HRSG-01 INSTALLATION ITP

Scale Job Number Ud System Doc.Orig Doc nr. Sheet Number Free
Document

Type
Disc

NA 15091 001
Size Project Num.of Sheets Rev.
trubarabia.com

A4 DU B 01 VA Q P I T RU 00 2 042 03

This Document is property of CONSORTIUM INITEC Energía-SSEM, and cannot be duplicated or disclosed for any use other than this project and the
purpose for which it is issued for without the written consent OF CONSORTIUM INITEC Energía-SSEM.
Procedure format.docx
DUBA GREEN INTEGRATED SOLAR COMBINED CYCLE
POWER PLANT ITP MECHANICAL WORKS
trubarabia.com

ACTIVITY: HRSG ASSEMBLY & ERECTION


GENERAL ARRANGEMENT DRAWING.: 2014T0007-HGA-A001/2/3/4/5/6 PROCEDURE: DUB-01-VA-MM-TRU-002 DOC. Nº: DUB-01-VA-QPI-TRU-002 Rev. 03
ELEMENT: HRSG-01

INVOLVED PARTIES
INSPECTION / REVISION / TEST
Applicable Standard /
Point Nº General Activity Specific Activity Project Specification TRUBA CIS O/E GE Report Nº / RFI Nº Remarks
Supplier Specifications
Responsability
Type % Action Code Action Code Action Code Action Code
Assignment
1. GENERAL

GE Energy Typical Pre- Documental 100 Material Depart. H


Reception ,Storage Check of equipments and materials
1.1 Erection Narrative for HRSG Dimensional 100 H H S GE TA will attend OPI if necessary
and handling received at workshop
Point 2.3 Visual 100 Quality S

Documental 100 R
Reception ,Storage Check filler material and welding
1.2 H Quality
and handling consumables
Visual 100 S

Welding
1.3 Check welding procedure specifications Documental 100 H Quality R
Documentation

Welding Check welder performance


1.4 Documental 100 H Quality R
Documentation qualifications

1.5 NDT Documentation Check non destructive test procedures Documental 100 H Quality R

1.6 NDT Documentation Check NDT personnel qualifications Documental 100 H Quality R

Verify all the drawings issued for


Construction
1.7 construction are approved and in latest Documental 100 H T.O. Depart. R
Documentation
revision

Check all the equipments for Visual 100 S


Inspection & Test
1.8 inspection, test and measuring are H Quality
Equipments
properly calibrated before use Documental 100 R

2. FOUNDATION, ANCHOR BOLTS AND BASE PLATES

GE Energy Typical Pre- Construction


Check the surface preparation and
2.1 Foundation Erection Narrative for HRSG Visual 100 H S
cleanliness inside pockets
Point 6.1 Quality

GE Energy Typical Pre- Topographic 100 R


Check the location, elevation and size
2.2 Anchor bolts Erection Narrative for HRSG H Construction R
of all achor bolts
Point 6.1 Dimensional 100 S

Check the position and level of tne GE Energy Typical Pre-


2.3 Base plates base plates after installation on the Erection Narrative for HRSG Topographic 100 H Construction R R
anchor bolts Point 6.2

GEMSS-C-15, Rev-02 GE Energy Typical Pre- Construction


Ckeck the grout preparation and
2.4 Base plates Point 8.1.6.1 Erection Narrative for HRSG Visual 100 H S
pouring for securing of base plates
Point 8.2.3.1 Point 6.2 Quality

GE Energy Typical Pre- Expansion 2 samples from each


GEMSS-C-15, Rev-02
2.5 Base plates Check the grout testing Erection Narrative for HRSG Flow batch used in the H Quality W
Point 8.3.2
Point 6.2 Strength works

Check the base plates for elevation and


2.6 Base plates Topographic 100 H Construction R R
leveness after grout is cured
DUBA GREEN INTEGRATED SOLAR COMBINED CYCLE
POWER PLANT ITP MECHANICAL WORKS
trubarabia.com

ACTIVITY: HRSG ASSEMBLY & ERECTION


GENERAL ARRANGEMENT DRAWING.: 2014T0007-HGA-A001/2/3/4/5/6 PROCEDURE: DUB-01-VA-MM-TRU-002 DOC. Nº: DUB-01-VA-QPI-TRU-002 Rev. 03
ELEMENT: HRSG-01

INVOLVED PARTIES
INSPECTION / REVISION / TEST
Applicable Standard /
Point Nº General Activity Specific Activity Project Specification TRUBA CIS O/E GE Report Nº / RFI Nº Remarks
Supplier Specifications
Responsability
Type % Action Code Action Code Action Code Action Code
Assignment

3. GENERALBOX ROW 1
MODULE

GE Energy Typical Pre-


Check the installation of the temporary
3.1 Module B Erection Narrative for HRSG Visual 100 H Construction S
support before module lay down
Point 6.3

GE Energy Typical Pre-


Check the dismantle of module top
3.2 Module B Erection Narrative for HRSG Visual 100 H Construction S
guide beams
Point 6.3

Check the installation of upper and


GE Energy Typical Pre-
lower elevation lifting lugs (verify new /
3.3 Module B Erection Narrative for HRSG Visual 100 H Construction S S
unused bolting hardware and
Point 6.3
tensioning)

Check the upringht & set on foudation


GE Energy Typical Pre- Visual 100 S
base plates, ensure centerline of
3.4 Module B Erection Narrative for HRSG H Construction R
module is at centerline of foudation,
Point 6.3 Topographic 100 R
verify level, square and plumb.

GE Energy Typical Pre-


Check the dismantle of module top
3.5 Module A Erection Narrative for HRSG Visual 100 H Construction S
guide beams
Point 6.3

Check the installation of upper and


GE Energy Typical Pre-
lower elevation lifting lugs (verify new /
3.6 Module A Erection Narrative for HRSG Visual 100 H Construction S
unused bolting hardware and
Point 6.3
tensioning)

Check the upright & set on foudation


base plates, verify initial fit up of upper GE Energy Typical Pre- Visual 100 S
3.7 Module A and lower transverse beams and initial Erection Narrative for HRSG H Construction R
bolting of fit up plates, verify level, Point 6.3 Topographic 100 R
square and plumb.

GE Energy Typical Pre-


Modules B+A Verify upper transverse beam elevation
3.8 Erection Narrative for HRSG Dimensional 100 H Construction S
(Alignment) and level across all both modules
Point 6.3

GE Energy Typical Pre-


Modules B+A Check the tighteninig of bolts for fit up
3.9 Erection Narrative for HRSG Dimensional 100 H Quality H
(Alignment) plates in the upper transverse beam
Point 6.3

GE Energy Typical Pre-


Modules B+A Verify lower transverse beam elevation
3.10 Erection Narrative for HRSG Dimensional 100 H Construction S
(Alignment) and level across all both modules
Point 6.3

GE Energy Typical Pre-


Modules B+A Check the tighteninig of bolts for fit up
3.11 Erection Narrative for HRSG Dimensional 100 H Quality H R
(Alignment) plates in the lower transverse beam
Point 6.3

GE Energy Typical Pre-


Check the dismantle of shipping and
3.12 Modules B+A Erection Narrative for HRSG Visual 100 H Construction S S
erection temporary frames
Point 6.3
DUBA GREEN INTEGRATED SOLAR COMBINED CYCLE
POWER PLANT ITP MECHANICAL WORKS
trubarabia.com

ACTIVITY: HRSG ASSEMBLY & ERECTION


GENERAL ARRANGEMENT DRAWING.: 2014T0007-HGA-A001/2/3/4/5/6 PROCEDURE: DUB-01-VA-MM-TRU-002 DOC. Nº: DUB-01-VA-QPI-TRU-002 Rev. 03
ELEMENT: HRSG-01

INVOLVED PARTIES
INSPECTION / REVISION / TEST
Applicable Standard /
Point Nº General Activity Specific Activity Project Specification TRUBA CIS O/E GE Report Nº / RFI Nº Remarks
Supplier Specifications
Responsability
Type % Action Code Action Code Action Code Action Code
Assignment

4. GENERALBOX ROW 2
MODULE

GE Energy Typical Pre-


Check the installation of the temporary
4.1 Module B Erection Narrative for HRSG Visual 100 H Construction S
support before module lay down
Point 6.3

GE Energy Typical Pre-


Check the dismantle of module top
4.2 Module B Erection Narrative for HRSG Visual 100 H Construction S
guide beams
Point 6.3

Check the installation of upper and


GE Energy Typical Pre-
lower elevation lifting lugs (verify new /
4.3 Module B Erection Narrative for HRSG Visual 100 H Construction S S
unused bolting hardware and
Point 6.3
tensioning)

Check the upringht & set on foudation


GE Energy Typical Pre- Visual 100 S
base plates, ensure centerline of
4.4 Module B Erection Narrative for HRSG H Construction R
module is at centerline of foudation,
Point 6.3 Topographic 100 R
verify level, square and plumb.

GE Energy Typical Pre-


Check the dismantle of module top
4.5 Module A Erection Narrative for HRSG Visual 100 H Construction S
guide beams
Point 6.3

Check the installation of upper and


GE Energy Typical Pre-
lower elevation lifting lugs (verify new /
4.6 Module A Erection Narrative for HRSG Visual 100 H Construction S
unused bolting hardware and
Point 6.3
tensioning)

Check the upright & set on foudation


base plates, verify initial fit up of upper GE Energy Typical Pre- Visual 100 S
4.7 Module A and lower transverse beams and initial Erection Narrative for HRSG H Construction R
bolting of fit up plates, verify level, Point 6.3 Topographic 100 R
square and plumb.

GE Energy Typical Pre-


Modules B+A Verify upper transverse beam elevation
4.8 Erection Narrative for HRSG Dimensional 100 H Construction S
(Alignment) and level across all both modules
Point 6.3

GE Energy Typical Pre-


Modules B+A Check the tighteninig of bolts for fit up
4.9 Erection Narrative for HRSG Dimensional 100 H Quality H
(Alignment) plates in the upper transverse beam
Point 6.3

GE Energy Typical Pre-


Modules B+A Verify lower transverse beam elevation
4.10 Erection Narrative for HRSG Dimensional 100 H Construction S
(Alignment) and level across all both modules
Point 6.3

GE Energy Typical Pre-


Modules B+A Check the tighteninig of bolts for fit up
4.11 Erection Narrative for HRSG Dimensional 100 H Quality H R
(Alignment) plates in the lower transverse beam
Point 6.3

GE Energy Typical Pre-


Check the dismantle of shipping and
4.12 Modules B+A Erection Narrative for HRSG Visual 100 H Construction S S
erection temporary frames
Point 6.3
DUBA GREEN INTEGRATED SOLAR COMBINED CYCLE
POWER PLANT ITP MECHANICAL WORKS
trubarabia.com

ACTIVITY: HRSG ASSEMBLY & ERECTION


GENERAL ARRANGEMENT DRAWING.: 2014T0007-HGA-A001/2/3/4/5/6 PROCEDURE: DUB-01-VA-MM-TRU-002 DOC. Nº: DUB-01-VA-QPI-TRU-002 Rev. 03
ELEMENT: HRSG-01

INVOLVED PARTIES
INSPECTION / REVISION / TEST
Applicable Standard /
Point Nº General Activity Specific Activity Project Specification TRUBA CIS O/E GE Report Nº / RFI Nº Remarks
Supplier Specifications
Responsability
Type % Action Code Action Code Action Code Action Code
Assignment

5. GENERALBOX ROW 3
MODULE

GE Energy Typical Pre-


Check the installation of the temporary
5.1 Module B Erection Narrative for HRSG Visual 100 H Construction S
support before module lay down
Point 6.3

GE Energy Typical Pre-


Check the dismantle of module top
5.2 Module B Erection Narrative for HRSG Visual 100 H Construction S
guide beams
Point 6.3

Check the installation of upper and


GE Energy Typical Pre-
lower elevation lifting lugs (verify new /
5.3 Module B Erection Narrative for HRSG Visual 100 H Construction S S
unused bolting hardware and
Point 6.3
tensioning)

Check the upringht & set on foudation


GE Energy Typical Pre- Visual 100 S
base plates, ensure centerline of
5.4 Module B Erection Narrative for HRSG H Construction R
module is at centerline of foudation,
Point 6.3 Topographic 100 R
verify level, square and plumb.

GE Energy Typical Pre-


Check the dismantle of module top
5.5 Module A Erection Narrative for HRSG Visual 100 H Construction S
guide beams
Point 6.3

Check the installation of upper and


GE Energy Typical Pre-
lower elevation lifting lugs (verify new /
5.6 Module A Erection Narrative for HRSG Visual 100 H Construction S
unused bolting hardware and
Point 6.3
tensioning)

Check the upright & set on foudation


base plates, verify initial fit up of upper GE Energy Typical Pre- Visual 100 S
5.7 Module A and lower transverse beams and initial Erection Narrative for HRSG H Construction R
bolting of fit up plates, verify level, Point 6.3 Topographic 100 R
square and plumb.

GE Energy Typical Pre-


Modules B+A Verify upper transverse beam elevation
5.8 Erection Narrative for HRSG Dimensional 100 H Construction S
(Alignment) and level across all both modules
Point 6.3

GE Energy Typical Pre-


Modules B+A Check the tighteninig of bolts for fit up
5.9 Erection Narrative for HRSG Dimensional 100 H Quality H
(Alignment) plates in the upper transverse beam
Point 6.3

GE Energy Typical Pre-


Modules B+A Verify lower transverse beam elevation
5.10 Erection Narrative for HRSG Dimensional 100 H Construction S
(Alignment) and level across all both modules
Point 6.3

GE Energy Typical Pre-


Modules B+A Check the tighteninig of bolts for fit up
5.11 Erection Narrative for HRSG Dimensional 100 H Quality H R
(Alignment) plates in the lower transverse beam
Point 6.3

GE Energy Typical Pre-


Check the dismantle of shipping and
5.12 Modules B+A Erection Narrative for HRSG Visual 100 H Construction S S
erection temporary frames
Point 6.3
DUBA GREEN INTEGRATED SOLAR COMBINED CYCLE
POWER PLANT ITP MECHANICAL WORKS
trubarabia.com

ACTIVITY: HRSG ASSEMBLY & ERECTION


GENERAL ARRANGEMENT DRAWING.: 2014T0007-HGA-A001/2/3/4/5/6 PROCEDURE: DUB-01-VA-MM-TRU-002 DOC. Nº: DUB-01-VA-QPI-TRU-002 Rev. 03
ELEMENT: HRSG-01

INVOLVED PARTIES
INSPECTION / REVISION / TEST
Applicable Standard /
Point Nº General Activity Specific Activity Project Specification TRUBA CIS O/E GE Report Nº / RFI Nº Remarks
Supplier Specifications
Responsability
Type % Action Code Action Code Action Code Action Code
Assignment

6. GENERALBOX ROW 4
MODULE

GE Energy Typical Pre-


Check the installation of the temporary
6.1 Module B Erection Narrative for HRSG Visual 100 H Construction S
support before module lay down
Point 6.3

GE Energy Typical Pre-


Check the dismantle of module top
6.2 Module B Erection Narrative for HRSG Visual 100 H Construction S
guide beams
Point 6.3

Check the installation of upper and


GE Energy Typical Pre-
lower elevation lifting lugs (verify new /
6.3 Module B Erection Narrative for HRSG Visual 100 H Construction S S
unused bolting hardware and
Point 6.3
tensioning)

Check the upringht & set on foudation


GE Energy Typical Pre- Visual 100 S
base plates, ensure centerline of
6.4 Module B Erection Narrative for HRSG H Construction R
module is at centerline of foudation,
Point 6.3 Topographic 100 R
verify level, square and plumb.

GE Energy Typical Pre-


Check the dismantle of module top
6.5 Module A Erection Narrative for HRSG Visual 100 H Construction S
guide beams
Point 6.3

Check the installation of upper and


GE Energy Typical Pre-
lower elevation lifting lugs (verify new /
6.6 Module A Erection Narrative for HRSG Visual 100 H Construction S
unused bolting hardware and
Point 6.3
tensioning)

Check the upright & set on foudation


base plates, verify initial fit up of upper GE Energy Typical Pre- Visual 100 S
6.7 Module A and lower transverse beams and initial Erection Narrative for HRSG H Construction R
bolting of fit up plates, verify level, Point 6.3 Topographic 100 R
square and plumb.

GE Energy Typical Pre-


Modules B+A Verify upper transverse beam elevation
6.8 Erection Narrative for HRSG Dimensional 100 H Construction S
(Alignment) and level across all both modules
Point 6.3

GE Energy Typical Pre-


Modules B+A Check the tighteninig of bolts for fit up
6.9 Erection Narrative for HRSG Dimensional 100 H Quality H
(Alignment) plates in the upper transverse beam
Point 6.3

GE Energy Typical Pre-


Modules B+A Verify lower transverse beam elevation
6.10 Erection Narrative for HRSG Dimensional 100 H Construction S
(Alignment) and level across all both modules
Point 6.3

GE Energy Typical Pre-


Modules B+A Check the tighteninig of bolts for fit up
6.11 Erection Narrative for HRSG Dimensional 100 H Quality H R
(Alignment) plates in the lower transverse beam
Point 6.3

GE Energy Typical Pre-


Check the dismantle of shipping and
6.12 Modules B+A Erection Narrative for HRSG Visual 100 H Construction S S
erection temporary frames
Point 6.3
DUBA GREEN INTEGRATED SOLAR COMBINED CYCLE
POWER PLANT ITP MECHANICAL WORKS
trubarabia.com

ACTIVITY: HRSG ASSEMBLY & ERECTION


GENERAL ARRANGEMENT DRAWING.: 2014T0007-HGA-A001/2/3/4/5/6 PROCEDURE: DUB-01-VA-MM-TRU-002 DOC. Nº: DUB-01-VA-QPI-TRU-002 Rev. 03
ELEMENT: HRSG-01

INVOLVED PARTIES
INSPECTION / REVISION / TEST
Applicable Standard /
Point Nº General Activity Specific Activity Project Specification TRUBA CIS O/E GE Report Nº / RFI Nº Remarks
Supplier Specifications
Responsability
Type % Action Code Action Code Action Code Action Code
Assignment

7. GENERALBOX ROW 5
MODULE

GE Energy Typical Pre-


Check the installation of the temporary
7.1 Module B Erection Narrative for HRSG Visual 100 H Construction S
support before module lay down
Point 6.3

GE Energy Typical Pre-


Check the dismantle of module top
7.2 Module B Erection Narrative for HRSG Visual 100 H Construction S
guide beams
Point 6.3

Check the installation of upper and


GE Energy Typical Pre-
lower elevation lifting lugs (verify new /
7.3 Module B Erection Narrative for HRSG Visual 100 H Construction S S
unused bolting hardware and
Point 6.3
tensioning)

Check the upringht & set on foudation


GE Energy Typical Pre- Visual 100 S
base plates, ensure centerline of
7.4 Module B Erection Narrative for HRSG H Construction R
module is at centerline of foudation,
Point 6.3 Topographic 100 R
verify level, square and plumb.

GE Energy Typical Pre-


Check the dismantle of module top
7.5 Module A Erection Narrative for HRSG Visual 100 H Construction S
guide beams
Point 6.3

Check the installation of upper and


GE Energy Typical Pre-
lower elevation lifting lugs (verify new /
7.6 Module A Erection Narrative for HRSG Visual 100 H Construction S
unused bolting hardware and
Point 6.3
tensioning)

Check the upright & set on foudation


base plates, verify initial fit up of upper GE Energy Typical Pre- Visual 100 S
7.7 Module A and lower transverse beams and initial Erection Narrative for HRSG H Construction R
bolting of fit up plates, verify level, Point 6.3 Topographic 100 R
square and plumb.

GE Energy Typical Pre-


Modules B+A Verify upper transverse beam elevation
7.8 Erection Narrative for HRSG Dimensional 100 H Construction S
(Alignment) and level across all both modules
Point 6.3

GE Energy Typical Pre-


Modules B+A Check the tighteninig of bolts for fit up
7.9 Erection Narrative for HRSG Dimensional 100 H Quality H
(Alignment) plates in the upper transverse beam
Point 6.3

GE Energy Typical Pre-


Modules B+A Verify lower transverse beam elevation
7.10 Erection Narrative for HRSG Dimensional 100 H Construction S
(Alignment) and level across all both modules
Point 6.3

GE Energy Typical Pre-


Modules B+A Check the tighteninig of bolts for fit up
7.11 Erection Narrative for HRSG Dimensional 100 H Quality H R
(Alignment) plates in the lower transverse beam
Point 6.3

GE Energy Typical Pre-


Check the dismantle of shipping and
7.12 Modules B+A Erection Narrative for HRSG Visual 100 H Construction S S
erection temporary frames
Point 6.3
DUBA GREEN INTEGRATED SOLAR COMBINED CYCLE
POWER PLANT ITP MECHANICAL WORKS
trubarabia.com

ACTIVITY: HRSG ASSEMBLY & ERECTION


GENERAL ARRANGEMENT DRAWING.: 2014T0007-HGA-A001/2/3/4/5/6 PROCEDURE: DUB-01-VA-MM-TRU-002 DOC. Nº: DUB-01-VA-QPI-TRU-002 Rev. 03
ELEMENT: HRSG-01

INVOLVED PARTIES
INSPECTION / REVISION / TEST
Applicable Standard /
Point Nº General Activity Specific Activity Project Specification TRUBA CIS O/E GE Report Nº / RFI Nº Remarks
Supplier Specifications
Responsability
Type % Action Code Action Code Action Code Action Code
Assignment

8. GENERAL
LOOSE COLUMNS, LOOSE PANEL AND FILLER PANELS

Check the upright & set on foudation GE Energy Typical Pre-


Loose Column
8.1 base plates of loose columns betwee Erection Narrative for HRSG Visual 100 H Construction S
Right Side
module 1 and module 2 (burner duct) Point 6.4

Check the upright & set on foudation GE Energy Typical Pre-


Loose Column
8.2 base plates of loose column betwee Erection Narrative for HRSG Visual 100 H Construction S
Left Side
module 1 and module 2 (burner duct) Point 6.4

Verify fit up of upper and lower GE Energy Typical Pre- Visual 100 S
8.3 Loose Columns transverse beams, bolting, level, Erection Narrative for HRSG Dimensional 100 H Construction H R
square and plumb Point 6.4 Topographic 100 R

Verify fit up, fixing, level and welding GE Energy Typical Pre- Construction
Loose Panels
8.4 between module 1-loose panel-loose Erection Narrative for HRSG Visual 100 H S
Right Side
column Point 6.4 Quality

Verify fit up, fixing, level and welding GE Energy Typical Pre- Construction
Loose Panels
8.5 between module 2-loose panel-loose Erection Narrative for HRSG Visual 100 H S
Right Side
column Point 6.4 Quality

Loose Panels Final inspection for inside and outside


8.6 GE comment Visual 100 H Quality W W
Right Side welds on loose panels

Verify fit up, fixing, level and welding GE Energy Typical Pre- Construction
Loose Panels
8.7 between module 1-loose panel-loose Erection Narrative for HRSG Visual 100 H S
Left Side
column Point 6.4 Quality

Verify fit up, fixing, level and welding GE Energy Typical Pre- Construction
Loose Panels
8.8 between module 2-loose panel-loose Erection Narrative for HRSG Visual 100 H S
Left Side
column Point 6.4 Quality

Loose Panels Final inspection for inside and outside


8.9 GE comment Visual 100 H Quality W W
Left Side welds on loose panels

Check the installation of insulation and


Loose Columns GE Energy Typical Pre-
liner plates in loose columns, loose
8.10 Loose Panels Erection Narrative for HRSG Visual 100 H Construction S
panels, between them and between
Right Side Point 6.4
them and modules 1 & 2
Check the installation of insulation and
Loose Columns GE Energy Typical Pre-
liner plates in loose columns, loose
8.11 Loose Panels Erection Narrative for HRSG Visual 100 H Construction W W
panels, between them and between
Left Side Point 6.4
them and modules 1 & 2

GE Energy Typical Pre- Construction


Filler Panels Verify fit up, fixing, level and welding
8.12 Erection Narrative for HRSG Visual 100 H S
Right Side between module 2-fillerpanel-module 3
Point 6.4 Quality

GE Energy Typical Pre- Construction


Filler Panels Verify fit up, fixing, level and welding
8.13 Erection Narrative for HRSG Visual 100 H S
Right Side between module 3-fillerpanel-module 4
Point 6.4 Quality

GE Energy Typical Pre- Construction


Filler Panels Verify fit up, fixing, level and welding
8.14 Erection Narrative for HRSG Visual 100 H S
Right Side between module 4-fillerpanel-module 5
Point 6.4 Quality
DUBA GREEN INTEGRATED SOLAR COMBINED CYCLE
POWER PLANT ITP MECHANICAL WORKS
trubarabia.com

ACTIVITY: HRSG ASSEMBLY & ERECTION


GENERAL ARRANGEMENT DRAWING.: 2014T0007-HGA-A001/2/3/4/5/6 PROCEDURE: DUB-01-VA-MM-TRU-002 DOC. Nº: DUB-01-VA-QPI-TRU-002 Rev. 03
ELEMENT: HRSG-01

INVOLVED PARTIES
INSPECTION / REVISION / TEST
Applicable Standard /
Point Nº General Activity Specific Activity Project Specification TRUBA CIS O/E GE Report Nº / RFI Nº Remarks
Supplier Specifications
Responsability
Type % Action Code Action Code Action Code Action Code
Assignment
GENERAL
Check the installation of insulation and GE Energy Typical Pre-
Filler Panels
8.15 liner plates in filler panels and between Erection Narrative for HRSG Visual 100 H Construction S
Right Side
them and modules Point 6.4

Filler Panels Final inspection for inside and outside


8.16 GE comment Visual 100 H Quality W W
Right Side welds on filler panels

GE Energy Typical Pre- Construction


Filler Panels Verify fit up, fixing, level and welding
8.17 Erection Narrative for HRSG Visual 100 H S
Left Side between module 2-fillerpanel-module 3
Point 6.4 Quality

GE Energy Typical Pre- Construction


Filler Panels Verify fit up, fixing, level and welding
8.18 Erection Narrative for HRSG Visual 100 H S
Left Side between module 3-fillerpanel-module 4
Point 6.4 Quality

GE Energy Typical Pre- Construction


Filler Panels Verify fit up, fixing, level and welding
8.19 Erection Narrative for HRSG Visual 100 H S
Left Side between module 4-fillerpanel-module 5
Point 6.4 Quality

Check the installation of insulation and GE Energy Typical Pre-


Filler Panels
8.20 liner plates in filler panels and between Erection Narrative for HRSG Visual 100 H Construction S
Left Side
them and modules Point 6.4

Filler Panels Final inspection for inside and outside


8.21 GE comment Visual 100 H Quality W W
Left Side welds on filler panels

9. DUCT BURNER

Verify fit up, fixing, level and welding Construction


Mounting supports GE Drawing
9.1 between duct burner and main Visual 100 H S
EL. 9600 2014T0007-DTB-V101
brackets Quality

Verify fit up, fixing, level and torque


Mounting supports GE Drawing
9.2 between main brackets and secondary Dimensional 100 H Quality S
EL. 9600 2014T0007-DTB-V101
brackets

Check the installation, level and gaps


Construction
Mounting supports between the mounting support and GE Drawing
9.3 Dimensional 100 H S W
EL. 9600 brackets and between mounting suport 2014T0007-DTB-V101
Quality
and duct burner

Check the fit up and fixing between the


Support Burner GE Drawing
9.4 support burner insert and the burner Visual 100 H Construction S
Inserts EL. 9600 2014T0007-DTB-V101
support

Check the position of the burners M&S (Mehldau & Steinfath)


relating to thir twist direction: Instruction for Assembly of
9.5 Burners EL. 9600 Visual 100 H Construction W S
Burner Nº 1 CW = right hand twist Burner Duct
Burner Nº 2 CWW = left hand twist Point Nº 3

Check the position of the burner on the


Construction
mounting support (check the 20 mm GE Drawing
9.6 Burners EL. 9600 Dimensional 100 H S
misalignment) and the fixation of the 2014T0007-DTB-V101
Quality
burner insert holders

Check the fit up and fixing of the gas


Gas Lances and Oil GE Drawing
9.7 lance/oil gun and the fixation of the gas Visual 100 H Construction S
Guns EL. 9600 2014T0007-DTB-V101
lance holders
DUBA GREEN INTEGRATED SOLAR COMBINED CYCLE
POWER PLANT ITP MECHANICAL WORKS
trubarabia.com

ACTIVITY: HRSG ASSEMBLY & ERECTION


GENERAL ARRANGEMENT DRAWING.: 2014T0007-HGA-A001/2/3/4/5/6 PROCEDURE: DUB-01-VA-MM-TRU-002 DOC. Nº: DUB-01-VA-QPI-TRU-002 Rev. 03
ELEMENT: HRSG-01

INVOLVED PARTIES
INSPECTION / REVISION / TEST
Applicable Standard /
Point Nº General Activity Specific Activity Project Specification TRUBA CIS O/E GE Report Nº / RFI Nº Remarks
Supplier Specifications
Responsability
Type % Action Code Action Code Action Code Action Code
Assignment
GENERAL
Visual 100 S
Verify fit up, fixing, and orientation GE Drawing
9.8 Ignitors EL. 9600 H Construction
between ignitor and burner 2014T0007-DTB-V101
Dimensional 100 S

Flame detectors and Visual 100 S


Verify fit up, fixing, and orientation of GE Drawing
9.9 inspection holes EL. H Construction W
flame detectors and inspection holes 2014T0007-DTB-V101
9600 Dimensional 100 S

Construction
Mounting supports Verify fit up, fixing, level and welding GE Drawing
9.10 Visual 100 H S
EL. 16600 between boiler and main brackets 2014T0007-DTB-V101
Quality

Verify fit up, fixing, level and torque


Mounting supports GE Drawing
9.11 between main brackets and secondary Dimensional 100 H Quality S
EL. 16600 2014T0007-DTB-V101
brackets

Check the installation, level and gaps


Construction
Mounting supports between the mounting support and GE Drawing
9.12 Dimensional 100 H S W
EL. 16600 brackets and between mounting suport 2014T0007-DTB-V101
Quality
and duct burner

Check the fit up and fixing between the


Support Burner GE Drawing
9.13 support burner insert and the burner Visual 100 H Construction S
Inserts EL. 16600 2014T0007-DTB-V101
support

Check the position of the burners M&S (Mehldau & Steinfath)


relating to thir twist direction: Instruction for Assembly of
9.14 Burners EL. 16600 Visual 100 H Construction W S
Burner Nº 3 CWW = left hand twist Burner Duct
Burner Nº 4 CW = right hand twist Point Nº 3

Check the position of the burner on the


Construction
mounting support (check the 20 mm GE Drawing
9.15 Burners EL. 16600 Dimensional 100 H S
misalignment) and the fixation of the 2014T0007-DTB-V101
Quality
burner insert holders

Check the fit up and fixing of the gas


Gas Lances and Oil GE Drawing
9.16 lance/oil gun and the fixation of the gas Visual 100 H Construction S
Guns EL. 16600 2014T0007-DTB-V101
lance holders

Visual 100 S
Verify fit up, fixing, and orientation GE Drawing
9.17 Ignitors EL. 16600 H Construction
between ignitor and burner 2014T0007-DTB-V101
Dimensional 100 S

Flame detectors and Visual 100 S


Verify fit up, fixing, and orientation of GE Drawing
9.18 inspection holes EL. H Construction W
flame detectors and inspection holes 2014T0007-DTB-V101
16600 Dimensional 100 S

Construction
Mounting supports Verify fit up, fixing, level and welding GE Drawing
9.19 Visual 100 H S
EL. 23600 between boiler and main brackets 2014T0007-DTB-V101
Quality

Verify fit up, fixing, level and torque


Mounting supports GE Drawing
9.20 between main brackets and secondary Dimensional 100 H Quality S
EL. 23600 2014T0007-DTB-V101
brackets

Check the installation, level and gaps


Construction
Mounting supports between the mounting support and GE Drawing
9.21 Dimensional 100 H S W
EL. 23600 brackets and between mounting suport 2014T0007-DTB-V101
Quality
and duct burner
DUBA GREEN INTEGRATED SOLAR COMBINED CYCLE
POWER PLANT ITP MECHANICAL WORKS
trubarabia.com

ACTIVITY: HRSG ASSEMBLY & ERECTION


GENERAL ARRANGEMENT DRAWING.: 2014T0007-HGA-A001/2/3/4/5/6 PROCEDURE: DUB-01-VA-MM-TRU-002 DOC. Nº: DUB-01-VA-QPI-TRU-002 Rev. 03
ELEMENT: HRSG-01

INVOLVED PARTIES
INSPECTION / REVISION / TEST
Applicable Standard /
Point Nº General Activity Specific Activity Project Specification TRUBA CIS O/E GE Report Nº / RFI Nº Remarks
Supplier Specifications
Responsability
Type % Action Code Action Code Action Code Action Code
Assignment
GENERAL
Check the fit up and fixing between the
Support Burner GE Drawing
9.22 support burner insert and the burner Visual 100 H Construction S
Inserts EL. 23600 2014T0007-DTB-V101
support

Check the position of the burners M&S (Mehldau & Steinfath)


relating to thir twist direction: Instruction for Assembly of
9.23 Burners EL. 23600 Visual 100 H Construction W S
Burner Nº 5 CW = right hand twist Burner Duct
Burner Nº 6 CWW = left hand twist Point Nº 3

Check the position of the burner on the


Construction
mounting support (check the 20 mm GE Drawing
9.24 Burners EL. 23600 Dimensional 100 H S
misalignment) and the fixation of the 2014T0007-DTB-V101
Quality
burner insert holders

Check the fit up and fixing of the gas


Gas Lances and Oil GE Drawing
9.25 lance/oil gun and the fixation of the gas Visual 100 H Construction S
Guns EL. 23600 2014T0007-DTB-V101
lance holders

Visual 100 S
Verify fit up, fixing, and orientation GE Drawing
9.26 Ignitors EL. 23600 H Construction
between ignitor and burner 2014T0007-DTB-V101
Dimensional 100 S

Flame detectors and Visual 100 S


Verify fit up, fixing, and orientation of GE Drawing
9.27 inspection holes EL. H Construction W
flame detectors and inspection holes 2014T0007-DTB-V101
23600 Dimensional 100 S

GE Drawing
2014T0007-DTB-V101
Verify fit up, fixing, welding and gaps for Visual 100 Construction S
Pipe construction for M&S (Mehldau & Steinfath)
9.28 thermal movements at boiler top and H
Baffles Instruction for Assembly of
boiler bottom Dimensional 100 Quality S
Burner Duct
Point Nº 4
M&S (Mehldau & Steinfath)
Verify fit up and fastening (fixed point or Instruction for Assembly of
9.29 Baffles Visual 100 H Construction S S
sliding point) of baffles Burner Duct
Point Nº 4

Check the installation of the 4 layers of GE Drawings


9.30 Bottom Insulation insuflax blocks on the bottom of the 2014T0007-HCS-E001 Visual 100 H Construction S S
burner duct 2014T0007-HCS-E024

Check the installation of 1 layer of light GE Drawings


9.31 Bottom Insulation weight brick onto the last layer of 2014T0007-HCS-E001 Visual 100 H Construction S
insuflax blocks 2014T0007-HCS-E024

Check the installation of 1 layer of GE Drawings


9.32 Bottom Insulation fireclay brick onto the layer of light 2014T0007-HCS-E001 Visual 100 H Construction S S
weight brick 2014T0007-HCS-E024

Check the installation and fixing, with


GE Drawings
stud bolts and nuts, of 1 layer of pyro
9.33 Top & Side Insulation 2014T0007-HCS-E001 Visual 100 H Construction S S
blocks for covering all the internal
2014T0007-HCS-E024
walls and ceiling surfaces

Check after the assembly the gastight GE Drawing


9.34 Burner Orifices Visual 100 H Construction S
seal weld all around the burner orifices 2014T0007-DTB-V101
DUBA GREEN INTEGRATED SOLAR COMBINED CYCLE
POWER PLANT ITP MECHANICAL WORKS
trubarabia.com

ACTIVITY: HRSG ASSEMBLY & ERECTION


GENERAL ARRANGEMENT DRAWING.: 2014T0007-HGA-A001/2/3/4/5/6 PROCEDURE: DUB-01-VA-MM-TRU-002 DOC. Nº: DUB-01-VA-QPI-TRU-002 Rev. 03
ELEMENT: HRSG-01

INVOLVED PARTIES
INSPECTION / REVISION / TEST
Applicable Standard /
Point Nº General Activity Specific Activity Project Specification TRUBA CIS O/E GE Report Nº / RFI Nº Remarks
Supplier Specifications
Responsability
Type % Action Code Action Code Action Code Action Code
Assignment

10. GENERAL BELLOWS


METALLIC

GE Energy Typical Pre-


Bellows for Top Check the insulation of pipes before
10.1 Erection Narrative for HRSG Visual 100 H Construction S
Panels inserting the belows
Point 6.5

Check the installation of temporary


Bellows for Top
10.2 cover protection for all metallic bellows GE comment Visual 100 H Construction S
Panels
prior its installation

GE Energy Typical Pre-


Bellows for Top Check the the below is positioning in a
10.3 Erection Narrative for HRSG Visual 100 H Construction S S
Panels concentric circle respect to the pipe
Point 6.5

GE Energy Typical Pre-


Bellows for Top Check the welding of bellow flange to
10.4 Erection Narrative for HRSG Visual 100 H Quality S
Panels pipe
Point 6.5

GE Energy Typical Pre-


Bellows for Top Check the fiiling of the gap between
10.5 Erection Narrative for HRSG Visual 100 H Construction S S
Panels pipe and panel wth insulation material
Point 6.5

Check the welding of the cover plate on GE Energy Typical Pre- Construction
Bellows for Top
10.6 the inner part of panel and check the Erection Narrative for HRSG Visual 100 H S
Panels
installation of clip Point 6.5 Quality

Check the tack weld of bellow flange to GE Energy Typical Pre-


Bellows for Top
10.7 outer part of panel (after internal & Erection Narrative for HRSG Visual 100 H Quality S
Panels
external pipe installed and aligned Point 6.5

Check the seal weld of bellow flange to


GE Energy Typical Pre-
Bellows for Top outer part of panel after internal &
10.8 Erection Narrative for HRSG Visual 100 H Quality S
Panels external HRSG pipes installed and
Point 6.5
aligned

GE Energy Typical Pre-


Bellows for Top Remove protection cover, bolts and
10.9 Erection Narrative for HRSG Visual 100 H Construction S
Panels nuts from below just prior to initial firing
Point 6.5

GE Energy Typical Pre-


Bellows for Side Check the insulation of pipes before
10.10 Erection Narrative for HRSG Visual 100 H Construction S
Panels inserting the belows
Point 6.5

Check the installation of temporary


Bellows for Side
10.11 cover protection for all metallic bellows GE comment Visual 100 H Construction S
Panels
prior its installation

GE Energy Typical Pre-


Bellows for Side Check the the below is positioning in a
10.12 Erection Narrative for HRSG Visual 100 H Construction S S
Panels concentric circle respect to the pipe
Point 6.5

GE Energy Typical Pre-


Bellows for Side Check the welding of bellow flange to
10.13 Erection Narrative for HRSG Visual 100 H Quality S
Panels pipe
Point 6.5

GE Energy Typical Pre-


Bellows for Side Check the fiiling of the gap between
10.14 Erection Narrative for HRSG Visual 100 H Construction S S
Panels pipe and panel wth insulation material
Point 6.5
DUBA GREEN INTEGRATED SOLAR COMBINED CYCLE
POWER PLANT ITP MECHANICAL WORKS
trubarabia.com

ACTIVITY: HRSG ASSEMBLY & ERECTION


GENERAL ARRANGEMENT DRAWING.: 2014T0007-HGA-A001/2/3/4/5/6 PROCEDURE: DUB-01-VA-MM-TRU-002 DOC. Nº: DUB-01-VA-QPI-TRU-002 Rev. 03
ELEMENT: HRSG-01

INVOLVED PARTIES
INSPECTION / REVISION / TEST
Applicable Standard /
Point Nº General Activity Specific Activity Project Specification TRUBA CIS O/E GE Report Nº / RFI Nº Remarks
Supplier Specifications
Responsability
Type % Action Code Action Code Action Code Action Code
Assignment
GENERAL
Check the welding of the cover plate on GE Energy Typical Pre- Construction
Bellows for Side
10.15 the inner part of panel and check the Erection Narrative for HRSG Visual 100 H S
Panels
installation of clip Point 6.5 Quality

Check the tack weld of bellow flange to GE Energy Typical Pre-


Bellows for Side
10.16 outer part of panel (after internal & Erection Narrative for HRSG Visual 100 H Quality S
Panels
external pipe installed and aligned Point 6.5

Check the seal weld of bellow flange to


GE Energy Typical Pre-
Bellows for Side outer part of panel after internal &
10.17 Erection Narrative for HRSG Visual 100 H Quality S
Panels external HRSG pipes installed and
Point 6.5
aligned

GE Energy Typical Pre-


Bellows for Side Remove protection cover, bolts and
10.18 Erection Narrative for HRSG Visual 100 H Construction S
Panels nuts from below just prior to initial firing
Point 6.5

GE Energy Typical Pre-


Bellows for Bottom Check the insulation of pipes before
10.19 Erection Narrative for HRSG Visual 100 H Construction S
Panels inserting the belows
Point 6.5

Check the installation of temporary


Bellows for Bottom
10.20 cover protection for all metallic bellows GE comment Visual 100 H Construction S
Panels
prior its installation

GE Energy Typical Pre-


Bellows for Bottom Check the the below is positioning in a
10.21 Erection Narrative for HRSG Visual 100 H Construction S S
Panels concentric circle respect to the pipe
Point 6.5

GE Energy Typical Pre-


Bellows for Bottom Check the welding of bellow flange to
10.22 Erection Narrative for HRSG Visual 100 H Quality S
Panels pipe
Point 6.5

GE Energy Typical Pre-


Bellows for Bottom Check the fiiling of the gap between
10.23 Erection Narrative for HRSG Visual 100 H Construction S S
Panels pipe and panel wth insulation material
Point 6.5

Check the welding of the cover plate on GE Energy Typical Pre- Construction
Bellows for Bottom
10.24 the inner part of panel and check the Erection Narrative for HRSG Visual 100 H S
Panels
installation of clip Point 6.5 Quality

Check the tack weld of bellow flange to GE Energy Typical Pre-


Bellows for Bottom
10.25 outer part of panel (after internal & Erection Narrative for HRSG Visual 100 H Quality S
Panels
external pipe installed and aligned Point 6.5

Check the seal weld of bellow flange to


GE Energy Typical Pre-
Bellows for Bottom outer part of panel after internal &
10.26 Erection Narrative for HRSG Visual 100 H Quality S
Panels external HRSG pipes installed and
Point 6.5
aligned

GE Energy Typical Pre-


Bellows for Bottom Remove protection cover, bolts and
10.27 Erection Narrative for HRSG Visual 100 H Construction S
Panels nuts from below just prior to initial firing
Point 6.5

11. HP & LP STEAM DRUMS

Check the installation of drum support GE Energy Typical Pre-


11.1 Support Beams beams onto the upper beams of HRSG Erection Narrative for HRSG Visual 100 H Construction S
steel structure Point 6.5
DUBA GREEN INTEGRATED SOLAR COMBINED CYCLE
POWER PLANT ITP MECHANICAL WORKS
trubarabia.com

ACTIVITY: HRSG ASSEMBLY & ERECTION


GENERAL ARRANGEMENT DRAWING.: 2014T0007-HGA-A001/2/3/4/5/6 PROCEDURE: DUB-01-VA-MM-TRU-002 DOC. Nº: DUB-01-VA-QPI-TRU-002 Rev. 03
ELEMENT: HRSG-01

INVOLVED PARTIES
INSPECTION / REVISION / TEST
Applicable Standard /
Point Nº General Activity Specific Activity Project Specification TRUBA CIS O/E GE Report Nº / RFI Nº Remarks
Supplier Specifications
Responsability
Type % Action Code Action Code Action Code Action Code
Assignment
GENERAL
Check the welding of stoppers and the GE Energy Typical Pre-
11.2 Slide Plates installation of slide plate onto the Erection Narrative for HRSG Visual 100 H Construction S
support beam Point 6.5

GE Energy Typical Pre-


Check the setting and alignmnet of
11.3 Drums Erection Narrative for HRSG Topographic 100 H Construction R R
drum according to center marks
Point 6.5

Check the elevation of drum adding GE Energy Typical Pre-


11.4 Drums shim plates between suport beam and Erection Narrative for HRSG Dimensional 100 H Construction S S
slide plate if necessary Point 6.5

Check the bolting of bolts according to GE Energy Typical Pre-


11.5 Drums GE erection manual and tack weld all Erection Narrative for HRSG Dimensional 100 H Quality W
nuts after proper leveling and bolting Point 6.5

Check the pressure test of drums is Construction


11.6 Drums performed jointly with the others boiler GE comment Visual 100 H H W
pressure parts Quality

12. LINK PIPES AND DOWNCOMERS

GE Energy Typical Pre-


Link Pipes Module 5 Check the fit up, fixing and alignment of
12.1 Erection Narrative for HRSG Visual 100 H Construction S S
Bottom Side links between modules A and B
Point 6.6

GE Energy Typical Pre-


Link Pipes Module 4 Check the fit up, fixing and alignment of
12.2 Erection Narrative for HRSG Visual 100 H Construction S
Bottom Side links between modules A and B
Point 6.6

GE Energy Typical Pre-


Link Pipes Module 3 Check the fit up, fixing and alignment of
12.3 Erection Narrative for HRSG Visual 100 H Construction S
Bottom Side links between modules A and B
Point 6.6

GE Energy Typical Pre-


Link Pipes Module 2 Check the fit up, fixing and alignment of
12.4 Erection Narrative for HRSG Visual 100 H Construction S
Bottom Side links between modules A and B
Point 6.6

GE Energy Typical Pre-


Link Pipes Module 1 Check the fit up, fixing and alignment of
12.5 Erection Narrative for HRSG Visual 100 H Construction S
Bottom Side links between modules A and B
Point 6.6

GE Energy Typical Pre-


Link Pipes Module 5 Check the fit up, fixing and alignment of
12.6 Erection Narrative for HRSG Visual 100 H Construction S
Top Side links between modules A and B
Point 6.6

GE Energy Typical Pre-


Link Pipes Module 4 Check the fit up, fixing and alignment of
12.7 Erection Narrative for HRSG Visual 100 H Construction S
Top Side links between modules A and B
Point 6.6

GE Energy Typical Pre-


Link Pipes Module 3 Check the fit up, fixing and alignment of
12.8 Erection Narrative for HRSG Visual 100 H Construction S
Top Side links between modules A and B
Point 6.6

GE Energy Typical Pre-


Link Pipes Module 2 Check the fit up, fixing and alignment of
12.9 Erection Narrative for HRSG Visual 100 H Construction S
Top Side links between modules A and B
Point 6.6
DUBA GREEN INTEGRATED SOLAR COMBINED CYCLE
POWER PLANT ITP MECHANICAL WORKS
trubarabia.com

ACTIVITY: HRSG ASSEMBLY & ERECTION


GENERAL ARRANGEMENT DRAWING.: 2014T0007-HGA-A001/2/3/4/5/6 PROCEDURE: DUB-01-VA-MM-TRU-002 DOC. Nº: DUB-01-VA-QPI-TRU-002 Rev. 03
ELEMENT: HRSG-01

INVOLVED PARTIES
INSPECTION / REVISION / TEST
Applicable Standard /
Point Nº General Activity Specific Activity Project Specification TRUBA CIS O/E GE Report Nº / RFI Nº Remarks
Supplier Specifications
Responsability
Type % Action Code Action Code Action Code Action Code
Assignment
GENERAL
GE Energy Typical Pre-
Link Pipes Module 1 Check the fit up, fixing and alignment of
12.10 Erection Narrative for HRSG Visual 100 H Construction S
Top Side links between modules A and B
Point 6.6

GE Energy Typical Pre-


Visual 100 S
Check the fit up, welding and PWHT if Erection Narrative for HRSG
12.11 Downcomers Hardness According to Code H Construction R
needed Point 6.6
RT According to Code R
ASME I

Final inspection for welds on


12.12 Downcomers GE comment Visual 100 H Quality W W
downcomers

Check the pressure test of Construction


12.13 Downcomers downcomers is performed jointly with GE comment Visual 100 H W W
the others boiler pressure parts Quality

13. BUMPERS

GE Energy Typical Pre-


Downstream Verify the installation of insulation on
13.1 Erection Narrative for HRSG Visual 100 H Construction S
(Right Side) the internal support
Point 6.7

GE Energy Typical Pre-


Downstream Check the bumper assembly and
13.2 Erection Narrative for HRSG Visual 100 H Construction S
(Right Side) bolting to the internal support
Point 6.7

Verify bumper plates face module GE Energy Typical Pre-


Downstream
13.3 headers and required gap according to Erection Narrative for HRSG Visual 100 H Construction W W
(Right Side)
drawings Point 6.7

GE Energy Typical Pre-


Downstream Verify the installation of insulation on
13.4 Erection Narrative for HRSG Visual 100 H Construction S
(Left Side) the internal support
Point 6.7

GE Energy Typical Pre-


Downstream Check the bumper assembly and
13.5 Erection Narrative for HRSG Visual 100 H Construction S
(Left Side) bolting to the internal support
Point 6.7

Verify bumper plates face module GE Energy Typical Pre-


Downstream
13.6 headers and required gap according to Erection Narrative for HRSG Visual 100 H Construction W W
(Left Side)
drawings Point 6.7

GE Energy Typical Pre-


Upstream Verify the installation of insulation on
13.7 Erection Narrative for HRSG Visual 100 H Construction S
(Right Side) the internal support
Point 6.7

GE Energy Typical Pre-


Upstream Check the bumper assembly and
13.8 Erection Narrative for HRSG Visual 100 H Construction S
(Right Side) bolting to the internal support
Point 6.7

Verify bumper plates face module GE Energy Typical Pre-


Upstream
13.9 headers and required gap according to Erection Narrative for HRSG Visual 100 H Construction W W
(Right Side)
drawings Point 6.7

GE Energy Typical Pre-


Upstream Verify the installation of insulation on
13.10 Erection Narrative for HRSG Visual 100 H Construction S
(Left Side) the internal support
Point 6.7
DUBA GREEN INTEGRATED SOLAR COMBINED CYCLE
POWER PLANT ITP MECHANICAL WORKS
trubarabia.com

ACTIVITY: HRSG ASSEMBLY & ERECTION


GENERAL ARRANGEMENT DRAWING.: 2014T0007-HGA-A001/2/3/4/5/6 PROCEDURE: DUB-01-VA-MM-TRU-002 DOC. Nº: DUB-01-VA-QPI-TRU-002 Rev. 03
ELEMENT: HRSG-01

INVOLVED PARTIES
INSPECTION / REVISION / TEST
Applicable Standard /
Point Nº General Activity Specific Activity Project Specification TRUBA CIS O/E GE Report Nº / RFI Nº Remarks
Supplier Specifications
Responsability
Type % Action Code Action Code Action Code Action Code
Assignment
GENERAL
GE Energy Typical Pre-
Upstream Check the bumper assembly and
13.11 Erection Narrative for HRSG Visual 100 H Construction S
(Left Side) bolting to the internal support
Point 6.7

Verify bumper plates face module GE Energy Typical Pre-


Upstream
13.12 headers and required gap according to Erection Narrative for HRSG Visual 100 H Construction W W
(Left Side)
drawings Point 6.7

14. LOWER HEADER SUPPORTS

Check the installation of lower header GE Energy Typical Pre-


14.1 Module 1A supports and required gap according to Erection Narrative for HRSG Visual 100 H Construction W W
drawings Point 6.7

GE Energy Typical Pre-


Verify the installation of insulation on
14.2 Module 1A Erection Narrative for HRSG Visual 100 H Construction S
lower header supports
Point 6.7

Check the installation of lower header GE Energy Typical Pre-


14.3 Module 1B supports and required gap according to Erection Narrative for HRSG Visual 100 H Construction W W
drawings Point 6.7

GE Energy Typical Pre-


Verify the installation of insulation on
14.4 Module 1B Erection Narrative for HRSG Visual 100 H Construction S
lower header supports
Point 6.7

Check the installation of lower header GE Energy Typical Pre-


14.5 Module 5A supports and required gap according to Erection Narrative for HRSG Visual 100 H Construction W W
drawings Point 6.7

GE Energy Typical Pre-


Verify the installation of insulation on
14.6 Module 5A Erection Narrative for HRSG Visual 100 H Construction S
lower header supports
Point 6.7

Check the installation of lower header GE Energy Typical Pre-


14.7 Module 5B supports and required gap according to Erection Narrative for HRSG Visual 100 H Construction W W
drawings Point 6.7

GE Energy Typical Pre-


Verify the installation of insulation on
14.8 Module 5B Erection Narrative for HRSG Visual 100 H Construction S
lower header supports
Point 6.7

15. FLOOR BAFFLES

GE Energy Typical Pre-


Top Elevation Baffles Check the proper landing on centerline
15.1 Erection Narrative for HRSG Visual 100 H Construction S
Module 1 and lapping of baffles
Point 6.7

Verify the installation of all bolts and


nuts between baffle plates and header GE Energy Typical Pre-
Top Elevation Baffles
15.2 attachments without not tight (5 mm Erection Narrative for HRSG Visual 100 H Construction S
Module 1
gap between nut and header Point 6.7
attachment) downstream side

GE Energy Typical Pre- Quality


Top Elevation Baffles Verify the tack weld of nuts to bolts
15.3 Erection Narrative for HRSG Visual 100 H S
Module 1 downstream side
Point 6.7 Construction
DUBA GREEN INTEGRATED SOLAR COMBINED CYCLE
POWER PLANT ITP MECHANICAL WORKS
trubarabia.com

ACTIVITY: HRSG ASSEMBLY & ERECTION


GENERAL ARRANGEMENT DRAWING.: 2014T0007-HGA-A001/2/3/4/5/6 PROCEDURE: DUB-01-VA-MM-TRU-002 DOC. Nº: DUB-01-VA-QPI-TRU-002 Rev. 03
ELEMENT: HRSG-01

INVOLVED PARTIES
INSPECTION / REVISION / TEST
Applicable Standard /
Point Nº General Activity Specific Activity Project Specification TRUBA CIS O/E GE Report Nº / RFI Nº Remarks
Supplier Specifications
Responsability
Type % Action Code Action Code Action Code Action Code
Assignment
GENERAL
Verify the welding between baffle GE Energy Typical Pre-
Top Elevation Baffles
15.4 plates and header attachments Erection Narrative for HRSG Visual 100 H Quality S S
Module 1
upstream side Point 6.7

GE Energy Typical Pre-


Top Elevation Baffles Check the proper landing on centerline
15.5 Erection Narrative for HRSG Visual 100 H Construction S
Module 2 and lapping of baffles
Point 6.7

Verify the installation of all bolts and


nuts between baffle plates and header GE Energy Typical Pre-
Top Elevation Baffles
15.6 attachments without not tight (5 mm Erection Narrative for HRSG Visual 100 H Construction S
Module 2
gap between nut and header Point 6.7
attachment) downstream side

GE Energy Typical Pre- Quality


Top Elevation Baffles Verify the tack weld of nuts to bolts
15.7 Erection Narrative for HRSG Visual 100 H S
Module 2 downstream side
Point 6.7 Construction

Verify the welding between baffle GE Energy Typical Pre-


Top Elevation Baffles
15.8 plates and header attachments Erection Narrative for HRSG Visual 100 H Quality S S
Module 2
upstream side Point 6.7

GE Energy Typical Pre-


Top Elevation Baffles Check the proper landing on centerline
15.9 Erection Narrative for HRSG Visual 100 H Construction S
Module 3 and lapping of baffles
Point 6.7

Verify the installation of all bolts and


nuts between baffle plates and header GE Energy Typical Pre-
Top Elevation Baffles
15.10 attachments without not tight (5 mm Erection Narrative for HRSG Visual 100 H Construction S
Module 3
gap between nut and header Point 6.7
attachment) downstream side

GE Energy Typical Pre- Quality


Top Elevation Baffles Verify the tack weld of nuts to bolts
15.11 Erection Narrative for HRSG Visual 100 H S
Module 3 downstream side
Point 6.7 Construction

Verify the welding between baffle GE Energy Typical Pre-


Top Elevation Baffles
15.12 plates and header attachments Erection Narrative for HRSG Visual 100 H Quality S S
Module 3
upstream side Point 6.7

GE Energy Typical Pre-


Top Elevation Baffles Check the proper landing on centerline
15.13 Erection Narrative for HRSG Visual 100 H Construction S
Module 4 and lapping of baffles
Point 6.7

Verify the installation of all bolts and


GE Energy Typical Pre-
Top Elevation Baffles nuts between baffle plates and header
15.14 attachments without not tight (5 mm Erection Narrative for HRSG Visual 100 H Construction S
Module 4
gap between nut and header Point 6.7
attachment) downstream side
GE Energy Typical Pre- Quality
Top Elevation Baffles Verify the tack weld of nuts to bolts
15.15 Erection Narrative for HRSG Visual 100 H S
Module 4 downstream side
Point 6.7 Construction

Verify the welding between baffle GE Energy Typical Pre-


Top Elevation Baffles
15.16 plates and header attachments Erection Narrative for HRSG Visual 100 H Quality S S
Module 4
upstream side Point 6.7
DUBA GREEN INTEGRATED SOLAR COMBINED CYCLE
POWER PLANT ITP MECHANICAL WORKS
trubarabia.com

ACTIVITY: HRSG ASSEMBLY & ERECTION


GENERAL ARRANGEMENT DRAWING.: 2014T0007-HGA-A001/2/3/4/5/6 PROCEDURE: DUB-01-VA-MM-TRU-002 DOC. Nº: DUB-01-VA-QPI-TRU-002 Rev. 03
ELEMENT: HRSG-01

INVOLVED PARTIES
INSPECTION / REVISION / TEST
Applicable Standard /
Point Nº General Activity Specific Activity Project Specification TRUBA CIS O/E GE Report Nº / RFI Nº Remarks
Supplier Specifications
Responsability
Type % Action Code Action Code Action Code Action Code
Assignment
GENERAL
GE Energy Typical Pre-
Top Elevation Baffles Check the proper landing on centerline
15.17 Erection Narrative for HRSG Visual 100 H Construction S
Module 5 and lapping of baffles
Point 6.7

Verify the installation of all bolts and


GE Energy Typical Pre-
Top Elevation Baffles nuts between baffle plates and header
15.18 attachments without not tight (5 mm Erection Narrative for HRSG Visual 100 H Construction S
Module 5
gap between nut and header Point 6.7
attachment) downstream side
GE Energy Typical Pre- Quality
Top Elevation Baffles Verify the tack weld of nuts to bolts
15.19 Erection Narrative for HRSG Visual 100 H S
Module 5 downstream side
Point 6.7 Construction

Verify the welding between baffle GE Energy Typical Pre-


Top Elevation Baffles
15.20 plates and header attachments Erection Narrative for HRSG Visual 100 H Quality S S
Module 5
upstream side Point 6.7

GE Energy Typical Pre-


Bottom Elevation Check the proper landing on centerline
15.21 Erection Narrative for HRSG Visual 100 H Construction S
Baffles Module 1 and lapping of baffles
Point 6.7

Verify the installation of all bolts and


nuts between baffle plates and header GE Energy Typical Pre-
Bottom Elevation
15.22 attachments without not tight (5 mm Erection Narrative for HRSG Visual 100 H Construction S
Baffles Module 1
gap between nut and header Point 6.7
attachment) downstream side

GE Energy Typical Pre- Quality


Bottom Elevation Verify the tack weld of nuts to bolts
15.23 Erection Narrative for HRSG Visual 100 H S
Baffles Module 1 downstream side
Point 6.7 Construction

Verify the welding between baffle GE Energy Typical Pre-


Bottom Elevation
15.24 plates and header attachments Erection Narrative for HRSG Visual 100 H Quality S S
Baffles Module 1
upstream side Point 6.7

GE Energy Typical Pre-


Bottom Elevation Check the proper landing on centerline
15.25 Erection Narrative for HRSG Visual 100 H Construction S
Baffles Module 2 and lapping of baffles
Point 6.7

Verify the installation of all bolts and


nuts between baffle plates and header GE Energy Typical Pre-
Bottom Elevation
15.26 attachments without not tight (5 mm Erection Narrative for HRSG Visual 100 H Construction S
Baffles Module 2
gap between nut and header Point 6.7
attachment) downstream side

GE Energy Typical Pre- Quality


Bottom Elevation Verify the tack weld of nuts to bolts
15.27 Erection Narrative for HRSG Visual 100 H S
Baffles Module 2 downstream side
Point 6.7 Construction

Verify the welding between baffle GE Energy Typical Pre-


Bottom Elevation
15.28 plates and header attachments Erection Narrative for HRSG Visual 100 H Quality S S
Baffles Module 2
upstream side Point 6.7

GE Energy Typical Pre-


Bottom Elevation Check the proper landing on centerline
15.29 Erection Narrative for HRSG Visual 100 H Construction S
Baffles Module 3 and lapping of baffles
Point 6.7
DUBA GREEN INTEGRATED SOLAR COMBINED CYCLE
POWER PLANT ITP MECHANICAL WORKS
trubarabia.com

ACTIVITY: HRSG ASSEMBLY & ERECTION


GENERAL ARRANGEMENT DRAWING.: 2014T0007-HGA-A001/2/3/4/5/6 PROCEDURE: DUB-01-VA-MM-TRU-002 DOC. Nº: DUB-01-VA-QPI-TRU-002 Rev. 03
ELEMENT: HRSG-01

INVOLVED PARTIES
INSPECTION / REVISION / TEST
Applicable Standard /
Point Nº General Activity Specific Activity Project Specification TRUBA CIS O/E GE Report Nº / RFI Nº Remarks
Supplier Specifications
Responsability
Type % Action Code Action Code Action Code Action Code
Assignment
GENERAL
Verify the installation of all bolts and
nuts between baffle plates and header GE Energy Typical Pre-
Bottom Elevation
15.30 attachments without not tight (5 mm Erection Narrative for HRSG Visual 100 H Construction S
Baffles Module 3
gap between nut and header Point 6.7
attachment) downstream side

GE Energy Typical Pre- Quality


Bottom Elevation Verify the tack weld of nuts to bolts
15.31 Erection Narrative for HRSG Visual 100 H S
Baffles Module 3 downstream side
Point 6.7 Construction

Verify the welding between baffle GE Energy Typical Pre-


Bottom Elevation
15.32 plates and header attachments Erection Narrative for HRSG Visual 100 H Quality S S
Baffles Module 3
upstream side Point 6.7

GE Energy Typical Pre-


Bottom Elevation Check the proper landing on centerline
15.33 Erection Narrative for HRSG Visual 100 H Construction S
Baffles Module 4 and lapping of baffles
Point 6.7

Verify the installation of all bolts and


nuts between baffle plates and header GE Energy Typical Pre-
Bottom Elevation
15.34 attachments without not tight (5 mm Erection Narrative for HRSG Visual 100 H Construction S
Baffles Module 4
gap between nut and header Point 6.7
attachment) downstream side

GE Energy Typical Pre- Quality


Bottom Elevation Verify the tack weld of nuts to bolts
15.35 Erection Narrative for HRSG Visual 100 H S
Baffles Module 4 downstream side
Point 6.7 Construction

Verify the welding between baffle GE Energy Typical Pre-


Bottom Elevation
15.36 plates and header attachments Erection Narrative for HRSG Visual 100 H Quality S S
Baffles Module 4
upstream side Point 6.7

GE Energy Typical Pre-


Bottom Elevation Check the proper landing on centerline
15.37 Erection Narrative for HRSG Visual 100 H Construction S
Baffles Module 5 and lapping of baffles
Point 6.7

Verify the installation of all bolts and


nuts between baffle plates and header GE Energy Typical Pre-
Bottom Elevation
15.38 attachments without not tight (5 mm Erection Narrative for HRSG Visual 100 H Construction S
Baffles Module 5
gap between nut and header Point 6.7
attachment) downstream side

GE Energy Typical Pre- Quality


Bottom Elevation Verify the tack weld of nuts to bolts
15.39 Erection Narrative for HRSG Visual 100 H S
Baffles Module 5 downstream side
Point 6.7 Construction

Verify the welding between baffle GE Energy Typical Pre-


Bottom Elevation
15.40 plates and header attachments Erection Narrative for HRSG Visual 100 H Quality S S
Baffles Module 5
upstream side Point 6.7

16. PARTITION BAFFLES

Verify the installation of the bent plates GE Energy Typical Pre-


Top Elevation Baffles
16.1 to the partition baffles on lower side of Erection Narrative for HRSG Visual 100 H Construction S
Module 3
partion baffles Point 6.7
DUBA GREEN INTEGRATED SOLAR COMBINED CYCLE
POWER PLANT ITP MECHANICAL WORKS
trubarabia.com

ACTIVITY: HRSG ASSEMBLY & ERECTION


GENERAL ARRANGEMENT DRAWING.: 2014T0007-HGA-A001/2/3/4/5/6 PROCEDURE: DUB-01-VA-MM-TRU-002 DOC. Nº: DUB-01-VA-QPI-TRU-002 Rev. 03
ELEMENT: HRSG-01

INVOLVED PARTIES
INSPECTION / REVISION / TEST
Applicable Standard /
Point Nº General Activity Specific Activity Project Specification TRUBA CIS O/E GE Report Nº / RFI Nº Remarks
Supplier Specifications
Responsability
Type % Action Code Action Code Action Code Action Code
Assignment
GENERAL
Check the proper landing on centerline GE Energy Typical Pre-
Top Elevation Baffles
16.2 and welding of lower bent plates to Erection Narrative for HRSG Visual 100 H Construction S
Module 3
floor baffles Point 6.7

Verify the installation of all bolts, nuts


GE Energy Typical Pre-
Top Elevation Baffles and washers, without not tight, for
16.3 Erection Narrative for HRSG Visual 100 H Construction S
Module 3 joining the bent plates to the partition
Point 6.7
baffles on upper side of partion baffles

Check the proper landing on centerline GE Energy Typical Pre-


Top Elevation Baffles
16.4 and welding of upper bent plates to the Erection Narrative for HRSG Visual 100 H Quality S S
Module 3
liner plate Point 6.7

GE Energy Typical Pre- Quality


Top Elevation Baffles
16.5 Verify the tack weld of nuts to bolts Erection Narrative for HRSG Visual 100 H S
Module 3
Point 6.7 Construction

Verify the installation of the bent plates GE Energy Typical Pre-


Top Elevation Baffles
16.6 to the partition baffles on lower side of Erection Narrative for HRSG Visual 100 H Construction S
Module 4
partion baffles Point 6.7

Check the proper landing on centerline GE Energy Typical Pre-


Top Elevation Baffles
16.7 and welding of lower bent plates to Erection Narrative for HRSG Visual 100 H Construction S
Module 4
floor baffles Point 6.7

Verify the installation of all bolts, nuts


GE Energy Typical Pre-
Top Elevation Baffles and washers, without not tight, for
16.8 Erection Narrative for HRSG Visual 100 H Construction S
Module 4 joining the bent plates to the partition
Point 6.7
baffles on upper side of partion baffles

Check the proper landing on centerline GE Energy Typical Pre-


Top Elevation Baffles
16.9 and welding of upper bent plates to the Erection Narrative for HRSG Visual 100 H Quality S S
Module 4
liner plate Point 6.7

GE Energy Typical Pre- Quality


Top Elevation Baffles
16.10 Verify the tack weld of nuts to bolts Erection Narrative for HRSG Visual 100 H S
Module 4
Point 6.7 Construction

Verify the installation of the bent plates GE Energy Typical Pre-


Top Elevation Baffles
16.11 to the partition baffles on lower side of Erection Narrative for HRSG Visual 100 H Construction S
Module 5
partion baffles Point 6.7

Check the proper landing on centerline GE Energy Typical Pre-


Top Elevation Baffles
16.12 and welding of lower bent plates to Erection Narrative for HRSG Visual 100 H Construction S S
Module 5
floor baffles Point 6.7

Verify the installation of all bolts, nuts


GE Energy Typical Pre-
Top Elevation Baffles and washers, without not tight, for
16.13 Erection Narrative for HRSG Visual 100 H Construction S
Module 5 joining the bent plates to the partition
Point 6.7
baffles on upper side of partion baffles

Check the proper landing on centerline GE Energy Typical Pre-


Top Elevation Baffles
16.14 and welding of upper bent plates to the Erection Narrative for HRSG Visual 100 H Quality S S
Module 5
liner plate Point 6.7

GE Energy Typical Pre- Quality


Top Elevation Baffles
16.15 Verify the tack weld of nuts to bolts Erection Narrative for HRSG Visual 100 H S
Module 5
Point 6.7 Construction
DUBA GREEN INTEGRATED SOLAR COMBINED CYCLE
POWER PLANT ITP MECHANICAL WORKS
trubarabia.com

ACTIVITY: HRSG ASSEMBLY & ERECTION


GENERAL ARRANGEMENT DRAWING.: 2014T0007-HGA-A001/2/3/4/5/6 PROCEDURE: DUB-01-VA-MM-TRU-002 DOC. Nº: DUB-01-VA-QPI-TRU-002 Rev. 03
ELEMENT: HRSG-01

INVOLVED PARTIES
INSPECTION / REVISION / TEST
Applicable Standard /
Point Nº General Activity Specific Activity Project Specification TRUBA CIS O/E GE Report Nº / RFI Nº Remarks
Supplier Specifications
Responsability
Type % Action Code Action Code Action Code Action Code
Assignment
GENERAL
Verify the installation of the bent plates GE Energy Typical Pre-
Bottom Elevation
16.16 to the partition baffles on lower side of Erection Narrative for HRSG Visual 100 H Construction S
Baffles Module 3
partion baffles Point 6.7

Check the proper landing on centerline GE Energy Typical Pre-


Bottom Elevation
16.17 and welding of lower bent plates to liner Erection Narrative for HRSG Visual 100 H Construction S S
Baffles Module 3
plate Point 6.7

Verify the installation of all bolts, nuts


GE Energy Typical Pre-
Bottom Elevation and washers, without not tight, for
16.18 Erection Narrative for HRSG Visual 100 H Construction S
Baffles Module 3 joining the bent plates to the partition
Point 6.7
baffles on upper side of partion baffles

Check the proper landing on centerline GE Energy Typical Pre-


Bottom Elevation
16.19 and welding of upper bent plates to the Erection Narrative for HRSG Visual 100 H Quality S S
Baffles Module 3
floor bafles Point 6.7

GE Energy Typical Pre- Quality


Bottom Elevation
16.20 Verify the tack weld of nuts to bolts Erection Narrative for HRSG Visual 100 H S
Baffles Module 3
Point 6.7 Construction

Verify the installation of the bent plates GE Energy Typical Pre-


Bottom Elevation
16.21 to the partition baffles on lower side of Erection Narrative for HRSG Visual 100 H Construction S
Baffles Module 4
partion baffles Point 6.7

Check the proper landing on centerline GE Energy Typical Pre-


Bottom Elevation
16.22 and welding of lower bent plates to liner Erection Narrative for HRSG Visual 100 H Construction S S
Baffles Module 4
plate Point 6.7

Verify the installation of all bolts, nuts


GE Energy Typical Pre-
Bottom Elevation and washers, without not tight, for
16.23 Erection Narrative for HRSG Visual 100 H Construction S
Baffles Module 4 joining the bent plates to the partition
Point 6.7
baffles on upper side of partion baffles

Check the proper landing on centerline GE Energy Typical Pre-


Bottom Elevation
16.24 and welding of upper bent plates to the Erection Narrative for HRSG Visual 100 H Quality S S
Baffles Module 4
floor bafles Point 6.7

GE Energy Typical Pre- Quality


Bottom Elevation
16.25 Verify the tack weld of nuts to bolts Erection Narrative for HRSG Visual 100 H S
Baffles Module 4
Point 6.7 Construction

Verify the installation of the bent plates GE Energy Typical Pre-


Bottom Elevation
16.26 to the partition baffles on lower side of Erection Narrative for HRSG Visual 100 H Construction S
Baffles Module 5
partion baffles Point 6.7

Check the proper landing on centerline GE Energy Typical Pre-


Bottom Elevation
16.27 and welding of lower bent plates to liner Erection Narrative for HRSG Visual 100 H Construction S S
Baffles Module 5
plate Point 6.7

Verify the installation of all bolts, nuts


GE Energy Typical Pre-
Bottom Elevation and washers, without not tight, for
16.28 Erection Narrative for HRSG Visual 100 H Construction S
Baffles Module 5 joining the bent plates to the partition
Point 6.7
baffles on upper side of partion baffles

Check the proper landing on centerline GE Energy Typical Pre-


Bottom Elevation
16.29 and welding of upper bent plates to the Erection Narrative for HRSG Visual 100 H Quality S S
Baffles Module 5
floor bafles Point 6.7
DUBA GREEN INTEGRATED SOLAR COMBINED CYCLE
POWER PLANT ITP MECHANICAL WORKS
trubarabia.com

ACTIVITY: HRSG ASSEMBLY & ERECTION


GENERAL ARRANGEMENT DRAWING.: 2014T0007-HGA-A001/2/3/4/5/6 PROCEDURE: DUB-01-VA-MM-TRU-002 DOC. Nº: DUB-01-VA-QPI-TRU-002 Rev. 03
ELEMENT: HRSG-01

INVOLVED PARTIES
INSPECTION / REVISION / TEST
Applicable Standard /
Point Nº General Activity Specific Activity Project Specification TRUBA CIS O/E GE Report Nº / RFI Nº Remarks
Supplier Specifications
Responsability
Type % Action Code Action Code Action Code Action Code
Assignment
GENERAL
GE Energy Typical Pre- Quality
Bottom Elevation
16.30 Verify the tack weld of nuts to bolts Erection Narrative for HRSG Visual 100 H S
Baffles Module 5
Point 6.7 Construction

17. SIDE BAFFLES

Verify the installation of the pressure GE Energy Typical Pre-


Top Elevation Baffles
17.1 part baffles and required gap according Erection Narrative for HRSG Visual 100 H Construction S S
Module 1
to drawings Point 6.7

GE Energy Typical Pre- Quality


Top Elevation Baffles Check the proper landing on centerline
17.2 Erection Narrative for HRSG Visual 100 H S
Module 1 and welding of baffles to liner plates
Point 6.7 Construction

Top Elevation Baffles Final inspection for welds of baffles to


17.3 GE comment Visual 100 H Quality W W
Module 1 liner plates

Verify the installation of the pressure GE Energy Typical Pre-


Top Elevation Baffles
17.4 part baffles and required gap according Erection Narrative for HRSG Visual 100 H Construction S S
Module 2
to drawings Point 6.7

GE Energy Typical Pre- Quality


Top Elevation Baffles Check the proper landing on centerline
17.5 Erection Narrative for HRSG Visual 100 H S
Module 2 and welding of baffles to liner plates
Point 6.7 Construction

Top Elevation Baffles Final inspection for welds of baffles to


17.6 GE comment Visual 100 H Quality W W
Module 2 liner plates

Verify the installation of the pressure GE Energy Typical Pre-


Top Elevation Baffles
17.7 part baffles and required gap according Erection Narrative for HRSG Visual 100 H Construction S S
Module 3
to drawings Point 6.7

GE Energy Typical Pre- Quality


Top Elevation Baffles Check the proper landing on centerline
17.8 Erection Narrative for HRSG Visual 100 H S
Module 3 and welding of baffles to liner plates
Point 6.7 Construction

Top Elevation Baffles Final inspection for welds of baffles to


17.9 GE comment Visual 100 H Quality W W
Module 3 liner plates

Verify the installation of the pressure GE Energy Typical Pre-


Top Elevation Baffles
17.10 part baffles and required gap according Erection Narrative for HRSG Visual 100 H Construction S S
Module 4
to drawings Point 6.7

GE Energy Typical Pre- Quality


Top Elevation Baffles Check the proper landing on centerline
17.11 Erection Narrative for HRSG Visual 100 H S
Module 4 and welding of baffles to liner plates
Point 6.7 Construction

Top Elevation Baffles Final inspection for welds of baffles to


17.12 GE comment Visual 100 H Quality W W
Module 4 liner plates

Verify the installation of the pressure GE Energy Typical Pre-


Top Elevation Baffles
17.13 part baffles and required gap according Erection Narrative for HRSG Visual 100 H Construction S S
Module 5
to drawings Point 6.7
DUBA GREEN INTEGRATED SOLAR COMBINED CYCLE
POWER PLANT ITP MECHANICAL WORKS
trubarabia.com

ACTIVITY: HRSG ASSEMBLY & ERECTION


GENERAL ARRANGEMENT DRAWING.: 2014T0007-HGA-A001/2/3/4/5/6 PROCEDURE: DUB-01-VA-MM-TRU-002 DOC. Nº: DUB-01-VA-QPI-TRU-002 Rev. 03
ELEMENT: HRSG-01

INVOLVED PARTIES
INSPECTION / REVISION / TEST
Applicable Standard /
Point Nº General Activity Specific Activity Project Specification TRUBA CIS O/E GE Report Nº / RFI Nº Remarks
Supplier Specifications
Responsability
Type % Action Code Action Code Action Code Action Code
Assignment
GENERAL
Top Elevation Baffles Final inspection for welds of baffles to
17.14 GE comment Visual 100 H Quality W W
Module 5 liner plates

Top Elevation Baffles Final inspection for welds of baffles to


17.15 GE comment Visual 100 H Quality W W
Module 5 liner plates

Verify the installation of the pressure GE Energy Typical Pre-


Bottom Elevation
17.16 part baffles and required gap according Erection Narrative for HRSG Visual 100 H Construction S S
Baffles Module 1
to drawings Point 6.7

GE Energy Typical Pre- Quality


Bottom Elevation Check the proper landing on centerline
17.17 Erection Narrative for HRSG Visual 100 H S
Baffles Module 1 and welding of baffles to liner plates
Point 6.7 Construction

Bottom Elevation Final inspection for welds of baffles to


17.18 GE comment Visual 100 H Quality W W
Baffles Module 1 liner plates

Verify the installation of the pressure GE Energy Typical Pre-


Bottom Elevation
17.19 part baffles and required gap according Erection Narrative for HRSG Visual 100 H Construction S S
Baffles Module 2
to drawings Point 6.7

GE Energy Typical Pre- Quality


Bottom Elevation Check the proper landing on centerline
17.20 Erection Narrative for HRSG Visual 100 H S
Baffles Module 2 and welding of baffles to liner plates
Point 6.7 Construction

Bottom Elevation Final inspection for welds of baffles to


17.21 GE comment Visual 100 H Quality W W
Baffles Module 2 liner plates

Verify the installation of the pressure GE Energy Typical Pre-


Bottom Elevation
17.22 part baffles and required gap according Erection Narrative for HRSG Visual 100 H Construction S S
Baffles Module 3
to drawings Point 6.7

GE Energy Typical Pre- Quality


Bottom Elevation Check the proper landing on centerline
17.23 Erection Narrative for HRSG Visual 100 H S
Baffles Module 3 and welding of baffles to liner plates
Point 6.7 Construction

Bottom Elevation Final inspection for welds of baffles to


17.24 GE comment Visual 100 H Quality W W
Baffles Module 3 liner plates

Verify the installation of the pressure GE Energy Typical Pre-


Bottom Elevation
17.25 part baffles and required gap according Erection Narrative for HRSG Visual 100 H Construction S S
Baffles Module 4
to drawings Point 6.7

GE Energy Typical Pre- Quality


Bottom Elevation Check the proper landing on centerline
17.26 Erection Narrative for HRSG Visual 100 H S
Baffles Module 4 and welding of baffles to liner plates
Point 6.7 Construction

Bottom Elevation Final inspection for welds of baffles to


17.27 GE comment Visual 100 H Quality W W
Baffles Module 4 liner plates
DUBA GREEN INTEGRATED SOLAR COMBINED CYCLE
POWER PLANT ITP MECHANICAL WORKS
trubarabia.com

ACTIVITY: HRSG ASSEMBLY & ERECTION


GENERAL ARRANGEMENT DRAWING.: 2014T0007-HGA-A001/2/3/4/5/6 PROCEDURE: DUB-01-VA-MM-TRU-002 DOC. Nº: DUB-01-VA-QPI-TRU-002 Rev. 03
ELEMENT: HRSG-01

INVOLVED PARTIES
INSPECTION / REVISION / TEST
Applicable Standard /
Point Nº General Activity Specific Activity Project Specification TRUBA CIS O/E GE Report Nº / RFI Nº Remarks
Supplier Specifications
Responsability
Type % Action Code Action Code Action Code Action Code
Assignment
GENERAL
Verify the installation of the pressure GE Energy Typical Pre-
Bottom Elevation
17.28 part baffles and required gap according Erection Narrative for HRSG Visual 100 H Construction S S
Baffles Module 5
to drawings Point 6.7

GE Energy Typical Pre- Quality


Bottom Elevation Check the proper landing on centerline
17.29 Erection Narrative for HRSG Visual 100 H S
Baffles Module 5 and welding of baffles to liner plates
Point 6.7 Construction

Bottom Elevation Final inspection for welds of baffles to


17.30 GE comment Visual 100 H Quality W W
Baffles Module 5 liner plates

18. INSULATION OF HEADERS

GE Energy Typical Pre-


Top Elevation Check the proper landing of insulation
18.1 Erection Narrative for HRSG Visual 100 H Construction S S
Headers Module 1 pad on headers (do not install tautly)
Point 6.7

GE Energy Typical Pre- Quality


Top Elevation Check the tack welding of all bolts after
18.2 Erection Narrative for HRSG Visual 100 H S S
Headers Module 1 installation
Point 6.7 Construction

GE Energy Typical Pre-


Top Elevation Check the proper landing of insulation
18.3 Erection Narrative for HRSG Visual 100 H Construction S S
Headers Module 2 pad on headers (do not install tautly)
Point 6.7

GE Energy Typical Pre- Quality


Top Elevation Check the tack welding of all bolts after
18.4 Erection Narrative for HRSG Visual 100 H S S
Headers Module 3 installation
Point 6.7 Construction

GE Energy Typical Pre-


Top Elevation Check the proper landing of insulation
18.5 Erection Narrative for HRSG Visual 100 H Construction S S
Headers Module 3 pad on headers (do not install tautly)
Point 6.7

GE Energy Typical Pre- Quality


Top Elevation Check the tack welding of all bolts after
18.6 Erection Narrative for HRSG Visual 100 H S S
Headers Module 3 installation
Point 6.7 Construction

GE Energy Typical Pre-


Top Elevation Check the proper landing of insulation
18.7 Erection Narrative for HRSG Visual 100 H Construction S S
Headers Module 4 pad on headers (do not install tautly)
Point 6.7

GE Energy Typical Pre- Quality


Top Elevation Check the tack welding of all bolts after
18.8 Erection Narrative for HRSG Visual 100 H S S
Headers Module 4 installation
Point 6.7 Construction

GE Energy Typical Pre-


Top Elevation Check the proper landing of insulation
18.9 Erection Narrative for HRSG Visual 100 H Construction S S
Headers Module 5 pad on headers (do not install tautly)
Point 6.7

GE Energy Typical Pre- Quality


Top Elevation Check the tack welding of all bolts after
18.10 Erection Narrative for HRSG Visual 100 H S S
Headers Module 5 installation
Point 6.7 Construction

GE Energy Typical Pre-


Bottom Elevation Check the proper landing of insulation
18.11 Erection Narrative for HRSG Visual 100 H Construction S S
Headers Module 1 pad on headers (do not install tautly)
Point 6.7
DUBA GREEN INTEGRATED SOLAR COMBINED CYCLE
POWER PLANT ITP MECHANICAL WORKS
trubarabia.com

ACTIVITY: HRSG ASSEMBLY & ERECTION


GENERAL ARRANGEMENT DRAWING.: 2014T0007-HGA-A001/2/3/4/5/6 PROCEDURE: DUB-01-VA-MM-TRU-002 DOC. Nº: DUB-01-VA-QPI-TRU-002 Rev. 03
ELEMENT: HRSG-01

INVOLVED PARTIES
INSPECTION / REVISION / TEST
Applicable Standard /
Point Nº General Activity Specific Activity Project Specification TRUBA CIS O/E GE Report Nº / RFI Nº Remarks
Supplier Specifications
Responsability
Type % Action Code Action Code Action Code Action Code
Assignment
GENERAL
GE Energy Typical Pre- Quality
Bottom Elevation Check the tack welding of all bolts after
18.12 Erection Narrative for HRSG Visual 100 H S S
Headers Module 1 installation
Point 6.7 Construction

GE Energy Typical Pre-


Bottom Elevation Check the proper landing of insulation
18.13 Erection Narrative for HRSG Visual 100 H Construction S S
Headers Module 2 pad on headers (do not install tautly)
Point 6.7

GE Energy Typical Pre- Quality


Bottom Elevation Check the tack welding of all bolts after
18.14 Erection Narrative for HRSG Visual 100 H S S
Headers Module 2 installation
Point 6.7 Construction

GE Energy Typical Pre-


Bottom Elevation Check the proper landing of insulation
18.15 Erection Narrative for HRSG Visual 100 H Construction S S
Headers Module 3 pad on headers (do not install tautly)
Point 6.7

GE Energy Typical Pre- Quality


Bottom Elevation Check the tack welding of all bolts after
18.16 Erection Narrative for HRSG Visual 100 H S S
Headers Module 3 installation
Point 6.7 Construction

GE Energy Typical Pre-


Bottom Elevation Check the proper landing of insulation
18.17 Erection Narrative for HRSG Visual 100 H Construction S S
Headers Module 4 pad on headers (do not install tautly)
Point 6.7

GE Energy Typical Pre- Quality


Bottom Elevation Check the tack welding of all bolts after
18.18 Erection Narrative for HRSG Visual 100 H S S
Headers Module 4 installation
Point 6.7 Construction

GE Energy Typical Pre-


Bottom Elevation Check the proper landing of insulation
18.19 Erection Narrative for HRSG Visual 100 H Construction S S
Headers Module 5 pad on headers (do not install tautly)
Point 6.7

GE Energy Typical Pre- Quality


Bottom Elevation Check the tack welding of all bolts after
18.20 Erection Narrative for HRSG Visual 100 H S S
Headers Module 5 installation
Point 6.7 Construction

19. CENTER BAFFLES (NOSE PIECES)

GE Energy Typical Pre-


Front Side Baffles Check the installation of tie pieces and
19.1 Erection Narrative for HRSG Visual 100 H Quality W W
Module 1 pin gaps before welding
Point 6.7

GE Energy Typical Pre-


Front Side Baffles Check the welding of tie plates to
19.2 Erection Narrative for HRSG Visual 100 H Quality W W
Module 1 modules and washers to pins
Point 6.7

Check the gap of nose pieces to center GE Energy Typical Pre-


Front Side Baffles
19.3 baffles, already attached on the Erection Narrative for HRSG Visual 100 H Quality W W
Module 1
module at shop, before welding Point 6.7

GE Energy Typical Pre-


Front Side Baffles Check the welding of nose pieces to
19.4 Erection Narrative for HRSG Visual 100 H Quality W W
Module 1 center baffles
Point 6.7

GE Energy Typical Pre-


Rear Side Baffles Check the installation of tie pieces and
19.5 Erection Narrative for HRSG Visual 100 H Quality S S
Module 1 pin gaps before welding
Point 6.7
DUBA GREEN INTEGRATED SOLAR COMBINED CYCLE
POWER PLANT ITP MECHANICAL WORKS
trubarabia.com

ACTIVITY: HRSG ASSEMBLY & ERECTION


GENERAL ARRANGEMENT DRAWING.: 2014T0007-HGA-A001/2/3/4/5/6 PROCEDURE: DUB-01-VA-MM-TRU-002 DOC. Nº: DUB-01-VA-QPI-TRU-002 Rev. 03
ELEMENT: HRSG-01

INVOLVED PARTIES
INSPECTION / REVISION / TEST
Applicable Standard /
Point Nº General Activity Specific Activity Project Specification TRUBA CIS O/E GE Report Nº / RFI Nº Remarks
Supplier Specifications
Responsability
Type % Action Code Action Code Action Code Action Code
Assignment
GENERAL
GE Energy Typical Pre-
Rear Side Baffles Check the welding of tie plates to
19.6 Erection Narrative for HRSG Visual 100 H Quality S S
Module 1 modules and washers to pins
Point 6.7

Check the gap of nose pieces to center GE Energy Typical Pre-


Rear Side Baffles
19.7 baffles, already attached on the Erection Narrative for HRSG Visual 100 H Quality S S
Module 1
module at shop, before welding Point 6.7

GE Energy Typical Pre-


Rear Side Baffles Check the welding of nose pieces to
19.8 Erection Narrative for HRSG Visual 100 H Quality S S
Module 1 center baffles
Point 6.7

GE Energy Typical Pre-


Front Side Baffles Check the installation of tie pieces and
19.9 Erection Narrative for HRSG Visual 100 H Quality W W
Module 2 pin gaps before welding
Point 6.7

GE Energy Typical Pre-


Front Side Baffles Check the welding of tie plates to
19.10 Erection Narrative for HRSG Visual 100 H Quality W W
Module 2 modules and washers to pins
Point 6.7

Check the gap of nose pieces to center GE Energy Typical Pre-


Front Side Baffles
19.11 baffles, already attached on the Erection Narrative for HRSG Visual 100 H Quality W W
Module 2
module at shop, before welding Point 6.7

GE Energy Typical Pre-


Front Side Baffles Check the welding of nose pieces to
19.12 Erection Narrative for HRSG Visual 100 H Quality W W
Module 2 center baffles
Point 6.7

GE Energy Typical Pre-


Rear Side Baffles Check the installation of tie pieces and
19.13 Erection Narrative for HRSG Visual 100 H Quality S S
Module 2 pin gaps before welding
Point 6.7

GE Energy Typical Pre-


Rear Side Baffles Check the welding of tie plates to
19.14 Erection Narrative for HRSG Visual 100 H Quality S S
Module 2 modules and washers to pins
Point 6.7

Check the gap of nose pieces to center GE Energy Typical Pre-


Rear Side Baffles
19.15 baffles, already attached on the Erection Narrative for HRSG Visual 100 H Quality S S
Module 2
module at shop, before welding Point 6.7

GE Energy Typical Pre-


Rear Side Baffles Check the welding of nose pieces to
19.16 Erection Narrative for HRSG Visual 100 H Quality S S
Module 2 center baffles
Point 6.7

GE Energy Typical Pre-


Front Side Baffles Check the installation of tie pieces and
19.17 Erection Narrative for HRSG Visual 100 H Quality W W
Module 3 pin gaps before welding
Point 6.7

GE Energy Typical Pre-


Front Side Baffles Check the welding of tie plates to
19.18 Erection Narrative for HRSG Visual 100 H Quality W W
Module 3 modules and washers to pins
Point 6.7

Check the gap of nose pieces to center GE Energy Typical Pre-


Front Side Baffles
19.19 baffles, already attached on the Erection Narrative for HRSG Visual 100 H Quality W W
Module 3
module at shop, before welding Point 6.7
DUBA GREEN INTEGRATED SOLAR COMBINED CYCLE
POWER PLANT ITP MECHANICAL WORKS
trubarabia.com

ACTIVITY: HRSG ASSEMBLY & ERECTION


GENERAL ARRANGEMENT DRAWING.: 2014T0007-HGA-A001/2/3/4/5/6 PROCEDURE: DUB-01-VA-MM-TRU-002 DOC. Nº: DUB-01-VA-QPI-TRU-002 Rev. 03
ELEMENT: HRSG-01

INVOLVED PARTIES
INSPECTION / REVISION / TEST
Applicable Standard /
Point Nº General Activity Specific Activity Project Specification TRUBA CIS O/E GE Report Nº / RFI Nº Remarks
Supplier Specifications
Responsability
Type % Action Code Action Code Action Code Action Code
Assignment
GENERAL
GE Energy Typical Pre-
Front Side Baffles Check the welding of nose pieces to
19.20 Erection Narrative for HRSG Visual 100 H Quality W W
Module 3 center baffles
Point 6.7

GE Energy Typical Pre-


Rear Side Baffles Check the installation of tie pieces and
19.21 Erection Narrative for HRSG Visual 100 H Quality S S
Module 3 pin gaps before welding
Point 6.7

GE Energy Typical Pre-


Rear Side Baffles Check the welding of tie plates to
19.22 Erection Narrative for HRSG Visual 100 H Quality S S
Module 3 modules and washers to pins
Point 6.7

Check the gap of nose pieces to center GE Energy Typical Pre-


Rear Side Baffles
19.23 baffles, already attached on the Erection Narrative for HRSG Visual 100 H Quality S S
Module 3
module at shop, before welding Point 6.7

GE Energy Typical Pre-


Rear Side Baffles Check the welding of nose pieces to
19.24 Erection Narrative for HRSG Visual 100 H Quality S S
Module 3 center baffles
Point 6.7

GE Energy Typical Pre-


Front Side Baffles Check the installation of tie pieces and
19.25 Erection Narrative for HRSG Visual 100 H Quality W W
Module 4 pin gaps before welding
Point 6.7

GE Energy Typical Pre-


Front Side Baffles Check the welding of tie plates to
19.26 Erection Narrative for HRSG Visual 100 H Quality W W
Module 4 modules and washers to pins
Point 6.7

Check the gap of nose pieces to center GE Energy Typical Pre-


Front Side Baffles
19.27 baffles, already attached on the Erection Narrative for HRSG Visual 100 H Quality W W
Module 4
module at shop, before welding Point 6.7

GE Energy Typical Pre-


Front Side Baffles Check the welding of nose pieces to
19.28 Erection Narrative for HRSG Visual 100 H Quality W W
Module 4 center baffles
Point 6.7

GE Energy Typical Pre-


Rear Side Baffles Check the installation of tie pieces and
19.29 Erection Narrative for HRSG Visual 100 H Quality S S
Module 4 pin gaps before welding
Point 6.7

GE Energy Typical Pre-


Rear Side Baffles Check the welding of tie plates to
19.30 Erection Narrative for HRSG Visual 100 H Quality S S
Module 4 modules and washers to pins
Point 6.7

Check the gap of nose pieces to center GE Energy Typical Pre-


Rear Side Baffles
19.31 baffles, already attached on the Erection Narrative for HRSG Visual 100 H Quality S S
Module 4
module at shop, before welding Point 6.7

GE Energy Typical Pre-


Rear Side Baffles Check the welding of nose pieces to
19.32 Erection Narrative for HRSG Visual 100 H Quality S S
Module 4 center baffles
Point 6.7

GE Energy Typical Pre-


Front Side Baffles Check the installation of tie pieces and
19.33 Erection Narrative for HRSG Visual 100 H Quality W W
Module 5 pin gaps before welding
Point 6.7
DUBA GREEN INTEGRATED SOLAR COMBINED CYCLE
POWER PLANT ITP MECHANICAL WORKS
trubarabia.com

ACTIVITY: HRSG ASSEMBLY & ERECTION


GENERAL ARRANGEMENT DRAWING.: 2014T0007-HGA-A001/2/3/4/5/6 PROCEDURE: DUB-01-VA-MM-TRU-002 DOC. Nº: DUB-01-VA-QPI-TRU-002 Rev. 03
ELEMENT: HRSG-01

INVOLVED PARTIES
INSPECTION / REVISION / TEST
Applicable Standard /
Point Nº General Activity Specific Activity Project Specification TRUBA CIS O/E GE Report Nº / RFI Nº Remarks
Supplier Specifications
Responsability
Type % Action Code Action Code Action Code Action Code
Assignment
GENERAL
GE Energy Typical Pre-
Front Side Baffles Check the welding of tie plates to
19.34 Erection Narrative for HRSG Visual 100 H Quality W W
Module 5 modules and washers to pins
Point 6.7

Check the gap of nose pieces to center GE Energy Typical Pre-


Front Side Baffles
19.35 baffles, already attached on the Erection Narrative for HRSG Visual 100 H Quality W W
Module 5
module at shop, before welding Point 6.7

GE Energy Typical Pre-


Front Side Baffles Check the welding of nose pieces to
19.36 Erection Narrative for HRSG Visual 100 H Quality W W
Module 5 center baffles
Point 6.7

GE Energy Typical Pre-


Rear Side Baffles Check the installation of tie pieces and
19.37 Erection Narrative for HRSG Visual 100 H Quality S S
Module 5 pin gaps before welding
Point 6.7

GE Energy Typical Pre-


Rear Side Baffles Check the welding of tie plates to
19.38 Erection Narrative for HRSG Visual 100 H Quality S S
Module 5 modules and washers to pins
Point 6.7

Check the gap of nose pieces to center GE Energy Typical Pre-


Rear Side Baffles
19.39 baffles, already attached on the Erection Narrative for HRSG Visual 100 H Quality S S
Module 5
module at shop, before welding Point 6.7

GE Energy Typical Pre-


Rear Side Baffles Check the welding of nose pieces to
19.40 Erection Narrative for HRSG Visual 100 H Quality S S
Module 5 center baffles
Point 6.7

20. INLET DUCT

GE Energy Typical Pre- Construction


Check the surface preparation and
20.1 Foundation Erection Narrative for HRSG Visual 100 H S
cleanliness inside pockets
Point 6.8 Quality

GE Energy Typical Pre- Topographic 100 R


Check the location, elevation and size
20.2 Anchor bolts Erection Narrative for HRSG H Construction R
of all achor bolts
Point 6.8 Dimensional 100 S

Check the position and level of tne GE Energy Typical Pre-


20.3 Base plates base plates after installation on the Erection Narrative for HRSG Topographic 100 H Construction R
anchor bolts Point 6.8

GEMSS-C-15, Rev-02 GE Energy Typical Pre- Construction


Ckeck the grout preparation and
20.4 Base plates Point 8.1.6.1 Erection Narrative for HRSG Visual 100 H S
pouring for securing of base plates
Point 8.2.3.1 Point 6.8 Quality

GE Energy Typical Pre- Expansion 2 samples from each


GEMSS-C-15, Rev-02
20.5 Base plates Check the grout testing Erection Narrative for HRSG Flow batch used in the H Quality W
Point 8.3.2
Point 6.8 Strength works

GE Energy Typical Pre-


Check the base plates for elevation and
20.6 Base plates Erection Narrative for HRSG Topographic 100 H Construction R
leveness after grout is cured
Point 6.8

Check the upringht & set on foudation


GE Energy Typical Pre- Visual 100 S
base plates, ensure centerline of
20.7 Main Columns Erection Narrative for HRSG H Construction R
columns is at centerline of foudation,
Point 6.8 Topographic 100 R
verify level and plumb.
DUBA GREEN INTEGRATED SOLAR COMBINED CYCLE
POWER PLANT ITP MECHANICAL WORKS
trubarabia.com

ACTIVITY: HRSG ASSEMBLY & ERECTION


GENERAL ARRANGEMENT DRAWING.: 2014T0007-HGA-A001/2/3/4/5/6 PROCEDURE: DUB-01-VA-MM-TRU-002 DOC. Nº: DUB-01-VA-QPI-TRU-002 Rev. 03
ELEMENT: HRSG-01

INVOLVED PARTIES
INSPECTION / REVISION / TEST
Applicable Standard /
Point Nº General Activity Specific Activity Project Specification TRUBA CIS O/E GE Report Nº / RFI Nº Remarks
Supplier Specifications
Responsability
Type % Action Code Action Code Action Code Action Code
Assignment
GENERAL
Check the proper installation and GE Energy Typical Pre- Construction
20.8 Bottom Beams bolting of bottom beams for joining Erection Narrative for HRSG Dimensional 100 H H
main columns Point 6.8 Quality

Check the proper installation and GE Energy Typical Pre- Construction


20.9 Top Beams bolting of top beams for joining main Erection Narrative for HRSG Dimensional 100 H H
columns Point 6.8 Quality

Check the proper installation and GE Energy Typical Pre- Construction


20.10 Side Beams bolting of side beams for joining main Erection Narrative for HRSG Dimensional 100 H H
columns Point 6.8 Quality

Check the installation, bolting and


GE Energy Typical Pre- Construction
exterior tack welding of the different
20.11 Bottom Panels Erection Narrative for HRSG Visual 100 H S
panels starting from HRSG side and
Point 6.8 Quality
finishing in diverter side

GE Energy Typical Pre-


Check all the fit up bolts are seal
20.12 Bottom Panels Erection Narrative for HRSG Visual 100 H Quality S
welded
Point 6.8

Check the installation, bolting and


GE Energy Typical Pre- Construction
exterior tack welding of the different
20.13 Side Panels Erection Narrative for HRSG Visual 100 H S
panels starting from HRSG side and
Point 6.8 Quality
finishing in diverter side

GE Energy Typical Pre-


Check all the fit up bolts are seal
20.14 Side Panels Erection Narrative for HRSG Visual 100 H Quality S
welded
Point 6.8

Check the installation, bolting and


GE Energy Typical Pre- Construction
exterior tack welding of the different
20.15 Top Panels Erection Narrative for HRSG Visual 100 H S
panels starting from HRSG side and
Point 6.8 Quality
finishing in diverter side

GE Energy Typical Pre-


Check all the fit up bolts are seal
20.16 Top Panels Erection Narrative for HRSG Visual 100 H Quality S
welded
Point 6.8

GE Energy Typical Pre-


Final inspection for internal and
20.17 Joint Welding Erection Narrative for HRSG Visual 100 H Quality W W
external welded joints
Point 6.8

Check the installation of internal


GE Energy Typical Pre-
insulation and liner cover plates taking
20.18 Insulation Erection Narrative for HRSG Visual 100 H Construction S S
into account the covering sequence of
Point 6.8
field liner

GE Energy Typical Pre- Construction


Check the installation, bolting and
20.19 Square Duct Erection Narrative for HRSG Visual 100 H S
exterior tack welding of the lower panel
Point 6.8 Quality

GE Energy Typical Pre-


Check all the fit up bolts are seal
20.20 Square Duct Erection Narrative for HRSG Visual 100 H Quality S
welded
Point 6.8

GE Energy Typical Pre- Construction


Check the installation, bolting and
20.21 Square Duct Erection Narrative for HRSG Visual 100 H S
exterior tack welding of the top panel
Point 6.8 Quality
DUBA GREEN INTEGRATED SOLAR COMBINED CYCLE
POWER PLANT ITP MECHANICAL WORKS
trubarabia.com

ACTIVITY: HRSG ASSEMBLY & ERECTION


GENERAL ARRANGEMENT DRAWING.: 2014T0007-HGA-A001/2/3/4/5/6 PROCEDURE: DUB-01-VA-MM-TRU-002 DOC. Nº: DUB-01-VA-QPI-TRU-002 Rev. 03
ELEMENT: HRSG-01

INVOLVED PARTIES
INSPECTION / REVISION / TEST
Applicable Standard /
Point Nº General Activity Specific Activity Project Specification TRUBA CIS O/E GE Report Nº / RFI Nº Remarks
Supplier Specifications
Responsability
Type % Action Code Action Code Action Code Action Code
Assignment
GENERAL
GE Energy Typical Pre-
Check all the fit up bolts are seal
20.22 Square Duct Erection Narrative for HRSG Visual 100 H Quality S
welded
Point 6.8

GE Energy Typical Pre- Construction


Check the installation, bolting and
20.23 Square Duct Erection Narrative for HRSG Visual 100 H S
exterior tack welding of the side panels
Point 6.8 Quality

GE Energy Typical Pre-


Check all the fit up bolts are seal
20.24 Square Duct Erection Narrative for HRSG Visual 100 H Quality S
welded
Point 6.8

GE Energy Typical Pre-


Final inspection for internal and
20.25 Square Duct Erection Narrative for HRSG Visual 100 H Quality W W
external welded joints
Point 6.8

Check the installation of internal


GE Energy Typical Pre-
insulation and liner cover plates taking
20.26 Square Duct Erection Narrative for HRSG Visual 100 H Construction S S
into account the covering sequence of
Point 6.8
field liner
Check the installation of expansion joint
GE Energy Typical Pre-
between diverter and square duct
20.27 Square Duct Erection Narrative for HRSG Visual 100 H Construction S
according to the manufacturer
Point 6.8
instructions
21. MAIN STACK

GE Energy Typical Pre- Construction


Check the surface preparation,
21.1 Foundation Erection Narrative for HRSG Visual 100 H S
flatness, level and cleanliness
Point 6.9 Quality

GE Energy Typical Pre- Topographic 100 R


Check the location, elevation,
21.2 Anchor bolts Erection Narrative for HRSG H Construction
straightness and size of all achor bolts
Point 6.9 Dimensional 100 S

GE Energy Typical Pre- Construction


Check the fit up, alignment and welding
21.3 1st Shell Course Erection Narrative for HRSG Visual 100 H S S
of each section of the shell
Point 6.9 Quality

Check the position and level of the GE Energy Typical Pre-


21.4 1st Shell Course shell after installation on the anchor Erection Narrative for HRSG Topographic 100 H Construction R R
bolts Point 6.9

GEMSS-C-15, Rev-02 GE Energy Typical Pre- Construction


Ckeck the grout preparation and
21.5 1st Shell Course Point 8.1.6.1 Erection Narrative for HRSG Visual 100 H S
pouring after position and level
Point 8.2.3.1 Point 6.9 Quality

GE Energy Typical Pre- Expansion 2 samples from each


GEMSS-C-15, Rev-02
21.6 1st Shell Course Check the grout testing Erection Narrative for HRSG Flow batch used in the H Quality W
Point 8.3.2
Point 6.9 Strength works

Check the bolting of anchor bolts GE Energy Typical Pre-


21.7 1st Shell Course according to required tightening Erection Narrative for HRSG Dimensional 100 H Quality W
methods Point 6.9

GE Energy Typical Pre- Construction


Check the fit up, alignment and welding
21.8 2st Shell Course Erection Narrative for HRSG Visual 100 H S S
of each section of the shell
Point 6.9 Quality
DUBA GREEN INTEGRATED SOLAR COMBINED CYCLE
POWER PLANT ITP MECHANICAL WORKS
trubarabia.com

ACTIVITY: HRSG ASSEMBLY & ERECTION


GENERAL ARRANGEMENT DRAWING.: 2014T0007-HGA-A001/2/3/4/5/6 PROCEDURE: DUB-01-VA-MM-TRU-002 DOC. Nº: DUB-01-VA-QPI-TRU-002 Rev. 03
ELEMENT: HRSG-01

INVOLVED PARTIES
INSPECTION / REVISION / TEST
Applicable Standard /
Point Nº General Activity Specific Activity Project Specification TRUBA CIS O/E GE Report Nº / RFI Nº Remarks
Supplier Specifications
Responsability
Type % Action Code Action Code Action Code Action Code
Assignment
GENERAL
GE Energy Typical Pre- Construction
Check the fit up, alignment and welding
21.9 2st Shell Course Erection Narrative for HRSG Visual 100 H S S
of the drain plate and pipe into the shell
Point 6.9 Quality

GE Energy Typical Pre-


Check the lifting & set onto the 1st shell
21.10 2st Shell Course Erection Narrative for HRSG Topographic 100 H Construction R R
course, verify level and plumb.
Point 6.9

GE Energy Typical Pre-


Check the welding between 1st shell
21.11 2st Shell Course Erection Narrative for HRSG Visual 100 H Quality S
and 2nd shell courses Point 6.9

GE Energy Typical Pre- Construction


Check the fit up, alignment and welding
21.12 3th Shell Course Erection Narrative for HRSG Visual 100 H S S
of each section of the shell
Point 6.9 Quality

GE Energy Typical Pre-


Check the lifting & set onto the 2nd shell
21.13 3th Shell Course Erection Narrative for HRSG Topographic 100 H Construction R R
course, verify level and plumb.
Point 6.9

GE Energy Typical Pre-


Check the welding between 2nd shell
21.14 3th Shell Course Erection Narrative for HRSG Visual 100 H Quality S
and 3th shell courses Point 6.9

GE Energy Typical Pre- Construction


Check the fit up, alignment and welding
21.15 4th Shell Course Erection Narrative for HRSG Visual 100 H S S
of each section of the shell
Point 6.9 Quality

GE Energy Typical Pre- Construction


Check the fit up, alignment bolting and
21.16 4th Shell Course Erection Narrative for HRSG Visual 100 H S
welding of platforms and ladders
Point 6.9 Quality

GE Energy Typical Pre-


Check the lifting & set onto the 3th shell
21.17 4th Shell Course Erection Narrative for HRSG Topographic 100 H Construction R R
course, verify level and plumb.
Point 6.9

GE Energy Typical Pre-


Check the welding between 3th shell
21.18 4th Shell Course Erection Narrative for HRSG Visual 100 H Quality S
and 4th shell courses Point 6.9

Check the assembly of the different Nem Stack Damper


21.19 Damper parts of the damper according to Arrangement Visual 100 H Construction S
manufacturer´s instructions Drawing 11895-01-0100c

Check the welding of damper onto the


Nem Stack Damper Construction
4th shell course is done according the
21.20 Damper Arrangement Visual 100 H S
low stress welding secuence provide by
Drawing 11895-01-0100c Quality
manufacture´s damper

Check the opening and closing by


21.21 Damper GE comment Visual 100 H Construction S
manually

GE Energy Typical Pre- Construction


Check the fit up, alignment and welding
21.22 5th Shell Course Erection Narrative for HRSG Visual 100 H S S
of each section of the shell
Point 6.9 Quality
DUBA GREEN INTEGRATED SOLAR COMBINED CYCLE
POWER PLANT ITP MECHANICAL WORKS
trubarabia.com

ACTIVITY: HRSG ASSEMBLY & ERECTION


GENERAL ARRANGEMENT DRAWING.: 2014T0007-HGA-A001/2/3/4/5/6 PROCEDURE: DUB-01-VA-MM-TRU-002 DOC. Nº: DUB-01-VA-QPI-TRU-002 Rev. 03
ELEMENT: HRSG-01

INVOLVED PARTIES
INSPECTION / REVISION / TEST
Applicable Standard /
Point Nº General Activity Specific Activity Project Specification TRUBA CIS O/E GE Report Nº / RFI Nº Remarks
Supplier Specifications
Responsability
Type % Action Code Action Code Action Code Action Code
Assignment
GENERAL
GE Energy Typical Pre- Construction
Check the fit up, alignment bolting and
21.23 5th Shell Course Erection Narrative for HRSG Visual 100 H S
welding of platforms and ladders
Point 6.9 Quality

GE Energy Typical Pre-


Check the lifting & set onto the damper,
21.24 5th Shell Course Erection Narrative for HRSG Topographic 100 H Construction R R
verify level and plumb.
Point 6.9

GE Energy Typical Pre-


Check the welding between damper
21.25 5th Shell Course Erection Narrative for HRSG Visual 100 H Quality S
and 5th shell course
Point 6.9

GE Energy Typical Pre- Construction


Check the fit up, alignment and welding
21.26 6th Shell Course Erection Narrative for HRSG Visual 100 H S S
of each section of the shell
Point 6.9 Quality

GE Energy Typical Pre- Construction


Check the fit up, alignment bolting and
21.27 6th Shell Course Erection Narrative for HRSG Visual 100 H S
welding of silencer indide the shell
Point 6.9 Quality

GE Energy Typical Pre- Construction


Check the fit up, alignment bolting and
21.28 6th Shell Course Erection Narrative for HRSG Visual 100 H S
welding of platforms and ladders
Point 6.9 Quality

GE Energy Typical Pre-


Check the lifting & set onto the 5th shell
21.29 6th Shell Course Erection Narrative for HRSG Topographic 100 H Construction R R
course, verify level and plumb.
Point 6.9

GE Energy Typical Pre-


Check the welding between 5th shell
21.30 6th Shell Course Erection Narrative for HRSG Visual 100 H Quality S
and 6th shell courses Point 6.9

GE Energy Typical Pre- Construction


Check the fit up, alignment and welding
21.31 7th Shell Course Erection Narrative for HRSG Visual 100 H S S
of each section of the shell
Point 6.9 Quality

GE Energy Typical Pre- Construction


Check the fit up, alignment bolting and
21.32 7th Shell Course Erection Narrative for HRSG Visual 100 H S
welding of platforms and ladders
Point 6.9 Quality

GE Energy Typical Pre-


Check the lifting & set onto the 6th shell
21.33 7th Shell Course Erection Narrative for HRSG Topographic 100 H Construction R R
course, verify level and plumb.
Point 6.9

GE Energy Typical Pre-


Check the welding between 6th shell
21.34 7th Shell Course Erection Narrative for HRSG Visual 100 H Quality S
and 7th shell courses Point 6.9

GE Energy Typical Pre- Construction


Check the fit up, alignment and welding
21.35 8th Shell Course Erection Narrative for HRSG Visual 100 H S S
of each section of the shell
Point 6.9 Quality

GE Energy Typical Pre- Construction


Check the fit up, alignment bolting and
21.36 8th Shell Course Erection Narrative for HRSG Visual 100 H S
welding of platforms and ladders
Point 6.9 Quality
DUBA GREEN INTEGRATED SOLAR COMBINED CYCLE
POWER PLANT ITP MECHANICAL WORKS
trubarabia.com

ACTIVITY: HRSG ASSEMBLY & ERECTION


GENERAL ARRANGEMENT DRAWING.: 2014T0007-HGA-A001/2/3/4/5/6 PROCEDURE: DUB-01-VA-MM-TRU-002 DOC. Nº: DUB-01-VA-QPI-TRU-002 Rev. 03
ELEMENT: HRSG-01

INVOLVED PARTIES
INSPECTION / REVISION / TEST
Applicable Standard /
Point Nº General Activity Specific Activity Project Specification TRUBA CIS O/E GE Report Nº / RFI Nº Remarks
Supplier Specifications
Responsability
Type % Action Code Action Code Action Code Action Code
Assignment
GENERAL
GE Energy Typical Pre-
Check the lifting & set onto the 7th shell
21.37 8th Shell Course Erection Narrative for HRSG Topographic 100 H Construction R R
course, verify level and plumb.
Point 6.9

GE Energy Typical Pre-


Check the welding between 7th shell
21.38 8th Shell Course Erection Narrative for HRSG Visual 100 H Quality S
and 8th shell courses Point 6.9

GE Energy Typical Pre- Construction


Check the fit up, alignment and welding
21.39 9th Shell Course Erection Narrative for HRSG Visual 100 H S S
of each section of the shell
Point 6.9 Quality

GE Energy Typical Pre- Construction


Check the fit up, alignment bolting and
21.40 9th Shell Course Erection Narrative for HRSG Visual 100 H S
welding of platforms and ladders
Point 6.9 Quality

GE Energy Typical Pre-


Check the lifting & set onto the 8th shell
21.41 9th Shell Course Erection Narrative for HRSG Topographic 100 H Construction R R
course, verify level and plumb.
Point 6.9

GE Energy Typical Pre-


Check the welding between 8th shell
21.42 9th Shell Course Erection Narrative for HRSG Visual 100 H Quality S
and 9th shell courses Point 6.9

Visual 100 S
Verify the execution of NDT for the
21.43 NDT ASME STS-1 H Quality
welds performed
RT According to Code R

Check the grout preparation and


pouring between the bottom of the GEMSS-C-15, Rev-02 Construction
21.44 Grouting base plate and the top of the Point 8.1.6.1 Visual 100 H S
foundation after the stack is competely Point 8.2.3.1 Quality
erected

Expansion 2 samples from each


GEMSS-C-15, Rev-02
21.45 Grouting Check the grout testing Flow batch used in the H Quality W
Point 8.3.2
Strength works

Check the installation of floor part of


GE Energy Typical Pre-
expansion joint flange verifying location,
21.46 Breeching duct Erection Narrative for HRSG Dimensional 100 H Construction S
level and dimensions with respect to
Point 6.9
stack flage

Check the installation of side parts of


GE Energy Typical Pre-
expansion joint flange verifying location,
21.47 Breeching duct Erection Narrative for HRSG Dimensional 100 H Construction S
leve, plumb and dimensions with
Point 6.9
respect to stack flage

Check the installation of roof part of


GE Energy Typical Pre-
expansion joint flange verifying location,
21.48 Breeching duct Erection Narrative for HRSG Dimensional 100 H Construction S
level and dimensions with respect to
Point 6.9
stack flage
22- PIPING AND VALVES

Verify placement, welding, and GE Energy Typical Pre- Visual 100 S


High Pressure
22.1 orientation of pipe supports, keys, pins, Erection Narrative for HRSG H Construction
System
nuts, bolts, etc Point 6.11 Dimensional 100 S

Check the installation of pipes and GE Energy Typical Pre- Visual 100 S
High Pressure
22.2 fittings as per codes, specifications and Erection Narrative for HRSG H Construction S
System
AFC drawings Point 6.11 Dimensional 100 S
DUBA GREEN INTEGRATED SOLAR COMBINED CYCLE
POWER PLANT ITP MECHANICAL WORKS
trubarabia.com

ACTIVITY: HRSG ASSEMBLY & ERECTION


GENERAL ARRANGEMENT DRAWING.: 2014T0007-HGA-A001/2/3/4/5/6 PROCEDURE: DUB-01-VA-MM-TRU-002 DOC. Nº: DUB-01-VA-QPI-TRU-002 Rev. 03
ELEMENT: HRSG-01

INVOLVED PARTIES
INSPECTION / REVISION / TEST
Applicable Standard /
Point Nº General Activity Specific Activity Project Specification TRUBA CIS O/E GE Report Nº / RFI Nº Remarks
Supplier Specifications
Responsability
Type % Action Code Action Code Action Code Action Code
Assignment
GENERAL
GE Energy Typical Pre- Visual 100 S
High Pressure Verify valve placement, orientation and
22.3 Erection Narrative for HRSG H Construction
System accessibility
Point 6.11 Dimensional 100 S

GE Energy Typical Pre- Visual 100 S


High Pressure Check the fit up and welding of piping
22.4 Erection Narrative for HRSG H Quality S
System and valves
Point 6.11 Dimensional 100 S

High Pressure
22.5 Check the first wled of P91 material GE comment Visual 100 H Quality H W
System

Visual 100 S

RT According to Code & R


Contract
High Pressure ASME I
22.6 Check NDT and PWHT if applicable Requirements H Quality
System ASME B31.1
Hardness According to Code & R
Contract
Requirements

Check the correct installation of the


components of the line to be tested Construction
High Pressure
22.7 (supports, blind discs, valves, etc ASME I Visual 100 H H W
System
according flow direction) before Quality
pressure test starting

Verify the disassembly of valve


High Pressure
22.8 internals and assembly of hydro kit GE comment Visual 100 H Construction S
System
before pressure test

Construction
High Pressure
22.9 Check the ongoing of pressure test ASME I Visual 100 H H
System
Quality

Verify placement, welding, and GE Energy Typical Pre- Visual 100 S


22.10 Reheater System orientation of pipe supports, keys, pins, Erection Narrative for HRSG H Construction
nuts, bolts, etc Point 6.11 Dimensional 100 S

Check the installation of pipes and GE Energy Typical Pre- Visual 100 S
22.11 Reheater System fittings as per codes, specifications and Erection Narrative for HRSG H Construction S
AFC drawings Point 6.11 Dimensional 100 S

GE Energy Typical Pre- Visual 100 S


Verify valve placement, orientation and
22.12 Reheater System Erection Narrative for HRSG H Construction
accessibility
Point 6.11 Dimensional 100 S

GE Energy Typical Pre- Visual 100 S


Check the fit up and welding of piping
22.13 Reheater System Erection Narrative for HRSG H Quality S
and valves
Point 6.11 Dimensional 100 S

High Pressure
22.14 Check the first wled of P91 material GE comment Visual 100 H Quality H W
System
DUBA GREEN INTEGRATED SOLAR COMBINED CYCLE
POWER PLANT ITP MECHANICAL WORKS
trubarabia.com

ACTIVITY: HRSG ASSEMBLY & ERECTION


GENERAL ARRANGEMENT DRAWING.: 2014T0007-HGA-A001/2/3/4/5/6 PROCEDURE: DUB-01-VA-MM-TRU-002 DOC. Nº: DUB-01-VA-QPI-TRU-002 Rev. 03
ELEMENT: HRSG-01

INVOLVED PARTIES
INSPECTION / REVISION / TEST
Applicable Standard /
Point Nº General Activity Specific Activity Project Specification TRUBA CIS O/E GE Report Nº / RFI Nº Remarks
Supplier Specifications
Responsability
Type % Action Code Action Code Action Code Action Code
Assignment
GENERAL
Visual 100 S

RT According to Code & R


Contract
ASME I
22.15 Reheater System Check NDT and PWHT if applicable Requirements H Quality
ASME B31.1
Hardness According to Code & R
Contract
Requirements

Check the correct installation of the


components of the line to be tested Construction
22.16 Reheater System (supports, blind discs, valves, etc ASME I Visual 100 H H W
according flow direction) before Quality
pressure test starting

Construction
22.17 Reheater System Check the ongoing of pressure test ASME I Visual 100 H H
Quality

Verify placement, welding, and GE Energy Typical Pre- Visual 100 S


Low Pressure
22.18 orientation of pipe supports, keys, pins, Erection Narrative for HRSG H Construction
System
nuts, bolts, etc Point 6.11 Dimensional 100 S

Check the installation of pipes and GE Energy Typical Pre- Visual 100 S
Low Pressure
22.19 fittings as per codes, specifications and Erection Narrative for HRSG H Construction S
System
AFC drawings Point 6.11 Dimensional 100 S

GE Energy Typical Pre- Visual 100 S


Low Pressure Verify valve placement, orientation and
22.20 Erection Narrative for HRSG H Construction
System accessibility
Point 6.11 Dimensional 100 S

GE Energy Typical Pre- Visual 100 S


Low Pressure Check the fit up and welding of piping
22.21 Erection Narrative for HRSG H Quality S
System and valves
Point 6.11 Dimensional 100 S

Visual 100 S

RT According to Code & R


Contract
Low Pressure ASME I
22.22 Check NDT and PWHT if applicable Requirements H Quality
System ASME B31.1
Hardness According to Code & R
Contract
Requirements

Check the correct installation of the


components of the line to be tested Construction
Low Pressure
22.23 (supports, blind discs, valves, etc ASME I Visual 100 H H W
System
according flow direction) before Quality
pressure test starting

Construction
Low Pressure
22.24 Check the ongoing of pressure test ASME I Visual 100 H H
System
Quality

Verify placement, welding, and GE Energy Typical Pre- Visual 100 S


22.25 Burner System orientation of pipe supports, keys, pins, Erection Narrative for HRSG H Construction
nuts, bolts, etc Point 6.11 Dimensional 100 S
DUBA GREEN INTEGRATED SOLAR COMBINED CYCLE
POWER PLANT ITP MECHANICAL WORKS
trubarabia.com

ACTIVITY: HRSG ASSEMBLY & ERECTION


GENERAL ARRANGEMENT DRAWING.: 2014T0007-HGA-A001/2/3/4/5/6 PROCEDURE: DUB-01-VA-MM-TRU-002 DOC. Nº: DUB-01-VA-QPI-TRU-002 Rev. 03
ELEMENT: HRSG-01

INVOLVED PARTIES
INSPECTION / REVISION / TEST
Applicable Standard /
Point Nº General Activity Specific Activity Project Specification TRUBA CIS O/E GE Report Nº / RFI Nº Remarks
Supplier Specifications
Responsability
Type % Action Code Action Code Action Code Action Code
Assignment
GENERAL
Check the installation of pipes and GE Energy Typical Pre- Visual 100 S
22.26 Burner System fittings as per codes, specifications and Erection Narrative for HRSG H Construction S
AFC drawings Point 6.11 Dimensional 100 S

GE Energy Typical Pre- Visual 100 S


Verify valve placement, orientation and
22.27 Burner System Erection Narrative for HRSG H Construction
accessibility
Point 6.11 Dimensional 100 S

GE Energy Typical Pre- Visual 100 S


Check the fit up and welding of piping
22.28 Burner System Erection Narrative for HRSG H Quality S
and valves
Point 6.11 Dimensional 100 S

Visual 100 S

RT According to Code & R


Contract
ASME I
22.29 Burner System Check NDT and PWHT if applicable Requirements H Quality
ASME B31.1
Hardness According to Code & R
Contract
Requirements

Check the correct installation of the


components of the line to be tested Construction
22.30 Burner System (supports, blind discs, valves, etc ASME I Visual 100 H H W
according flow direction) before Quality
pressure test starting

Construction
ASME I
22.31 Burner System Check the ongoing of pressure test Visual 100 H H
Quality

Verify placement, welding, and GE Energy Typical Pre- Visual 100 S


22.32 Blowdown System orientation of pipe supports, keys, pins, Erection Narrative for HRSG H Construction
nuts, bolts, etc Point 6.11 Dimensional 100 S

Check the installation of pipes and GE Energy Typical Pre- Visual 100 S
22.33 Blowdown System fittings as per codes, specifications and Erection Narrative for HRSG H Construction S
AFC drawings Point 6.11 Dimensional 100 S

GE Energy Typical Pre- Visual 100 S


Verify valve placement, orientation and
22.34 Blowdown System Erection Narrative for HRSG H Construction
accessibility
Point 6.11 Dimensional 100 S

GE Energy Typical Pre- Visual 100 S


Check the fit up and welding of piping
22.35 Blowdown System Erection Narrative for HRSG H Quality S
and valves
Point 6.11 Dimensional 100 S

Visual 100 S

RT According to Code & R


Contract
ASME I
22.36 Blowdown System Check NDT and PWHT if applicable Requirements H Quality
ASME B31.1
Hardness According to Code & R
Contract
Requirements
DUBA GREEN INTEGRATED SOLAR COMBINED CYCLE
POWER PLANT ITP MECHANICAL WORKS
trubarabia.com

ACTIVITY: HRSG ASSEMBLY & ERECTION


GENERAL ARRANGEMENT DRAWING.: 2014T0007-HGA-A001/2/3/4/5/6 PROCEDURE: DUB-01-VA-MM-TRU-002 DOC. Nº: DUB-01-VA-QPI-TRU-002 Rev. 03
ELEMENT: HRSG-01

INVOLVED PARTIES
INSPECTION / REVISION / TEST
Applicable Standard /
Point Nº General Activity Specific Activity Project Specification TRUBA CIS O/E GE Report Nº / RFI Nº Remarks
Supplier Specifications
Responsability
Type % Action Code Action Code Action Code Action Code
Assignment
GENERAL Check the correct installation of the
components of the line to be tested Construction
22.37 Blowdown System (supports, blind discs, valves, etc ASME I Visual 100 H H W
according flow direction) before Quality
pressure test starting

Construction
22.38 Blowdown System Check the ongoing of pressure test ASME I Visual 100 H H
Quality

Silencers, PSV´s Verify placement, welding, and GE Energy Typical Pre- Visual 100 S
22.39 vents and Drain orientation of pipe supports, keys, pins, Erection Narrative for HRSG H Construction
System nuts, bolts, etc Point 6.11 Dimensional 100 S

Silencers, PSV´s Check the installation of pipes and GE Energy Typical Pre- Visual 100 S
22.40 vents and Drain fittings as per codes, specifications and Erection Narrative for HRSG H Construction S
System AFC drawings Point 6.11 Dimensional 100 S

Silencers, PSV´s GE Energy Typical Pre- Visual 100 S


Verify valve placement, orientation and
22.41 vents and Drain Erection Narrative for HRSG H Construction
accessibility
System Point 6.11 Dimensional 100 S

Silencers, PSV´s GE Energy Typical Pre- Visual 100 S


Check the fit up and welding of piping
22.42 vents and Drain Erection Narrative for HRSG H Quality S
and valves
System Point 6.11 Dimensional 100 S

Visual 100 S

RT According to Code & R


Silencers, PSV´s Contract
ASME I
22.43 vents and Drain Check NDT and PWHT if applicable Requirements H Quality
ASME B31.1
System
Hardness According to Code & R
Contract
Requirements

Check the correct installation of the


Silencers, PSV´s components of the line to be tested Construction
22.44 vents and Drain (supports, blind discs, valves, etc ASME I Visual 100 H H W
System according flow direction) before Quality
pressure test starting

Silencers, PSV´s Construction


22.45 vents and Drain Check the ongoing of pressure test ASME I Visual 100 H H
System Quality

23. STAIR TOWER / SECONDARY STEEL STRUCTURE / PLATFORMS

Check the correct alingment between GE Drawing


23.1 Pre-Assembly Visual 100 H Construction S
the drill holes of joints 2014T0007-STR-E001

Check all the bolts, nuts and washers GE Drawing Construction


23.2 Pre-Assembly placed in each joint are according with 2014T0007-STR-E022 Visual 100 H S
drawings 2014T0007-STR-E023 Quality

Check the initial torque before the GE Drawing


23.3 Pre-Assembly Visual 100 H Construction S
erection of the structure 2014T0007-STR-E001
DUBA GREEN INTEGRATED SOLAR COMBINED CYCLE
POWER PLANT ITP MECHANICAL WORKS
trubarabia.com

ACTIVITY: HRSG ASSEMBLY & ERECTION


GENERAL ARRANGEMENT DRAWING.: 2014T0007-HGA-A001/2/3/4/5/6 PROCEDURE: DUB-01-VA-MM-TRU-002 DOC. Nº: DUB-01-VA-QPI-TRU-002 Rev. 03
ELEMENT: HRSG-01

INVOLVED PARTIES
INSPECTION / REVISION / TEST
Applicable Standard /
Point Nº General Activity Specific Activity Project Specification TRUBA CIS O/E GE Report Nº / RFI Nº Remarks
Supplier Specifications
Responsability
Type % Action Code Action Code Action Code Action Code
Assignment
GENERAL
GE Drawing
Check the erection of preassemblied
23.4 Erection 2014T0007-STR-E022 Visual 100 H Construction S
structure
2014T0007-STR-E023

Check the joint between structure and GE Drawing


23.5 Erection foundations (elevation,pre- 2014T0007-STR-FR037 Visual 100 H Construction S
tightening…) 2014T0007-STR-FR038

Check all the bolts, nuts and washers GE Drawing Construction


23.6 Final-Assembly placed in each joint are according with 2014T0007-STR-E022 Visual 100 H S S
drawings 2014T0007-STR-E023 Quality

GE Drawing
23.7 Final-Assembly Check the final torque of the structure Dimensional 100 H Quality W
2014T0007-STR-E001

NDT (visual,penetrant or ultrasonic) for


23.8 Final-Assembly Documental 100 H Quality R
welds (if applicable)

Check alignment, leveling and GE Drawing


23.9 Final-Assembly Topographic 100 H Construction R R
plumbness of the structure 2014T0007-STR-E001

Expansion 2 samples from each


GEMSS-C-15, Rev-02
23.10 Final-Assembly Check grouting of base plates Flow batch used in the H Quality W
Point 8.3.2
Strength works

GE Drawing
Chech the assembly of remaing
2014T0007-STR-E002
23.11 Final-Assembly elements (gangways, platforms, Visual 100 H Construction S S
2014T0007-STR-E003
leaders…)
2014T0007-STR-E004

GE HRSG Painting Construction


23.12 Final-Assembly Painting touch up Specification Visual 100 H S
Point 4.3.2 Quality

Construction
23.13 Final-Assembly Final inspection Visual 100 H W
Quality

24. ELEVATOR

Steel Structure Pre- Check the correct alingment between GE Drawing


24.1 Visual 100 H Construction S
Assembly the drill holes of joints 2014T0007-STR-E001

Check all the bolts, nuts and washers GE Drawing Construction


Steel Structure Pre-
24.2 placed in each joint are according with 2014T0007-STR-E022 Visual 100 H S
Assembly
drawings 2014T0007-STR-E023 Quality

Steel Structure Pre- Check the initial torque before the GE Drawing
24.3 Visual 100 H Construction S
Assembly erection of the structure 2014T0007-STR-E001

GE Drawing
Steel Structure Check the erection of preassemblied
24.4 2014T0007-STR-E022 Visual 100 H Construction S
Erection structure
2014T0007-STR-E023
DUBA GREEN INTEGRATED SOLAR COMBINED CYCLE
POWER PLANT ITP MECHANICAL WORKS
trubarabia.com

ACTIVITY: HRSG ASSEMBLY & ERECTION


GENERAL ARRANGEMENT DRAWING.: 2014T0007-HGA-A001/2/3/4/5/6 PROCEDURE: DUB-01-VA-MM-TRU-002 DOC. Nº: DUB-01-VA-QPI-TRU-002 Rev. 03
ELEMENT: HRSG-01

INVOLVED PARTIES
INSPECTION / REVISION / TEST
Applicable Standard /
Point Nº General Activity Specific Activity Project Specification TRUBA CIS O/E GE Report Nº / RFI Nº Remarks
Supplier Specifications
Responsability
Type % Action Code Action Code Action Code Action Code
Assignment
GENERAL
Check the joint between structure and GE Drawing
Steel Structure
24.5 foundations (elevation,pre- 2014T0007-STR-FR1001 Visual 100 H Construction S
Erection
tightening…) 2014T0007-STR-FR1002

Check all the bolts, nuts and washers GE Drawing Construction


Steel Structure Final-
24.6 placed in each joint are according with 2014T0007-STR-E022 Visual 100 H S
Assembly
drawings 2014T0007-STR-E023 Quality

Steel Structure Final- GE Drawing


24.7 Check the final torque of the structure Dimensional 100 H Quality W
Assembly 2014T0007-STR-E001

Steel Structure Final- NDT (visual,penetrant or ultrasonic) for


24.8 Documental 100 H Quality R
Assembly welds (if applicable)

Steel Structure Final- Check alignment, leveling and GE Drawing


24.9 Topographic 100 H Construction R R
Assembly plumbness of the structure 2014T0007-STR-E001

Expansion 2 samples from each


Steel Structure Final- GEMSS-C-15, Rev-02
24.10 Check grouting of base plates Flow batch used in the H Quality W
Assembly Point 8.3.2
Strength works

Check the fit up anf fixing of the purlins GE Drawing


24.11 Purlins and Girths Visual 100 H Construction S
and girths to the main structure 2014T0007-STR-E033

Check the fit up anf fixing of the GE Drawing


24.12 Cladding external cladding onto the elevator 2014T0007-ED-E101 Visual 100 H Construction S
steel structure 2014T0007-ED-E102

GE HRSG Painting Construction


Steel Structure Final-
24.13 Painting touch up Specification Visual 100 H S
Assembly
Point 4.3.2 Quality

Construction
Steel Structure Final-
24.14 Final inspection Visual 100 H W W
Assembly
Quality

Check the erection, assembly and


GE Specification for Rack and
24.15 Mast tightening of the mast to the steel Visual 100 H Construction S
Pinion Elevator
structure allready installed

Check the deflexion of steel structure at GE Specification for Rack and


24.16 Mast Dimensional 100 H Quality S
tie in level Pinion Elevator

Check the erection, assembly and


GE Specification for Rack and
24.17 Top Buffer fixing of the top buffer to the top of the Visual 100 H Construction S
Pinion Elevator
mast

Check the installation and fixing of the GE Specification for Rack and
24.18 Forces Visual 100 H Construction S
forces at the bottom of the mast Pinion Elevator
DUBA GREEN INTEGRATED SOLAR COMBINED CYCLE
POWER PLANT ITP MECHANICAL WORKS
trubarabia.com

ACTIVITY: HRSG ASSEMBLY & ERECTION


GENERAL ARRANGEMENT DRAWING.: 2014T0007-HGA-A001/2/3/4/5/6 PROCEDURE: DUB-01-VA-MM-TRU-002 DOC. Nº: DUB-01-VA-QPI-TRU-002 Rev. 03
ELEMENT: HRSG-01

INVOLVED PARTIES
INSPECTION / REVISION / TEST
Applicable Standard /
Point Nº General Activity Specific Activity Project Specification TRUBA CIS O/E GE Report Nº / RFI Nº Remarks
Supplier Specifications
Responsability
Type % Action Code Action Code Action Code Action Code
Assignment
GENERAL
Cable Guiding Check the installation of cable guiding GE Specification for Rack and
24.19 Visual 100 H Construction S S
Devices devices every 3 meters Pinion Elevator

Check the assembly of the differents


components of the car and check the GE Specification for Rack and
24.20 Car Visual 100 H Construction S S
connection of the car to the mast Pinion Elevator
allready installed
Check the assembly of the differents
components of the landing and check GE Specification for Rack and
24.21 Landings Visual 100 H Construction S S
the installation of the landing at the Pinion Elevator
ground level

Construction
24.22 Final-Assembly Final inspection GE comment Visual 100 H W W Elevator TA will perform this inspection
Quality

25. PAINTING

Verify any coating system to be applied GE HRSG Painting Construction


25.1 Coating Systems is in accordance to the applicable Specification Visual 100 H S
painting specification from GE Point 4.5 Quality

Verify any solvent, cleaner, coating GE HRSG Painting


product and any touch up and repair Specification Construction
25.2 Materials coating product are according to the Point 4.4 Visual 100 H S
applicable painting specification from Point 4.3.3 Quality
GE Point 4.2.16

Verify the abrasive material is sharp GE HRSG Painting Construction


25.3 Materials silica sand, aluminum oxide or steel Specification Visual 100 H S
slag grit if applicable Point 4.1.20 Quality

GE HRSG Painting
Construction
Verify the abrasive material is dry, oil- Specification
25.4 Materials Visual 100 H S
free and contaminat- free if applicable Point 4.1.16
Quality
Point 4.1.17

Verify the use of oil and water GE HRSG Painting Construction


25.5 Equipment separators in compresed air lines for Specification Visual 100 H S
abrasive blasting if applicable Point 4.1.16 Quality

Verify all necessary instrument for


Testing and
25.6 testing and inspection are properly Documental 100 H Quality R
Inspection Instument
calibrated and maintained

GE HRSG Painting Construction


Environmental Verify no rain before any blasting work
25.7 Specification Visual 100 H S
Control (if applicable) start
Point 4.1.11 Quality

Check all weld spatter, slag from


GE HRSG Painting
welding operations, burrs, slivers, Construction
Specification
25.8 Surface Preparation scabs, and laminations, which become Visual 100 H S S
Point 4.1.1
visible shall be removed prior blasting Quality
Point 4.1.2
(if applicable) by smooth ground

Check any oil and grease shall be GE HRSG Painting Construction


25.9 Surface Preparation removed by solvent cleaning prior Specification Visual 100 H S S
blasting (if applicable) Point 4.1.3 Quality
DUBA GREEN INTEGRATED SOLAR COMBINED CYCLE
POWER PLANT ITP MECHANICAL WORKS
trubarabia.com

ACTIVITY: HRSG ASSEMBLY & ERECTION


GENERAL ARRANGEMENT DRAWING.: 2014T0007-HGA-A001/2/3/4/5/6 PROCEDURE: DUB-01-VA-MM-TRU-002 DOC. Nº: DUB-01-VA-QPI-TRU-002 Rev. 03
ELEMENT: HRSG-01

INVOLVED PARTIES
INSPECTION / REVISION / TEST
Applicable Standard /
Point Nº General Activity Specific Activity Project Specification TRUBA CIS O/E GE Report Nº / RFI Nº Remarks
Supplier Specifications
Responsability
Type % Action Code Action Code Action Code Action Code
Assignment
GENERAL Check the removal of rust for weld
zones and for touch up areas by GE HRSG Painting Construction
25.10 Surface Preparation grinding machines or brushes to achive Specification Visual 100 H S
a degree of cleaning better than SSPC- Point 4.1.7 Quality
SP3 (St3)
Check the cleaning of parts, that are
impossible for blasting, by solvent
GE HRSG Painting Construction
cleaning (SSPC-SP1) or hand tool
25.11 Surface Preparation Specification Visual 100 H S
cleaning (SSPC-SP2) or power tool
Point 4.1.14 Quality
cleaning (SSPC-SP3), whichever is
better
Check the surface preparation grade is
GE HRSG Painting Construction
according to SSPC-SP10 (Sa2.5) when
25.12 Surface Preparation Specification Visual 100 H S
performed by dry blasting abrasive (if
Point 4.1.4 Quality
applicable)
GE HRSG Painting
Construction
Check the anchor pattern profile deep Specification
25.13 Surface Preparation Visual & Tactil 100 H S
is between 1.5 and 4 µm Point 4.1.12
Quality
ASTM D4417 Method A

Check all weld spatter, slag from


welding operations, burrs, slivers, GE HRSG Painting Construction
25.14 Surface Preparation scabs, and laminations, which become Specification Visual 100 H S
visible shall be removed after blasting Point 4.1.2 Quality
(if applicable) by smooth ground

Verifiy the temperature of surrounding GE HRSG Painting Construction


Environmental
25.15 air is between 10ºC and 43ºC before Specification Dimensional 100 H S
Control
any painting work start Point 4.1.2 Quality

GE HRSG Painting Construction


Environmental Verify the relative humidity is below
25.16 Specification Dimensional 100 H S
Control 85ºC before any painting work start
Point 4.1.19 Quality

Verify the wind velocity in exterior GE HRSG Painting Construction


Environmental
25.17 locations is less than 15 miles per hour Specification Dimensional 100 H S
Control
(7 m/s) before any painting work start Point 4.1.19 Quality

Verifiy the temperature of surface to be GE HRSG Painting Construction


25.18 Surface Control coated is between 10ºC and 43ºC Specification Dimensional 100 H S
before any painting work start Point 4.1.19 Quality

Verifiy the temperature of surface to be GE HRSG Painting Construction


25.19 Surface Control coated is, as minumum, 3ºC above the Specification Dimensional 100 H S
dew point before any painting work start Point 4.1.19 Quality

Verifiy the surface is free from blasting GE HRSG Painting Construction


25.20 Surface Control dust and abrasives before any painting Specification Visual 100 H S
work start Point 4.2.6 Quality

Verifiy no condensation on the surface GE HRSG Painting Construction


25.21 Surface Control to be coated before any painting work Specification Visual 100 H S
start Point 4.1.19 Quality

Verify the painting is applied after 4


GE HRSG Painting Construction
Application of hours maximum after the surface has
25.22 Specification Visual 100 H S
Coating been prepared and never if during this
Point 4.2.3 Quality
period of time visible rusting occurs
DUBA GREEN INTEGRATED SOLAR COMBINED CYCLE
POWER PLANT ITP MECHANICAL WORKS
trubarabia.com

ACTIVITY: HRSG ASSEMBLY & ERECTION


GENERAL ARRANGEMENT DRAWING.: 2014T0007-HGA-A001/2/3/4/5/6 PROCEDURE: DUB-01-VA-MM-TRU-002 DOC. Nº: DUB-01-VA-QPI-TRU-002 Rev. 03
ELEMENT: HRSG-01

INVOLVED PARTIES
INSPECTION / REVISION / TEST
Applicable Standard /
Point Nº General Activity Specific Activity Project Specification TRUBA CIS O/E GE Report Nº / RFI Nº Remarks
Supplier Specifications
Responsability
Type % Action Code Action Code Action Code Action Code
Assignment
GENERAL Verify mixing, applying and curing of the
GE HRSG Painting Construction
Application of coating material is performed in strict
25.23 Specification Visual 100 H S
Coating accordance with the manufacturer´s
Point 4.2.10 Quality
instructions
GE HRSG Painting
Specification
25.24 Coating Inspections Check the dry film thickness Dimensional Every 1m 2 H Quality W S
Point 5.1.1
SSPC PA2

Verify each coat is relatively free of


application defects (pitting, blisters,
scratches, buckling, etc), embedded
GE HRSG Painting
contaminants (rust, contaminants, Construction
Specification
25.25 Coating Inspections particulates, blasting media, dirt, dust, Visual 100 H S
Point 5.1.4
grinding debris, skips, sags or runs, Quality
Point 5.1.6
drips, etc) and mechanical damages.
Shall ensure also the uniformity of film,
color and gloss of each cured coating.

Verify any touch up and/or repair work


GE HRSG Painting Construction
Touch Up and Repair to be applied is in accordance to the
25.26 Specification Visual 100 H S
Works applicable touch up painting system
Point 4.3.3 Quality
from GE

Verify the touch up and/or repair works


GE HRSG Painting Construction
Touch Up and Repair are carried out by brush (or airless
25.27 Specification Visual 100 H S
Works spray if blasting operation is possible)
Point 4.3.2 Quality
after SSPC-SP1/2/3 cleaning

Verify the touch up and/or repair works GE HRSG Painting Construction


Touch Up and Repair
25.28 are carried out with the same type and Specification Visual 100 H S S
Works
colors of the original paint Point 4.3.1 Quality

ACTION CODE CLOSED OUT RESULT CONFIRMATION


RFI shall be issued for notifiying of inspection or test in advance.
H: Hold point The work cannot proceed until O / E is able to verify the quality of the completed work. ACCEPTANCE BY TRUBA ACCEPTANCE BY CIS ACCEPTANCE BY O/E/GE
Release of the Hold Point by O / E by means of Inspection Request approval.
RFI shall be issued for notifiying of inspection or test in advance.
W: Witness point The work can proceed even if O / E is not present to verify the quality of the completed work.
Release of the Witness Point by O / E by means of Inspection Request approval if present or by means of checking of reports if not present.
Random attendance at site
S: Surveillance point RFI not required and no documentation associated to this action code shall be generated

R: Review of reports/certificates Documents shall be available foe O / E checking at anytime in CIS offices Signature and Date Signature and Date Signature and Date