressing Steel
Factored BM Mf = γf X (Msw+MF+MLL)
(From STAAD Analysis Results) = 1.5 X (216 + 24 + 245) Refer Page of
= 727.139 kNm
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Where,
Maximum principal tensile stress ft = 0.24 f ck
= 1.518 N/mm 2
Effective Prestress Force Pe = 0.8 x0.75 xAp xf p
= 4262kN
Comp. Stress at Centroidal axis Pe
f cp =
due to Prestress A
f cp = 4.736 N/mm 2
∴ V co = 1711.4 kN
For section cracked in flexure
f
V cr = 1 − 0.55 pe ζ 0 bd + M 0 V
f p M
f pe = 1136.4 N/mm 2
Ap
100 = 0.56
bd
ζ = 0.5316 N/mm 2
I
M0 = 0.8 f pt
Y
f pt = 4.74 - 7.0089
= -2.27 N/mm 2
3
I = bD /12
4
= 42187500000 mm
Y = 375 mm
M0 = 204.6 kNm
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
0.1bd f ck = 425.0 kN
So Vcr = 425.0 kN
Shear Strength lesser of Vcr/Vco Vc = 425.0 kN
Factored Shear Force V = 0.0 kN
Asv V − Vc
=
sv 0.87 f v d t
V -V c = *****
dt Min. of 560 or (750-30-10-16)
dt = 694 mm
0.87 x f v x d t = 250569 N/mm
A sv = 314.16 sq.mm
sv = NOT APPLICABLE
PROVIDE MINIMUM. SHR.
REINFORCEMENT
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Asv 0.4
Minimum Reinforcement = ≥
bsv 0.87 f y
A sv = 314.16 sq.mm
Sv = 236.31 mm
2
Area of the Cross Section A = 900000 mm
3
Section Modulus of the section Z = 112500000 mm
Bending Moment Me = 528.54 kNm
BM due to Selfweight Msw = 216.08 kNm
M 30 M 40 M 60
fck
fci = 0.8 X fck
= 32 N/mm 2
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Pi Pie Msw
- + < 3.00
A Z Z
Stress at Bottom
Pi Pie Msw
+ - < 15.47
A Z Z
M 30 M 40 M 60
fck
Stress at Top
Pe Pee Me
- + < 12.67
A Z Z
Stress at Bottom
Pe Pee Me
+ - < 3.00
A Z Z
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Prestressing Steel
Factored BM Mf = γf X (Msw+MF+MLL)
(From STAAD Analysis Results) = 1.5 X (369 + 63 + 329)
= 1141.59 kNm
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Where,
Maximum principal tensile stress ft = 0.24 f ck
= 1.518 N/mm 2
Effective Prestress Force Pe = 0.8 x0.75 xAp xf p
= 4262kN
Comp. Stress at Centroidal axis Pe
f cp =
due to Prestress A
f cp = 4.736 N/mm 2
∴ V co = 1711.4 kN
For section cracked in flexure
f
V cr = 1 − 0.55 pe ζ 0 bd + M 0 V
f p M
f pe = 1136.4 N/mm 2
Ap
100 = 0.59
bd
ζ = 0.5424 N/mm 2
I
M0 = 0.8 f pt
Y
f pt = 4.74 - 5.8723
= -1.14 N/mm 2
3
I = bD /12
4
= 42187500000 mm
Y = 375 mm
M0 = 102.3 kNm
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
0.1bd f ck = 402.2 kN
So Vcr = 402.2 kN
Shear Strength lesser of Vcr/Vco Vc = 402.2 kN
Factored Shear Force V = 655.9 kN
Asv V − Vc
=
sv 0.87 f v d t
V -V c = 253.7 kN
dt Min. of 530 or (750-30-10-16)
dt = 694 mm
0.87 x f v x d t = 250569 N/mm
A sv = 314.16 sq.mm
sv = 310 mm
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Asv 0.4
Minimum Reinforcement = ≥
bsv 0.87 f y
A sv = 314.16 sq.mm
Sv = 236.31 mm
2
Area of the Cross Section A = 900000 mm
3
Section Modulus of the section Z = 112500000 mm
Bending Moment Me = 994.16 kNm
BM due to Selfweight Msw = 369.22 kNm
M 30 M 40 M 60
fck
fci = 0.8 X fck
= 32 N/mm 2
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Pi Pie Msw
- + < 3.00
A Z Z
Stress at Top
Pi Pie Msw
+ - < 15.47
A Z Z
M 30 M 40 M 60
fck
Stress at Bottom
Pe Pee Me
- + < 12.67
A Z Z
Stress at Top
Pe Pee Me
+ - < 3.00
A Z Z
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Max. 5.058 mm
Max. 13.84 mm
Max. 0.708 mm
Max. 1.48 mm
Max. 4.931 mm
Max. 15.19 mm
Max. 17.25 mm
Max. 9.701 mm
Yugasoft PAGE: 44 of 91
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
At Service
= 65.600
> 12.119
Hence Okay
Yugasoft PAGE: 45 of 91
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Total Stress
Average Stress =
6
2
= 7.82 N/mm
1 fc
Loss of Strain = X
Ec 2
= 0.00010849
-4
= 1.08 x 10
Loss of Stress = Loss of Strain X Es
2
= 21.16 N/mm
2 X 10-4
Shrinkage Strain@ T = 28days =
log(T +2)
Loss of Strain = 0.00014
-4
= 1.35 x 10
Loss of Stress = Loss of Strain X Es
2
= 26.40 N/mm
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Total Stress
Average Stress =
6
2
= 7.82 N/mm
Assuming the Creep Coefficient φ = 1.6
Average Stress X φ
Loss of Strain(Creep Strain) =
Ec
Loss of Strain(Creep Strain) = 0.00035
-4
= 3.47 x 10
Loss of Stress = Loss of Strain X Es
2
= 67.70 N/mm
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
-4
Loss of Strain = 2.79 x 10
Loss of Stress = Loss of Strain X Es
2
= 54.36 N/mm
Slope Change
θ1 = 9 deg = 0.1571
µ = 0.300
k = 0.003
Total Slope Change α = 0.1571
x = 16.400
(µα + kx) = 0.096
- (µα + kx)
Effect, Prestress Px = Po x e
2
= 1720.1 N/mm
Loss of Prestress = Po-Px
2
= 173.9 N/mm
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Fbst Ypo
= 0.32 - 0.3
Pk Yo
Where,
Ypo = 270 mm
Yo = 400 mm
270
∴ Fbst = 4972.5 x 0.32 - 0.3
400
Fbst = 584.27 KN
584.27
As =
0.87 X 415
2
As = 1618.26 mm
2
Each Layers = 400 mm
400.0
10 mm BARS =
78.5
= 5.1 Nos
Provide 6 Nos
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Prestressing Steel
Factored BM Mf = γf X (Msw+MF+MLL)
(From STAAD Analysis Results) = 1.5 X (654 + 87 + 611)
= 2026.53 kNm
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Where,
Maximum principal tensile stress ft = 0.24 f ck
= 1.518 N/mm 2
Effective Prestress Force Pe = 0.8 x0.75 xAp xf p
= 4262kN
Comp. Stress at Centroidal axis Pe
f cp =
due to Prestress A
f cp = 4.736 N/mm 2
∴ V co = 1711.4 kN
For section cracked in flexure
f
V cr = 1 − 0.55 pe ζ 0 bd + M 0 V
f p M
f pe = 1136.4 N/mm 2
Ap
100 = 0.59
bd
ζ = 0.5424 N/mm 2
I
M0 = 0.8 f pt
Y
f pt = 4.74 - 5.8723
= -1.14 N/mm 2
3
I = bD /12
4
= 42187500000 mm
Y = 375 mm
M0 = 102.3 kNm
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
0.1bd f ck = 402.2 kN
So Vcr = 402.2 kN
Shear Strength lesser of Vcr/Vco Vc = 402.2 kN
Factored Shear Force V = 978.9 kN
Asv V − Vc
=
sv 0.87 f v d t
V -V c = 576.6 kN
dt Min. of 530 or (750-30-10-16)
dt = 694 mm
0.87 x f v x d t = 250569 N/mm
A sv = 314.16 sq.mm
sv = 137 mm
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Asv 0.4
Minimum Reinforcement = ≥
bsv 0.87 f y
A sv = 314.16 sq.mm
Sv = 236.31 mm
2
Area of the Cross Section A = 900000 mm
3
Section Modulus of the section Z = 112500000 mm
Bending Moment Me = 1485.52 kNm
BM due to Selfweight Msw = 653.70 kNm
M 30 M 40 M 60
fck
fci = 0.8 X fck
= 32 N/mm 2
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Pi Pie Msw
- + < 3.00
A Z Z
Stress at Top
Pi Pie Msw
+ - < 15.47
A Z Z
M 30 M 40 M 60
fck
Stress at Bottom
Pe Pee Me
- + < 12.67
A Z Z
Stress at Top
Pe Pee Me
+ - < 3.00
A Z Z
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Prestressing Steel
Factored BM Mf = γf X (Msw+MF+MLL)
(From STAAD Analysis Results) = 1.5 X (531 + 56 + 607)
= 1791.17 kNm
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Where,
Maximum principal tensile stress ft = 0.24 f ck
= 1.518 N/mm 2
Effective Prestress Force Pe = 0.8 x0.75 xAp xf p
= 4262kN
Comp. Stress at Centroidal axis Pe
f cp =
due to Prestress A
f cp = 4.736 N/mm 2
∴ V co = 1711.4 kN
For section cracked in flexure
f
V cr = 1 − 0.55 pe ζ 0 bd + M 0 V
f p M
f pe = 1136.4 N/mm 2
Ap
100 = 0.56
bd
ζ = 0.5316 N/mm 2
I
M0 = 0.8 f pt
Y
f pt = 4.74 - 7.0089
= -2.27 N/mm 2
3
I = bD /12
4
= 42187500000 mm
Y = 375 mm
M0 = 204.6 kNm
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
0.1bd f ck = 425.0 kN
So Vcr = 425.0 kN
Shear Strength lesser of Vcr/Vco Vc = 425.0 kN
Factored Shear Force V = 0.0 kN
Asv V − Vc
=
sv 0.87 f v d t
V -V c = *****
dt Min. of 560 or (750-30-10-16)
dt = 694 mm
0.87 x f v x d t = 250569 N/mm
A sv = 314.16 sq.mm
sv = NOT APPLICABLE
PROVIDE MINIMUM.
SHR. REINFORCEMENT
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Asv 0.4
Minimum Reinforcement = ≥
bsv 0.87 f y
A sv = 314.16 sq.mm
Sv = 236.31 mm
2
Area of the Cross Section A = 900000 mm
3
Section Modulus of the section Z = 112500000 mm
Bending Moment Me = 1237.66 kNm
BM due to Selfweight Msw = 531.31 kNm
M 30 M 40 M 60
fck
fci = 0.8 X fck
= 32 N/mm 2
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Pi Pie Msw
- + < 3.00
A Z Z
Stress at Bottom
Pi Pie Msw
+ - < 15.47
A Z Z
M 30 M 40 M 60
fck
Stress at Top
Pe Pee Me
- + < 12.67
A Z Z
Stress at Bottom
Pe Pee Me
+ - < 3.00
A Z Z
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Prestressing Steel
Factored BM Mf = γf X (Msw+MF+MLL)
(From STAAD Analysis Results) = 1.5 X (743 + 78 + 872)
= 2539.38 kNm
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Where,
Maximum principal tensile stress ft = 0.24 f ck
= 1.518 N/mm 2
Effective Prestress Force Pe = 0.8 x0.75 xAp xf p
= 4262kN
Comp. Stress at Centroidal axis Pe
f cp =
due to Prestress A
f cp = 4.736 N/mm 2
∴ V co = 1711.4 kN
For section cracked in flexure
f
V cr = 1 − 0.55 pe ζ 0 bd + M 0 V
f p M
f pe = 1136.4 N/mm 2
Ap
100 = 0.50
bd
ζ = 0.5100 N/mm 2
I
M0 = 0.8 f pt
Y
f pt = 4.74 - 9.6609
= -4.93 N/mm 2
3
I = bD /12
4
= 42187500000 mm
Y = 375 mm
M0 = 443.3 kNm
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
0.1bd f ck = 478.1 kN
So Vcr = 538.3 kN
Shear Strength lesser of Vcr/Vco Vc = 538.3 kN
Factored Shear Force V = 1030.5 kN
Asv V − Vc
=
sv 0.87 f v d t
V -V c = 492.2 kN
dt Min. of 630 or (750-30-10-16)
dt = 694 mm
0.87 x f v x d t = 250569 N/mm
A sv = 314.16 sq.mm
sv = 160 mm
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Asv 0.4
Minimum Reinforcement = ≥
bsv 0.87 f y
A sv = 314.16 sq.mm
Sv = 236.31 mm
2
Area of the Cross Section A = 900000 mm
3
Section Modulus of the section Z = 112500000 mm
Bending Moment Me = 1740.33 kNm
BM due to Selfweight Msw = 743.34 kNm
M 30 M 40 M 60
fck
fci = 0.8 X fck
= 32 N/mm 2
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Pi Pie Msw
- + < 3.00
A Z Z
Stress at Top
Pi Pie Msw
+ - < 15.47
A Z Z
M 30 M 40 M 60
fck
Stress at Bottom
Pe Pee Me
- + < 12.67
A Z Z
Stress at Top
Pe Pee Me
+ - < 3.00
A Z Z
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Prestressing Steel
Factored BM Mf = γf X (Msw+MF+MLL)
(From STAAD Analysis Results) = 1.5 X (572 + 55 + 696)
= 1985.55 kNm
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Where,
Maximum principal tensile stress ft = 0.24 f ck
= 1.518 N/mm 2
Effective Prestress Force Pe = 0.8 x0.75 xAp xf p
= 4262kN
Comp. Stress at Centroidal axis Pe
f cp =
due to Prestress A
f cp = 4.736 N/mm 2
∴ V co = 1711.4 kN
For section cracked in flexure
f
V cr = 1 − 0.55 pe ζ 0 bd + M 0 V
f p M
f pe = 1136.4 N/mm 2
Ap
100 = 0.50
bd
ζ = 0.5100 N/mm 2
I
M0 = 0.8 f pt
Y
f pt = 4.74 - 9.6609
= -4.93 N/mm 2
3
I = bD /12
4
= 42187500000 mm
Y = 375 mm
M0 = 443.3 kNm
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
0.1bd f ck = 478.1 kN
So Vcr = 536.7 kN
Shear Strength lesser of Vcr/Vco Vc = 536.7 kN
Factored Shear Force V = 814.1 kN
Asv V − Vc
=
sv 0.87 f v d t
V -V c = 277.4 kN
dt Min. of 630 or (750-30-10-16)
dt = 694 mm
0.87 x f v x d t = 250569 N/mm
A sv = 314.16 sq.mm
sv = 284 mm
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Asv 0.4
Minimum Reinforcement = ≥
bsv 0.87 f y
A sv = 314.16 sq.mm
Sv = 236.31 mm
2
Area of the Cross Section A = 900000 mm
3
Section Modulus of the section Z = 112500000 mm
Bending Moment Me = 1375.64 kNm
BM due to Selfweight Msw = 572.41 kNm
M 30 M 40 M 60
fck
fci = 0.8 X fck
= 32 N/mm 2
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Pi Pie Msw
- + < 3.00
A Z Z
Stress at Top
Pi Pie Msw
+ - < 15.47
A Z Z
M 30 M 40 M 60
fck
Stress at Bottom
Pe Pee Me
- + < 12.67
A Z Z
Stress at Top
Pe Pee Me
+ - < 3.00
A Z Z
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Prestressing Steel
Factored BM Mf = γf X (Msw+MF+MLL)
(From STAAD Analysis Results) = 1.5 X (208 + 20 + 241)
= 704.234 kNm
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Where,
Maximum principal tensile stress ft = 0.24 f ck
= 1.518 N/mm 2
Effective Prestress Force Pe = 0.8 x0.75 xAp xf p
= 4262kN
Comp. Stress at Centroidal axis Pe
f cp =
due to Prestress A
f cp = 4.736 N/mm 2
∴ V co = 1711.4 kN
For section cracked in flexure
f
V cr = 1 − 0.55 pe ζ 0 bd + M 0 V
f p M
f pe = 1136.4 N/mm 2
Ap
100 = 0.56
bd
ζ = 0.5316 N/mm 2
I
M0 = 0.8 f pt
Y
f pt = 4.74 - 7.0089
= -2.27 N/mm 2
3
I = bD /12
4
= 42187500000 mm
Y = 375 mm
M0 = 204.6 kNm
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
0.1bd f ck = 425.0 kN
So Vcr = 425.0 kN
Shear Strength lesser of Vcr/Vco Vc = 425.0 kN
Factored Shear Force V = 0.0 kN
Asv V − Vc
=
sv 0.87 f v d t
V -V c = *****
dt Min. of 560 or (750-30-10-16)
dt = 694 mm
0.87 x f v x d t = 250569 N/mm
A sv = 314.16 sq.mm
sv = NOT APPLICABLE
PROVIDE MINIMUM.
SHR. REINFORCEMENT
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Asv 0.4
Minimum Reinforcement = ≥
bsv 0.87 f y
A sv = 314.16 sq.mm
Sv = 236.31 mm
2
Area of the Cross Section A = 900000 mm
3
Section Modulus of the section Z = 112500000 mm
Bending Moment Me = 523.96 kNm
BM due to Selfweight Msw = 207.65 kNm
M 30 M 40 M 60
fck
fci = 0.8 X fck
= 32 N/mm 2
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Pi Pie Msw
- + < 3.00
A Z Z
Stress at Bottom
Pi Pie Msw
+ - < 15.47
A Z Z
M 30 M 40 M 60
fck
Stress at Top
Pe Pee Me
- + < 12.67
A Z Z
Stress at Bottom
Pe Pee Me
+ - < 3.00
A Z Z
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Prestressing Steel
Factored BM Mf = γf X (Msw+MF+MLL)
(From STAAD Analysis Results) = 1.5 X (396 + 59 + 372)
= 1240.02 kNm
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Where,
Maximum principal tensile stress ft = 0.24 f ck
= 1.518 N/mm 2
Effective Prestress Force Pe = 0.8 x0.75 xAp xf p
= 4262kN
Comp. Stress at Centroidal axis Pe
f cp =
due to Prestress A
f cp = 4.736 N/mm 2
∴ V co = 1711.4 kN
For section cracked in flexure
f
V cr = 1 − 0.55 pe ζ 0 bd + M 0 V
f p M
f pe = 1136.4 N/mm 2
Ap
100 = 0.59
bd
ζ = 0.5424 N/mm 2
I
M0 = 0.8 f pt
Y
f pt = 4.74 - 5.8723
= -1.14 N/mm 2
3
I = bD /12
4
= 42187500000 mm
Y = 375 mm
M0 = 102.3 kNm
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
0.1bd f ck = 402.2 kN
So Vcr = 402.2 kN
Shear Strength lesser of Vcr/Vco Vc = 402.2 kN
Factored Shear Force V = 692.9 kN
Asv V − Vc
=
sv 0.87 f v d t
V -V c = 290.6 kN
dt Min. of 530 or (750-30-10-16)
dt = 694 mm
0.87 x f v x d t = 250569 N/mm
A sv = 314.16 sq.mm
sv = 271 mm
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Asv 0.4
Minimum Reinforcement = ≥
bsv 0.87 f y
A sv = 314.16 sq.mm
Sv = 236.31 mm
2
Area of the Cross Section A = 900000 mm
3
Section Modulus of the section Z = 112500000 mm
Bending Moment Me = 987.58 kNm
BM due to Selfweight Msw = 395.86 kNm
M 30 M 40 M 60
fck
fci = 0.8 X fck
= 32 N/mm 2
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Pi Pie Msw
- + < 3.00
A Z Z
Stress at Top
Pi Pie Msw
+ - < 15.47
A Z Z
M 30 M 40 M 60
fck
Stress at Bottom
Pe Pee Me
- + < 12.67
A Z Z
Stress at Top
Pe Pee Me
+ - < 3.00
A Z Z
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Max. 5.420 mm
Max. 16.09 mm
Max. 0.647 mm
Max. 1.72 mm
Max. 4.869 mm
Max. 17.50 mm
Max. 17.25 mm
Max. 9.701 mm
Yugasoft PAGE: 81 of 91
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
At Service
= 65.600
> 18.395
Hence Okay
Yugasoft PAGE: 82 of 91
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Total Stress
Average Stress =
6
2
= 7.86 N/mm
1 fc
Loss of Strain = X
Ec 2
= 0.00010902
-4
= 1.09 x 10
Loss of Stress = Loss of Strain X Es
2
= 21.26 N/mm
2 X 10-4
Shrinkage Strain@ T = 28days =
log(T +2)
Loss of Strain = 0.00014
-4
= 1.35 x 10
Loss of Stress = Loss of Strain X Es
2
= 26.40 N/mm
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Total Stress
Average Stress =
6
2
= 7.86 N/mm
Assuming the Creep Coefficient φ = 1.6
Average Stress X φ
Loss of Strain(Creep Strain) =
Ec
Loss of Strain(Creep Strain) = 0.00035
-4
= 3.49 x 10
Loss of Stress = Loss of Strain X Es
2
= 68.03 N/mm
-4
Loss of Strain = 2.79 x 10
Loss of Stress = Loss of Strain X Es
2
= 54.36 N/mm
Yugasoft PAGE: 85 of 91
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Slope Change
θ1 = 9 deg = 0.1571
µ = 0.300
k = 0.003
Total Slope Change α = 0.1571
x = 16.400
(µα + kx) = 0.096
- (µα + kx)
Effect, Prestress Force Px = Po x e
2
= 1720.1 N/mm
Loss of Prestress = Po-Px
2
= 173.9 N/mm
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Fbst Ypo
= 0.32 - 0.3
Pk Yo
Where,
Ypo = 270 mm
Yo = 400 mm
270
∴ Fbst = 4972.5 x 0.32 - 0.3
400
Fbst = 584.27 KN
584.27
As =
0.87 X 415
2
As = 1618.26 mm
2
Each Layers = 400 mm
400.0
10 mm BARS =
78.5
= 5.1 Nos
Provide 6Nos
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
5.1.1.2 RB10 1 1.5 91 Bot 450 688 0.64 0.1 0.16 ---- 4.95 ---- 3 Y20
1 1.5 137 Top 450 688 0.96 0.1 0.276 ---- 8.54 ---- 4 Y20
2 1.2 135 Bot 450 688 0.76 0.1 0.214 ---- 6.63 ---- 3 Y20
2 1.2 88 Top 450 688 0.5 0.1 0.141 ---- 4.37 ---- 2 Y20
5.1.1.3 RB11 1 1.5 50 Bot 450 688 0.35 0.1 0.098 ---- 3.03 ---- 4 Y16
1 1.5 71 Top 450 688 0.5 0.1 0.141 ---- 4.37 ---- 4 Y16
2 1.2 96 Bot 450 688 0.54 0.1 0.156 ---- 4.83 ---- 4 Y16
2 1.2 205 Top 450 688 1.15 0.1 0.334 ---- 10.34 ---- 6 Y16
5.1.2.2 FB10 1 1.5 99 Bot 450 688 0.7 0.1 0.507 ---- 15.7 ---- 6 Y20
1 1.5 193 Top 450 688 1.36 0.1 0.396 ---- 12.26 ---- 5 Y20
2 1.2 151 Bot 450 688 0.85 0.1 0.244 ---- 7.55 ---- 3 Y20
2 1.2 452 Top 450 688 2.55 0.1 0.794 ---- 24.58 ---- 9 Y20
5.1.2.3 FB11 1 1.5 61 Bot 450 688 0.43 0.1 0.127 ---- 3.93 ---- 3 Y16
1 1.5 88 Top 450 688 0.62 0.1 0.18 ---- 5.57 ---- 4 Y16
2 1.2 140 Bot 450 688 0.79 0.1 0.229 ---- 7.09 ---- 5 Y16
2 1.2 400 Top 450 688 2.25 0.1 0.69 ---- 21.36 ---- 12 Y16
5.1.1.5 RB10 1 1.5 121 450 688 182 0.276 0.34 105 1.12 Y 10 Stp 2 300
2 1.2 134 450 688 161 0.214 0.34 105 0.81 Y 10 Stp 2 300
5.1.1.6 RB11 1 1.5 54 450 688 81 0.141 0.34 105 -0.35 Y 10 Stp 2 300
2 1.2 98 450 688 118 0.334 0.34 105 0.19 Y 10 Stp 2 300
5.1.2.5 FB10 1 1.5 196 450 688 294 0.507 0.51 158 1.98 Y 10 Stp 2 200
2 1.2 271 450 688 325 0.794 0.62 192 1.93 Y 10 Stp 2 200
5.1.2.6 FB11 1 1.5 99 450 688 149 0.18 0.34 105 0.64 Y 10 Stp 2 300
2 1.2 209 450 688 251 0.69 0.59 183 0.99 Y 10 Stp 2 300
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
TITLE Design of Post Tensioned and RCC Beams REVISION DATE CHECKED DATE
R1 12-Apr-05 KMD 12-Apr-05
Reinforcement ( Reqd) Y8@ 139 Y8@ 236 Y8@ 120 Y8@ 175
Reinforcement (Provd) Y8@ 130 Y8@ 230 Y8@ 120 Y8@ 175
PAGE: 91 of 91
Post Tensioned Beams for the floor slab and RC Beams for the floor & roof have
been designed and the respective Cable & Reinforcement Details are shown in the
drawing. Refer Annexure – 1
Post Tensioned Beams for the Roof is already designed and been sent for checking.
We shall send the Cable Details in Two or Three day’s time.
The overall proof checking is being done by Prof P.K. Aravindan. The Column Sizes
and Reinforcements were also checked for the axial forces and moments. The
Column provided is adequate from Foundation to the First Floor Level. Due to the
increased moment coming at the roof level the section shown in your drawing from
First Floor level to the roof is inadequate and the % of Reinforcement and placement
of main rods have to be altered. These details shall also be sent to you at the earliest.