REBAR CAGE RECORD

Location IC 7 - PIER 1
Pile ID No. BP 1.2
Date of Inspection 22/7/2017

Cage Main Bars Lap Helical Links Internal Bars (Frame) Spacer Blocks Welding
No.
Diameter Size No. of Spacing Length Size Spacing Size Spacing Nos. at Spacing Checked Remarks
(mm) (mm) Bars (mm) (mm) (mm) (mm) (mm) (mm) each level (mm) Per Level
1 1650 T32 36 140 1300 T16 125 T16 3300 3 550 3 points 36T32 x 12m + 36T32 x 6m
Alt. Placed + T16-125 Links
2 1650 T25 36 140 1000 T16 200 T16 3200 3 550 2 points 36T25 x 12m + T16-200 Links
3 1650 T25 36 140 1000 T16 200 T16 3200 3 550 2 points 36T25 x 9.0m + T16-200 Links

Contractor: SE:

Signature Signature Signature


Name Zawin Najah Name Name
Designation SE Designation Designation
Date 22/7/2017 Date Date
CONCRETE POURING RECORD

Location Supplier Method of Placing TREMIE


Pile ID No. BP 1.2 Concrete Grade/ Mix G40T2 Estimated Pour Vol. 95.62
Date/ Time of Pour 22/07/17 Target Slump 175+/- 25 Weather FINE

Time Truck Cubes Time Discharge Volume (m3)


Delivery Order
No. Truck No. Slump Remarks
No. Batched On Site No. Made Ref. No. Start Finish Delivery Cumulative

1 J063075 955 2252 2310 200 4 1.2-1,2,3,4 1130 1141 10 10


2 J063076 2327 2258 2320 195 1142 1149 6 16
3 J063077 4092 2305 2335 190 4 1.2-5,6,7,8 1150 1157 7 23
4 J063078 3161 2334 2356 170 4 1.2-9,10,11,12 0005 0013 7 30
5 J063079 1305 2357 0009 195 0024 0029 7 37
6 J063080 955 0014 0040 180 4 1.2-13,14,15,16 0041 0055 10 47
7 J063082 2327 0122 0135 175 4 1.2-17,18,19,20 0140 0148 6 53
8 J063083 4092 0132 0150 180 4 1.2-21,22,23,24 0158 0207 7 60
9 J063084 1305 0143 0155 170 0210 0217 7 67
10 J063085 2327 0223 0237 195 4 1.2-25,26,27,28 0245 0251 6 73
11 J063086 4092 0233 0247 180 4 1.2-29,30,31,32 0302 0311 7 80
12 J063087 1305 0242 0254 190 0313 0321 7 87
13 J063088 2327 0309 0324 180 4 1.2-33,34,35,36 0331 0343 6 93
14 J063089 4092 0330 0342 180 0350 0400 6 99

Contractor: QA/QC: SE:


Signature Signature Signature
Name Name Name
Designation SE Designation Designation
Date 22/7/2017 Date Date
Remarks
CONCRETE POURING RECORD

Location Supplier Method of Placing TREMIE


Pile ID No. BP 5.G Concrete Grade/ Mix G40T2 Estimated Pour Vol. 95.62
Date/ Time of Pour 14/07/2017 Target Slump 165+/- 25 Weather FINE

Time Truck Cubes Time Discharge Volume (m3)


No. Delivery Order No. Truck No. Slump Remarks
Batched On Site No. Made Ref. No. Start Finish Delivery Cumulative
15
16
17
18
19
20
21
22
23

Contractor: QA/QC: SE:

Signature Signature Signature


Name Name Name
Designation Designation Designation
Date Date Date
marks
CONCRETE PROGRESS CHART

Location Supplier
Pile ID No. Concrete Grade/ Mix G40T2
Pile Diameter 1800 mm Top of Casing Level 17.341 m
Date/ Time of Pour 22/07/17 @ 1130 Total Depth from TOC 37.57 m

Truck No. 0 1 2 3 4 5 6 7 8
Delivery Vol. (m3) 0.0 10.0 6.0 7.0 7.0 7.0 10.0 6.0 7.0
Measured Depth from TOC (m) 37.57 33.60 31.20 28.40 25.50 22.80 18.90 16.50 13.80
Concrete Cumulative Vol. (m3) 0.0 10.0 16.0 23.0 30.0 37.0 47.0 53.0 60.0
Actual BP Depth (m) 0.00 3.97 6.37 9.17 12.07 14.77 18.67 21.07 23.77
Theoretical BP Depth (m) 0.00 3.93 6.29 9.04 11.79 14.54 18.47 20.83 23.58

Truck No. 15 16 17 18 19 20 21 22 23
Delivery Vol. (m3)
Measured Depth from TOC (m)
Concrete Cumulative Vol. (m3)
Actual BP Depth (m)
Theoretical BP Depth (m)

45.00
Actual BP Depth
Theoretical BP Depth (m)

40.00

35.00

30.00 28.87

26.67
Depth of Bored Pile (m)

25.00 23.77

20.00 18.67 21.07

14.77
15.00
12.07

10.00 9.17
10.00 9.17

6.37

5.00 3.97

0.00 0.00
0 0 .0 .0 0 0 .0 .0 0 .0 0
0. 10
.
16 23 30
.
37
.
47 53 60
.
67 73
.

Cumulative Concrete Volume (m³)

Contractor: IKHMAS JAYA SDN. BHD. QA/QC: ISEDECOR BINA SDN. BHD. SE: PERU

Signature Signature Signature

Name Zawin Najah Name Name


Designation Site Engineer Designation Designatio

Date 17/7/2017 Date Date


PROGRESS CHART

Theoretical Volume 95.6 m3


Actual Volume 99.0 m3
Over Break 3.4 m3
Percentage 3.43 %

9 10 11 12 13 14
7.0 6.0 7.0 7.0 6.0 6.0
10.90 8.70 6.10 3.20 1.00 0.00
67.0 73.0 80.0 87.0 93.0 99.0
26.67 28.87 31.47 34.37 36.57 37.57
26.33 28.69 31.44 34.19 36.55 38.9

24 25 26 27 28 29

36.57 37.57

34.37

31.47

28.87

26.67

23.77

21.07
.0 . 0 .0 . 0 .0 . 0 . 0 .0
53 60 67 73 80 87 93 99

ve Concrete Volume (m³)

SE: PERUNDING JAMBATAN OSD S/B

Signature

Name
Designation

Date