Beruflich Dokumente
Kultur Dokumente
CONTENTS
DEFINITION ............................................................................... 1
4 OCCUPANCY …………………………………………. 6
5 COMMON AREA ........................................................... 6
6 RENOVATION................................................................ 7
7 BULK DELIVERY ......................................................... 9
8 CAR PARKING .............................................................. 9
9 USE OF FACILITIES
(i) Meeting Room ............................................................ 10
(ii) Tennis Court .............................................................. 11
PART D: FORMS
Application for the Use of Tennis Court/ Conference Room 18
Occupier’s Particulars ........................................................... 19
PART E: OTHERS
Building Specifications .............................................................. 20
UBI TECHPARK OWNER’S MANUAL
DEFINITION
3. The Management reserves the right to change any of these rules after due notice is
given to the Owners/ Tenants.
4. All Owners/ Tenants shall observe and comply with the rules, which may from time to
time be amended or added on by the Management.
1
UBI TECHPARK OWNER’S MANUAL
1 GENERAL
Management Staff
The duties of the Management are primarily to manage and maintain the “common
property” within the Techpark. In order to provide a high standard of management,
professional service providers have been engaged to discharge the duties of the
Management.
The developer has provided an estate management team on site to upkeep and maintain
the common property and facilities of the Techpark. If you have any feedback or
complaints, please feel free to contact the estate management staff who will attend to
your needs promptly. If you wish to write, you may drop the note at the Management
office at –
10, Ubi Crescent
#02-05, UBI Techpark
Singapore 408564
Alternately, you may reach them by fax at 6743 9816 or call the Management office at
6743 9163.
The Management office is open from 0830 hours to 1730 hours on weekdays and from
0830 hours to 1230 hours on Saturdays. The office will be closed on Sundays and
Public Holidays.
Use of lifts
Use of passenger and fireman lift for transportation of goods is strictly prohibited. The
goods lifts are intended for the purpose of transporting of goods. Contractors are not
allowed to jam the lifts while they are unloading their goods from the lift. Should there
be a need to hold the lift, please seek help from the security officers.
Your official mailing address in our records are based on that indicated in the Sale &
Purchase Agreement. Please immediately notify the Management in writing on any
change in mailing address so that all correspondences and invoices will be correctly
delivered.
Change of Ownership
The Owners shall notify the Management of any change/ transfer of ownership of their
property in writing specifying the name of the transferee and an address in Singapore
for the purpose of service of notice.
2
UBI TECHPARK OWNER’S MANUAL
Refuse Disposal
Owners/ Tenants are advised that loose waste should be sealed in plastic bags and
disposed into the litter bins provide outside the bin centre located at first level. A
refuse disposal contractor will be engaged to remove the refuse collected at the bin
centre for disposal.
Owners/ Tenants shall make their own arrangements to cart away unwanted bulky
items from the Techpark for disposal at dumping grounds at their own costs.
Flammable items, wet cement and other adhesive materials are not permitted to throw
into the bin centre as these materials can cause damage to the bin. Offenders shall be
liable for the replacement or repair cost.
Owners/ Tenants shall not disposed rubbish, strong chemical or other refuse, or permit
the same to be thrown into sinks, water closets or water or soil pipes in the building as
this can choke up and damaged the pipes. Offenders shall be liable for the replacement
or repair cost.
Car Park
The car park is open 24 hours. Each unit may apply for one season parking non-
designated car park lot. For units that are above 300 square meters, the Owner/ Tenant
may apply for an additional car park lot.
To apply for a car season parking, please fill up the attached form, attach a copy of
your vehicle logbook and submit to the following address:
MCST No 2719
10 Ubi Crescent
#02-05 Ubi Techpark
Singapore 408564
Tel: 6743 9163
Fax: 6743 9816
To apply for a lorry season parking above 1500 Tonnages, applicants has to fill up the
attached vehicle parking certificate (VPC), attached a copy of the road tax renewal
notice and submit to the above address.
Parking is on first come first served basis. No reservation of parking lot is allowed.
Lorries and containers are allowed to park at the lorry lots installed with dock leveller
for loading/ unloading purpose only. Lorry lots outside the Strata Terrace Units are
part of the common property and shall not be reserved for Owner' s/ Tenant's exclusive
use.
3
UBI TECHPARK OWNER’S MANUAL
For details on car park operations, please refer to the appended House Rules.
In case of breakdowns in essential services such as electrical supply, lifts, etc., please
contact The Management office at 6743 9163 or Fire Command Centre at 6743 1375.
After office hours, you can contact the security for assistance at 6743 1784 (24 hrs).
For units'internal fittings and equipment such as air-conditioners, you should contact
the relevant contractors directly for the defective condition of the said items.
4
UBI TECHPARK OWNER’S MANUAL
- completing the application form from SingTel. You can send the completed
application form and relevant documents to SingTel direct.
- Or you can fax over the relevant documents to SingTel at 6737 5151 and
subsequently mail them the original forms and photocopied documents to SingTel.
For “Normal” service, it takes about 5 working days from date received by SingTel to
have the telephone line installed. Should you have any enquiries, you can call the
SingTel service hotline at 1606.
Similarly, application of water, electricity can be made directly to Power Supply Ltd
by:
- Mailing the completed application forms and relevant documents.
- Or if you wish, you can open an account by bringing along the relevant documents
to the Customer Service Centre at 111 Somerset Road during office hours.
Power Supply Ltd requires 3 working days for the utilities to be turned on. Should you
have any enquiries, you can call Power Supply at 1800 235 6841.
A group of Customer Service Officers is deployed on site to handover the unit to the
Owners, receiving defect lists and co-ordination of defects rectification. Their
temporary office during the handover period is at the Management office.
In order to facilitate contact between the Management and the Owners/ Tenants in
times of emergency, please complete the occupier’s particulars form attached and
return them to the Management office once you moved in. If there are any other
changes in future, you are advised to inform the Management office of the changes
immediately.
Fire
IN CASE OF FIRE:
a. Raise the fire alarm by activating the nearest “breakglass” call-point.
b. If fire is at its initial stage, attempt without personal risk to extinguish the fire
with fire hose reel or extinguisher until fire-fighting personnel arrives.
c. Withdraw from the scene of fire if you are unable to control or contain the fire.
Allow Singapore Defence Force to take control of the fire fighting.
5
UBI TECHPARK OWNER’S MANUAL
Lifts
Please contact the Management office or the security guard when the lift breakdown.
The lift company will accord priority to attend to breakdowns with passengers trapped
in the lifts.
Power Failure
The building'
s emergency power supply will light up strategic parts of the common
The Owners/ Tenants are responsible for the repair and maintenance of the interior of
their unit, including all equipment, fixtures and fittings at their own costs.
4 OCCUPANCY
a. The unit shall be used only for the purpose intended for only. The occupier shall
ensure that the premises is granted “Change of Use” approval by the relevant
authorities where the intended use is different from the original approved use.
Such approval must be obtained before any works are carried out.
b. Occupier who are not the Owner of a particular unit must obtain a written
approval from the Owner of that particular unit to confirm that the Owner is
aware of the renovation work carried out within the unit.
c. Owners/ Tenants must not, without the written consent from the Management,
carry out any alterations or install any fittings or fixtures that deviate from the
approved plans and specifications. Owners/ Tenants will be responsible for and
shall pay all fines or penalties imposed by any government department for any
unauthorised additions and/or alterations found within their premises.
5 COMMON AREA
a. The passages, lobbies, stairways and corridors must not be obstructed at any
time, or used for any purposes other than their designated usage.
6
UBI TECHPARK OWNER’S MANUAL
b. Personal property of any kind shall not be placed on or stored in the common
areas.
c. Owners/ Tenants have to take good care of the floor tiles along the corridor, and
they will liable for the repair cost should the workers deliberately, or carelessly,
lower their pallets and trolleys in such manner that cracked the floor tiles.
6 RENOVATION
a. All Owners’/ Tenants’ fitting-out work must be vetted by the Management prior
to submission to the relevant authorities.
b. Prior to the issue of the Certificate of Statutory Completion (CSC) for the
buildings, the responsibility of compliance with the Building Regulation is still
with the project team. All occupiers and their consultants are requested to co-
operate fully and comply with the project team’s advice. In the event that any
unauthorised renovation causes delay in obtaining the CSC for the project, the
Owner will be held liable.
c. Owners/ Tenants shall not carry out any work which may affect the external
facade of the building and its structural stability.
e. Renovation works shall only be carried out on the days and hours as follow:
Monday – Friday : 9.00 am – 5.00 pm
Saturday : 9.00 am – 12.00 noon
(No work shall be carried out on Sundays and Public Holidays).
Owners/ Tenants and their contractors must inform the Management of their
work schedule at least 5 days before the works commence.
f. All renovation contractors must report at the security check-point before they
proceed to carry out work, failing which the Management reserves the right to
refuse entry to any unknown person which cannot be verified there and then.
h. All renovation workmen should only use designated lifts and staircases so as not
to cause inconvenience to Owners/ Tenants. Packing and crating materials must
7
UBI TECHPARK OWNER’S MANUAL
i. All Owners/ Tenants are not allowed to tap water/ electricity supply from the
common areas for their special use unless approval is granted by the
Management.
j. No storage space will be provided on site. All articles/ materials must be stored
within the Owners'/ Tenants'unit.
k. The Owners/ Tenants shall be fully responsible for the dumping of debris by
their contractors and/ or by their personnel. Unwanted materials, debris etc.,
should not be left in the corridors, lift lobbies, fire escape staircases or any other
common areas of the Techpark. Otherwise they will be removed and the cost
charged to the Owners/ Tenants concerned.
n. Owners/ Tenants must ensure that adequate measures are taken to protect the
common property during the delivery or removal of materials by their
contractors. A doormat must be provided by the contractor at the door entrance
of the unit to prevent worker in that unit from dirtying the common area. The
common property affected during the delivery or removal of materials must be
left in a clean and tidy condition on the completion of work each day.
o. Owners/ Tenants shall be responsible for the conduct and behaviour of their
appointed contractors. Any damages to the building and its equipment caused
by the moving of equipment or other effects shall be replaced or repaired at the
expenses of the Owners/ Tenants concerned.
8
UBI TECHPARK OWNER’S MANUAL
7 BULK DELIVERY
b. All deliveries must be reported at the security checkpoint prior to the work
being carried out. Otherwise, the Management reserves the right to refuse entry
of any unknown personnel for purpose, which cannot be verified.
c. All contractors and their workmen must report at the security check-point to
obtain identification passes, and must wear their pass at all times.
d. Workmen carrying out deliveries should use only designated lifts and staircases
so as not to inconvenience others. Packing and crating materials must be
disposed of and removed from the Techpark by the Owners/ Tenants on the
same day that they are brought in.
d. Owners/ Tenants are not allowed to tap water/ electricity supply from the
common areas for their personal use unless the Management grants approval.
f. Unwanted materials, debris, etc., should not be left in the corridors, lift lobbies,
fire escape staircase or any other common areas in the building. Otherwise,
they will be removed and the cost will be charged to the owners concerned.
g. Owners/ Tenants must ensure that adequate measures are taken to protect the
common property during any bulk deliveries work.
h. Owners/ Tenants shall be responsible for the conduct and behaviour of their
appointed contractors. Any damages to the building and equipment caused by
the moving of equipment or other effects shall be replaced or repaired at the
expenses of the Owners/ Tenants concerned.
8 CAR PARKING
a. Owners/ Tenants shall apply for car park labels directly to the car park operator.
A car park label shall only be issued to an owner or his authorised employees.
Tenants have to attach a copy of tenancy agreement or authorised letter
endorsed by the owner for carpark application.
9
UBI TECHPARK OWNER’S MANUAL
d. Parking areas are not to be used for recreation, storage or repair works by
Owners/ Tenants.
f. Handicapped parking lots are strictly to be used by the said category of drivers.
g. All vehicles parked in the Techpark will be at the owner’s risk. The
Management shall not be held liable for any theft, damage or other
misdemeanour caused to the vehicles and/ or their contents.
i. The VPC fee is payable is $6.00 plus and administrative fee of $10.30
(inclusive of 5% GST) in cash per certificate or any other rate as may be
prescribed from time to time regardless of the period required.
j. All vehicles should park at the designated parking lot to prevent causing
unnecessary obstruction to the flow of traffic. A wheel-clamped fee of $100.00
will be charged to offenders for unauthorized and illegal parking in the building.
9 USE OF FACILITIES
a. Only Owners/ Tenants and their invited Guests are entitled to use the Meeting
Room. Owners/ Tenants are required to be present with their Guests at all times
and to ensure that their guests comply with the House Rules.
b. Owners/ Tenants are requested to produce their Staff ID at the time of booking
of the Meeting Room.
c. Children under 12 years old shall not be allowed to handle any of the equipment
in the Meeting Room. They shall be accompanied by their parents or
supervisory adults who shall be responsible for their safety and proper
behaviour.
10
UBI TECHPARK OWNER’S MANUAL
d. Owners/ Tenants shall be responsible for any damage caused to the equipment
in the Meeting Room by them or their Guests. Owners/ Tenants shall inform the
security or the Management staff of any existing damage to the Meeting Room
and its facilities they or their Guests are about to use, failing which they may be
held responsible for such damage.
f. The Management, security officers may require any person in the Meeting
Room to identify himself or herself.
g. Except for meetings, discussions, training and business presentations for which
the Meeting Room were intended, no other activities will be allowed in the
Meeting Room.
i. Owners/ Tenants and their Guests shall abide by all rules set out by the
Management when they utilise the Meeting Room.
j. The Management reserves the right to change the rules. Owners/ Tenants shall
be notified in advance before such changes take effect.
b. The charge for using the tennis court is S$5.00 (inclusive of GST) per hour.
c. Each Owner/ Tenant is entitled to book a maximum two-hours per week for not
more than 2 sessions a month.
f. If due to un-permitted weather, the Owners/ Tenants shall notify the security
officer or the Management immediately. Another time slot will be arranged
11
UBI TECHPARK OWNER’S MANUAL
g. Owners/ Tenants shall produce booking receipts for identification before the
security officer proceed to switch on the lights for the court.
h. Owners/ Tenants will not be permitted to enter the court without valid booking
receipts.
i. All players shall be in proper attire for the game. Shoes and balls used shall be
of the non-marking types. Any player found not complying with such rulings
would be barred from the court.
j. Owners/ Tenants who booked the court must be present when their Guests are
playing.
k. Players must vacate the courts when their sessions of play end.
m. Owners/ Tenants will be held responsible for any damage caused by their
Guests or themselves. Any damages caused by the previous players must be
reported to the Management immediately before the commencement of the
game.
n. The Management will not be held responsible for any injuries, damages or loss
sustained by Owners/ Tenants and their Guests, however caused during the use
of these facilities.
12
UBI TECHPARK OWNER’S MANUAL
Q5 After installing the glass door, can I leave the fire doors ajar?
A5 Yes, you can but the arrangement shall comply with the relevant authorities
requirements.
13
UBI TECHPARK OWNER’S MANUAL
A1 For units which have its own air-con ledge, you could install your condensing
unit there. For units without an air-con ledge, a designated location will be
given. Please approach the Management office for advice.
3 ELECTRICITY
14
UBI TECHPARK OWNER’S MANUAL
5 FALSE CEILING
6 CABINET/ CUPBOARD
7 RENOVATIONS
Q1 Can I start the renovation immediately after taking over the unit?
A1 Yes, you may do so provided you have no reporting on defects. Any damages
caused by the renovation contractor appointed by you will not be taken as a
defect item.
15
UBI TECHPARK OWNER’S MANUAL
Q5 If I own more than one unit, can I bring down the dividing partition walls?
A5 Yes, you could do so. But please engage the original building’s structural
engineer to check and endorse for the work. Submission of the alteration works
to the relevant authorities is required.
Q6 What types of hammering tools are allowed to be used for removing the
partition brick wall?
A6 Only hand-held power hammering tools are allowed. Removing wall by manual
knocking is strictly disallowed.
Q8 If my unit has no water point and floor trap, can I install one?
A8 No, you are not allowed to do so.
Q10 Can the floor slab in my unit withstand the weight of my machines?
A10 The Owners/ Tenants are advised to check the floor maximum loading before
installing any heavy machinery.
Q11 Where can my contractor place their open-top container for their debris?
A11 The contractor should approach the Management office for a designated place
for parking his open-top container.
8 DEFECTS
9 FACILITIES
16
UBI TECHPARK OWNER’S MANUAL
Q4 What are the charges and rules for the use of facilities?
A4 You may refer to the handover package for details.
10 SECURITY
12 MANAGING AGENT
17
UBI TECHPARK OWNER’S MANUAL
I understand and agreed to abide by the HOUSE RULES governing the use of the MEETING ROOM and the
TENNIS COURT.
________________________ _________________________
Signature of Applicant Company Stamp
Return of Equipment
1) This is to certify that all equipment for use in connection with the above facility has been returned in
good condition.
__________________________________
Name/Signature of the Management Staff
Date: ________________________
F or book enquiries, please feel free to call telephone 6743 9163 for further details or
alternatively, please call on the Management office at the following address:
18
UBI TECHPARK OWNER’S MANUAL
OCCUPIER’S PARTICULARS
(owner / Tenant)
Unit No :
Company Name :
Company Address :
Mailing Address :
Main Line :
Fax No :
Website :
E-Mail :
Nature of Business :
19
UBI TECHPARK OWNER’S MANUAL
Foundation
Cast in-situ concrete bored piles.
Roof
Flat reinforced concrete roof with appropriate insulation and waterproofing system.
Floor-to-floor Heights
1st Storey : 6.0m approximate
2nd to 7th Storeys : 4.2m approximate
Windows
Aluminium-framed glass window system where windows are available at unit.
Doors
Timber door with plastic laminate finish and one glass door where available at unit.
Electrical Installation
Each unit is provided with one isolator. The electrical loading ranges from 60A to 150A, 3-
phase incoming supply, subject to diversity factor of 0.7. Exit lighting and emergency lighting
are provided according to authorities’ requirement.
Lift System
Capacity of passenger lift : 20 persons
Capacity of goods lift : 3000 kg
Car size of goods lift : 2500(W) x 3500(D) x 2300(H) approx.
Capacity of fire lift : 13 persons
Internal Finishes
Production Area
Wall : Plaster and paint
Floor : Power floated concrete with floor hardener
Ceiling: Skim coat to slab soffit
20
UBI TECHPARK OWNER’S MANUAL
Toilets
Wall : Homogeneous tiles
Floor : Homogeneous tiles
Ceiling: Fibre cement board
Staircases
Wall : Plaster and paint
Floor : Cement and sand screed
Ceiling: Skim coat to slab soffit
Fire Protection
Fire sprinkler system is provided in each unit
Mechanical Ventilation
Mechanical ventilation is provided for units where natural ventilation cannot be achieved.
Sanitary Installation
Sanitary fittings complete with pipings are provided to all toilets.
Others
• One number of telephone terminal block is provided in each unit.
• For units without a/c ledges, provisions are made to facilitate installation of air-
conditioning units at common areas by occupiers.
• Water supply pipes are provided to certain units to facilitate connection of water supply by
occupiers. Water sub-meter enclosures, floor traps, exposed waste and vent stacks are
provided for such units.
• Lightning protection to CP33: 1996
• Dock levellers are provided at loading areas.
+
21
UBI TECHPARK OWNER’S MANUAL
Foundation
Reinforced precast concrete piles.
Super-structure
Reinforced concrete column, beam and slab system.
Roof
Flat reinforced concrete roof with appropriate insulation and waterproofing system.
Floor-to-floor Heights
1st Storey : 6.0m approximate
2nd Storey : 4.2m approximate
3rd Storey : 4.2m approximate (for Type A only)
Windows
Aluminium-framed glass window system.
Doors
Glass door at front entrance.
Roller shutter at loading and unloading area.
Timber doors with plastic laminate finish except for exposed areas which are provided with
metal doors.
Electrical Installation
Type A : 250A with diversity factor of 0.7, 3-phase in-coming supply, complete with
switchboard.
Type D : 150A with diversity factor of 0.7, 3-phase in-coming supply, complete with
switchboard.
Exit lighting and emergency lighting are provided according to authorities’ requirement.
Lift System
One set of service lift is provided in each unit.
Capacity of lift : 1600 kg
Car size of lift : 2100(W) x 1500(D) x 2200(H) approx.
Internal Finishes
22
UBI TECHPARK OWNER’S MANUAL
Production Area
Wall : Plaster and paint
Floor : Power floated concrete with floor hardener
Ceiling: Skim coat to slab soffit
Staircases
Wall : Plaster and paint
Floor : Cement and sand screed with nosing tiles.
Ceiling: Skim coat to slab soffit
Toilets
Wall : Ceramic tiles
Floor : Homogeneous tiles
Ceiling: Calcium silicate board with paint finish.
Fire Protection
Manual fire alarm system, fire hose reels and fire extinguishers are provided.
Mechanical Ventilation
Mechanical Ventilation to toilets, lift motor room and staircases.
Sanitary Installation
Sanitary fittings complete with pipings are provided to all toilets
Others
• Telephone lead-in pipe sleeves.
• Plinths on common roof and a/c ledges are provided to facilitate installation of air-
conditioning units by occupier.
• Lightning protection to CP33: 1996.
23
UBI TECHPARK OWNER’S MANUAL
DEVELOPERS:
MARKETING AGENTS:
Colliers Jardine
10 Anson Road
#06-11 International Plaza
Singapore 079903
Tel: 6223 2323
Fax: 6225 3190
Person to contact: Dennis Yeo Hp: 9636 6388 Pgr: 9513 2315
Lim Poh Gheok Hp: 9617 1066
CONSULTANTS:
24
UBI TECHPARK OWNER’S MANUAL
CONTRACTORS:
Shimizu Corporation
78 Shenton Way
#11-01
Singapore 079120
Tel: 6220 0406
Fax: 6224 9890
25